Att-5-Price element breakdown.xls

XLS spreadsheet 51 KB Posted

Attached to
Armed Guard Services for Idaho Statewide and Eastern Washington
Solicitation number
HSHQWA-10-R-00001
Issued by

About this file

ATTACHMENT 5 PRICE ELEMENT BREAKDOWN (MS Excel Format

View the file

Other files

File Type Posted
Att-4-Past Performance Questionnaire.doc DOC document
HSHQWA-10-R-00001-PA0003.pdf PDF
Post Locations with WD-CBAs.xls XLS spreadsheet
Page 28.pdf PDF
Leave Hire Dates ID Submitted.xls XLS spreadsheet
HSHQWA-10-R-00001 -Addtional Questions and Answers.doc DOC document
Leave Hire Dates WA Submitted.xls XLS spreadsheet
HSHQWA-10-R-00001-PA0002.pdf PDF
Post Locations with WD-CBAs.xls XLS spreadsheet
CBA-DOL Acceptance Page.pdf PDF
HSHQWA-10-R-00001 -Amendment-01.doc DOC document
Schedule B.doc DOC document
HSHQWA-10-R-00001-PA0001.pdf PDF
Solicitation Provision and Contract Clauses-1.pdf PDF
Att-2-Exhibits.pdf PDF
Att-7-Award Approval Request.pdf PDF
Att-6-SB Subcontracting Plan.pdf PDF
SF1449.pdf PDF
Att-1-SOW.pdf PDF
Solicitation Provision and Contract Clauses.pdf PDF
TABLE OF CONTENTS.doc DOC document
Att-4-Past Performance Questionnaire.pdf PDF
Att-5-Price Element Breakdown.pdf PDF
Att-8-CBA —
Att-8-CBA —
Pricing Schedule.xls XLS spreadsheet
Att-3-Past Project Form.pdf PDF
Att-8-CBA —
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Model for Price Realism

Base PeriodBase PeriodOptional/Additional Ordering Period 1Additional Period 1Optional/Additional Ordering Period 2Additional Period 2Optional/Additional Ordering Period 3Additional Period 3Optional/Additional Ordering Period 4Additional Period 4Grand
PRICING ELEMENTWD or CBA #WD or CBA #WD or CBA #TotalWD or CBA #WD or CBA #WD or CBA #TotalWD or CBA #WD or CBA #WD or CBA #TotalWD or CBA #WD or CBA #WD or CBA #TotalWD or CBA #WD or CBA #WD or CBA #TotalTotal
Reg Hours Bid00000- 0
OT Hours Bid00000- 0
Total Hours Bid- 0- 0- 000000- 0
WD or CBA Rate
Reg. Labor Rate Used (Ref Note 1)
OT Labor Rate Used
Direct Labor- 0- 0- 00.00- 0- 0- 00.00- 0- 0- 00.00- 0- 0- 00.00- 0- 0- 00.00- 0
Overtime Premium Labor- 0- 0- 00.00- 0- 0- 00.00- 0- 0- 00.00- 0- 0- 00.00- 0- 0- 00.00- 0
Subtotal - Labor- 0- 0- 0- 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
Fringe Benefits
Health and Welfare Rate Used (Ref Note 1)- 0
Health and Welfare0.000.000.000.000.00- 0
Pension Rate Used (Ref Note 1)- 0
Pension0.000.000.000.000.00- 0
401K Matching0.000.000.000.000.00- 0
Annual Benefit Rate Used (Ref Note 1)- 0
Annual Benefit0.000.000.000.000.00- 0
Holiday0.000.000.000.000.00- 0
Vacation0.000.000.000.000.00- 0
Sick0.000.000.000.000.00- 0
Personal0.000.000.000.000.00- 0
Jury Duty0.000.000.000.000.00- 0
Other0.000.000.000.00- 0
Sub-Total Fringe Benefits$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
Taxes
FICA0.000.000.000.000.00- 0
FUTA0.000.000.000.000.00- 0
SUTA0.000.000.000.000.00- 0
Other0.000.000.000.000.00- 0
Sub-Total Taxes$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
Overhead$0.00$0.00$ - 00.000.00- 0
Other Direct Elements (Reference Note 2)
Relief0.000.00$ - 00.000.00- 0
Guard Mount0.000.00$ - 00.000.00- 0
Workman's Comp Insurance0.000.00$ - 00.000.00- 0
General Liability Ins0.000.00$ - 00.000.00- 0
Training - Basic, Range new hires0.000.00$ - 00.000.00- 0
Training - Baton0.000.00$ - 00.000.00- 0
Training - CPR/First Aid Recertification Yearly0.000.00$ - 00.000.00- 0
Training - Supervisory0.000.00$ - 00.000.00- 0
Training - Supervisory Re-Certification0.000.00$ - 00.000.00- 0
Training - Range Recertification0.000.00$ - 00.000.00- 0
Training - Triennial Recertification training0.000.00$ - 00.000.00- 0
Training - Other0.000.00$ - 00.000.00- 0
Uniforms0.000.00$ - 00.000.00- 0
Body Armor0.000.00$ - 00.000.00- 0
Weapons0.000.00$ - 00.000.00- 0
Ammunition0.000.00$ - 00.000.00- 0
Targets0.000.00$ - 00.000.00- 0
Travel0.000.00$ - 00.000.00- 0
Guard License Fees0.000.00$ - 00.000.00- 0
Medical/Physical Fitness/Drug Screen0.000.00$ - 00.000.00- 0
Start up0.000.00$ - 00.000.00- 0
Vehicle (Lease or Depreciation)0.000.00$ - 00.000.00- 0
Other:0.000.00$ - 00.000.00- 0
XXXXX0.000.00$ - 00.000.00- 0
XXXXX0.000.00$ - 00.000.00- 0
XXXXX0.000.000.000.000.00- 0
Sub-Total - Other Direct Elements$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Management Approach (Ref: Note 3)0.000.000.000.000.00- 0
Material Handling0.000.000.000.000.00- 0
General and Administrative0.000.000.000.000.00- 0
Total Price w/o Profit and IFF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Profit0.000.000.000.000.000.00
Industrial Funding Fee0.000.000.000.000.00- 0
Grand Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Basic Rate0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Explanatory Notes
Note 1 - Rates
Note 2 - Other Direct Element Pricing
Note 3 - Pricing for Management Approach Items
Signature and Title of Preparer

&C(&"Arial,Italic"Name of Company&"Arial,Regular") Price Element Breakdown for Solicitation: HSHQWA-10-R-00001&R &D For the purpose of this price breakdown model, these elements should be separately broken out as shown, even if it is the contractor's practice to include these items in their Overhead and/or G&A rate. However, the contractor should reduce their reported Overhead and G&A amounts for the impact of these separately identified price elements to the extent they are already included in their Overhead and G&A. This will ensure that price elements are not duplicated in the breakdown.

For the purpose of this price breakdown model, this amount represents the price associated with the advantageous aspects of the contractor's management approach, which are above the minimum requirements of the SOW. However, the contractor should reduce their reported Overhead, Other Direct Elements, and G&A to the extent these elements are included under the Management Approach pricing. This will ensure that price elements are not duplicated in the breakdown.

Additionally, the contractor should include a brief description of the items priced under the Management Approach and may include subsidiary calculations of the pricing on a separate worksheet. For example, if the contractor proposes to conduct weekly QC inspections on 25% of posts, then they should explain that the Management Approach pricing is specifically for weekly QC inspections.

The contractor should explain the basis of the rates used including providing the calculations when a weighted average of applicable rates is used.

Sheet3

File details come from the government source that posted it. Updated .