Hult Center Seating Electrical and Mecahanical Improvements Addendum 03.pdf
PDF 144 KB Posted
- Solicitation number
- S-KE0010-00016903
- Issued by
- Lane County, Oregon
About this file
This is Addendum No. 3 to the bidding documents for the Hult Center Seating, Electrical & Mechanical Improvements project (Project No. 51400) located at the Eugene Center in Eugene, Oregon. The addendum, issued on June 4, 2026, modifies the original bidding documents dated May 7, 2026. The project scope includes removal of existing seating platforms and lighting system upgrades as the base bid, with Alternate 1 encompassing installation of a cooling system in the existing spot booth, including placement of cooling and rooftop units, electrical infrastructure extension through Silva Hall above the ceiling, gypsum plenum opening between roof structures, patching work, core drilling, and membrane roof modifications. Bidders are required to acknowledge receipt of this addendum on the Bid Form, with failure to do so potentially resulting in disqualification from consideration.
The addendum specifies that all bids must include prevailing wage as outlined in Section 001113 - Advertisement to Bid of the project manual. The bid submission deadline was June 4, 2026, with the contract opportunity having been posted on May 8, 2026. The contract opportunity documents do not explicitly disclose set-aside designations, disadvantaged enterprise restrictions, specific award values, budget ranges, or incumbent vendor information. Bidders are advised to consult the complete project manual and request for proposal documents and contact the contracting entity directly for clarification on minority-owned business enterprise participation requirements, bonding and insurance specifications, evaluation criteria, and any scheduled pre-bid meetings or site visit opportunities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 3 June 4, 2026
Project No. 51400
Addendum No. 3 page1
HULT CENTER SEATING, ELECTRICAL &
MECHANICAL IMPROVEMENTS
1 Eugene Center Eugene, Oregon
This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated May 7,2026, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.
PROJECT MANUAL
1. SECTION 001113 – ADVERTISEMENT TO BID
A. PREVAILING WAGE: Bids to include prevailing wage.