Pricing Template - HT940626QE005.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- Water Sample Collection and Analysis Services - Amendment 6 Federal contract opportunity
- Solicitation number
- HT940626QE005
- Issued by
- Defense Health Agency
About this file
This document is a Pricing Template for a firm fixed price solicitation (HT940626QE005) for water sample collection and analysis services. The contract is for the Defense Health Agency and covers water testing at three locations: Shaw AFB, Poinsett Range, and Wateree Air Force Recreational area, with services including sample collection, labeling, transportation, and analysis using various EPA-approved methods. The contract structure includes a base year and four 12-month option periods, with a potential start date of April 1, 2026.
The pricing template details multiple line items for routine and emergency/special event water testing, specifying different EPA testing methods such as Method 533, Method 9223B Colilert, Method 4500-H+B, Residual Chlorine Method 4500-CI G, and Method 200.8. The solicitation is a small business set-aside, with quotes to be submitted electronically. Contractors are required to complete the pricing template by entering unit prices, with calculations for total line item and period prices. The template provides instructions for vendors to modify and complete the document, ensuring accurate representation of their proposed pricing.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pricing Template - HT940626QE005 - Amend 6.xlsx | XLSX spreadsheet | |
| Amendment 6 - Solicitation HT940626QE005.pdf | ||
| Questions and Answers - HT940626QE005 16JAN26.docx | DOCX document | |
| Amendment 5 - Solicitation HT940626QE005.pdf | ||
| Questions and Answers - HT940626QE005 15JAN26.docx | DOCX document | |
| Amendment 4 - Solicitation HT940626QE0050004.pdf | ||
| Amendment 3 - Solicitation HT940626QE005.pdf | ||
| Questions and Answers - HT940626QE005 13JAN26.docx | DOCX document | |
| Amendment 2 - Solicitation HT940626QE005.pdf | ||
| Amendment 1 - Solicitation HT940626QE005.pdf | ||
| Questions and Answers - HT940626QE005.docx | DOCX document | |
| Solicitation - HT940626QE005.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOPR # 10327
Firm Fixed Price Solicitation # HT940626QE005
| CLIN/SLIN | Line Item Description | Unit Of Measure (e.g.,Each, Hour) | Quantity | ||
| Unit Price | SLIN Total Price | Period Total Price | |||
| BASE PERIOD - (12 month) | |||||
| 0001 | The contractor must provide water sample collection and analysis services for Shaw AFB utilizing Environmental Protection Agency (EPA) approved analytical methods as specified in the PWS. The contractor must travel two (2) times per month to Shaw AFB. | $0.00 | Delete these instructions once you have completed the document for your quote or before submitting it to the Contracting Office. |
Enter the unit price in column E ("Unit price") to calculate the SLIN Total Price and Period Total Price.
Pricing for SLINs that contain "For emergencies or special events" in the description: If the contractor's quoted price for each location (Shaw AFB, Poinsett Range, and Wateree Air Force Recreational area) differs, then the contractor must provide the price per location with their quote. The SLIN Total Price for those SLINs that contain "For emergencies Or Special Event" in its description are calculated by multiplying the quantity by the location with the higher price. Those SLINs will be "Not to exceed" SLINs in the contract..
Contractors must edit and change this template to accurately represent their quote. However, the pricing spreadsheet shall contain the SLIN, line item description, the unit of measure, quantity, unit price, SLIN Total Price, and period total price columns.
The contractor shall make sure that the calculation formulas are correct. The contractor can insert or delete rows and columns to accurately represent the contractor's proposal, and sign the document before submision.
| 0001AA | The contractor shall perform water testing using the EPA Method 533 according to the requirements | ||||
| detailed in the PWS. | Each | 40 | $0.00 | ||
| 0001AB | The contractor shall perform water testing using Method 9223B Colilert according to the requirements | ||||
| detailed in the PWS. | Each | 72 | $0.00 | ||
| 0001AC | The contractor shall perform water testing using Method 4500-H+B according to the requirements | ||||
| detailed in the PWS. | Each | 72 | $0.00 | ||
| 0001AD | The contractor shall perform water testing using the Residual Chlorine Method 4500-CI G according to the requirements detailed in the PWS. | Each | 72 | $0.00 | |
| 0001AE | The contractor shall perform water testing using EPA Method 200.8 according to the requirements detailed in the PWS. | Each | 3 | $0.00 | |
| 0002 | For emergencies Or Special Events, the contractor must provide water sample collection and analysis |
services for Shaw AFB, Poinsett Range, and Wateree Air Force Recreational area utilizing Environmental Protection Agency (EPA) approved analytical methods as specified in the PWS.
| 0002.AA | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 533 according to the requirements detailed in the PWS. | Each | 8 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 533 according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 533 according to the requirements detailed in the PWS. | ||||||
| 0002AB | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 9223B Colilert according to the requirements detailed in the PWS. | Each | 3 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 9223B Colilert according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 9223B Colilert according to the requirements detailed in the PWS. | ||||||
| 0002AC | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 4500-H+B according to the requirements detailed in the PWS. | Each | 3 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA4500-H+B Colilert according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 4500-H+B according to the requirements detailed in the PWS. | ||||||
| 0002AD | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method4500-CI G according to the requirements detailed in the PWS. | Each | 3 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 4500-CI G according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 4500-CI G according to the requirements detailed in the PWS. | ||||||
| 0002AE | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 200.8 according to the requirements detailed in the PWS. | Each | 6 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 200.8 according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 200.8 according to the requirements detailed in the PWS. | ||||||
| OPTION PERIOD 1 - (12 month) | ||||||
| 2001 | The contractor must provide water sample collection and analysis services for Shaw AFB utilizing Environmental Protection Agency (EPA) approved analytical methods as specified in the PWS. The contractor must travel two (2) times per month to Shaw AFB. | $0.00 | ||||
| 2001AA | The contractor shall perform water testing using the EPA Method 533 according to the requirements | |||||
| detailed in the PWS. | Each | 40 | $0.00 | |||
| 2001AB | The contractor shall perform water testing using Method 9223B Colilert according to the requirements | |||||
| detailed in the PWS. | Each | 72 | $0.00 | |||
| 2001AC | The contractor shall perform water testing using Method 4500-H+B according to the requirements | |||||
| detailed in the PWS. | Each | 72 | $0.00 | |||
| 2001AD | The contractor shall perform water testing using the Residual Chlorine Method 4500-CI G according to the requirements detailed in the PWS. | Each | 72 | $0.00 | ||
| 2001AE | The contractor shall perform water testing using EPA Method 200.8 according to the requirements detailed in the PWS. | Each | 3 | $0.00 | ||
| 2002 | For emergencies Or Special Events, the contractor must provide water sample collection and analysis |
services for Shaw AFB, Poinsett Range, and Wateree Air Force Recreational area utilizing Environmental Protection Agency (EPA) approved analytical methods as specified in the PWS.
| 2002.AA | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 533 according to the requirements detailed in the PWS. | Each | 8 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 533 according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 533 according to the requirements detailed in the PWS. | ||||||
| 2002AB | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 9223B Colilert according to the requirements detailed in the PWS. | Each | 3 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 9223B Colilert according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 9223B Colilert according to the requirements detailed in the PWS. | ||||||
| 2002AC | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 4500-H+B according to the requirements detailed in the PWS. | Each | 3 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA4500-H+B Colilert according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 4500-H+B according to the requirements detailed in the PWS. | ||||||
| 2002AD | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method4500-CI G according to the requirements detailed in the PWS. | Each | 3 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 4500-CI G according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 4500-CI G according to the requirements detailed in the PWS. | ||||||
| 2002AE | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 200.8 according to the requirements detailed in the PWS. | Each | 6 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 200.8 according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 200.8 according to the requirements detailed in the PWS. | ||||||
| OPTION PERIOD 3 - (12 month) | ||||||
| 3001 | The contractor must provide water sample collection and analysis services for Shaw AFB utilizing Environmental Protection Agency (EPA) approved analytical methods as specified in the PWS. The contractor must travel two (2) times per month to Shaw AFB. | $0.00 | ||||
| 3001AA | The contractor shall perform water testing using the EPA Method 533 according to the requirements | |||||
| detailed in the PWS. | Each | 40 | $0.00 | |||
| 3001AB | The contractor shall perform water testing using Method 9223B Colilert according to the requirements | |||||
| detailed in the PWS. | Each | 72 | $0.00 | |||
| 3001AC | The contractor shall perform water testing using Method 4500-H+B according to the requirements | |||||
| detailed in the PWS. | Each | 72 | $0.00 | |||
| 3001AD | The contractor shall perform water testing using the Residual Chlorine Method 4500-CI G according to the requirements detailed in the PWS. | Each | 72 | $0.00 | ||
| 3001AE | The contractor shall perform water testing using EPA Method 200.8 according to the requirements detailed in the PWS. | Each | 3 | $0.00 | ||
| 3002 | For emergencies Or Special Events, the contractor must provide water sample collection and analysis |
services for Shaw AFB, Poinsett Range, and Wateree Air Force Recreational area utilizing Environmental Protection Agency (EPA) approved analytical methods as specified in the PWS.
| 3002.AA | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 533 according to the requirements detailed in the PWS. | Each | 8 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 533 according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 533 according to the requirements detailed in the PWS. | ||||||
| 3002AB | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 9223B Colilert according to the requirements detailed in the PWS. | Each | 3 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 9223B Colilert according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 9223B Colilert according to the requirements detailed in the PWS. | ||||||
| 3002AC | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 4500-H+B according to the requirements detailed in the PWS. | Each | 3 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA4500-H+B Colilert according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 4500-H+B according to the requirements detailed in the PWS. | ||||||
| 3002AD | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method4500-CI G according to the requirements detailed in the PWS. | Each | 3 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 4500-CI G according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 4500-CI G according to the requirements detailed in the PWS. | ||||||
| 3002AE | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 200.8 according to the requirements detailed in the PWS. | Each | 6 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 200.8 according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 200.8 according to the requirements detailed in the PWS. | ||||||
| OPTION PERIOD 4 - (12 month) | ||||||
| 4001 | The contractor must provide water sample collection and analysis services for Shaw AFB utilizing Environmental Protection Agency (EPA) approved analytical methods as specified in the PWS. The contractor must travel two (2) times per month to Shaw AFB. | $0.00 | ||||
| 4001AA | The contractor shall perform water testing using the EPA Method 533 according to the requirements | |||||
| detailed in the PWS. | Each | 40 | $0.00 | |||
| 4001AB | The contractor shall perform water testing using Method 9223B Colilert according to the requirements | |||||
| detailed in the PWS. | Each | 72 | $0.00 | |||
| 4001AC | The contractor shall perform water testing using Method 4500-H+B according to the requirements | |||||
| detailed in the PWS. | Each | 72 | $0.00 | |||
| 4001AD | The contractor shall perform water testing using the Residual Chlorine Method 4500-CI G according to the requirements detailed in the PWS. | Each | 72 | $0.00 | ||
| 4001AE | The contractor shall perform water testing using EPA Method 200.8 according to the requirements detailed in the PWS. | Each | 3 | $0.00 | ||
| 4002 | For emergencies Or Special Events, the contractor must provide water sample collection and analysis |
services for Shaw AFB, Poinsett Range, and Wateree Air Force Recreational area utilizing Environmental Protection Agency (EPA) approved analytical methods as specified in the PWS.
| 4002.AA | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 533 according to the requirements detailed in the PWS. | Each | 8 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 533 according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 533 according to the requirements detailed in the PWS. | ||||||
| 4002AB | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 9223B Colilert according to the requirements detailed in the PWS. | Each | 3 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 9223B Colilert according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 9223B Colilert according to the requirements detailed in the PWS. | ||||||
| 4002AC | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 4500-H+B according to the requirements detailed in the PWS. | Each | 3 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA4500-H+B Colilert according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 4500-H+B according to the requirements detailed in the PWS. | ||||||
| 4002AD | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method4500-CI G according to the requirements detailed in the PWS. | Each | 3 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 4500-CI G according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 4500-CI G according to the requirements detailed in the PWS. | ||||||
| 4002AE | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 200.8 according to the requirements detailed in the PWS. | Each | 6 | $0.00 | ||
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 200.8 according to the requirements detailed in the PWS. | ||||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 200.8 according to the requirements detailed in the PWS. | ||||||
| OPTION PERIOD Subject to FAR 52.217-8 - (6 month) | ||||||
| 5001 | The contractor must provide water sample collection and analysis services for Shaw AFB utilizing Environmental Protection Agency (EPA) approved analytical methods as specified in the PWS. The contractor must travel two (2) times per month to Shaw AFB. | $0.00 | ||||
| 5001AA | The contractor shall perform water testing using the EPA Method 533 according to the requirements | |||||
| detailed in the PWS. | Each | 40 | $0.00 | |||
| 5001AB | The contractor shall perform water testing using Method 9223B Colilert according to the requirements | |||||
| detailed in the PWS. | Each | 72 | $0.00 | |||
| 5001AC | The contractor shall perform water testing using Method 4500-H+B according to the requirements | |||||
| detailed in the PWS. | Each | 72 | $0.00 | |||
| 5001AD | The contractor shall perform water testing using the Residual Chlorine Method 4500-CI G according to the requirements detailed in the PWS. | Each | 72 | $0.00 | ||
| 5001AE | The contractor shall perform water testing using EPA Method 200.8 according to the requirements detailed in the PWS. | Each | 3 | $0.00 | ||
| 5002 | For emergencies Or Special Events, the contractor must provide water sample collection and analysis |
services for Shaw AFB, Poinsett Range, and Wateree Air Force Recreational area utilizing Environmental Protection Agency (EPA) approved analytical methods as specified in the PWS.
| 5002AA | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 533 according to the requirements detailed in the PWS. | Each | 4 | $0.00 | |
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 533 according to the requirements detailed in the PWS. | |||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 533 according to the requirements detailed in the PWS. | |||||
| 5002AB | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 9223B Colilert according to the requirements detailed in the PWS. | Each | 2 | $0.00 | |
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 9223B Colilert according to the requirements detailed in the PWS. | |||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 9223B Colilert according to the requirements detailed in the PWS. | |||||
| 5002AC | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 4500-H+B according to the requirements detailed in the PWS. | Each | 2 | $0.00 | |
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA4500-H+B Colilert according to the requirements detailed in the PWS. | |||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 4500-H+B according to the requirements detailed in the PWS. | |||||
| 5002AD | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method4500-CI G according to the requirements detailed in the PWS. | Each | 2 | $0.00 | |
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 4500-CI G according to the requirements detailed in the PWS. | |||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 4500-CI G according to the requirements detailed in the PWS. | |||||
| 5002AE | For emergencies Or Special Events at Shaw AFB, the contractor shall perform water testing using the EPA Method 200.8 according to the requirements detailed in the PWS. | Each | 3 | $0.00 | |
| For emergencies Or Special Events at Poinsett Range, the contractor shall perform water testing using the EPA Method 200.8 according to the requirements detailed in the PWS. | |||||
| For emergencies Or Special Events at Wateree Air Force Recreational Area, the contractor shall perform water testing using the EPA Method 200.8 according to the requirements detailed in the PWS. | |||||
| Grand Total | $0.00 |
Signature / Date
Title:
Organization:
File details come from the government source that posted it. Updated .