Technical_Exhibit_-_Facilities_Listing_(v1)_(20170130).pdf
PDF 79 KB Posted
- Attached to
- PIADC Center-Wide Support Program (CWSP) - Solicitation Federal contract opportunity
- Solicitation number
- HSHQPD-17-R-00002
About this file
Technical Exhibit - Facilities Listing (v1) (20170130)
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT – FACILITES LISTING
BUILDINGS IN USE:
Level of Maintenance Bldg. No. Description Sq. Footage (Sec. 3.10 of SOW)
1 Administration, Orient Point 2,890 1 2 Receiving Garage, Orient Point 780 2 3 Warehouse, Orient Point 2,250 3
Orient Point Guard House 100 2 13 Fire Station 2,300 3 26 Electrical Substation 330 3 35 Dock Guardhouse 3,830 5 38 Motor Pool 4,220 3 47 Duty Officer's Quarters 1,700 2 59 Well Pumphouse 800 2 67 Dock Warehouse, Storage 4,060 3 100 Administrative* 55,000 1 101 Laboratory* 198,829199,57
102 Sewage Decontamination Building 11,740 2 103 Power Plant 8,380 4 105 Wastewater Treatment Plant (WWTP) 400 2 106 WWTP Blower Building 185 2 107 Chiller Building 1,320 2 108 408V Switchgear Room 896 2 109 New Power Plant 13,700 2 110 WWTP Pump/UV Building 872 2 111 Waste Water Thermal Decontamination
Plant 18,300 2
112 Shipping/Receiving/RMW 3,300 2 256 Electrical Substation 350 3 258 Electrical Substation 1,300 5 W Tech Warehouse 17,600 3 LTH Light House 2,630 4
Salt Water Pump Station 816 3 Plum Island Guard House 100 2 GT Government Trailer East of Bldg. 100 2,160 1 CT Contractor Trailer West of Bldg. 100 2,160 1
ABANDONED BUILDINGS
Level of Maintenance
Bldg. No. Description Sq. Footage (Sec. 3.10 of SOW)
Administration
21,000
15 Chlorinator Building 80 5 21 Animal Quarantine 7,190 5 24 Composter 1,660 5 25 Laboratory, Animal Breeding 3,140 5 37 Warehouse, Dead Storage 9,600 5 44 Warehouse, Dead Storage 2,660 5 49 Cafeteria 7,650 5 54 Engineering & Plant Maintenance 21,500 5 55 Safety, Emergency Housing, Warehouse 39,960 5
60 Laboratory Animal Breeding 13,700 5 62 Large Animal Holding 25,500 5 63 Laboratory Animal Breeding 12,900 5 90 Animal Holding 10,960 5 94 Incinerator 640 5 115 Well and Pipe Pump House 550 5 226 Gamma cell Irradiator Building 400 5 227 Paint Shop 400 5 228 Storage, Vacant 400 5 232 Assembly Hall 3,360 5 257 Lab 40,750 5 259 Garage 370 5
*LABORATORY SQUARE FOOTAGE:
Square footages are as follows but may vary in accuracy from scaling off drawings.
BSL - 3 Lab Space (Laboratories only: Mods 1-6, Labs A, B, C, D on the 1st and basement floors, and the High Thru-Put Lab. Does not include corridors outside the lab doors)
First Floor Mods 1 - 6 6,527 Labs A, B 6,459 Labs C, D 6,290 Hi Thru-Put 1,850
Basement Floor Lab A 2,484 Lab B 2,608 Lab C 2,327 Lab D 1,616 Total 30,161
BSL – 3E Animal Room Space West Animal Wing 8,913 2926 sq ft hooves on the ground East Animal Wing 9,818 2760 sq ft hooves on the ground Orient Animal Wing 10,174 4400 sq ft hooves on the ground (est.)
West Necropsy and Shower 858 East/Orient Necropsy and Shower 2,828 _____ Total 32,591 810,086 BSL - 3Ag Animal Room Space New Animal Wing
3,836 2,165 sq ft hooves on the ground Total 3,836 2,165
Grand Total all Animal Room and Support Space 66,58836,427 120,251 sq ft hooves on the ground
BSL - 3 Support Space West Airlock 240 East Airlock and Autoclave Area 1,078 Transfer Autoclave Area, Safety Area, Laundry 2,783 Outside / Inside Change Rooms / Showers, Conference Room 8,733 Basement Maintenance Work Areas 6,998 Basement Rad Storage Area 1,138 Basement APHIS Freezer Room 1,138 Second Floor APHIS Lunch Room 1,959 Building 100 ARS Second Floor Lunch Room 1,734
Total 25,801
BSL - 3 Machine Spaces and Miscellaneous Areas Main Corridors First Floor 7,940 Main Corridors Basement 6,718 Basement Machine Spaces 14,714 Second Floor Machine Spaces 69,085 West Incinerator Room 1,262 East/Orient Incinerator Room 1,503 Tank Room 634
Total 101,856
BSL - 3 Unusable Areas Former Incinerator Area 4,000 East Service Wing Central Area 584 Total 4,5846,434
BSL - 2 Lab Space (Building 100)
First Floor 3,152 Second Floor Machine Space 1,336 Total 4,488
File details come from the government source that posted it. Updated .