Attachment 2 - Schedule of Rates (SOR).xlsx
XLSX spreadsheet 78 KB Posted
- Attached to
- S&RTS- Ports of Livorno and Tombolo Dock Italy
- Solicitation number
- HTC711-25-R-E119
About this file
This document is a Schedule of Rates (SOR) for a Stevedoring and Related Terminal Services (S&RTS) contract with the Department of Defense United States Transportation Command. The solicitation (HTC711-25-R-E119) covers cargo handling services at the Ports of Livorno and Tombolo Dock in Italy, with a performance period from November 1, 2025, through April 30, 2031, including a potential 6-month extension. The total evaluated value for both ports is $462,000, with a 25% ceiling amount of $115,500, bringing the total potential contract value to $577,500.
The comprehensive service scope includes managing US Military cargo such as containers, vehicles, and breakbulk materials, with detailed pricing schedules for various handling activities like vessel loading/unloading, rail and truck transfers, equipment rentals, labor, and miscellaneous services. The contract encompasses a wide range of operational tasks including stevedoring, longshoring, cargo management, intra-port transfers, vessel preparation, documentation, and warehousing. Pricing is structured with consistent annual rates of $42,000 per port, with specific line items for different cargo types, handling methods, and equipment rentals, reflecting the complex logistics requirements of military cargo transportation.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| OFFEROR NAME: | |||||||
| INSTRUCTIONS TO OFFEROR: | |||||||
| SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104 (When Filled-In, this Document becomes CUI//SP-SSEL) | |||||||
| SUMMARY for all Port Locations | |||||||
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | 6mo Extension | ||
| PORT OF LIVORNO ITALY | $ 42,000.00 | $ 42,000.00 | $ 42,000.00 | $ 42,000.00 | $ 42,000.00 | $ 21,000.00 |
TOMBOLO DOCK $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 21,000.00
TOTAL $ 84,000.00 $ 84,000.00 $ 84,000.00 $ 84,000.00 $ 84,000.00 $ 42,000.00
TOTAL ESTIMATED VALUE OF 5 YEAR PLUS EXTENSION PERIOD FOR PORT OF LIVORNO ITALY $ 231,000.00
TOTAL ESTIMATED VALUE OF 5 YEAR PLUS EXTENSION PERIOD FOR TOMBOLO DOCK $ 231,000.00
TOTAL EVALUATED VALUE OF ALL YEARS COMBINED FOR ALL PORT LOCATIONS $ 462,000.00
TOTAL CEILING AMOUNT 25% $ 115,500.00
TOTAL ALL PORTS PLUS CEILING $ 577,500.00
↓↓↓ PORT(S) SUMMARYS BELOW ↓↓↓
| SUMMARY PORT OF LIVORNO ITALY | Controlled Unclassified Information – CUI | |||||||
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | 6mo Extension | |||
| Schedule | 1A1 | LOAD VESSEL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Schedule 1A1a LASHING ONLY $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 1A2 DISCHARGE VESSEL $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 1A2a UNLASHING ONLY $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 1B1 LOAD RAIL $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 1B2 DISCHARGE RAIL $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 1B3 LOAD TRUCKS $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 1B4 DISCHARGE TRUCKS $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 1E STUFFING/UNSTUFFING $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 1F INTRA PORT TRANSFER $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 2 EXTRA LABOR $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 3A DETENTION $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 3B OVERTIME DIFFERENTIALS $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 3C MINIMUM TIME $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 4 EQUIPMENT $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 6 FACILITIES $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 8 MISCELLANEOUS $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 21,000.00
Schedule 10 3PL SERVICES $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
TOTAL $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 21,000.00
TOTAL EVALUATED PRICE PORT OF LIVORNO ITALY $ 231,000.00
| SUMMARY TOMBOLO DOCK | Controlled Unclassified Information – CUI | |||||||
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | 6mo Extension | |||
| Schedule | 1A1 | LOAD VESSEL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Schedule 1A1a LASHING ONLY $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 1A2 DISCHARGE VESSEL $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 1A2a UNLASHING ONLY $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 1B3 LOAD TRUCKS $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 1B4 DISCHARGE TRUCKS $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 1C RECEPTION $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 1D DISPOSITION $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 2 EXTRA LABOR $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 3A DETENTION $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 3B OVERTIME DIFFERENTIALS $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 3C MINIMUM TIME $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 4 EQUIPMENT $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Schedule 8 MISCELLANEOUS $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 21,000.00
Schedule 10 MISCELLANEOUS $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
TOTAL $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 21,000.00
TOTAL EVALUATED PRICE TOMBOLO DOCK $ 231,000.00
&"Times New Roman,Bold"&18&K00B050UNCLASSIFIED // FOR OFFICIAL USE ONLY - FOUO
Definitions SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104 (When Filled-In, this Document becomes CUI//SP-SSEL)
| WORKING HOURS | SHIFT HOURS (as applicable) | |
| Hours may be estimated | Working Shift / Hours | operating hours |
| Straight Time | Base wages before differentials are applied | Day Shift | 08:00-12:00 14:00-17:30 |
| Night shift | |||
| Regular | 8am to 5pm | 1st Shift | 07:00-13:00 |
| duty hours | 2nd Shift | 14:00-20:00 | |
| 3rd Shift | 20:00-02:00 | ||
| Regular Over | Before 8am and after 5pm | 4th Shift | 02:00-07:00 |
| Time (OT) | |||
| Swing / Hoot Owl | |||
| Meal Hours | Noon to 1pm (may be premium meal hour) | ||
| 6pm to 7-pm | Normal work day hours | ||
| Midnight to 1am | |||
| 6am to 7am | ** Note: Hours stated may be changed as operations or mission scope dictates. |
UNITS OF MEASURE
| MTON | Measurement Tons (measure of volume) | 1 MTON = 40 cubic feet (1.13 cubic meters) |
| HR | Hour = 1 HR = 60 minutes | |
| DY | Day = 1 DY = 24 hours | |
| MTH | Month = 1 MTH = 30 days | |
| EA | Each | |
| SQFT | Square Feet (measure of area) | 1' SQFT = 144'' inchs dimensions 12''x12'' |
| SQMT | Square Meter (measure of area) | 1 SQFT = 0.0929 square meters |
| 1 CFT = 1728 cubic inches 12"x12"x12" | ||
| BND | Bundle | |
| PC | Piece (one each) | |
| ROLL | Roll ( roll of wire) | |
| MI | Mile (measure of distance) = 1 Mile = 5280 feet ( 1,609.34 meters ) | |
| TRIPS | Trip = 1 Trip, as described in the PWS (if applicable) | |
| LT | Long Ton = 1 LT = 2,240 pounds ( 1,016.05 kilograms ) | |
| LBS | US. Pounds = 1 LBS = 0.45 kilograms | |
| KG | kg = 1 kg = 2.204 pounds | |
| MTON | MTON recorded and billed to the sponsor will be applied to the gross cube (40 cubic feet = 1 MTON) of the container. |
COMMODITY HANDLING METHODS (includes all standard lashing & Unlashing, blocking and bracing cargo)
| LO/LO | Lift On / Lift Off - includes all standard lashing, | ( a ) Shore Crane Type (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald)) |
| & Unlashing, blocking and bracing cargo | ( b ) Ships Gear, Ships crane |
| RO/RO | Roll On / Roll Off - includes all standard lashing, | ( c ) Vehicle rolling under Own Power - Containers loaded by ramp |
| & Unlashing, blocking and bracing cargo |
| TO/TO | Tow On / Tow Off - includes all standard lashing, | ( d ) Trailers towed by Contractor Equipment or Gov't vehicles |
| & Unlashing, blocking and bracing cargo | ( e ) Inoperable Vehicles being towed |
RO/RO Containers, loaded by contractor trailer Containers loaded onto trailers, bomb carts, MIFI's, or other equipment, otherwise trailered into RORO vessels and unloaded, stowed and lashed
| CONTAINER - BREAK BULK DEFINITIONS | |
| 20 | Explosives, in crates, boxes, tubs, tubes |
| 25 | Milvan - Containers packed with explosives. Explosives placed in containers are classified as containers. |
| 40 | Break-Bulk cargo, Non-explosive, Non-ISO cornered , includes M7 FRS, shelters, shop sets, ISU-90/60, mind rollers, blade boxes, skid mounted generators, |
| crates, 463L pallets, | |
| 44 | Cargo transporters (CONEX) ISO Fitted, loaded/empty - INCLUDE QUADCONS, BICONS, TRICONS, stackable tank modules, SINGLE OR LESS THAN TEU |
| 45 | Milvan - Containers (non-explosives). All containers ISO Fitted 20'-40' empty or full, includes ISO 20' FRC-Fuel tank moduals, ISO hippo, |
| ISO 20' stackable flat racks, ISO FPU/BOH |
| VEHICLE CATEGORY DEFINITIONS | |
| 60 - MEDIUM VEHICLE | 25,001 US. pounds to 60,000 pounds 11,340.26 kg to 27,215.54 kg 11.161 LT to 26.786 LT |
| 60 - GOVERNMENT VEHICLES, UNBOXED, weighing 25,001lbs. to 60,000lbs. per unit |
| Includes but not limited to: trucks, tractors, track vehicles, semi-trailer vans, mobile cranes, construction equipment (track or wheel), road graders, |
| rock crushers, busses, boats (trailered/cradled). |
61 - LIGHT VEHICLE 25,000 pounds or less 11,339.81 kilograms or less 11.16 long tons
| 61 - GOVERNMENT VEHICLES, UNBOXED, weighing 25,000lbs. or less per unit includes but limited to: trucks, ambulances, tractors, POV, engineer construction equipment, |
| personnel carriers, boats or boats on cradles) engineer construction equipment, tracked vehicles and boats (trailered/cradled). |
67 - HEAVY VEHICLE 60,001 pounds or more 27,216 kg. or more 26.786 LT or more
| 67 - GOVERNMENT VEHICLES, UNBOXED, weighing 60,000lbs. per unit or more includes but not limited to: trucks, tractors, vans, track vehicles, HETS, MRAPs, Heavy mobile cranes, |
| tracked or wheeled engineer construction equipment, and boats (trailered/cradled). |
LIVORNO
| SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104 (When Filled-In, this Document becomes CUI//SP-SSEL) | |||||||||||||
| PERIOD OF PERFORMANCE: | 1 Nov 2025 | through | 30 Apr 2031 | (including 6 mth. extension, if applicable) | |||||||||
| LOCATION: | PORT OF LIVORNO ITALY | STEVEDORING & RELATED TERMINAL SERVICES | input start date | input final end date | |||||||||
| Attachment #2 | HTC711-25-R-E119 | TOTAL COST ALL SCHEDULES PORT 1 | $ 42,000.00 | ||||||||||
| Line Item | Category | Schedule | Commodity Code | Commodity | Description | Unit of Measure | Unit Price | Unit Quantity | Extended Price | ||||
| 1 | Commodity | 1A1 | LOAD VESSEL | 40 | a | BREAKBULK - GENERAL CARGO - NOT OTHERWISE SPECIFIED (NOS) (see definitions) | LO/LO - LOADED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | MTON | 500.00 | $ - 0 | |||
| 2 | Commodity | 1A1 | LOAD VESSEL | 40 | b | BREAKBULK - GENERAL CARGO - NOT OTHERWISE SPECIFIED (NOS) (see definitions) | RO/RO - LOADED ONBOARD VESSEL BY CFE TRUCK/TRAILER, FORKLIFT, BY RAMP | MTON | 100.00 | $ - 0 | |||
| 3 | Commodity | 1A1 | LOAD VESSEL | 44 | a | ISO - CONTAINERS LESS THAN TEU - SINGLE - CONEX, QUADCONS,TRICONS, BICONS | LO/LO - LOADED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 100 | $ - 0 | |||
| 4 | Commodity | 1A1 | LOAD VESSEL | 44 | c | ISO - CONTAINERS LESS THAN TEU - SINGLE - CONEX, QUADCONS,TRICONS, BICONS | RO/RO - LOADED ONBOARD VESSEL BY CFE TRUCK/TRAILER, FORKLIFT, BY RAMP | EA | 50 | $ - 0 | |||
| 5 | Commodity | 1A1 | LOAD VESSEL | 45 | a | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OR FULL) | LO/LO - LOADED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 100 | $ - 0 | |||
| 6 | Commodity | 1A1 | LOAD VESSEL | 45 | c | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OR FULL) | RO/RO - LOADED ONBOARD VESSEL BY CFE TRUCK/TRAILER, FORKLIFT, BY RAMP | EA | 50 | $ - 0 | |||
| 7 | Commodity | 1A1 | LOAD VESSEL | 60 | a | VEHICLES & TRAILERS - MEDIUM WEIGHT CLASS - 25,000-60000LBS | LO/LO - LOADED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 300 | $ - 0 | |||
| 8 | Commodity | 1A1 | LOAD VESSEL | 60 | c | VEHICLES ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 50 | $ - 0 | |||
| 9 | Commodity | 1A1 | LOAD VESSEL | 60 | d | TRAILERS ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | TO/TO - TOWED ONBOARD VESSEL BY CONTRACTOR EQUIPMENT | EA | 50 | $ - 0 | |||
| 10 | Commodity | 1A1 | LOAD VESSEL | 60 | e | VEHICLES ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | TO/TO - INOPERABLE VEHICLE TOWED ONBOARD VESSEL BY CONTRACTOR EQUIPMENT | EA | 10 | $ - 0 | |||
| 11 | Commodity | 1A1 | LOAD VESSEL | 61 | a | VEHICLES & TRAILERS - LIGHT WEIGHT CLASS - LESS THAT 25,000LBS | LO/LO - LOADED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 550 | $ - 0 | |||
| 12 | Commodity | 1A1 | LOAD VESSEL | 61 | c | VEHICLES ONLY - LIGHT WEIGHT CLASS - LESS THAT 25,000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 500 | $ - 0 | |||
| 13 | Commodity | 1A1 | LOAD VESSEL | 61 | d | TRAILERS ONLY - LIGHT WEIGHT - LESS THAT 25,000LBS | TO/TO - TOWED ONBOARD VESSEL BY CONTRACTOR EQUIPMENT | EA | 300 | $ - 0 | |||
| 14 | Commodity | 1A1 | LOAD VESSEL | 61 | e | VEHICLES ONLY - LIGHT WEIGHT - LESS THAT 25,000LBS | TO/TO - INOPERABLE VEHICLE TOWED ONBOARD VESSEL BY CONTRACTOR EQUIPMENT | EA | 50 | $ - 0 | |||
| 15 | Commodity | 1A1 | LOAD VESSEL | 67 | a | VEHICLES & TRAILERS - HEAVY WEIGHT CLASS - OVER 60,000LBS | LO/LO - LOADED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 20 | $ - 0 | |||
| 16 | Commodity | 1A1 | LOAD VESSEL | 67 | c | VEHICLES ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 10 | $ - 0 | |||
| 17 | Commodity | 1A1 | LOAD VESSEL | 67 | d | TRAILERS ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | TO/TO - TOWED ONBOARD VESSEL BY CONTRACTOR EQUIPMENT | EA | 5 | $ - 0 | |||
| 18 | Commodity | 1A1 | LOAD VESSEL | 67 | e | VEHICLES ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | TO/TO - INOPERABLE VEHICLE TOWED ONBOARD VESSEL BY CONTRACTOR EQUIPMENT | EA | 5 | $ - 0 | |||
| TOTAL 1A1 - Loading Vessel | $ - 0 | ||||||||||||
| 19 | Commodity | 1A1a | LASHING - TIEDOWN ONLY | 40 | BREAKBULK | GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | MTON | 50.00 | $ - 0 | ||||
| 20 | Commodity | 1A1a | LASHING - TIEDOWN ONLY | 44 | ISO CONTAINERS (LESS THAN TEU CONFIGURED) - SINGLE | CONEX, QUADCONS,TRICONS, BICONS | EA | 10 | $ - 0 | ||||
| 21 | Commodity | 1A1a | LASHING - TIEDOWN ONLY | 45 | ISO CONTAINER 20' - 40' (TEU CONFIGURED) | NON-EXPLOSIVES - EMPTY OR FULL | EA | 10 | $ - 0 | ||||
| 22 | Commodity | 1A1a | LASHING - TIEDOWN ONLY | 60 | VEHICLE OR TRAILERS MEDIUM WEIGHT CLASS - 25,000-60000LBS | MEDIUM VEHICLES OR TRAILERS | EA | 10 | $ - 0 | ||||
| 23 | Commodity | 1A1a | LASHING - TIEDOWN ONLY | 61 | VEHICLE OR TRAILERS LIGHT WEIGHT CLASS - LESS THAT 25,000LBS | LIGHT VEHICLES OR TRAILERS | EA | 50 | $ - 0 | ||||
| 24 | Commodity | 1A1a | LASHING - TIEDOWN ONLY | 67 | VEHICLES OR TRAILERS HEAVY WEIGHT CLASS - OVER 60,000LBS | HEAVY VEHICLES OR TRAILERS | EA | 10 | $ - 0 | ||||
| TOTAL 1A1a - Lashing Only | $ - 0 | ||||||||||||
| 25 | Commodity | 1A2 | DISCHARGE VESSEL | 40 | a | BREAKBULK - GENERAL CARGO - NOT OTHERWISE SPECIFIED (NOS) (see definitions) | LO/LO - DISCHARGED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | MTON | 500.00 | $ - 0 | |||
| 26 | Commodity | 1A2 | DISCHARGE VESSEL | 40 | b | BREAKBULK - GENERAL CARGO - NOT OTHERWISE SPECIFIED (NOS) (see definitions) | RO/RO - DISCHARGED FROM THE VESSEL BY TRUCK/TRAILER, FORKLIFT, BY RAMP | MTON | 100.00 | $ - 0 | |||
| 27 | Commodity | 1A2 | DISCHARGE VESSEL | 44 | a | ISO - CONTAINERS LESS THAN TEU - SINGLE - CONEX, QUADCONS,TRICONS, BICONS | LO/LO - DISCHARGED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 100 | $ - 0 | |||
| 28 | Commodity | 1A2 | DISCHARGE VESSEL | 44 | c | ISO - CONTAINERS LESS THAN TEU - SINGLE - CONEX, QUADCONS,TRICONS, BICONS | RO/RO DISCHARGED FROM THE VESSEL BY TRUCK/TRAILER, FORKLIFT, BY RAMP | EA | 50 | $ - 0 | |||
| 29 | Commodity | 1A2 | DISCHARGE VESSEL | 45 | a | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OR FULL) | LO/LO - DISCHARGED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 100 | $ - 0 | |||
| 30 | Commodity | 1A2 | DISCHARGE VESSEL | 45 | c | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OR FULL) | RO/RO DISCHARGED FROM THE VESSEL BY TRUCK/TRAILER, FORKLIFT, BY RAMP | EA | 50 | $ - 0 | |||
| 31 | Commodity | 1A2 | DISCHARGE VESSEL | 60 | a | VEHICLES & TRAILERS - MEDIUM WEIGHT CLASS - 25,000-60000LBS | LO/LO - DISCHARGED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 300 | $ - 0 | |||
| 32 | Commodity | 1A2 | DISCHARGE VESSEL | 60 | c | VEHICLES ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 50 | $ - 0 | |||
| 33 | Commodity | 1A2 | DISCHARGE VESSEL | 60 | d | TRAILERS ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | TO/TO - TOWED OFF THE VESSEL BY CONTRACTOR EQUIPMENT | EA | 50 | $ - 0 | |||
| 34 | Commodity | 1A2 | DISCHARGE VESSEL | 60 | e | VEHICLES ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | TO/TO - INOPERABLE VEHICLE TOWED OFF VESSEL BY CONTRACTOR EQUIPMENT | EA | 10 | $ - 0 | |||
| 35 | Commodity | 1A2 | DISCHARGE VESSEL | 61 | a | VEHICLES & TRAILERS - LIGHT WEIGHT CLASS - LESS THAT 25,000LBS | LO/LO - DISCHARGED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 550 | $ - 0 | |||
| 36 | Commodity | 1A2 | DISCHARGE VESSEL | 61 | c | VEHICLES ONLY - LIGHT WEIGHT CLASS - LESS THAT 25,000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 500 | $ - 0 | |||
| 37 | Commodity | 1A2 | DISCHARGE VESSEL | 61 | d | TRAILERS ONLY - LIGHT WEIGHT - LESS THAT 25,000LBS | TO/TO - TOWED OFF THE VESSEL BY CONTRACTOR EQUIPMENT | EA | 300 | $ - 0 | |||
| 38 | Commodity | 1A2 | DISCHARGE VESSEL | 61 | e | VEHICLES ONLY - LIGHT WEIGHT - LESS THAT 25,000LBS | TO/TO - INOPERABLE VEHICLE TOWED OFF VESSEL BY CONTRACTOR EQUIPMENT | EA | 50 | $ - 0 | |||
| 39 | Commodity | 1A2 | DISCHARGE VESSEL | 67 | a | VEHICLES & TRAILERS - HEAVY WEIGHT CLASS - OVER 60,000LBS | LO/LO - DISCHARGED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 20 | $ - 0 | |||
| 40 | Commodity | 1A2 | DISCHARGE VESSEL | 67 | c | VEHICLES ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 10 | $ - 0 | |||
| 41 | Commodity | 1A2 | DISCHARGE VESSEL | 67 | d | TRAILERS ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | TO/TO - TOWED OFF THE VESSEL BY CONTRACTOR EQUIPMENT | EA | 5 | $ - 0 | |||
| 42 | Commodity | 1A2 | DISCHARGE VESSEL | 67 | e | VEHICLES ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | TO/TO - INOPERABLE VEHICLE TOWED OFF VESSEL BY CONTRACTOR EQUIPMENT | EA | 5 | $ - 0 | |||
| TOTAL - 1A2- Discharge Vessel | $ - 0 | ||||||||||||
| 42 | Commodity | 1A2a | UNLASHING ONLY | 40 | BREAKBULK | GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | MTON | 50.00 | $ - 0 | ||||
| 43 | Commodity | 1A2a | UNLASHING ONLY | 44 | ISO CONTAINERS (LESS THAN TEU CONFIGURED) - SINGLE | CONEX, QUADCONS,TRICONS, BICONS | EA | 10 | $ - 0 | ||||
| 44 | Commodity | 1A2a | UNLASHING ONLY | 45 | ISO CONTAINER 20' - 40' (TEU CONFIGURED) | NON-EXPLOSIVES - EMPTY OR FULL | EA | 10 | $ - 0 | ||||
| 45 | Commodity | 1A2a | UNLASHING ONLY | 60 | MEDIUM VEHICLES OR TRAILERS - 25,000-60000LBS | MEDIUM VEHICLES OR TRAILERS | EA | 10 | $ - 0 | ||||
| 46 | Commodity | 1A2a | UNLASHING ONLY | 61 | LIGHT VEHICLES OR TRAILERS - LESS THAT 25,000LBS | LIGHT VEHICLES OR TRAILERS | EA | 50 | $ - 0 | ||||
| 47 | Commodity | 1A2a | UNLASHING ONLY | 67 | HEAVY VEHICLES OR TRAILERS - OVER 60,000LBS | HEAVY VEHICLES OR TRAILERS | EA | 10 | $ - 0 | ||||
| TOTAL 1A2a Unlashing only | $ - 0 | ||||||||||||
| 48 | Commodity | 1B1 | LOAD RAIL | 45 | a | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OR FULL) | LO/LO - LOADED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 5 | $ - 0 | |||
| 49 | Commodity | 1B1 | LOAD RAIL | 45 | c | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OR FULL) | LO/LO - LOADED ON RAILCARL BY CFE TRUCK/TRAILER, FORKLIFT -CONTAINER HANDLER | EA | 10 | $ - 0 | |||
| 50 | Commodity | 1B1 | LOAD RAIL | 60 | a | VEHICLES & TRAILERS - MEDIUM WEIGHT CLASS - 25,000-60000LBS | LO/LO - LOADED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 5 | $ - 0 | |||
| 51 | Commodity | 1B1 | LOAD RAIL | 60 | c | VEHICLES ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 50 | $ - 0 | |||
| 52 | Commodity | 1B1 | LOAD RAIL | 60 | d | TRAILERS ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | TO/TO - TOWED ON RAILCAR BY CONTRACTOR EQUIPMENT | EA | 40 | $ - 0 | |||
| 53 | Commodity | 1B1 | LOAD RAIL | 60 | e | VEHICLES ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | TO/TO - INOPERABLE VEHICLE TOWED ON RAILCAR BY CONTRACTOR EQUIPMENT | EA | 10 | $ - 0 | |||
| 54 | Commodity | 1B1 | LOAD RAIL | 61 | a | VEHICLES & TRAILERS - LIGHT WEIGHT CLASS - LESS THAT 25,000LBS | LO/LO - LOADED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 5 | $ - 0 | |||
| 55 | Commodity | 1B1 | LOAD RAIL | 61 | c | VEHICLES ONLY - LIGHT WEIGHT CLASS - LESS THAT 25,000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 50 | $ - 0 | |||
| 56 | Commodity | 1B1 | LOAD RAIL | 61 | d | TRAILERS ONLY - LIGHT WEIGHT - LESS THAT 25,000LBS | TO/TO - TOWED ON RAILCAR BY CONTRACTOR EQUIPMENT | EA | 40 | $ - 0 | |||
| 57 | Commodity | 1B1 | LOAD RAIL | 61 | e | VEHICLES ONLY - LIGHT WEIGHT - LESS THAT 25,000LBS | TO/TO - INOPERABLE VEHICLE TOWED ON RAILCAR BY CONTRACTOR EQUIPMENT | EA | 10 | $ - 0 | |||
| 58 | Commodity | 1B1 | LOAD RAIL | 67 | a | VEHICLES & TRAILERS - HEAVY WEIGHT CLASS - OVER 60,000LBS | LO/LO - LOADED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 5 | $ - 0 | |||
| 59 | Commodity | 1B1 | LOAD RAIL | 67 | c | VEHICLES ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 50 | $ - 0 | |||
| 60 | Commodity | 1B1 | LOAD RAIL | 67 | d | TRAILERS ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | TO/TO - TOWED ON RAILCAR BY CONTRACTOR EQUIPMENT | EA | 40 | $ - 0 | |||
| 61 | Commodity | 1B1 | LOAD RAIL | 67 | e | VEHICLES ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | TO/TO - INOPERABLE VEHICLE TOWED ON RAILCAR BY CONTRACTOR EQUIPMENT | EA | 10 | $ - 0 | |||
| TOTAL 1B1 Load Railcars | $ - 0 | ||||||||||||
| 62 | Commodity | 1B2 | DISCHARGE RAIL | 45 | a | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OR FULL) | LO/LO - DISCHARGED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 5 | $ - 0 | |||
| 63 | Commodity | 1B2 | DISCHARGE RAIL | 45 | c | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OR FULL) | LO/LO - DISCHARGED FROM RAILCARL BY CFE TRUCK/TRAILER, FORKLIFT -CONTAINER HANDLER | EA | 10 | $ - 0 | |||
| 64 | Commodity | 1B2 | DISCHARGE RAIL | 60 | a | VEHICLES & TRAILERS - MEDIUM WEIGHT CLASS - 25,000-60000LBS | LO/LO - DISCHARGED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 5 | $ - 0 | |||
| 65 | Commodity | 1B2 | DISCHARGE RAIL | 60 | c | VEHICLES ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 50 | $ - 0 | |||
| 66 | Commodity | 1B2 | DISCHARGE RAIL | 60 | d | TRAILERS ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | TO/TO - TOWED OFF RAILCAR BY CONTRACTOR EQUIPMENT | EA | 40 | $ - 0 | |||
| 67 | Commodity | 1B2 | DISCHARGE RAIL | 60 | e | VEHICLES ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | TO/TO - INOPERABLE VEHICLE TOWED OFF RAILCAR BY CONTRACTOR EQUIPMENT | EA | 10 | $ - 0 | |||
| 68 | Commodity | 1B2 | DISCHARGE RAIL | 61 | a | VEHICLES & TRAILERS - LIGHT WEIGHT CLASS - LESS THAT 25,000LBS | LO/LO - DISCHARGED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 5 | $ - 0 | |||
| 69 | Commodity | 1B2 | DISCHARGE RAIL | 61 | c | VEHICLES ONLY - LIGHT WEIGHT CLASS - LESS THAT 25,000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 50 | $ - 0 | |||
| 70 | Commodity | 1B2 | DISCHARGE RAIL | 61 | d | TRAILERS ONLY - LIGHT WEIGHT - LESS THAT 25,000LBS | TO/TO - TOWED OFF RAILCAR BY CONTRACTOR EQUIPMENT | EA | 40 | $ - 0 | |||
| 71 | Commodity | 1B2 | DISCHARGE RAIL | 61 | e | VEHICLES ONLY - LIGHT WEIGHT - LESS THAT 25,000LBS | TO/TO - INOPERABLE VEHICLE TOWED OFF RAILCAR BY CONTRACTOR EQUIPMENT | EA | 10 | $ - 0 | |||
| 72 | Commodity | 1B2 | DISCHARGE RAIL | 67 | a | VEHICLES & TRAILERS - HEAVY WEIGHT CLASS - OVER 60,000LBS | LO/LO - DISCHARGED BY PORT CRANE (GANTRY CRANE - MOBILE CRANE) OR SHIPS CRANE | EA | 5 | $ - 0 | |||
| 73 | Commodity | 1B2 | DISCHARGE RAIL | 67 | c | VEHICLES ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 50 | $ - 0 | |||
| 74 | Commodity | 1B2 | DISCHARGE RAIL | 67 | d | TRAILERS ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | TO/TO - TOWED OFF RAILCAR BY CONTRACTOR EQUIPMENT | EA | 40 | $ - 0 | |||
| 75 | Commodity | 1B2 | DISCHARGE RAIL | 67 | e | VEHICLES ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | TO/TO - INOPERABLE VEHICLE TOWED OFF RAILCAR BY CONTRACTOR EQUIPMENT | EA | 10 | $ - 0 | |||
| TOTAL 1B2 Discharge Railcars | $ - 0 | ||||||||||||
| 76 | Commodity | 1B3 | LOAD TRUCKS | 40 | a | BREAKBULK - GENERAL CARGO - NOT OTHERWISE SPECIFIED (NOS) (see definitions) | LO/LO - LOADED BY PORT CRANE (GANTRY CRANE -MOBILE CRANE) OR SHIPS CRANE | MTON | 32.00 | $ - 0 | |||
| 77 | Commodity | 1B3 | LOAD TRUCKS | 40 | b | BREAKBULK - GENERAL CARGO - NOT OTHERWISE SPECIFIED (NOS) (see definitions) | LO/LO - LOADED ON TRUCK BY LIFT BY CONTRACTOR EQUIPMENT | MTON | 1000.00 | $ - 0 | |||
| 78 | Commodity | 1B3 | LOAD TRUCKS | 44 | a | ISO - CONTAINERS LESS THAN TEU - SINGLE - CONEX, QUADCONS,TRICONS, BICONS | LO/LO - LOADED BY PORT CRANE (GANTRY CRANE -MOBILE CRANE) OR SHIPS CRANE | EA | 10 | $ - 0 | |||
| 79 | Commodity | 1B3 | LOAD TRUCKS | 44 | c | ISO - CONTAINERS LESS THAN TEU - SINGLE - CONEX, QUADCONS,TRICONS, BICONS | LO/LO - LOADED ON TRUCK BY LIFT BY CONTRACTOR EQUIPMENT | EA | 50 | $ - 0 | |||
| 80 | Commodity | 1B3 | LOAD TRUCKS | 45 | a | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OR FULL) | LO/LO - LOADED BY PORT CRANE (GANTRY CRANE -MOBILE CRANE) OR SHIPS CRANE | EA | 10 | $ - 0 | |||
| 81 | Commodity | 1B3 | LOAD TRUCKS | 45 | b | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OR FULL) | LO/LO - LOADED ON TRUCK BY LIFT BY CONTRACTOR EQUIPMENT | EA | 50 | $ - 0 | |||
| 82 | Commodity | 1B3 | LOAD TRUCKS | 60 | a | VEHICLES & TRAILERS - MEDIUM WEIGHT CLASS - 25,000-60000LBS | LO/LO - LOADED BY PORT CRANE (GANTRY CRANE -MOBILE CRANE) OR SHIPS CRANE | EA | 10 | $ - 0 | |||
| 83 | Commodity | 1B3 | LOAD TRUCKS | 60 | c | VEHICLES ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 300 | $ - 0 | |||
| 84 | Commodity | 1B3 | LOAD TRUCKS | 60 | d | TRAILERS ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | TO/TO - TOWED ON TRUCK BY CONTRACTOR EQUIPMENT | EA | 200 | $ - 0 | |||
| 85 | Commodity | 1B3 | LOAD TRUCKS | 60 | e | VEHICLES ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | TO/TO - INOPERABLE VEHICLE TOWED ON TRUCK BY CONTRACTOR EQUIPMENT | EA | 20 | $ - 0 | |||
| 86 | Commodity | 1B3 | LOAD TRUCKS | 61 | a | VEHICLES & TRAILERS - LIGHT WEIGHT CLASS - LESS THAT 25,000LBS | LO/LO - LOADED BY PORT CRANE (GANTRY CRANE -MOBILE CRANE) OR SHIPS CRANE | EA | 10 | $ - 0 | |||
| 87 | Commodity | 1B3 | LOAD TRUCKS | 61 | c | VEHICLES ONLY - LIGHT WEIGHT CLASS - LESS THAT 25,000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 300 | $ - 0 | |||
| 88 | Commodity | 1B3 | LOAD TRUCKS | 61 | d | TRAILERS ONLY - LIGHT WEIGHT - LESS THAT 25,000LBS | TO/TO - TOWED ON TRUCK BY CONTRACTOR EQUIPMENT | EA | 20 | $ - 0 | |||
| 89 | Commodity | 1B3 | LOAD TRUCKS | 61 | e | VEHICLES ONLY - LIGHT WEIGHT - LESS THAT 25,000LBS | TO/TO - INOPERABLE VEHICLE TOWED ON TRUCK BY CONTRACTOR EQUIPMENT | EA | 10 | $ - 0 | |||
| 90 | Commodity | 1B3 | LOAD TRUCKS | 67 | a | VEHICLES & TRAILERS - HEAVY WEIGHT CLASS - OVER 60,000LBS | LO/LO - LOADED BY PORT CRANE (GANTRY CRANE -MOBILE CRANE) OR SHIPS CRANE | EA | 5 | $ - 0 | |||
| 91 | Commodity | 1B3 | LOAD TRUCKS | 67 | c | VEHICLES ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 50 | $ - 0 | |||
| 92 | Commodity | 1B3 | LOAD TRUCKS | 67 | d | TRAILERS ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | TO/TO - TOWED ON TRUCK BY CONTRACTOR EQUIPMENT | EA | 40 | $ - 0 | |||
| 93 | Commodity | 1B3 | LOAD TRUCKS | 67 | e | VEHICLES ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | TO/TO - INOPERABLE VEHICLE TOWED ON TRUCK BY CONTRACTOR EQUIPMENT | EA | 2 | $ - 0 | |||
| TOTAL 1B3 Loading Trucks | $ - 0 | ||||||||||||
| 94 | Commodity | 1B4 | DISCHARGE TRUCKS | 40 | a | BREAKBULK - GENERAL CARGO - NOT OTHERWISE SPECIFIED (NOS) (see definitions) | LO/LO - PORT CRANE (QUAR, GANTRY, PEDESTAL, CRANE) OR SHIPS CRANE | MTON | 32.00 | $ - 0 | |||
| 95 | Commodity | 1B4 | DISCHARGE TRUCKS | 40 | b | BREAKBULK - GENERAL CARGO - NOT OTHERWISE SPECIFIED (NOS) (see definitions) | LO/LO - DISCHARGED FROM TRUCK BY LIFT BY CONTRACTOR EQUIPMENT | MTON | 1000.00 | $ - 0 | |||
| 96 | Commodity | 1B4 | DISCHARGE TRUCKS | 44 | a | ISO - CONTAINERS LESS THAN TEU - SINGLE - CONEX, QUADCONS,TRICONS, BICONS | LO/LO - PORT CRANE (QUAR, GANTRY, PEDESTAL, CRANE) OR SHIPS CRANE | EA | 10 | $ - 0 | |||
| 97 | Commodity | 1B4 | DISCHARGE TRUCKS | 44 | c | ISO - CONTAINERS LESS THAN TEU - SINGLE - CONEX, QUADCONS,TRICONS, BICONS | LO/LO - DISCHARGED FROM TRUCK BY LIFT BY CONTRACTOR EQUIPMENT | EA | 50 | $ - 0 | |||
| 98 | Commodity | 1B4 | DISCHARGE TRUCKS | 45 | a | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OR FULL) | LO/LO - PORT CRANE (QUAR, GANTRY, PEDESTAL, CRANE) OR SHIPS CRANE | EA | 10 | $ - 0 | |||
| 99 | Commodity | 1B4 | DISCHARGE TRUCKS | 45 | c | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OR FULL) | LO/LO - DISCHARGED FROM TRUCK BY LIFT BY CONTRACTOR EQUIPMENT | EA | 50 | $ - 0 | |||
| 100 | Commodity | 1B4 | DISCHARGE TRUCKS | 47 | CARGO PALLETIZED, UNITIZED OR SINGLE BOXES OR CRATES | HOUSE HOLD GOODS - DISCHARGED FROM TRUCK BY LIFT BY CONTRACTOR EQUIPMENT | MTON | 600 | $ - 0 | ||||
| 101 | Commodity | 1B4 | DISCHARGE TRUCKS | 60 | a | VEHICLES & TRAILERS - MEDIUM WEIGHT CLASS - 25,000-60000LBS | LO/LO - DISCHARGED FROM TRUCK BY LIFT BY CONTRACTOR EQUIPMENT | EA | 10 | $ - 0 | |||
| 102 | Commodity | 1B4 | DISCHARGE TRUCKS | 60 | c | VEHICLES ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 300 | $ - 0 | |||
| 103 | Commodity | 1B4 | DISCHARGE TRUCKS | 60 | d | TRAILERS ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | TO/TO - TOWED OFF TRUCK BY CONTRACTOR EQUIPMENT | EA | 200 | $ - 0 | |||
| 104 | Commodity | 1B4 | DISCHARGE TRUCKS | 60 | e | VEHICLES ONLY - MEDIUM WEIGHT CLASS - 25,000-60000LBS | TO/TO - INOPERABLE VEHICLE TOWED OFF TRUCK BY CONTRACTOR EQUIPMENT | EA | 20 | $ - 0 | |||
| 105 | Commodity | 1B4 | DISCHARGE TRUCKS | 61 | a | VEHICLES & TRAILERS - LIGHT WEIGHT CLASS - LESS THAT 25,000LBS | LO/LO - DISCHARGED FROM TRUCK BY LIFT BY CONTRACTOR EQUIPMENT | EA | 10 | $ - 0 | |||
| 106 | Commodity | 1B4 | DISCHARGE TRUCKS | 61 | c | VEHICLES ONLY - LIGHT WEIGHT CLASS - LESS THAT 25,000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 300 | $ - 0 | |||
| 107 | Commodity | 1B4 | DISCHARGE TRUCKS | 61 | d | TRAILERS ONLY - LIGHT WEIGHT - LESS THAT 25,000LBS | TO/TO - TOWED OFF TRUCK BY CONTRACTOR EQUIPMENT | EA | 20 | $ - 0 | |||
| 108 | Commodity | 1B4 | DISCHARGE TRUCKS | 61 | e | VEHICLES ONLY - LIGHT WEIGHT - LESS THAT 25,000LBS | TO/TO - INOPERABLE VEHICLE TOWED OFF TRUCK BY CONTRACTOR EQUIPMENT | EA | 10 | $ - 0 | |||
| 109 | Commodity | 1B4 | DISCHARGE TRUCKS | 67 | a | VEHICLES & TRAILERS - HEAVY WEIGHT CLASS - OVER 60,000LBS | LO/LO - DISCHARGED FROM TRUCK BY LIFT BY CONTRACTOR EQUIPMENT | EA | 5 | $ - 0 | |||
| 110 | Commodity | 1B4 | DISCHARGE TRUCKS | 67 | c | VEHICLES ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP | EA | 50 | $ - 0 | |||
| 111 | Commodity | 1B4 | DISCHARGE TRUCKS | 67 | d | TRAILERS ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | TO/TO - TOWED OFF TRUCK BY CONTRACTOR EQUIPMENT | EA | 40 | $ - 0 | |||
| 112 | Commodity | 1B4 | DISCHARGE TRUCKS | 67 | e | VEHICLES ONLY - HEAVY WEIGHT CLASS - OVER 60,000LBS | TO/TO - INOPERABLE VEHICLE TOWED OFF TRUCK BY CONTRACTOR EQUIPMENT | EA | 2 | $ - 0 | |||
| TOTAL 1B4 Discharge Trucks | $ - 0 | ||||||||||||
| 113 | Commodity | 1E | STUFFING / UNSTUFFING | 40 | BREAKBULK GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LOADING OR UNLOADING CONTAINERS, FLATRACKS OR CHOPS BY CONTRACTOR EQUIPMENT | MTON | 96.00 | $ - 0 | ||||
| 114 | Commodity | 1E | STUFFING / UNSTUFFING | 44 | ISO - CONTAINERS LESS THAN TEU - SINGLE - CONEX, QUADCONS,TRICONS, BICONS | EA | 1.00 | $ - 0 | |||||
| 115 | Commodity | 1E | STUFFING / UNSTUFFING | 45 | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OR FULL) | EA | 1.00 | $ - 0 | |||||
| 116 | Commodity | 1E | STUFFING / UNSTUFFING | 47 | CARGO PALLETIZED, UNITIZED OR SINGLE BOXES OR CRATES | HOUSE HOLD GOODS | MTON | 2500.00 | $ - 0 | ||||
| TOTAL 1E Stuffing-Unstuffing | $ - 0 | ||||||||||||
| 117 | Commodity | 1F | INTRA PORT TRANSFER | 40 | BREAKBULK | TRANSFERRED BY CONTRACTOR EQUIPMENT | MTON | 400 | $ - 0 | ||||
| 118 | Commodity | 1F | INTRA PORT TRANSFER | 44 | ISO CONTAINERS (LESS THAN TEU CONFIGURED) - SINGLE | TRANSFERRED BY CONTRACTOR EQUIPMENT | EA | 50 | $ - 0 | ||||
| 119 | Commodity | 1F | INTRA PORT TRANSFER | 45 | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OF FULL) | TRANSFERRED BY CONTRACTOR EQUIPMENT | EA | 100 | $ - 0 | ||||
| 120 | Commodity | 1F | INTRA PORT TRANSFER | 60 | MEDIUM VEHICLES WITH OR WITHOUT TRAILERS - 25,000-60000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER | EA | 30 | $ - 0 | ||||
| 121 | Commodity | 1F | INTRA PORT TRANSFER | 60 | VEHICLE OR TRAILER - MEDIUM WEIGHT CLASS - 25,000-60000LBS | TO/TO - TOWED BY CONTRACTOR EQUIPMENT | EA | 10 | $ - 0 | ||||
| 122 | Commodity | 1F | INTRA PORT TRANSFER | 61 | LIGHT VEHICLES WITH OR WITHOUT TRAILERS - LESS THAT 25,000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER | EA | 40 | $ - 0 | ||||
| 123 | Commodity | 1F | INTRA PORT TRANSFER | 61 | VEHICLE OR TRAILER - LESS THAT 25,000LBS | TO/TO - TOWED BY CONTRACTOR EQUIPMENT | EA | 10 | $ - 0 | ||||
| 124 | Commodity | 1F | INTRA PORT TRANSFER | 67 | HEAVY VEHICLES WITH OR WITHOUT TRAILERS - OVER 60,000LBS | RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER | EA | 20 | $ - 0 | ||||
| 125 | Commodity | 1F | INTRA PORT TRANSFER | 67 | VEHICLE OR TRAILER - OVER 60,000LBS | TO/TO - TOWED BY CONTRACTOR EQUIPMENT | EA | 5 | $ - 0 | ||||
| TOTAL 1F Intra Port Transfer | $ - 0 | ||||||||||||
| 126 | Manhours | 2 | EXTRA LABOR (XL) | STRAIGHT TIME | BASE HOURLY RATE | GENERAL LABOR: STEVEDORE | LONGSHOREMAN | LASHER | LINE HANDLERS | HR | 180 | $ - 0 | ||||
| 127 | Manhours | 2 | EXTRA LABOR (XL) | STRAIGHT TIME | BASE HOURLY RATE | SKILLED LABOR: VEHICLE DRIVER - MHE EQUIPMENT OPERATORS | HR | 180 | $ - 0 | ||||
| 128 | Manhours | 2 | EXTRA LABOR (XL) | STRAIGHT TIME | BASE HOURLY RATE | SKILLED LABOR: CRANE OPERATOR - CARPENTER | HR | 180 | $ - 0 | ||||
| 129 | Manhours | 2 | EXTRA LABOR (XL) | STRAIGHT TIME | BASE HOURLY RATE | SKILLED LABOR: MECHANIC | GEARMAN | HR | 180 | $ - 0 | ||||
| 130 | Manhours | 2 | EXTRA LABOR (XL) | STRAIGHT TIME | BASE HOURLY RATE | FOREMEN: SHIP FOREMAN - DOCK FOREMAN - GANG FOREMAN - RAIL/TRUCK FOREMEN | HR | 180 | $ - 0 | ||||
| 131 | Manhours | 2 | EXTRA LABOR (XL) | STRAIGHT TIME | BASE HOURLY RATE | CLERK: TIMEKEEPER - FOOT PRINTER | HR | 180 | $ - 0 | ||||
| 132 | Manhours | 2 | EXTRA LABOR (XL) | STRAIGHT TIME | BASE HOURLY RATE | CLERK: CHECKER - TALLYMAN | HR | 180 | $ - 0 | ||||
| TOTAL 2 Extra Labor (XL) | $ - 0 | ||||||||||||
| 133 | Manhours | 3A | DETENTION | STRAIGHT TIME | BASE HOURLY RATE | GENERAL LABOR: STEVEDORE | LONGSHOREMAN | LASHER | LINE HANDLERS | HR | 80 | $ - 0 | ||||
| 134 | Manhours | 3A | DETENTION | STRAIGHT TIME | BASE HOURLY RATE | SKILLED LABOR: VEHICLE DRIVER - MHE EQUIPMENT OPERATORS | HR | 80 | $ - 0 | ||||
| 135 | Manhours | 3A | DETENTION | STRAIGHT TIME | BASE HOURLY RATE | SKILLED LABOR: CRANE OPERATOR - CARPENTER | HR | 80 | $ - 0 | ||||
| 136 | Manhours | 3A | DETENTION | STRAIGHT TIME | BASE HOURLY RATE | SKILLED LABOR: MECHANIC | GEARMAN | HR | 80 | $ - 0 | ||||
| 137 | Manhours | 3A | DETENTION | STRAIGHT TIME | BASE HOURLY RATE | FOREMEN: SHIP FOREMAN - DOCK FOREMAN - GANG FOREMAN - RAIL/TRUCK FOREMEN | HR | 80 | $ - 0 | ||||
| 138 | Manhours | 3A | DETENTION | STRAIGHT TIME | BASE HOURLY RATE | CLERK: TIMEKEEPER - FOOT PRINTER | HR | 80 | $ - 0 | ||||
| 139 | Manhours | 3A | DETENTION | STRAIGHT TIME | BASE HOURLY RATE | CLERK: CHECKER - TALLYMAN | HR | 80 | $ - 0 | ||||
| TOTAL 3A Detention | $ - 0 | ||||||||||||
| 140 | Manhours | 3B | DIFFERENTIALS | OVERTIME | OVERTIME DIFFERENTIAL RATE | GENERAL LABOR: STEVEDORE | LONGSHOREMAN | LASHER | LINE HANDLERS | HR | 16 | $ - 0 | ||||
| 141 | Manhours | 3B | DIFFERENTIALS | OVERTIME | OVERTIME DIFFERENTIAL RATE | SKILLED LABOR: VEHICLE DRIVER - MHE EQUIPMENT OPERATORS | HR | 16 | $ - 0 | ||||
| 142 | Manhours | 3B | DIFFERENTIALS | OVERTIME | OVERTIME DIFFERENTIAL RATE | SKILLED LABOR: CRANE OPERATOR - CARPENTER | HR | 16 | $ - 0 | ||||
| 143 | Manhours | 3B | DIFFERENTIALS | OVERTIME | OVERTIME DIFFERENTIAL RATE | SKILLED LABOR: MECHANIC | GEARMAN | HR | 16 | $ - 0 | ||||
| 144 | Manhours | 3B | DIFFERENTIALS | OVERTIME | OVERTIME DIFFERENTIAL RATE | FOREMEN: SHIP FOREMAN - DOCK FOREMAN - GANG FOREMAN - RAIL/TRUCK FOREMEN | HR | 16 | $ - 0 | ||||
| 145 | Manhours | 3B | DIFFERENTIALS | OVERTIME | OVERTIME DIFFERENTIAL RATE | CLERK: TIMEKEEPER - FOOT PRINTER | HR | 16 | $ - 0 | ||||
| 146 | Manhours | 3B | DIFFERENTIALS | OVERTIME | OVERTIME DIFFERENTIAL RATE | CLERK: CHECKER - TALLYMAN | HR | 16 | $ - 0 | ||||
| TOTAL 3B Overtime Differentials | $ - 0 | ||||||||||||
| 147 | Manhours | 3C | GUARANTEED TIME | GENERAL LABOR: STEVEDORE | LONGSHOREMAN | LASHER | LINE HANDLERS | HR | 8 | $ - 0 | ||||||
| 148 | Manhours | 3C | GUARANTEED TIME | SKILLED LABOR: VEHICLE DRIVER - MHE EQUIPMENT OPERATORS | HR | 8 | $ - 0 | ||||||
| 149 | Manhours | 3C | GUARANTEED TIME | SKILLED LABOR: CRANE OPERATOR - CARPENTER | HR | 8 | $ - 0 | ||||||
| 150 | Manhours | 3C | GUARANTEED TIME | SKILLED LABOR: MECHANIC | GEARMAN | HR | 8 | $ - 0 | ||||||
| 151 | Manhours | 3C | GUARANTEED TIME | FOREMEN: SHIP FOREMAN - DOCK FOREMAN - GANG FOREMAN - RAIL/TRUCK FOREMEN | HR | 8 | $ - 0 | ||||||
| 152 | Manhours | 3C | GUARANTEED TIME | CLERK: TIMEKEEPER - FOOT PRINTER | HR | 8 | $ - 0 | ||||||
| 153 | Manhours | 3C | GUARANTEED TIME | CLERK: CHECKER - TALLYMAN | HR | 8 | $ - 0 | ||||||
| TOTAL 3C Guaranteed Time | $ - 0 | ||||||||||||
| Line Item | Category | Schedule | Commodity | Description | Unit of Duration | Estimated Duration | Unit of Measure | Unit Price | Unit Quantity | Extended Price | |||
| 154 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE/MHE- INCLUDES DRIVER/OPERATOR - FUEL-POL- | FORKLIFT, 3 LT CAPACITY | HR | 50 | EA | 1 | $ - 0 | |||
| 155 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE/MHE- INCLUDES DRIVER/OPERATOR - FUEL-POL- | FORKLIFT, 3.01 LT - 7 LT CAPACITY | HR | 30 | EA | 1 | $ - 0 | |||
| 156 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE/MHE- INCLUDES DRIVER/OPERATOR - FUEL-POL- | FORKLIFT, 7.01 LT - 10 LT CAPACITY | HR | 30 | EA | 1 | $ - 0 | |||
| 157 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE/MHE- INCLUDES DRIVER/OPERATOR - FUEL-POL- | FORKLIFT, 10.01 LT - 15 LT CAPACITY | HR | 50 | EA | 1 | $ - 0 | |||
| 158 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE/MHE- INCLUDES DRIVER/OPERATOR - FUEL-POL- | FORKLIFT, 15.01 LT - 25 LT CAPACITY | HR | 10 | EA | 1 | $ - 0 | |||
| 159 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE/MHE- INCLUDES DRIVER/OPERATOR - FUEL-POL- | MOBILE CRANE, 50 LT capacity | DY | 1 | EA | 20 | $ - 0 | |||
| 160 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE/MHE- INCLUDES DRIVER/OPERATOR - FUEL-POL- | MOBILE CRANE, 100 LT capacity | DY | 1 | EA | 20 | $ - 0 | |||
| 161 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE/MHE- INCLUDES DRIVER/OPERATOR - FUEL-POL- | MOBILE CRANE, 160 LT - capacity | DY | 1 | EA | 20 | $ - 0 | |||
| 162 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE/MHE- INCLUDES DRIVER/OPERATOR - FUEL-POL- | MOBILE CRANE, 250 LT - capacity | DY | 1 | EA | 50 | $ - 0 | |||
| 163 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE/MHE- INCLUDES DRIVER/OPERATOR - FUEL-POL- | CONTAINER HANDLER / top lift, 80,000 LB lifting CAPACITY | HR | 100 | EA | 1 | $ - 0 | |||
| 164 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE/MHE- INCLUDES DRIVER/OPERATOR - FUEL-POL- | YARD TRACTOR WITH 5TH WHEEL (HUSTLER, YARD DOG) | HR | 100 | EA | 1 | $ - 0 | |||
| 165 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE/MHE - | 20 FOOT CONTAINER CHASSIS | HR | 10 | EA | 1 | $ - 0 | |||
| 166 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE/MHE - | 40 FOOT CONTAINER CHASSIS | HR | 10 | EA | 1 | $ - 0 | |||
| 167 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE/MHE- INCLUDES DRIVER/OPERATOR - FUEL-POL- | 20FT /40FT FLAT BED TRAILERS | MAFIs or MAFIs WITH PROBE | HR | 100 | EA | 1 | $ - 0 | |||
| 168 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE/MHE- INCLUDES DRIVER/OPERATOR - FUEL-POL- | HEAVY DUTY MEDIUM TUG or TRACTOR | HR | 50 | EA | 1 | $ - 0 | |||
| 169 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE/MHE- INCLUDES DRIVER/OPERATOR - FUEL-POL- | HEAVY DUTY LARGE TUG or TRACTOR | HR | 1 | EA | 1 | $ - 0 | |||
| 170 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | INCLUDE SETUP-REMOVAL, MAINT, FUEL/POL | GENERATOR, 60 KIOLWATT (INCLUDES FUEL AND MAINT) | DY | 10 | EA | 1 | $ - 0 | |||
| 171 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | INCLUDE SETUP-REMOVAL, MAINT, FUEL/POL | PRESSURE WASHER HEATED TO 180 DEGREES @ 2500 PSI, WITH ALL ATTACHMENTS | DY | 10 | EA | 2 | $ - 0 | |||
| 172 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | INCLUDE SETUP-REMOVAL, MAINT, FUEL/POL OPERATIONS | MOBILE LIGHT TOWER, FOUR HEAD, 1000 WATT ILLUMINATION (INCLUDES FUEL AND MAINT) | DY | 10 | EA | 2 | $ - 0 | |||
| TOTAL 4 Equipment Rental | $ - 0 | ||||||||||||
| 173 | Miscellaneous | 6 | PORT FACILITIES | INCLUDES SETUP -REMOVAL - INTERNET - ELECTRICAL- KEYS - FURNITURE | TEMPORARY OR PORTABLE OFFICE SPACE 160SQFT INTERIOUR SPACE | MTH | 12 | EA | 1 | $ - 0 | |||
| 174 | Miscellaneous | 6 | PORT FACILITIES | FOLDING TABLE | DY | 1 | EA | 10 | $ - 0 | ||||
| 175 | Miscellaneous | 6 | PORT FACILITIES | FOLDING CHAIRS | DY | 1 | EA | 30 | $ - 0 | ||||
| 176 | Miscellaneous | 6 | PORT FACILITIES | INCLUDES DAILY CLEANING - SUPPLIES, DELIVERY SETUP AND REMOVAL | LATRINES & HANDWASHING STATION - (LOT= 2/PORT-O-LETS & 1 HANDWASHING) | MTH | 12 | LOT | 3 | $ - 0 | |||
| 177 | Miscellaneous | 6 | PORT FACILITIES | INCLUDES EMPYING AS NEEDED OR REQUESTED | REFUSE OR RECYCLE CONTAINER | MTH | 12 | EA | 3 | $ - 0 | |||
| 178 | Miscellaneous | 6 | PORT FACILITIES | INCLUDES SEPERATION FROM COMMERCIAL, SECURITY, 24/7 ACCESS (see PWS for more info) | WAREHOUSE - CLOSED STAGING AREA | see PWS for specific details | DY | 1 | SQMT | 1000 | $ - 0 | |||
| 179 | Miscellaneous | 6 | PORT FACILITIES | INCLUDES 10 DAYS FREE TIME (IMPORT/EXPORT) | HARD STAND LOTS - OPEN STAGING AREA | see PWS for specific details | MTH | 12 | SQMT | 20000 | $ - 0 | |||
| 180 | Miscellaneous | 6 | PORT FACILITIES | INCLUDES DELIVERY SETUP AND REMOVAL | RENTAL SHIPPING CONTAINERS (SECURITY WALL) | DY | 30 | EA | 50 | $ - 0 | |||
| TOTAL 6 Facilities | $ - 0 | ||||||||||||
| 181 | Miscellaneous | 8 | MISCELLANEOUS | OUT-OF-POCKET EXPENSE | MTH | 12 | USD | $ 3,500.00 | 1 | $ 42,000.00 | |||
| TOTAL Miscellaneous OOP | $ 42,000.00 | ||||||||||||
| 182 | Miscellaneous | 10 | Miscellaneous or 3PL services | INCLUDES INTIAL PREP, CORRECTION, COMPLEATION, PICKUP - DELIVERY | PROCESS CUSTOMS DOCUMENTS (NATO AE FORM 302) | Each | 200.00 | $ - 0 | |||||
| TOTAL 10 Miscellaneous or 3PL services | $ - 0 |
TOMBOLO
| SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104 (When Filled-In, this Document becomes CUI//SP-SSEL) | |||||||||||||
| STEVEDORING & RELATED TERMINAL SERVICES | PERIOD OF PERFORMANCE: | 1 Nov 2025 | through | 30 Apr 2031 | (including 6 mo extension, if applicable) | ||||||||
| LOCATION: | TOMBOLO DOCK | input start date | input final end date | ||||||||||
| Attachment #2 | HTC711-25-R-E119 | TOTAL COST ALL SCHEDULES PORT 2 | $ 42,000.00 | ||||||||||
| Line Item | Category | Schedule | Commodity | Description | Unit of Duration | Estimated Duration | Unit of Measure | Unit Price | Unit Quantity | Extended Price | |||
| 1 | Commodity | 1A1 | LOAD VESSEL | 25 | a | MILVAN-(ISO) CONTAINER (20'/40') PACKED W/ EXPLOSIVES | LO/LO - PORT CRANE, MOBILE CRANE OR SHIPS CRANE | EA | 1250 | $ - 0 | |||
| 2 | Commodity | 1A1 | LOAD VESSEL | 25 | c | MILVAN-(ISO) CONTAINER (20'/40') PACKED W/ EXPLOSIVES | RO/RO - LOADED ONBOARD VESSEL BY CFE TRUCK/TRAILER, FORKLIFT, BY RAMP | EA | 25 | $ - 0 | |||
| 3 | Commodity | 1A1 | LOAD VESSEL | 45 | a | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OF FULL) | LO/LO - PORT CRANE, MOBILE CRANE OR SHIPS CRANE | EA | 1250 | $ - 0 | |||
| 4 | Commodity | 1A1 | LOAD VESSEL | 45 | c | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OF FULL) | RO/RO - LOADED ONBOARD VESSEL BY CFE TRUCK/TRAILER, FORKLIFT, BY RAMP | EA | 25 | $ - 0 | |||
| TOTAL 1A1 - Loading Vessel | $ - 0 | ||||||||||||
| 5 | Commodity | 1A1a | LASHING - TIEDOWN ONLY | 25 | MILVAN-(ISO) CONTAINER (20'/40') PACKED W/ EXPLOSIVES | MILVAN-CONTAINERS PACKED WITH EXPLOSIVES | EA | 10 | $ - 0 | ||||
| 6 | Commodity | 1A1a | LASHING - TIEDOWN ONLY | 45 | ISO CONTAINER 20' - 40' (TEU CONFIGURED) | NON-EXPLOSIVES - EMPTY OR FULL | EA | 10 | $ - 0 | ||||
| TOTAL 1A1a - Lashing Only | $ - 0 | ||||||||||||
| 7 | Commodity | 1A2 | DISCHARGE VESSEL | 25 | a | MILVAN-(ISO) CONTAINER (20'/40') PACKED W/ EXPLOSIVES | LO/LO - PORT CRANE, MOBILE CRANE OR SHIPS CRANE | EA | 1250 | $ - 0 | |||
| 8 | Commodity | 1A2 | DISCHARGE VESSEL | 25 | c | MILVAN-(ISO) CONTAINER (20'/40') PACKED W/ EXPLOSIVES | RO/RO - TOWED OFF VESSEL BY CONTRACTOR EQUIPMENT, BY RAMP | EA | 25 | $ - 0 | |||
| 9 | Commodity | 1A2 | DISCHARGE VESSEL | 45 | a | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OF FULL) | LO/LO - PORT CRANE, MOBILE CRANE OR SHIPS CRANE | EA | 1250 | $ - 0 | |||
| 10 | Commodity | 1A2 | DISCHARGE VESSEL | 45 | c | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OF FULL) | RO/RO DISCHARGED FROM THE VESSEL BY TRUCK/TRAILER, FORKLIFT, BY RAMP | EA | 25 | $ - 0 | |||
| TOTAL - 1A2- Discharge Vessel | $ - 0 | ||||||||||||
| 11 | Commodity | 1A2a | UNLASHING ONLY | 25 | MILVAN-(ISO) CONTAINER | MILVAN-CONTAINERS PACKED WITH EXPLOSIVES | EA | 10 | $ - 0 | ||||
| 12 | Commodity | 1A2a | UNLASHING ONLY | 45 | ISO CONTAINER 20' - 40' (TEU CONFIGURED) | NON-EXPLOSIVES - EMPTY OR FULL | EA | 10 | $ - 0 | ||||
| TOTAL 1A2a Unlashing only | $ - 0 | ||||||||||||
| 13 | Commodity | 1B3 | LOAD TRUCKS | 25 | a | MILVAN-(ISO) CONTAINER (20'/40') PACKED W/ EXPLOSIVES | LO/LO - PORT CRANE, MOBILE CRANE OR SHIPS CRANE | EA | 1250 | $ - 0 | |||
| 14 | Commodity | 1B3 | LOAD TRUCKS | 25 | c | MILVAN-(ISO) CONTAINER (20'/40') PACKED W/ EXPLOSIVES | LO/LO - LOADED ONTO TRUCKS BY CONTRACTOR EQUIPMENT | EA | 25 | $ - 0 | |||
| 15 | Commodity | 1B3 | LOAD TRUCKS | 45 | a | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OF FULL) | LO/LO - PORT CRANE, MOBILE CRANE OR SHIPS CRANE | EA | 1250 | $ - 0 | |||
| 16 | Commodity | 1B3 | LOAD TRUCKS | 45 | b | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OF FULL) | LO/LO - LOADED ONTO TRUCK BY CONTRACTOR EQUIPMENT | EA | 25 | $ - 0 | |||
| TOTAL 1B3 Loading Trucks | $ - 0 | ||||||||||||
| 17 | Commodity | 1B4 | DISCHARGE TRUCKS | 25 | a | MILVAN-(ISO) CONTAINER (20'/40') PACKED W/ EXPLOSIVES | LO/LO - PORT CRANE, MOBILE CRANE OR SHIPS CRANE | EA | 1250 | $ - 0 | |||
| 18 | Commodity | 1B4 | DISCHARGE TRUCKS | 25 | c | MILVAN-(ISO) CONTAINER (20'/40') PACKED W/ EXPLOSIVES | LO/LO - DISCHARGED FROM TRUCK BY CONTRACTOR EQUIPMENT | EA | 25 | $ - 0 | |||
| 19 | Commodity | 1B4 | DISCHARGE TRUCKS | 45 | a | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OF FULL) | LO/LO - PORT CRANE, MOBILE CRANE OR SHIPS CRANE | EA | 1250 | $ - 0 | |||
| 20 | Commodity | 1B4 | DISCHARGE TRUCKS | 45 | c | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OF FULL) | LO/LO - DISCHARGED FROM TRUCK BY CONTRACTOR EQUIPMENT | EA | 25 | $ - 0 | |||
| TOTAL 1B4 Discharge Trucks | $ - 0 | ||||||||||||
| 21 | Commodity | 1C | RECEPTION ONLY | 25 | ISO CONTAINER PACKED WITH EXPLOSIVES (20' / 40') PACKED | MILVAN OR ISO CONTAINERS | EA | 1250 | $ - 0 | ||||
| 22 | Commodity | 1C | RECEPTION ONLY | 45 | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OF FULL) | MILVAN ISO CONTAINERS 20'/40' (TEU CONFIGURED QUADCONS,TRICONS, BICONS ) | EA | 1250 | $ - 0 | ||||
| TOTAL 1C Reception Only | $ - 0 | ||||||||||||
| 23 | Commodity | 1D | DISPOSITION ONLY | 25 | ISO CONTAINER EXPLOSIVES (20' / 40') PACKED | MILVAN OR ISO CONTAINERS PACKED W/ EXPLOSIVES | EA | 1250 | $ - 0 | ||||
| 24 | Commodity | 1D | DISPOSITION ONLY | 45 | ISO - CONTAINER NON-EXPLOSIVES (20' - 40') (MAY BE TEU CONFIGURED) (EMPTY OF FULL) | MILVAN ISO CONTAINERS 20'/40' (TEU CONFIGURED QUADCONS,TRICONS, BICONS ) | EA | 1250 | $ - 0 | ||||
| TOTAL 1D Disposition ONLY | $ - 0 | ||||||||||||
| 25 | Manhours | 2 | EXTRA LABOR (XL) | STRIGHT TIME | BASE HOURLY RATE | GENERAL LABOR: STEVEDORE | LONGSHOREMAN | LASHER | LINE HANDLERS | HR | 180 | $ - 0 | ||||
| 26 | Manhours | 2 | EXTRA LABOR (XL) | STRIGHT TIME | BASE HOURLY RATE | SKILLED LABOR: VEHICLE DRIVER - MHE EQUIPMENT OPERATORS | HR | 180 | $ - 0 | ||||
| 27 | Manhours | 2 | EXTRA LABOR (XL) | STRIGHT TIME | BASE HOURLY RATE | SKILLED LABOR: CRANE OPERATOR - CARPENTER | HR | 180 | $ - 0 | ||||
| 28 | Manhours | 2 | EXTRA LABOR (XL) | STRIGHT TIME | BASE HOURLY RATE | SKILLED LABOR: MECHANIC | GEARMAN | HR | 180 | $ - 0 | ||||
| 29 | Manhours | 2 | EXTRA LABOR (XL) | STRIGHT TIME | BASE HOURLY RATE | FOREMEN: SHIP FOREMAN - DOCK FOREMAN - GANG FOREMAN - RAIL/TRUCK FOREMEN | HR | 180 | $ - 0 | ||||
| 30 | Manhours | 2 | EXTRA LABOR (XL) | STRIGHT TIME | BASE HOURLY RATE | CLERK: TIMEKEEPER - FOOT PRINTER | HR | 180 | $ - 0 | ||||
| 31 | Manhours | 2 | EXTRA LABOR (XL) | STRIGHT TIME | BASE HOURLY RATE | CLERK: CHECKER - TALLYMAN | HR | 180 | $ - 0 | ||||
| TOTAL 2 Extra Labor (XL) | $ - 0 | ||||||||||||
| 32 | Manhours | 3A | DETENTION | STRIGHT TIME | BASE HOURLY RATE | GENERAL LABOR: STEVEDORE | LONGSHOREMAN | LASHER | LINE HANDLERS | HR | 80 | $ - 0 | ||||
| 33 | Manhours | 3A | DETENTION | STRIGHT TIME | BASE HOURLY RATE | SKILLED LABOR: VEHICLE DRIVER - MHE EQUIPMENT OPERATORS | HR | 80 | $ - 0 | ||||
| 34 | Manhours | 3A | DETENTION | STRIGHT TIME | BASE HOURLY RATE | SKILLED LABOR: CRANE OPERATOR - CARPENTER | HR | 80 | $ - 0 | ||||
| 35 | Manhours | 3A | DETENTION | STRIGHT TIME | BASE HOURLY RATE | SKILLED LABOR: MECHANIC | GEARMAN | HR | 80 | $ - 0 | ||||
| 36 | Manhours | 3A | DETENTION | STRIGHT TIME | BASE HOURLY RATE | FOREMEN: SHIP FOREMAN - DOCK FOREMAN - GANG FOREMAN - RAIL/TRUCK FOREMEN | HR | 80 | $ - 0 | ||||
| 37 | Manhours | 3A | DETENTION | STRIGHT TIME | BASE HOURLY RATE | CLERK: TIMEKEEPER - FOOT PRINTER | HR | 80 | $ - 0 | ||||
| 38 | Manhours | 3A | DETENTION | STRIGHT TIME | BASE HOURLY RATE | CLERK: CHECKER - TALLYMAN | HR | 80 | $ - 0 | ||||
| TOTAL 3A Detention | $ - 0 | ||||||||||||
| 39 | Manhours | 3B | DIFFERENTIALS | OVERTIME | OVERTIME DIFFERENTIAL RATE | GENERAL LABOR: STEVEDORE | LONGSHOREMAN | LASHER | LINE HANDLERS | HR | 16 | $ - 0 | ||||
| 40 | Manhours | 3B | DIFFERENTIALS | OVERTIME | OVERTIME DIFFERENTIAL RATE | SKILLED LABOR: VEHICLE DRIVER - MHE EQUIPMENT OPERATORS | HR | 16 | $ - 0 | ||||
| 41 | Manhours | 3B | DIFFERENTIALS | OVERTIME | OVERTIME DIFFERENTIAL RATE | SKILLED LABOR: CRANE OPERATOR - CARPENTER | HR | 16 | $ - 0 | ||||
| 42 | Manhours | 3B | DIFFERENTIALS | OVERTIME | OVERTIME DIFFERENTIAL RATE | SKILLED LABOR: MECHANIC | GEARMAN | HR | 16 | $ - 0 | ||||
| 43 | Manhours | 3B | DIFFERENTIALS | OVERTIME | OVERTIME DIFFERENTIAL RATE | FOREMEN: SHIP FOREMAN - DOCK FOREMAN - GANG FOREMAN - RAIL/TRUCK FOREMEN | HR | 16 | $ - 0 | ||||
| 44 | Manhours | 3B | DIFFERENTIALS | OVERTIME | OVERTIME DIFFERENTIAL RATE | CLERK: TIMEKEEPER - FOOT PRINTER | HR | 16 | $ - 0 | ||||
| 45 | Manhours | 3B | DIFFERENTIALS | OVERTIME | OVERTIME DIFFERENTIAL RATE | CLERK: CHECKER - TALLYMAN | HR | 16 | $ - 0 | ||||
| TOTAL 3B Overtime Differentials | $ - 0 | ||||||||||||
| 46 | Manhours | 3C | GUARANTEED TIME | GENERAL LABOR: STEVEDORE | LONGSHOREMAN | LASHER | LINE HANDLERS | HR | 8 | $ - 0 | ||||||
| 47 | Manhours | 3C | GUARANTEED TIME | SKILLED LABOR: VEHICLE DRIVER - MHE EQUIPMENT OPERATORS | HR | 8 | $ - 0 | ||||||
| 48 | Manhours | 3C | GUARANTEED TIME | SKILLED LABOR: CRANE OPERATOR - CARPENTER | HR | 8 | $ - 0 | ||||||
| 49 | Manhours | 3C | GUARANTEED TIME | SKILLED LABOR: MECHANIC | GEARMAN | HR | 8 | $ - 0 | ||||||
| 50 | Manhours | 3C | GUARANTEED TIME | FOREMEN: SHIP FOREMAN - DOCK FOREMAN - GANG FOREMAN - RAIL/TRUCK FOREMEN | HR | 8 | $ - 0 | ||||||
| 51 | Manhours | 3C | GUARANTEED TIME | CLERK: TIMEKEEPER - FOOT PRINTER | HR | 8 | $ - 0 | ||||||
| 52 | Manhours | 3C | GUARANTEED TIME | CLERK: CHECKER - TALLYMAN | HR | 8 | $ - 0 | ||||||
| TOTAL 3C Guaranteed Time | $ - 0 | ||||||||||||
| Line Item | Category | Schedule | Commodity | Description | Unit of Duration | Estimated Duration | Unit of Measure | Unit Price | Unit Quantity | Extended Price | |||
| 53 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE - INCLUDES OPERATOR | FORKLIFT, 3.01 LT - 7 LT CAPACITY | HR | 1 | EA | 1 | $ - 0 | |||
| 54 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE - INCLUDES OPERATOR | FORKLIFT, 15.01 LT - 25 LT CAPACITY | HR | 1 | EA | 1 | $ - 0 | |||
| 55 | Manhours | 4 | EQUIPMENT RENTAL (EQR) | CFE - INCLUDES OPERATOR | Semi Automatic Mechanical Container Spreader | HR | 1 | EA | 1 | $ - 0 | |||
| TOTAL 4 Equipment Rental | $ - 0 | ||||||||||||
| 56 | Miscellaneous | 8 | MISCELLANEOUS | OUT-OF-POCKET EXPENSE | MTH | 12 | USD | $ 3,500.00 | 1 | $ 42,000.00 | |||
| TOTAL Miscellaneous OOP | $ 42,000.00 | ||||||||||||
| 57 | Miscellaneous | 10 | Miscellaneous or 3PL services | INCLUDES INTIAL PREP, CORRECTION, COMPLEATION, PICKUP - DELIVERY | PROCESS CUSTOMS DOCUMENTS (NATO AE FORM 302) | Each | 200.00 | $ - 0 | |||||
| TOTAL 10 Miscellaneous or 3PL services | $ - 0 |