A02. PWS Attach 1 - Final Analytical Report & EDD Requirements v2.docx
DOCX document 20 KB Posted
- Attached to
- Trace Metal Sample Analysis
- Solicitation number
- HT942726RE010
- Issued by
- Not on record
About this file
This is a Performance Work Statement attachment document that establishes analytical requirements and deliverable specifications for trace metal sample analysis services.
The document defines the technical requirements for laboratories conducting trace metals analysis, including detailed procedures for sample handling, analytical methodologies, quality assurance protocols, and data reporting standards. Key requirements specify that analytical work must comply with established testing methodologies and include comprehensive documentation of results. The attachment outlines specific elements that must be included in final analytical reports, such as sample identification, analytical parameters tested, detection limits, quality control data, and chain of custody documentation. Electronic Data Deliverables (EDD) requirements are detailed to ensure standardized submission formats and data compatibility with government systems. The document establishes performance standards for laboratory operations, including equipment calibration, standard operating procedures, and personnel qualifications necessary to execute the trace metals analysis work. Deliverables must meet specified accuracy and precision requirements, with particular emphasis on data validation and traceability. The requirements support the Defense Health Agency Contracting Activity's (DHACA) need for qualified testing laboratory services under the commercial item solicitation HT942726RE010, which seeks vendors capable of providing reliable trace metals analysis in accordance with established federal testing standards and laboratory certification requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 6-Pricing Sheet v2.xlsx | XLSX spreadsheet | |
| Solicitation - HT942726RE010-0001.docx | DOCX document | |
| A02. PWS Attach 4 - Limit of Quantitation (LOQ) v2.docx | DOCX document | |
| A02. PWS Attach 3 - Analytical Methods v2.docx | DOCX document | |
| A02 PWS FINAL v2 COR.docx | DOCX document | |
| A02. PWS Attach 4 - Limit of Quantitation (LOQ).pdf | ||
| A02. PWS Attach 1 - Final Analytical Report & EDD Requirements.pdf | ||
| A02. PWS Attach 2 - EDD Specifications.pdf | ||
| Attachment 6-Pricing Sheet.xlsx | XLSX spreadsheet | |
| Solicitation - HT942726RE010_final.docx | DOCX document | |
| A02. PWS Attach 3 - Analytical Methods.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 - Final Analytical Report and Electronic Data Deliverable (EDD) Requirements Contractor data packages shall include the following documentation:
A. Complete Data Package (Submitted via PDF) – Data package shall comprise the following items:
a. Invoice for Services Rendered – Contractor shall submit a PDF of the invoice for each Outsource Sample Shipment (pick up order) document /report submitted.
b. Case Narrative – A summary description of the analytical operations that occurred during sample receipt and analyses. Case narrative should include quality control activities and actions taken by lab personnel to eliminate problem areas identified during sample analyses.
c. Analysis report forms – These forms contain the results from measurement of those chemical parameters that are requested and specified in the Outsource Sample Shipment (pick up order) document
d. . Data are to be identified by the DCPH-A Lab ID number and the corresponding field number.
e. Sample Receipt Documentation – sample receipt logs, temperature logs, Outsource Sample Shipment (pick up order) document, COC forms.
f. Quality Control Data Summary – This section shall include data from spikes, duplicates, blinds, reagent blanks, system calibrations, etc.
g. Raw data for analytical measurements to include the following:
i. Chemical parameter analyzed; NIOSH, OSHA, or other method description; date of analysis of samples.
ii. Calibration and stock standards (including method of preparation and standardization) with accompanying readings.
iii. Summary sheet to include designation of samples by DCPH-A number
iv. Summary sheets for quality control samples
v. Any instrument adjustments to include periodic base line adjustments or adjustments in attenuation/sensitivity.
vi. Copies of instrument print outs as applicable
vii. Calculation sheet clearly describing how positive results were calculated.
viii. Tabulation of instrument detection/Limit of Quantitation (LOQ) which have been determined by the contract laboratory and reported on Data Report Form. (Raw data must show that at least one standard was analyzed at or below detection limit for data to be valid).
B. PDF Instructions for the Complete “FINAL” Data Package – This PDF document will include the entire data package as described above, minus the invoice. Please provide the invoice via PDF as a separate file from Final report. Final package PDF and invoice PDF are emailed to the following addresses: DHA APG Pub Health - A Mailbox LAB COR at dha.apg.Pub-Health-A.mbx.lab-cor@health.mil and DHA APG Pub Health - A Mailbox DLS-Contract-Hardcopies at dha.apg.Pub-Health-A.mbx.dls-contract-hardcopies@health.mil
C. These will be due no later than 5:00 PM Eastern Standard Time on the due date specified on the Outsource Sample Shipment (pick up order) document. Naming convention of hard copy file and invoice should at least include the lab queue (acronym) and the DCPH-A Outsource Sample Shipment (pick up order) document number, both of which will be provided on the documentation.
D. Preliminary Sample Analysis Results (pdf file) – Due one day before Complete Hard Copy Data Package pdf, for a High and Top Priority Turn Around Time requests (see C.2.2 General Requirements). These preliminary pdfs will contain final, numerical results in appropriate units, for the requested chemical parameters. Sample data shall be identified by DCPH-A lab number and field ID number.
A Preliminary report (before a final validated data package is available) may be required only when the Government has a need for rapid, actionable results (for example a High Priority TAT requires a preliminary report one (1) day prior to the contractor High Priority TAT due date) E. Electronic Data Deliverable (EDD) - The electronic data deliverable (EDD) and Final PDF report are REQUIRED to be derived from the same source. Information (sample numbers, field numbers, etc.) and data (analytical results, units) must match. The process that generates the final report and EDD is REQUIRED to be validated to demonstrate that the process provides identical information and data.
a. Note: for instances where site specific matrix spike (MS) / matrix spike duplicates (MSD) are requested, LIMS limitations may not permit EDD reporting of the MS/MSD. Specific directions will be supplied on a case-by-case basis by the COR.
File details come from the government source that posted it. Updated .