Solicitation Amendment HTC71125RE1280002 SF 30.pdf
PDF 1 MB Posted
- Attached to
- S&RTS - Ports of Virginia
- Solicitation number
- HTC711-25-R-E128
About this file
Amendment 0002 to Solicitation HTC71125RE128
This is Standard Form 30, an amendment to a Request for Proposals (RFP) for marine cargo handling services issued by USTRANSCOM. Amendment 0002, effective 3 February 2026, extends the proposal response deadline from 18 December 2025 to 06 March 2026 at 10:00 AM Central Time and replaces Attachment 1 (Performance Work Statement) and Attachment 2 (Schedule of Rates) with updated versions.
Proposals must be submitted via email in three parts: Part I—Contract Documentation (no page limit), Part II—Technical Worksheet (not to exceed 15 pages), and Part III—Price Proposal. Part I requires completion of the RFP Information and General Compliance Worksheet, Standard Form 1449, SF 30s acknowledging amendments, and representations and certifications through SAM.gov or submitted documentation, including FAR 52.204-24, FAR 52.209-7, FAR 52.212-3 (with Deviations 2025-O0003 and 2025-O0004), FAR 52.229-11, and DFARS 252.204-7017. Part II includes a Technical Worksheet and a Mission Essential Plan per DFARS 252.237-7024. Part III requires completion of the Schedule of Rates (Attachment 2) with all unit prices in USD to two decimal places, supported by detailed breakdowns of gang costs, labor costs, equipment costs for Contractor Furnished Equipment, and manhour rates linked to proposed commodity rates. Wage Determination 2015-4341 applies. Formal communications must be directed to Douglas Otten (Contracting Officer), Melissa Romango (Contract Specialist), or Katherine Alexander (Contract Specialist) via email. The Government intends to award one contract and requires a minimum 180-day acceptance period for proposals. Offerors must be registered in SAM with NAICS 488320 (Marine Cargo Handling) at proposal submission and contract award.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form
The following modifications were made:
INFORMATION FROM TO
Response Due Date 18 Dec 2025 06 Mar 2026
Instructions, Conditions, & Notices to Offerors or Quoters
Header Miscellaneous Text (Modified):
ADDENDUM to FAR 52.212-1 INSTRUCTION TO OFFERORS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR 2023)
The following paragraphs of FAR 52.212-1 are tailored as follows:
Paragraph (b) entitled "Submission of Offers" is deleted in its entirety and replaced with the instructions contained paragraph (b) "Proposal Preparation Instructions" below.
Paragraph (c) entitled "Period of acceptance of offers" is tailored to read: "The Government requires a minimum of 180 calendar days for acceptance of proposals submitted in response to this solicitation."
Paragraph (e) entitled "Multiple Offers" is tailored to read: "The Government will not consider multiple proposals presenting alternate terms and conditions for satisfying the requirements of this solicitation."
Paragraph (h) entitled "Multiple awards" is tailored to read: "The Government intends to award one contract as a result of this RFP. Unless otherwise provided in the Schedule, proposals may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity proposed, at the unit prices proposed, unless the Offeror specifies otherwise in their proposal."
(b) Proposal Preparation Instructions
(1) The due date for proposals is 06 March 2026, 10:00 AM Central Time (CT).
(2) Proposals shall be submitted using Times New Roman, 12-point font except for figures, tables, and diagrams where smaller is acceptable if it is readable. The 12-point font requirement is waived if the document automatically converts to an 11.98-point font in PDF Format. The maximum page limit for each part includes all text pages, tables, graphs, and other types of illustrative material. Table of contents do not count against the page limits for the respective parts. Each page size shall be no larger than 8.5" x 11" and single sided. Excess pages exceeding the maximum limits will not be read or considered in teh evaluation.
ro(3) P posals shall be submitted via email to the individuals listed in paragraph (b)(4) by the due date specified above. Proposal submissions shall not exceed 20mb per email. Offerors may split proposal files across multiple emails due to file size, in which case the Offeror shall numerically label emails stating the sequential number of the individual email and the total number of emails for the submission in each message (e.g., "1 of 2"; "2 of 2"). The Government will make all reasonable attempts to promptly confirm proposal receipt and accessibility. If the Offeror fails to obtain confirmation of receipt and accessibility within two business days of proposal submission, the Offeror should assume the Government did not receive the proposal and contact the Contracting Officer and Contract Specialist. In determining whether an electronic proposal is late, the Contracting Officer will refer to FAR 15.208(b)(1)(i) and seek information as to whether the proposal was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals. Therefore, in order to ensure electronic receipt by the Government, the Offeror should submit the proposal not later than 5:
00 p.m. one working day prior to the submission deadline and request confirmation of receipt from the Contracting Officer or Contract Specialist. All documents shall be in English and Adobe PDF format, except the price proposal which shall be in Microsoft Excel format withan .xlsx file extension. Any contract documentation written in a language other than English shall be accompanied by an English translation of the document as provided by a third-party translation company. Additionally, a signed letter on company letterhead should accompany the quote to clarify any irregularities, such as translation errors or similar in the third-party translation to enable the Contracting Officer to easily determine the adequacy of the documentation.
HTC71125RE1280002
(4) Formal Communications:
USTRANSCOM Contracting Office Point of Contacts (POCs) for this acquisition are listed below. Formal communications concerning this RFP shall be submitted via e-mail to all POCs as follows:
Douglas Otten, Contracting Officer: Douglas.d.otten.civ@mail.mil
Melissa Romango, Contract Specialist: Melissa.s.romagno.civ@mail.mil
Katherine Alexander, Contract Specialist: Katherine.f.alexander.civ@mail.mil
No information concerning this RFP or requests for clarification will be provided in response to Offeror-initiated telephone calls. All such requests must be made in writing and submitted to the e-mail addresses listed above.
Inquiries will be answered in writing and posted on SAM.gov provided they are received no later than 10 calendar days prior to solicitation close date.
(5) All proposals shall include the following to be considered compliant: Part I - Contract Documentation, Part II - Technical Worksheet, Part III - Price Proposal.
(6) Part I - Contract Documentation (No page limit):
a. The contractor shall complete the actions required in the RFP Information and General Compliance Worksheet (Attachment 4) and submit a copy of the completed worksheet. To be eligible for award, the Offeror is required to be registered in the System for Award Management (SAM) when submitting a proposal and at the time of contract award. The contractor's SAM registration shall include NAICS 488320, Marine Cargo Handling.
b. The contractor shall submit the Standard Form (SF) 1449, Solicitation for Commercial Items. The following blocks shall becompleted: 12 (even if no discount is offered), 17a, 30a, 30b and 30c. Complete Block 17b only if remittance address is different (such address must be registered in the SAM database). In doing so, the Offeror accedes to the contract terms and conditions as written in the RFP, with attachments.
c. The Offeror shall submit SF 30s, Amendment of Solicitation. Complete blocks 8, 15A and 15B on each SF 30, Amendment of Solicitation, to acknowledge all solicitation amendments (if any).
d. In accordance with (IAW) FAR 4.1102(a), Representations and Certifications shall be submitted online using https://www.sam.gov where available OR may be submitted with your contract documentation. Failure to do so will result in your proposal being found non-compliant with the solicitation. The following provisions require your input and must be included with your proposal if they are not in your SAM record.
- FAR 52.204-24, Representation Regarding Certain Telecommunication and Video Surveillance Services or Equipment (Nov 2021) (NOTE: FAR 52.204-24 only needs to be completed if FAR 52.204-26 is not completed in SAM.gov, or if the Offeror represents it "will" provide or "does" use covered telecommunications equipment in FAR 52.204-26.)
- FAR 52.209-7, Information Regarding Responsibility Matters (Oct 2018)
- FAR 52.212-3, Offeror Reps & Certs - Commercial Products and Commercial Services (MAR 2025) (DEVIATION 2025-O0003 and 2025-O0004)
- FAR 52.229-11, Tax on Certain Foreign Procurements--Notice and Representation (Jun 2020) (NOTE:
Offerors representing as a "foreign person" must also submit an IRS Form W-14.)
- DFARS 252.204-7017, Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services--Representation (May 2021) (NOTE:DFARS 252.204-7017 only needs to be completed if DFARS 252.204-7016 is not completed in SAM.gov, or if the Offeror represents it "does" provide covered defense telecommunications equipment or services in DFARS 252.204-7016.)
(7) Part II - Technical Worksheet (Not to exceed 15 pages)
a. An Offeror's Technical Worksheet will be evaluated based on two subfactors, each evaluated individually IAW FAR 52.212. The subfactors are outlined below:
b. Subfactor A: Technical Worksheet (Attachment 5). The Offeror shall complete and submit the Technical Worksheet (Attachment 5) according to the instructions contained there in. Responses shall be clear, concise, and include sufficient detail for effective evaluation against the criteria defined in FAR 52.212-2.
c. Subfactor B: Mission Essential Plan (Attachment 3). The Offeror shall complete and submit a compliant Mission Essential Plan (Attachment 3) IAW DFARS 252.237-7024, Notice of Continuation of Essential Contractor Services.
(8) Part III - Price Proposal
a. The contractor shall complete and submit the Schedule of Rates (SOR) (Attachment 2). The contractor shall input rates for ALL items in the "Unit Price" column that are highlighted in yellow. Do not input formulas within the "unit price" column.
b. Do not attempt to change anything on the spreadsheet. Enter $0.00 if you wish to quote the item free of charge.
The Government will consider the SOR as incomplete if any cells is not filled in.
c. All prices shall be submitted in USD with two (2) decimal places only. If there are more than two (2) decimal places entered, the proposal may not be considered for award. NOTE: Contract award and payment shall be made in US Dollars.
d. A copy of the relevant Wage Determination (2015-4341) has been included at Attachment 7.
e. The Offeror shall provide a breakdown of gang costs, other labor costs, equipment costs (associated with Contractor Furnished Equipment (CFE) as listed in Attachment 5, Technical Worksheet), and all other costs used to develop the commodity rates which shall be provided in the Schedule of Rates (Attachment 2) and linked to the proposed commodity rates. This breakdown shall be accompanied by a detailed description of the method(s) used to develop the commodity rates which may be included in the SOR (Attachment 2) or as a seperate document. A breakdown shall also be provided for all proposed manhour rates which shall be provided in the SOR (Attachment
2) and linked to the proposed manhour rates.
| SUMMARY OF CHANGES |
| Solicitation/Contract Form |
| Instructions, Conditions, & Notices to Offerors or Quoters |
| IDCode: J |
| Page: 1 |
| Pages: 5 |
| AmendNo: 0002 |
| EffDate: 03 Feb 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: HTC711 |
| AdmCode: |
| IssuedBy: USTRANSCOM-AQ |
508 SCOTT DR, SCOTT AFB IL 62225-5357
SCOTT AFB, IL 62225-5357
UNITED STATES
Melissa Romagno, Email: melissa.s.romagno.civ@mail.mil Telephone: 6188179677 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: HTC71125RE128 |
| SolDate: 23 Sep 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of this amendment is to extend the response date of the solicitation to 06 March 2026 and replace Attachment 1, Performance Work Statement and Attachment 2, Schedule of Rates, with updated versions. |
| ContNameTitle: |
| CoNameTitle: Douglas D. Otten |
| ContDate: |
| CODate: 03 Feb 2026 |
File details come from the government source that posted it. Updated .