WIC Overseas Question and Answers Final.docx
DOCX document 45 KB Posted
- Attached to
- Women, Infant, Children Overseas Contract
- Solicitation number
- HT9425-26-R-E004
- Issued by
-
Defense Health Agency
About this file
This is a Question and Answers document for solicitation HT9427-26-R-E004, providing clarifications on proposal submission requirements, evaluation factors, pricing, and technical performance expectations for the Women, Infants & Children (WIC) Overseas Program Support Services contract.
The Q&A addresses proposal formatting and page limits, clarifying that the 25-page Volume I Technical Proposal limit applies only to the Factor 1 Approach narrative, while the Incoming Transition Plan (6 pages), Quality Control Plan, Program Management Plan, Level of Effort/Staffing Plan, and Organizational Conflict of Interest documentation are submitted as separate, non-counted appendices. Offerors are not bound to the Government's estimated labor categories or staffing quantities and may propose materially different labor mixes provided they demonstrate full PWS compliance. The Government will not provide incumbent staffing profiles, compensation ranges, or historical data; instead, offerors must determine appropriate staffing allocation across WIC Overseas locations. Staffing milestones require 90% of proposed labor to be onboarded within three weeks of contract commencement and full staffing by day 60. Regarding pricing, Government-established Travel and Miscellaneous Other Direct Costs (ODCs) with Not-To-Exceed amounts must be entered unchanged and apply equally to all offerors; no G&A, overhead, material handling, profit, or fee may be applied to any ODC. Cost of Living Allowance for eligible stateside personnel working overseas, Permanent Change of Station costs, and dependent-related expenses are reimbursable ODCs per PWS Section 5.2.3. Key Personnel positions include Program Manager, Deputy Program Manager, Director IM/IT, and Software Development & Evaluation Manager, evaluated on identical, similar, or related experience with overseas program management and DoD IT systems; signed Letters of Intent are required for all Key Personnel not currently employed by the offeror, with no exceptions for incumbent personnel. System documentation and technical training will transfer during the transition-in period; the Government will not provide current EBT processor information, banking arrangements, PIMS technical architecture, or historical defect and contingency activation data.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation HT9427-26-R-E004 Women, Infants & Children (WIC) Overseas Program Support Services Questions from Offerors
| Reference |
| Question |
| Answer |
| 1 |
| Instruction to Offerors and Solicitation |
Volume I Page Limit and Factor 1 Evaluation Section 2.2.3.1 of the ITO excludes the Incoming Transition Plan, Quality Control Plan, Program Management Plan, and Level of Effort/Staffing Plan from the 25-page Volume I Technical Proposal limit. However, these items are required under Factors 1 and 2 and are separately evaluated under Solicitation Sections 2.1.5 and 2.2.1 through 2.2.5.
Please confirm that the 25-page limit applies only to the Factor 1 Approach narrative addressing Sections 2.1.3 and 2.1.4, while the Incoming Transition Plan is a separate, excluded attachment (limited to six pages) evaluated under Factor 1.
Please also confirm whether all Factor 2 content including the Program Management Plan/management narrative, Level of Effort/Staffing Plan and crosswalk, and Quality Control Plan—must be submitted as appendices and will not count against the 25-page limit.
If this is not the Government’s intent, please identify precisely which Factor 1 and Factor 2 proposal content must be included within the 25-page limit
Confirmed. See section 2.2.3.1 Solicitation Attachment 1-Addendum to 52.212-1, The following sections are not subject to the twenty-five (25) page limit. Separate attachments are acceptable.
Please see section 2.2.3.1 Solicitation Attachment 1-Addendum to 52.212-1, The following sections are not subject to the twenty-five (25) page limit. Quality Control Plan, Program Management Plan, and Level of Effort/Staffing Plan; Organizational Conflict of Interest (OCI) Certification and OCI Avoidance or Mitigation Plan (if necessary)
| 2 |
| Instruction to Offerors and Solicitation |
2.2.3.1
| Will the Government allow section page numbers as well as continuous numbering throughout Volume1? |
| Please see section 2.2.3.1 in Solicitation Attachment 1-Addendum to 52.212-1, Pages should be numbered consecutively throughout the document and not by sections. |
| 3 |
| Instruction to Offerors and Solicitation |
| Can the government please specify if uplifts (COLA, Housing, Post Differential, Danger Pay (if applicable), Education, etc.) should be priced within labor as part of our salary or FBLR, or if that is considered to fall under the ODC NTE? |
| Please see PWS section 1.9, description of miscellaneous ODCs. |
No revisions were made to the solicitation.
| 4 |
| PWS 1.8 |
| Can the Government please confirm that all contract related domestic travel would be allowable under the ODC CLIN? |
| Confirmed. Please see PWS section 1.8, the contractor shall be required to travel in and outside the United States. Estimated Travel ODCs charts include stateside travel. |
No revisions were made to the solicitation.
| 5 |
| PWS 1.6; PWS 1.6.1.2 |
| Please confirm the required staffing milestones during Transition-In, including the percentage of staffing required at three weeks, at Day 60, and at the Full Performance Start Date. |
| Please see edited PWS section 1.6.1.2 |
Revisions were made
PWS 1.6.1.1; QASP PRS #9
| Please confirm the required staffing milestones during Transition-In, including the percentage of staffing required at three weeks, at Day 60, and at the Full Performance Start Date. |
| Please see PWS section 1.6.1.1, The contractor shall be fully staffed prior to the end of the 60-day Transition-In Period. |
Please see QASP PRS #9, Within 3 weeks of contract commencement, at least 90% of the Contractor’s proposed labor for exercised CLINs shall be staffed.
No revisions were made to the solicitation.
QASP PRS #3, #9 and #10
| Please confirm whether staffing percentages are calculated using total proposed FTEs, total labor hours, individual positions, labor categories, staffing by site, or another methodology. |
| Please see QASP PRS #9 and #10, Contractor’s proposed labor for exercised CLINs. |
No revisions were made to the solicitation.
QASP PRS #9/#10; PWS 1.11.1
| Please confirm whether vacancies or delayed starts caused by Government-controlled CAC issuance, background investigations, SOFA processing, installation access, network access, or similar Government actions will be excluded from QASP staffing calculations. |
| Please see PWS Sections 1.11.1- 1.11.2.3, the contractor shall complete all requirements, training, and forms. |
If the Government causes a delay, those vacancies would be excluded from QASP staffing calculations. However, it’s the contractor’s responsibility to complete the “Onboarding Checklist for Contractor Employees”.
No revisions were made to the solicitation.
PWS 1.7.1; Solicitation 2.4.8
| Please provide the current or required staffing allocation by WIC Overseas location, including labor category and full-time/part-time status. If no minimum site staffing applies, please confirm that Offerors may determine their own staffing allocation by site. |
| No, the Government will not provide the current or required staffing allocation by WIC Overseas locations, including labor category and full-time/part-time status. |
Confirmed. Please see Solicitation Attachment 1-Addendum to 52.212-1, see section 2.4.8. Offerors are not bound to propose these labor categories or quantities, rather Offerors are expected to provide the best solution citing the labor mix and quantity required to accomplish the tasks.
No revisions were made to the solicitation.
Solicitation 2.4.8
| Please confirm that Offerors may propose a materially different labor mix, FTE level or labor-hour total from the Government estimate without being considered nonresponsive, provided the proposed solution demonstrates full compliance with the PWS. |
| Confirmed. Please see Solicitation Attachment 1-Addendum to 52.212-1, see section 2.4.8, Offerors are not bound to propose these labor categories or quantities, rather Offerors are expected to provide the best solution citing the labor mix and quantity required to accomplish the tasks. |
No revisions were made to the solicitation.
| 11 |
| PWS 1.6.1.1; Solicitation Factor 2 |
| Please provide the current incumbent staffing profile by labor category and duty location, including filled/vacant status. Personally identifiable information is not requested. |
| No, the Government will not provide the current incumbent staffing by labor category and duty station. This is a performance-based acquisition, not a level of effort acquisition. |
Please see Solicitation Attachment 1-Addendum to 52.212-1, see section 2.4.8, Offerors are not bound to propose these labor categories or quantities, rather Offerors are expected to provide the best solution citing the labor mix and quantity required to accomplish the tasks.
No revisions were made to the solicitation.
Evaluation Factor 5, Price
| Will the Government provide current or historical incumbent compensation ranges, labor rates, or aggregate compensation information by labor category and country? |
| No, the Government will not provide current or historical incumbent compensations rages, labor rates, or aggregate compensations information by labor category and country. |
No revisions were made to the solicitation.
PWS 1.9, Miscellaneous ODCs
| Please confirm that COLA for eligible stateside hires working overseas should be excluded from FFP labor rates and reimbursed as an ODC. Please identify the applicable COLA schedule, methodology and eligibility criteria. |
| Confirmed. Please see PWS section 1.9, description of miscellaneous ODCs. |
Please see PWS section 5.2.3, Relocation of Qualified CONUS Personnel.
PWS 1.9, Miscellaneous ODCs
| Please identify the reimbursable cost elements included within Permanent Change of Station costs, including airfare, household goods shipment, temporary lodging, dependent travel, storage, relocation allowances, and repatriation at contract completion. |
| Please see PWS section 5.2.3, Relocation of Qualified CONUS Personnel. |
No revisions were made to the solicitation.
| 15 |
| PWS 1.9; overseas staffing requirements |
| Please clarify whether employee housing or housing allowances for U.S.-hire personnel assigned overseas are Government furnished, reimbursable ODCs, or contractor costs that must be included in FFP labor rates. |
| Please see PWS section 5.2.3, Relocation of Qualified CONUS Personnel. |
PWS 1.9, Logistical Support
| Please identify eligibility requirements for reimbursable DoD school tuition and clarify whether dependent relocation, airfare, visas, medical coverage, or other dependent-related costs are allowable ODCs. |
| Please see PWS section 5.2.3, Relocation of Qualified CONUS Personnel. |
| 17 |
| Overseas performance locations; SOFA requirements |
| Please identify which labor categories and locations are eligible for SOFA status and confirm Government responsibilities for visa, work permit, status accreditation, installation access, and dependent sponsorship. |
Please see Attachment 3, USFK Instructions.
No revisions were made to the solicitation.
PWS staffing requirements
| Please identify any positions requiring U.S. citizenship and clarify whether Offerors may use U.S. expatriates, local nationals, ordinarily resident personnel, and third-country nationals for each labor category and location. |
| Please see PWS, 1.7.1, Place of Performance. |
Contractors must comply with local labor, visa, and tax laws of the specific foreign country where they physically perform the work.
No revisions to the solicitation.
| 19 |
| PWS 1.6.1.1.1; CAC Handbook |
| Please provide the expected timelines for CAC sponsorship, background investigation processing, network account provisioning and related onboarding activities during Transition-In. |
| Please see PWS, 1.6.1.1, Transition-in period. |
No revisions to the solicitation.
PWS 5.5.2
Please identify who will provide PIMS training during transition, the anticipated duration, number of contractor personnel who may participate, and the system documentation and training environments that will be available at award.
Please see PWS, 1.6.1.2, the incumbent would be responsible for software transition support.
PWS 5.5, 5.5.1, 5.5.3 and 5.6
| Please provide the current PIMS technical architecture, application framework, programming languages, database platform, operating environment, interfaces, software versions, hosting architecture, current ATO expiration date, outstanding POA&Ms and known technical debt. |
| Please see PWS, 1.6.1.1 and 1.6.1.2, Transition-in period and Transition-out period. Transfer of all Systems/Tool documentation will happen during the transition-in for new contract award/transition out for the current contract. |
No revisions to the solicitation.
PWS 5.5/5.6
| Please provide the historical annual volume for PIMS software defects, enhancement requests, releases, security patches, RMF actions and major technical refresh activities for the most recent three years. |
| Please see PWS, 1.6.1.1 and 1.6.1.2, Transition-in period and Transition-out period. Transfer of all Systems/Tool documentation will happen during the transition-in for new contract award/transition out for the current contract. |
PWS 5.5.3
| Please define the respective Government and contractor responsibilities for maintaining the PIMS ATO, including RMF artifacts, security controls, scanning, remediation, POA&M management, testing and Authorizing Official coordination. |
| Please see PWS 5.5.3, Operational Testing of Equipment and Supplies and Part 6.0 Information Technology & Security. |
PWS 5.5.3
| Please define the required hours of on-call support, response and resolution expectations, and historical after-hours incident volume. Please confirm whether 24/7/365 support is required. |
| Please see Solicitation Attachment 1-Addendum to 52.212-1, section 2.3.1.2, the technical approach shall address an ability to provide technical support to the WIC Overseas offices to maintain and enhance the Participant Information Management System (PIMS). |
No revisions to the solicitation.
Solicitation 2.4.6.2
| Please confirm whether Offerors shall enter the Government-established Travel and Miscellaneous ODC NTE amounts unchanged in the pricing schedule. |
| Confirmed. Please see Solicitation Attachment 1-Addendum to 52.212-1, section 2.4.6.2.1 and 2.4.6.2.2. |
No revisions to the solicitation.
| 26 |
| Solicitation 2.4.6.2; Factor 5 |
| Please confirm whether the full Government-established ODC NTE amounts will be included equally in every Offeror's Total Evaluated Price. |
| Confirmed. Please see Solicitation Attachment 1-Addendum to 52.212-1, section 2.4.6.2.1 and 2.4.6.2.2. The Government is providing pre-determined NTE amounts for Travel and Miscellaneous ODCs. |
No revisions to the solicitation.
PWS 1.9; Solicitation 2.4.6.2
| Please confirm that no G&A, overhead, material handling, profit or fee may be applied to any ODC, including COLA, PCS, tuition, foreign taxes, IT purchases, EBT fees and subcontracted support. |
| Confirmed. Please see Solicitation Attachment 1-Addendum to 52.212-, section 2.4.6.2 and PWS 1.9. |
PWS 5.3/5.4; PWS 1.9
| Please provide the current EBT processing provider, current processing fee methodology, historical annual fees, average monthly transaction count/value, and confirm whether the successor contractor may retain the current processor. |
| No, the Government will not provide the current EBT processing provider, current processing fee methodology, historical annual fees, or average monthly transaction count/value. |
Please see Solicitation Attachment 1-Addendum to 52.212-1, section 2.3.1.2, the technical approach should address an ability to execute the WIC Overseas benefit to include issuing EBT cards and processing the EBT transitions.
No changes to the solicitation.
PWS 5.4.5 through 5.4.8
| Please identify the current banking arrangement and confirm whether the incumbent banking arrangement will remain operational during transition until the successor contractor's account is fully established and approved in ASAP. |
| The Government will not identify the current bank. Please see PWS 5.4.5, 5.4.6, 5.4.7, and 5.4.8 for banking requirements. |
No changes to the solicitation.
PWS Part 3; Solicitation Attachment 10
| Please confirm that Solicitation Attachment 10 represents the complete current GFP/GFE inventory and identify any equipment that is nonfunctional, obsolete, unavailable, or scheduled for replacement at contract start. |
| Confirmed. Solicitation Attachment 10 is the complete list of Government Furnished Property List. |
No changes to the solicitation.
PWS Part 3; PWS 5.5.3
| Please clarify the division of responsibility between Government-furnished IT equipment and contractor-purchased Government-owned replacement equipment, including the approval process for replacement purchases. |
| Please see PWS Part 3, Government Furnished Property, Equipment, and Services and PWS Section 5.5.3, Operational Testing of Equipment and Supplies. b. Purchase replacement equipment and supplies as needed, using existing government information technology procurements/delivery contracts. The contractor shall make available for audit purposes all documentation regarding the purchase and delivery of any purchases supporting the WIC Overseas program. Any purchases made in support of the WIC Overseas program are Government owned. |
No changes to the solicitation.
PWS 1.7.4
| Please provide the historical frequency and duration of contingency activations and clarify whether incremental labor and travel associated with such activations are included in FFP pricing or reimbursed separately. |
| The Government will not provide any historical contingency activation information. |
Please see PWS Section 1.7.4, Emergency Services/Contingency Operations Plan.
Please see Solicitation Attachment 1-Addendum to 52.212-1, section 2.4, Pricing shall include all anticipated cost to fully perform all objectives as stated in the solicitation.
No changes to the solicitation.
QASP PRS #1/#2
| Please define the criteria and process by which a participant complaint is considered validated and clarify whether multiple complaints resulting from the same event will be counted individually or as one occurrence. |
| Please see QASP 6.Methods of Quality Assurance Surveillance, PRS #1 and #2. The COR will investigate and validate the complaints. |
QASP PRS #7
| Please define how PIMS availability will be calculated, including the measurement period and treatment of scheduled maintenance, Government network outages, DHA data-center outages, cybersecurity events, and other downtime outside contractor control. |
| Please see QASP 6, Methods of Quality Assurance Surveillance and QASP PRS #7. The operational status of PIMS shall be included in the Monthly Progress Report. The COR will review and verify the MPR. |
No changes to the solicitation.
| 35 |
| SF1449; PWS; Solicitation Submission Instructions |
| Please confirm the official solicitation number that Offerors shall use on all proposal volumes, certifications, pricing files and proposal-submission emails. |
| Please see edited Solicitation Attachment 1 Addendum to 52.212-1, Contract Attachment 1-PWS to HT9427-26-R-E004. |
SF1449 CLIN Schedule
| Please confirm that CLIN 3001 is intended to represent Option Period 3 and revise the CLIN schedule if appropriate. |
| Please see edited CLIN 3001 to Option Period 3. |
Solicitation 2.3.3; PWS 1.12
| Please confirm whether Program Manager, Deputy Program Manager, Director IM/IT and Software Development & Evaluation Manager are mandatory Key Personnel. If not, please identify the justification required when an Offeror proposes a different Key Personnel structure. |
| Please see Solicitation 2.3.3 The Offeror shall submit written information which effectively demonstrates: Key Personnel’s experience identical to, similar to or related to performing services contained within the PWS. |
2.3.3.1 For all individuals proposed to fill Key Personnel positions, all proposed Key Personnel will be subject to PWS section 1.12 and the deviation much be justified by the Offeror.
Solicitation 2.2.3
| Please confirm that the 25-page Technical Proposal limitation excludes the Incoming Transition Plan, Program Management Plan, Quality Control Plan, Level of Effort/Staffing Plan, Past Performance, Key Personnel resumes, Letters of Intent and OCI documentation. |
| Please see response to question #1 |
| 39 |
| Solicitation 2.2.3; 2.3.2.5 |
| Please confirm that the Level of Effort/Staffing Plan has no separate page limitation. |
| Please see response to question #1 |
Solicitation 2.3.2.5
| Please confirm that the required PWS Task/Approach/Labor Category/LOE cross-reference matrix may be included within the Level of Effort/Staffing Plan and is excluded from the 25-page Technical Proposal limitation. |
| Please see response to question #1. |
No changes to the solicitation.
Solicitation 2.3.4
| Please confirm whether the 12-page Past Performance limit applies collectively to the Offeror and all subcontractor past performance narratives regardless of the number of subcontractors proposed. |
| Please see Solicitation Attachment 1-Addendum to 52.212-1, section 2.2.3.1 and 2.3.4 |
Solicitation Factor 3
| Please confirm whether signed Letters of Intent are required for Key Personnel who are current employees of a proposed subcontractor but are not employees of the prime Offeror. |
| Please see 52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES, section 2.3.3, Signed letters of intent for those individuals proposed as Key Personnel who are not current employees of the Offeror's company. |
Solicitation 2.3, Factor 3 - Key Personnel Experience; 2.3.2. PWS 1.12 - Key Personnel (Contractor) "Can the Government please provide the minimum qualifications and experience requirements for each of the four Key Personnel positions identified in Solicitation 2.3.2—Program Manager, Deputy Program Manager, Director IM/IT, and Software Development & Evaluation Manager? Specifically, can the Government identify, as applicable, the minimum:
* Education/degree requirements;
* Years of overall professional experience;
* Years and type of relevant program/project management experience;
* Years and type of relevant overseas/OCONUS experience;
* Years and type of relevant DoD experience;
* Technical experience applicable to each position;
* Required or preferred certifications, licenses, or professional credentials;
* Required experience with WIC, nutrition programs, healthcare programs, or other directly related program areas;
* Required experience with DoD IT systems, PIMS, software development, systems maintenance, cybersecurity, or related technologies, as applicable to the position; and
* Whether the Government intends any specific experience to be mandatory/minimum versus preferred/desirable.
Additionally, if the Government does not intend to establish specific minimum qualifications for each position, can the Government confirm that offerors may determine the appropriate qualifications and experience for each Key Personnel position based on the requirements of the PWS and that the Government will evaluate the proposed individuals based on the ""identical, similar, or related"" standard identified in 2.3.2?"
The Government will not provide specific minimum qualifications for Key Personnel positions.
Confirmed. Please see Solicitation 2.3.3 Factor 3 – The Offeror shall submit written information which effectively demonstrates: Key Personnel’s experience identical to, similar to or related to performing services contained within the PWS.
Please see the Labor Category description attachment
No changes to the solicitation.
| 44 |
| Solicitation 2.3, Factor 3 – Key Personnel Experience; 2.3.1 – Submission Requirements; 2.3.2 – Key Personnel. |
| "Can the Government please clarify how it intends to evaluate the terms “identical, similar, or related” experience for purposes of Factor 3 – Key Personnel Experience? |
Specifically, can the Government clarify:
1. Whether experience supporting the WIC Overseas Program specifically is required or wh ether experience supporting comparable DoD, Federal, healthcare, nutrition, benefits, or other large-scale programs will be considered similarly relevant;
2. Whether OCONUS/overseas program management experience is required for the Program Manager and Deputy Program Manager positions, or whether comparable CONUS experience managing geographically dispersed or multi-site programs will satisfy the requirement;
3. Whether DoD-specific IT systems experience is required for the Director, IM/IT and Software Development & Evaluation Manager positions, or whether comparable Federal Government or commercial IT systems experience will be considered relevant;
4. Whether the Government considers experience with systems comparable in size, complexity, user population, geographic distribution, cybersecurity requirements, software development, systems maintenance, or data management to be “similar” or “related” experience; and
5. Whether the Government will provide additional consideration to Key Personnel possessing experience that is directly aligned to multiple PWS requirements, as opposed to experience that is relevant to only one aspect of the position.
If possible, can the Government provide examples of experience it would consider “identical,” “similar,” and “related” for each of the four Key Personnel positions?"
Please see Solicitation 2.3.2, The Offeror's proposed Key Personnel Experience will be evaluated to the degree to which the Offeror's team of proposed Key Personnel has identical, similar, or related knowledge and experience with overseas Program Management and with DoD IT systems maintenance and enhancements.
a) Program Manager
b) Deputy Program Manager
c) Director IM/IT
d) Software Development & Evaluation Manager
No changes to the solicitation.
| 45 |
| Solicitation 2.3.3 – Signed Letters of Intent; Solicitation 2.3 – Factor 3, Key Personnel Experience; PWS 1.6.1.1 and 1.6.1.2 – Transition-In/Transition-Out. |
| "Would the Government consider allowing an exception to the LOI requirement in Solicitation 2.3.3 for personnel who are currently performing the WIC Overseas requirement under the incumbent contractor? |
Specifically, would the Government permit an offeror to identify and propose a qualified incumbent employee as Key Personnel based on the individual's resume, qualifications, and relevant experience, without requiring a pre-award Letter of Intent, with the understanding that any employment or assignment commitment would be finalized following contract award?
Such an approach would preserve the Government's ability to evaluate the qualifications and experience of proposed Key Personnel while allowing the successful offeror to compete for and recruit qualified incumbent personnel following award."
No, the Government will not make an exception to the Letters of intent. Please see 52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES, section 2.3.3, Signed letters of intent for those individuals proposed as Key Personnel who are not current employees of the Offeror's company.
No changes to the solicitation.
| 46 |
| PWS 1.3 – Place of Performance; PWS 1.7 – Contractor Personnel; applicable PWS requirements addressing Contractor Headquarters and CONUS-based support. |
| Can the Government clarify whether CONUS-based Contractor personnel are required to perform their duties from a designated Contractor or Government facility, or whether personnel performing CONUS-based functions may work remotely? If remote work is permitted, can the Government identify any positions or functions that require physical presence at a specific location and clarify whether a hybrid work arrangement would be acceptable? |
| Please see PWS Part 4, Contractor Furnished Items and Services. |
No changes to the solicitation.
| 47 |
| General Information |
1.5 Scope
The RFP states “…manage the WIC Overseas Electronic Bank Transfer (EBT) processing system and account for Government funds.”
Does the Government intend to retain the services of its current EBT Processor, in which case our role would be oversight and funds management?
Please see PWS Section 5.3, Managing WIC Overseas EBT Cards.
Please see Solicitation Attachment 1-Addendum to 52.212-1, section 2.3.1.2, the technical approach should address an ability to execute the WIC Overseas benefit to include issuing EBT cards and processing the EBT transitions.
| 48 |
| General Information |
1.5 Scope
| Will the government allow offerors access and review of the PIMS technical and functional documentation? |
| Please see PWS, 1.6.1.1 and 1.6.1.2, Transition-in period and Transition-out period. Transfer of all Systems/Tool documentation will happen during the transition-in for new contract award/transition out for the current contract. |
No revisions to the solicitation.
| 49 |
| 5.3 – 5.3.1 Managing WIC Overseas EBT Cards |
a-l
| The EBT Processor typically supplies the card stock, and the service site distributes them to the clients. Can offerors assume contractor would be responsible only for the cost? |
| Please see PWS Section 5.3, Managing WIC Overseas EBT Cards. |
Please see Solicitation Attachment 1-Addendum to 52.212-1, section 2.3.1.2, the technical approach should address an ability to execute the WIC Overseas benefit to include issuing EBT cards and processing the EBT transitions.
| 50 |
| 5.3 – 5.3.1 Managing WIC Overseas EBT Cards |
a-l
| Would the government allow offerors access and review of the EBT functional and administrative documentation to ensure the most efficient and effective solution? |
| No, the government will not provide EBT functional and administrative documentation. |
Please see PWS Section 5.3, Managing WIC Overseas EBT Cards.
Please see Solicitation Attachment 1-Addendum to 52.212-1, section 2.3.1.2, the technical approach should address an ability to execute the WIC Overseas benefit to include issuing EBT cards and processing the EBT transitions.
| 51 |
| 5.5 Information Systems |
| Would the government allow offerors to access and review the PIMS functional and technical documentation to best understand what is in place and what is needed under this contract? |
| Please see PWS, 1.6.1.1 and 1.6.1.2, Transition-in period and Transition-out period. Transfer of all Systems/Tool documentation will happen during the transition-in for new contract award/transition out for the current contract. |