5_TCRS_Section_E_11-10-16.pdf

PDF 12 KB Posted

Attached to
TRICARE Claims Review Services
Solicitation number
HT9402-17-R-0002
Issued by

About this file

Section E

View the file

Other files

File Type Posted
Amendment_8.pdf PDF
RFP_Q&As_01.06.2017.docx DOCX document
Amendment_7.pdf PDF
RFP_Q&As_12.27.16.docx DOCX document
HT9402-17-R-0002_Amendment_000006.pdf PDF
HT9402-17-R-0002_Amendment_000005.pdf PDF
HT9402-17-R-0002_Amendment_000004.pdf PDF
HT9402-17-R-0002_Amendment_000003.pdf PDF
26_TCRS_Section_J_Exhibit_A_CDRLS.pdf PDF
2_TCRS_SF_30_Section_B_11-16-2016.pdf PDF
20_TCRS_Sec_J_Atch_J-10_DHA_Comp_Rvw_Gdlns.pdf PDF
38_TCRS_Sec_L_Exhibit_L-10_Draft_QASP_11-7.16.pdf PDF
35_TCRS_Sec_L_Exhib_L-7_Price_Prop_Tmplt_4-4-16.xlsx XLSX spreadsheet
13_TCRS_Sec_J_Atch_J-3_Smpl_Init_Rnds_Test_Rpt.pdf PDF
39_TCRS_Section_M_11_10_16.pdf PDF
31_TCRS_Sec_L_Exhb_L-3_Samp_Team_Part_Subcntr_11-7-16.pdf PDF
29_TCRS_Sec_L_Exhibit_L-1_Sample_Client_Auth_Llt_11.7.16.pdf PDF
2_TCRS_Section_B_CLIN_Descriptions_11-4-2016.pdf PDF
30_TCRS_Sec_L_Exhibit_L-2_Past_Performance_Questionnaire_8-19-15.doc DOC document
4_TCRS_Section_D_11-10-16.pdf PDF
21_TCRS_Sec_J_Atch_J-13_Wage_Determinations.pdf PDF
8_TCRS_Section_H_11-10-16.pdf PDF
9_TCRS_Section_I_11-10-16.pdf PDF
18_TCRS_Sec_J_Atch_J-8_Example_of_TADR.pdf PDF
14_TCRS_Sec_J_Atch_J-4_Smpl_Final_Rdns_Test_Rpt.pdf PDF
28_TCRS_Section_L__11_15_16.pdf PDF
37_TCRS_Sec_L_Exhibit_L-9_Hist_TOP_Data_11-7-16.pdf PDF
7_TCRS_Section_G_11-10-16.pdf PDF
27_TCRS_Section_K_11-10-16.pdf PDF
6_TCRS_SECTION_F_11-10-16.pdf PDF
34_TCRS_Sec_L_Exhibit_L-6_TCRS_Hist_Wrkld_Rprt_11-7-16.pdf PDF
3_TCRS_Section_C_as_of_11-10-16.pdf PDF
22_TCRS_Sec_J_Atch_J-14_Cnt_Non_Discl_Agrmnt.pdf PDF
12_TCRS_Sec_J_Atch_J-2_Readiness_Test_Findings.pdf PDF
32_TCRS_Sec_L_Exh_L-4_Grnte_Agmnt_for_Corp_Grntor.pdf PDF
23_TCRS_Sec_J_Atch_J-15_ADP_Req CAC_Instruc.pdf PDF
25_TCRS_Sec_J_Atch_J-17_PCDIS_User_Guide.pdf PDF
17_TCRS_Sec_J_Atch_J-7_ADDP_MDR_Data_File.pdf PDF
19_TCRS_Sec_J_Atch_J-9_Example_of_ADDR.pdf PDF
24_TCRS_Sec_J_Atch_J-16_TA_User_Guide.pdf PDF
10_TCRS_Section_J_List_of_Attachments_11_10_16.pdf PDF
33_TCRS_Sec_L_Exhibit_L-5_Cross_Ref_Table_11-7-16.pdf PDF
15_TCRS_Sec_J_Atch_J-5_DHA_Sampling_Meth.pdf PDF
16_TCRS_Sec-J__J-6_Clm_Review_Schl.pdf PDF
36_TCRS_Sec_L_Exhibit_L-8_TCRS_Hist_Rebut__Rprt_11-7-16.pdf PDF
11_TCRS_Sect_J_Atch_J-1_DHA_PEPR_AARF.pdf PDF
Responses_to_Questions.pdf PDF
Amendment_000001.pdf PDF
40_TCRS_Section_M_10_3_16.pdf PDF
31_TCRS_Section_L_Exhibit_L-2_Past_Performance_Questionnaire_8-19-15.pdf PDF
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION E, INSPECTION AND ACCEPTANCE

TCRS HT9402-17-R-0002, Section E Page E1 of E1

1.0 CONTRACT CLAUSES:

FAR 52.246-4 INSPECTION OF SERVICES - FIXED PRICE (AUG 1996)

DFARS 252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR

2008)

2.0 INSPECTION AND ACCEPTANCE:

The final acceptance authority for the Government shall be the Contracting Officer (CO) or designee.

Defense Health Agency Contract Operations Division, Aurora 16401 E. Centretech Parkway Aurora, CO 80011-9066

3.0 INSPECTION LOCATION:

Inspections may be conducted electronically or by physical inspection. Inspections will be conducted either at Defense Health Agency, the contractor’s and/or subcontractor’s facilities, or other locations where work is performed. Inspection and acceptance of services provided shall be accomplished by the CO, Contracting Officer’s Representative (COR), or CO’s designee.

Inspections may include, but are not limited to, payment record audits, performance audits, program integrity audits, and contractor/DHA quality assurance audits.

4.0 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP):

The role of the Government is to design, implement and conduct adequate contract surveillance and quality assurance to ensure contract requirements and standards are satisfactorily performed.

For these purposes, the Government will be utilizing a QASP which the CO will provide to the contractor after award and as revisions occur.

File details come from the government source that posted it. Updated .