B08 Contract Attachment 2- WIC Overseas QASP.docx

DOCX document 31 KB Posted

Attached to
Women, Infant, Children Overseas Contract
Solicitation number
HT9425-26-R-E004
Issued by

About this file

This is a Quality Assurance Surveillance Plan (QASP) for the Women, Infants, and Children (WIC) Overseas Program Support Service Contract (HT9427-2X-C-XXXX) managed by the Defense Health Agency.

The QASP establishes systematic performance monitoring procedures for contractor management and support of approximately 38 WIC Overseas offices at Outside the Continental United States (OCONUS) sites serving Armed Forces members, civilian employees, DoD contractors, and their families. The document defines ten performance requirement standards (PRS) with corresponding Acceptable Quality Levels (AQL): professional service delivery with no more than five validated complaints per six-month period; nutritional counseling and education quality with the same complaint threshold; 90% minimum staffing levels at all sites; daily financial activity reporting every two weeks; annual audit reports; monthly financial reports due by the first workday of the following month; 95% or higher operational uptime for the PIMS information system; software configuration management with certifications updated within three days of release 95% of the time; initial staffing of 90% within three weeks of contract commencement; and recruitment/retention maintaining 95% staffing within 30 days of vacancies. Government roles are assigned to the Contracting Officer (final performance determination), Contract Specialist, Contracting Officer's Representative (technical administration and quality assurance file maintenance), and Contracting Officer's Technical Representative (performance monitoring). The QASP employs multiple surveillance methods including direct observation, periodic inspection, management information systems review, validated user complaints, 100% inspection of deliverables, periodic and random sampling, progress meetings, and performance reporting. Performance ratings range from Exceptional to Unsatisfactory, with documented corrective action plans required for marginal or unsatisfactory performance. Performance assessments are conducted monthly no later than the 15th of the following month, with quarterly contractor performance meetings mandated.

View the file

Other files

File Type Posted
Solicitation Amendment - HT942726RE0040001.pdf PDF
WIC Overseas Question and Answers Final.docx DOCX document
B08 Solicitation Attachment 1- Addendum to 52.212-1 Instructions to Offerors-Amendment 1.docx DOCX document
Solicitation Amendment HT942726RE0040001 SF 30.pdf PDF
B08 Contract Attachment 1- PWS - WIC Overseas Program Support Services-Amendment 1.docx DOCX document
B08 Solicitation Attachment 2-Pricing-Sheet.xlsx XLSX spreadsheet
B08 Solicitation Attachment 1- Addendum to 52.212-1 Instructions to Offerors.docx DOCX document
B08 Contract Attachment 1- PWS - WIC Overseas Program Support Services.docx DOCX document
B08 Solicitation Attachment 11-OCI-Certification.docx DOCX document
B08 Solicitation Attachment 9 -DHAPI 814001 Acceptable Use of DHA Information Technology IT.pdf PDF
B08 Solicitation Attachment 8 - DHA new employee handbook - WIC.pdf PDF
B08 Solicitation Attachment 6 -DMDC TASS ApplicationFor CAC.xlsx XLSX spreadsheet
B08 Solicitation Attachment 5- DHA CAC Request Process_20240715.pdf PDF
B08 Solicitation Attachment 2-Pricing-Sheet.xlsx XLSX spreadsheet
Solicitation - HT942726RE004.pdf PDF
B08 Solicitation Attachment 7 -DHA Training Checklist for Contractors -.pdf PDF
B08 Solicitation Attachment 4 - DHA Contractor NDA (DHA Form 49).pdf PDF
B08 Contract Attachment 3-USFK-Instruction-Status of Forces Agreement (SOFA).pdf PDF
B08 Solicitation Attachment 10- Government Furnished Property List.pdf PDF
B08 Solicitation Attachment 3 - WIC Overseas - Labor Category Descriptions-.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

FOR: WOMEN, INFANTS, AND CHILDREN OVERSEAS PROGRAM SUPPORT SERVICE CONTRACT – TBD HT9427-2X-C-XXXX

CONTRACTOR: TBD

CONTRACT DESCRIPTION: PROVIDE PROGRAM SUPPORT SERVICES TO THE WIC OVERSEAS PROGRAM

1. Purpose.

This (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

- What will be monitored?

- How monitoring will take place?

- Who will conduct the monitoring?

- How monitoring efforts and results will be documented?

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. Government Roles and Responsibilities.

a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

b. Contract Specialist (CS) – The CS shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract.

c. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the CO, the COR shall provide documentation to the CO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the CO for action.

d. Contracting Officer’s Technical Representative (COTR). A COTR is a Government employee who is authorized to monitor the contractor’s performance under the contract, serve as technical liaison between the contractor and the COR, and perform other duties specified in this document. COTRs have no authority to change any of the terms or conditions of the contract.

3. Contractor Representatives.

The contractor’s identified employee shall serve as the contractor’s Program Manager and Task Manager for this contract.

4. Performance Standards.

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

The Performance Requirements Summary Matrix, includes performance standards. The Government will use these standards to determine Contractor performance and will compare Contractor performance to the Acceptable Quality Level (AQL).

Task
Indicator
Standard
Acceptable Quality Level
Method of Surveillance
Incentive

PRS #1

Program Operations Section 5.2.1

Provide professional and quality service to the WIC Overseas participants.
Number of validated complaints in a six-month period.
No more than five validated complaints in a six-month period.
Written or oral validated complaints received by the COR.
CPARS Rating
PRS # 2 Program Operations Section 5.2.6
Provide quality Nutritional Counseling and Education to the WIC Overseas participants.
Number of validated complaints in a six-month period.
No more than five validated complaints in a six-month period.
Written or oral validated complaints received by the COR.
CPARS Rating

PRS # 3 Management Reporting and Quality Control Monthly Progress Report Section 5.1.1

Monthly Progress Report
Ensure all sites are staffed at all times. Administer the resources to support activities within scope.
All sites will be staffed at 90% or higher at all times.
MPR Reviewed and Verified (Deliverable 6)
CPARS Rating
PRS # 4 Managing WIC Overseas EBT Cards - Financial Report Section 5.3, 5.3.2
Financial Report
Provide a daily activity financial summary report.
Receiving the daily activity financial summary report every two weeks 100% of the time.
Financial Report Reviewed and Verified (Deliverable 10)
CPARS Rating
PRS # 5 Managing WIC Overseas EBT Cards – Annual Audit Report Section 5.3, 5.4.3
Annual Audit Report
Provide an annual audit report.
Receiving the annual audit report by the anniversary date of the first report 100% of the time.
Internal Review Audit Reviewed and Verified (Deliverable 8)
CPARS Rating

PRS # 6 Accounting for Government Funds – Monthly Financial Reports Section 5.4, 5.4.8

Monthly Financial Reports
Provide a monthly financial report.
Receiving the monthly financial report by the 1st workday of the following month 95% of the time.
Financial Report – Daily Operations Reviewed and Verified (Deliverable 9)
CPARS Rating

PRS #7 Information Systems Monthly Progress Report – Section 5.1.1, 5.5, 5.5.2, 5.6.2

Monthly Progress Report
Ensure PIMS is operational.
PIMS will be operations 95% or higher at all times.
MPR Reviewed and Verified (Deliverable 6)

Customer/ Organization Satisfaction CPARS Rating

PRS #8 – Software Management and Development – Section 5.1.1, 5.5.2, 5.5.3, 5.6
Track and maintain all PIMS software releases. Ensure certifications and accreditation of the PIMS software.
Configuration management document. All certifications and accreditation will be up to date for PIMS.
All configurations will be recorded, and all certifications and accreditations will be up to date for PIMS within 3 days of update release 95% of the time.
MPR Reviewed and Verified (Deliverable 6)

Customer, Organization Satisfaction.

CPARS Rating

PRS #9 Initial Staffing
Contractor Proposal including Level of Effort is incorporated by reference
Provide 100% staffing
Initial: Within 3 weeks of contract commencement, at least 90% of the Contractor’s proposed labor for exercised CLINs shall be staffed;
100% Inspection
Positive Past Performance Rating
PRS # 10 Recruitment and Retention
Contractor Proposal including Level of Effort is incorporated by reference
Provide and maintain 100%
After PRS #9 is satisfied, at least 95% of the Contractor’s proposed labor for exercised CLINs shall be staffed to proposed level within 30 days of any vacancy.
100% Inspection
Positive Past Performance Rating

The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL). If the performance standards are not met in the performance requirement summary the government will document the contractor’s past performance and may terminate the contract in accordance with FAR Clause 52.212-4 (m), Termination For Cause.

5. Incentives.

The Government shall use past performance as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards.

6. Methods of Quality Assurance Surveillance.

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

Regardless of the surveillance method, the COR shall always contact the contractor's Program Manager and Task Manager when a defect is identified and inform the manager of the specifics of the problem. The COR, with assistance from the CS, shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL.

a. DIRECT OBSERVATION. Can be performed periodically or through 100% surveillance.

b. PERIODIC INSPECTION

c. Management Information Systems (MIS). Evaluates outputs through the use of management information reports. Best used for general surveillance and may need to be supplemented by periodic inspections.

Provide Monthly Reports by 15th of each month.

Ensure all sites are 90% staffed at all times. Administer the resources to support activities within scope.

Ensure PIMS is operational 95% of the time.

Configuration management document. All certifications and accreditation will be up to date for PIMS.

d. Periodic Inspection. Uses a comprehensive evaluation of selected outputs. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.

As requested or required.

e. Validated User/Customer Complaints. Relies on the user of the service to identify deficiencies. Complaints are then investigated and validated. Highly applicable to services provided in quantity and where quality is highly subjective.

Program Satisfaction from WIC overseas participants.

Satisfactory Delivery of Nutritional Counseling and education programs from WIC overseas participants.

f. 100% Inspection. Evaluates all outputs. Most applicable to small quantity, but highly important services. May be used where there are written deliverables and stringent requirements such as tasks required by law, safety, or security.

Provide Monthly Reports by 15th of each month.

Provide Monthly Financial Report by the 1st workday of the following month.

Provide Audit Report annually.

Provide Daily Financial Activity Report every two weeks.

g. Periodic Sampling. Variation of random sampling. However, sample is only taken when a deficiency is suspected. Good follow-up to MIS analysis. Sample results are applicable only for the specific work inspected. Since sample is not entirely random, it cannot be applied to total activity performance.

h. Random Sampling. Designed to evaluate the outputs of the award requirement by randomly selecting and inspecting a statistically significant sample. Highly recommended for large quantity repetitive activities with objective and measurable quality attributes.

i. Progress or status meetings.

j. Analysis of Contractor's progress reports. Evaluate cost, schedule, etc.

COR Review of Monthly Reports.

k. Performance reporting. Evaluate metrics for a specific time period. Develop metrics or use metrics found in MIS.

Surveillance results may be used as the basis for actions (to include payment deductions) against the Contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the KO’s actions.

7. Ratings. Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

EXCEPTIONAL:
Performance meets contractual requirements and exceeds them in a way that benefits the government
VERY GOOD:
Performance meets contractual requirements and exceeds them in some ways that benefit the government
SATISFACTORY:
Performance meets contractual requirements.
MARGINAL:
Performance does not meet some contractual requirements.
UNSATISFACTORY:
Performance does not meet most contractual requirements, and recovery is unlikely to be timely.

8. Documenting Performance.

a. Acceptable Performance. The Government shall document positive performance.

b. Unacceptable Performance. When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR) and present it to the contractor's Program Manager and Task Manager or on-site representative.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other actions deemed necessary by the KO.

9. Frequency of Measurement.

a. FREQUENCY OF MEASUREMENT.

During contract performance, the COR shall take periodic measurements, as specified in the AQL column of the Performance Standards Summary Matrix, and shall analyze whether the negotiated frequency of measurement is appropriate for the work being performed.

b. FREQUENCY OF PERFORMANCE ASSESMENTS MEETINGS.

The COR shall assess performance and provide a written assessment, and upload the assessment to Surveillance and Performance Monitoring Module on a monthly basis, no later than the 15th day of the following month.

The COR at a minimum will meet with the contractor on a quarterly basis and conduct a performance meeting.

File details come from the government source that posted it. Updated .