HTC711-22-R-R002 - QA Round 3.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- HTC711-22-R-R002
About this file
This document contains a request for proposal for ship-to-shore and rail mounted gantry crane maintenance services. The Military Surface Deployment and Distribution Command requires scheduled and unscheduled maintenance as well as major repairs for cranes located in North Carolina and California. Scheduled maintenance includes inspections, tests, and preventative maintenance to avoid failures. Unscheduled maintenance covers special inspections, diagnostics, and repairs following malfunctions. Major projects have unknown requirements and will be priced separately from scheduled maintenance. Evaluation will focus on pricing for scheduled maintenance tasks in CLINs ending in 01, as unscheduled and major work cannot be estimated in advance. Normal mission lengths are up to 5 days for California locations and potentially extended over weekends in North Carolina, requiring day and occasional night shifts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HTC711-22-R-R002 - QA Round 2.xlsx | XLSX spreadsheet | |
| HTC711-22-R-R002 - Amendment 2.pdf | ||
| HTC711-22-R-R002 - Amendment 0001.pdf | ||
| HTC711-22-R-R002 - QA Round 1.xlsx | XLSX spreadsheet | |
| Attachment 2 - MOTCO Wage Determination.pdf | ||
| Attachment 4 - NMII Wage Determination.pdf | ||
| Attachment 3 - MOTSU Wage Determination.pdf | ||
| Attachment 1 - PWS.pdf | ||
| HTC711-22-R-R002 RFP.pdf | ||
| Attachment 5 - Small Business Subcontracting Plan.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Q# | Topic | RFP Document & Para | Question | Answer |
| 1 | RFP | Page 32, Paragraph 5 A (7) | Are the sample goals listed in the attachment 5 to be regarded as an example or are they goals that the USG would like to be achieved? If they are just a sample, will the USG provide goals to be achieved and evaluated? | The sample goals listed in Attachment 5 are examples for offerors to use to build their subcontracting goals. USG will not be providing goals for the offerors; it is up to the offerors to build their own subcontracting goals. |
| 2 | PWS | PWS, Para 5.3.6(e), Pg 8 | Please provide airfare and per diem for each location. | They are going to need to get an average commercial average cost- flight cost are not set by airlines. Hotel cost are based on the hotel they stay at. |
| 3 | PWS | PWS, Para 5.3.7, Pg 9 | Under which CLIN do Surge Operations fall? | Surge Operations falls under CLIN XXX2 (Unscheduled Maintenance). |
| 4 | PWS | PWS, Para 5.3.8, Pg 8 | Under which CLIN do Emergency Services fall? | Emergency Services falls under CLIN XXX2 (Unscheduled Maintenance). |
| 5 | PWS | PWS, Para 5.3.9, Pg 8 | Please confirm Quadrennial Inspections are covered by CLINs ending with "01." | Yes, Quadrennial Inspections are covered in CLINs XXX1 (Scheduled Maintenance). |
| 6 | PWS | PWS, Para 5.3.11 | Are load test weights available for contractor use at each location? | Load test weights are available as GFP if necessary. |
| 7 | RFP | RFP, CLIN 0002, Pg 3 | The quantity and nature of unscheduled maintenance is unknown. Please clarify how CLINs ending in 02 should be priced. | Because they are impossible to estimate in advance, price evaluation for unscheduled maintenance and major repairs will be performed at the time of submission of individual proposals for those projects. As such, only CLINs ending in 01 will be evaluated for award. |
| 8 | RFP | RFP, CLIN 0003, Pg 4 | The quantity and complexity of major projects is unknown. Please clarify how CLINs ending in 03 should be priced. | Because they are impossible to estimate in advance, price evaluation for unscheduled maintenance and major repairs will be performed at the time of submission of individual proposals for those projects. As such, only CLINs ending in 01 will be evaluated for award. |
| 9 | RFP | RFP, C(2), Pg 33 | By location, what is the length of the average mission, in hours, and how many cranes does it require? Are missions normally conducted during daytime hours or continuously, overnight, until completion. (This information is necessary in order to estimate a firm fixed price for mission support operations). | MOTSU located in North Carolina- Two Ship To Shore Cranes; Normal missions start time 0800 to 1800 Monday - Friday. (1-2 times annually) missions may be extended 0800-2300 (possibility for 2 days). MOTCO loctaed in California - Typically mission is less than 5 days and day shift only from 0800-1600. Night shift is needed typically once per quarter with shift time from 1800-0200. |