PSO_Smart_Book_&_Master_Certiification_File,_Past_Project_Form_&_Performance_Questionnaire.pdf

PDF 4 MB Posted

Attached to
Armed Protective Security Officer (PSO) Services
Solicitation number
HSHQEC-17-R-00012
Issued by

About this file

RFP - PSO Smart Book, PSO Master Certification File, PSO Personnel File Outline, Past Project Form, Past Performance Questionnaire - HSHQEC-17-R-00012

View the file

Other files

File Type Posted
Amendment_Five_(5).pdf PDF
Amendment_Four_(4)_-.pdf PDF
Amendment_Three_(3).pdf PDF
Amendment_Two_(2).pdf PDF
Amendment_One_(1).pdf PDF
Pricing,_Instructions,_Checklist,_filed_level_supervision,_seniority_list.pdf PDF
RFP_-_SF-1449_&_Contract_Clauses.pdf PDF
Price_Element_Realism_Breakdown.xlsx XLSX spreadsheet
RFP_-_CBAs.pdf PDF
RFP_-_Solicitation_Provisions.pdf PDF
RFP_-_Statement_of_Work.pdf PDF
Field_Level_Supervision_Exhibit.xls XLS spreadsheet
RFP_-_Exhibits.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Region # Date (last updated)

Contract # Contractor Name

La st

N am e

Su ff ix

Fi rs t N am e

M id dl e

In iti al

La st o f S

SN

St at us

SS

AN

C ar d

I- 9/ e- Ve rif y

Ex pe re in ce

Ed uc at io n

La ng ua ge

Ex hi bi t 9 a, Co nt ra ct or 's

Va lid at io n of

Em pl oy ee

P er so na l Da ta

HS

PD

-1

(P

IV

/P

IV

-I)

Ph ot og ra ph

Fi tn es s L et te r (P re lim in ar y)

Fi tn es s L et te r ( Fi na l)

N

SI

C Le tt er

N on

-D is cl os ur e

Ag re em en t F m

0-

Ph ys ic ia n' s

Ce rt ifi ca tio n

Dr ug

S cr ee ni ng

PSO Personal Information Employee Personal Data (Exhibit 9a)

MASTER PSO CERTIFICATION FILE

Ba si c

Tr ai ni ng

FP

S

O rie nt at io n

AE

D/

CP

R/

Fi rs t A id

EM

T

Sc re en er

(X -r ay /M ag

W

DT

P (1

6h r)

W

DT

P (8 hr

La ut en be rg

St at em en t

In iti al F ire ar m s

Tr ai ni ng

In iti al F ire ar m s

Q ua lif ic at io n

In iti al B on

Ce rt ifi ca tio n

In iti al O

C Ce rt ifi ca tio n

St at e G ua rd

L ic en se

S t at e W ea po ns

Q ua lif ic at io n

St at e W ea

Pe rm it

St at e Dr iv er

's L ic en se

O th er

O th er

O th er

Pre-Employment Validation (Exhibit 9b)

Ex hi bi t 9 b, Co nt ra ct

's

Va lid at io n of P re em pl oy m en t

Re qu ire m en ts

Ba si c Tr ai ni ng

Ex am in at io n

Re fr es he r T ra in in g

AE

D/

CP

R/

Fi rs t A id

EM

T

Sc re en er

(X -r ay /M ag

W

DT

P (1

6/ 8)

(A nn ua l)

W

DT

P Du ty lif ic at io n

La ut en be rg

St em en t

Se m ia nn ua l F ire ar m s

Tr ai ni ng

Se m ia nn ua l F ire ar m s

Q ua lif ic at io n

An nu al B on

Ce rt ifi ca tio n

An nu al O

C Ce rt ifi ca tio n

St at e G ua rd

L ic en se

S t at e W ea lif ic at io n

St at e W ea

Pe rm it

St at e Dr iv er

's L ic en se

Dr ug

S cr ee ni ng

O th er

Current Training and Certifications (Administrative Audit)

O th er

O th er

Standard. 7.2.5 The Contractor shall organize and maintain electronic PSO personnel files as outlined below. An example of the PSO personnel file outline has been provided in [Attachment 3].

1. Each PSO shall have an electronic personnel file.

2. The electronic personnel file shall be established in the following manner:

a. A main folder designated to each PSO

i. Three (3) subfolders [with varying documents]

1. Employee Personal Data Validation

a. Exhibit 7a completed

b. Items listed under Contractor employee personal data shall be reviewed and validated by the Contractor using Exhibit 7a, Contractor’s Validation of Employee Personal Data (Education, Experience, Language, SSN Card, I-9/e-Verify document, etc.)

2. Pre-employment Validation

a. Exhibit 7b completed

b. Items listed under Pre-employment Validation shall be reviewed and validated by the Contractor and the COR, using Exhibit 7b, Contractor’s Validation of Pre-employment Requirements, prior to the PSO taking the PSO basic training examination.

3. Current Training and Certification

a. Items listed under Current Training and Certifications are subjected to administrative audits; only the most current documentation or certification is required to be maintained.

Extraneous documentation shall be removed and maintained in accordance with applicable regulations or instructions.

b. All training and certification shall be documented using, Exhibit 7, Contractor’s Certification of Training and Qualification.

ATTACHMENT 3

PAST PROJECT FORM

1. Name of Contractor

1a. Solicitation Number (i.e. the solicitation your firm is responding to)

2. Complete Name of Government Agency, Commercial Firm, or Other Organization for Which Effort Performed.

3. Complete Address of Entity Named in #2 Above

4. Contract Number or Other Reference

5. Date of Project Award

6a. Total Project Price (to include all options):

6b. Current Annual Estimated Price:

7. Period of Performance (to include all options)

8. Level of Security Clearance Required (If applicable)

9a. Number of Productive Protective Security Officer Hours PerYear:

9b. Number of Protective Security Officers utilized to perform the required hours:

9c. Armed or Unarmed Protective Security Officers

Total Armed PSO Hours per Year:

Total Unarmed PSO Hours per Year:

10. Total Number of Posts Manned 11. Total Number of Facilities Manned

12a. Technical Point of Contact (name, title, address, telephone no., and email address)

12b. Contracting or Purchasing Point of Contact (name, title, address, telephone no., and email address)

13. Geographic Location of Work (Country, State or Province, County, City)

14. Contractor Performance Assessment Reporting System (CPARS) Completion: CPARS is a web-enabled application that collects and manages contractor performance assessments. A CPAR report is required to be completed annually through the conclusion of the contract. Once “finalized” CPAR assessments are copied to the Past Performance Informational Retrieval System (PPIRS). Contractors may view their own data in PPIRS at http://www.ppirs.gov/.

Contractor Complete the Following by Checking the Appropriate Box:

□ A “finalized” Contractor Performance Assessment Report IS resident in PPIRS for this contract for the most recently completed performance period.

□ A “finalized” Contractor Performance Assessment Report IS NOT resident in PPIRS for this contract for the most recently completed performance period..

http://www.ppirs.gov/

15. Description of Contract Work. In order to establish the relevance of your project to the instant requirement, please describe the scope, magnitude and complexity of this work, comparing and contrasting it to that required under this solicitation. Additionally, describe any unique or unusual requirements of the contract, and performance problems or issues encountered under the performance of the contract. Include discussion of any previous or ongoing Department of Labor investigations of your firm for Service Contract Act or other labor related violations.

For problems/issues noted, describe the method of resolution and/or corrective actions taken. Use a continuation sheet, if necessary.

16. Did this contract require the submission of a subcontracting plan? If so, describe the efforts being made to meet the subcontracting goals contained within the approved plan to include the name(s) of subcontractor(s) used, if any, and a description of the extent of work performed by the subcontractor(s).

Instructions for Completing the Past Project Form

Item1 Insert Name of Offeror Item 1a Insert Solicitation Number Item 2 Insert the complete name of the customer, including parent organization. Do not use acronyms.

Item 3 Insert the customer's complete address, including both post office box and street address, if possible.

Item 4 Insert any contract number or other contract reference used by the customer.

Item 5 Insert the date on which the contract came into existence.

Item 6 Insert the price, as it appeared in the original contract inclusive of all option periods. If the contract included multiple, separately-priced items, add the individual item amounts and insert the total price.

Item 6a Insert the current total annual amount Item 7 Insert the period of performance to include all option periods (if applicable).

Item 8 Annotate whether or not a clearance was required. If applicable, insert the type clearance, i.e. Top

Secret, Secret) Item 9a Insert the number of productive protective security officers hours under the contract on an annual basis.

Item 9b Insert the total number of protective security officers employed to perform this effort Item 9c Indicate whether or not the requirement called for armed or unarmed protective security officers. If requiring both type indicate the distribution of hours between armed and unarmed protective security officers.

Item 10 Insert the number of posts manned, Item 11 Insert the number of facilities requiring protective security officer services under this contract.

Item 12a Insert the name, title, address, telephone number, and email address (if available) of the program or project manager, quality assurance representative, or other customer technical representative who is most familiar with the quality of your work under the contract.

Item 12b Insert the name, title, address, telephone number, and email address (if available) of the contracting officer, purchasing agent, or other customer contracting or purchasing representative who is most familiar with your work under the contract.

Item 13 Insert the location(s) where the work was performed, including the country (if other than the United States) and the state or province, county (if applicable), and city. If contract requires protective security officer services at multiple locations, identify all locations.

Item 14 Indicate whether a “finalized” Contractor Performance Assessment Report is resident in PPIRS by checking the appropriate box.

Item 15 Describe the nature and scope of the work. The objective is to show how the work that you did or are doing is similar in nature and scope to the work that is to be performed under the contract contemplated by the request for proposal. Describe any unique or unusual requirements of the contract and any problems encountered during the performance of this contract work. Tell your side of the story of any conflicts with the customer concerning which they may make adverse remarks about your performance.

Describe any actions that you have taken or plan to take to correct any shortcomings in your performance.

Item 16 Insert the name, address, telephone number, and email address (if available) of the subcontractor(s) used, if any, and a description of the extent of work performed by the subcontractor(s).

ATTACHMENT 4

PAST PERFORMANCE QUESTIONNAIRE

Solicitation: HSHQEC-17-R-00012

NAME OF CONTRACTOR REQUESTING THE REFERENCE: __________________

The purpose of this questionnaire is to obtain information regarding the quality of the above named Contractor’s past performance relative to a contract, completed or in progress, at your company/agency. The Federal Protective Service is considering this Contractor for Protective Security Officer services at various Federal buildings located in the Washington, DC area. We would greatly appreciate your input regarding the quality of the Contractor’s past performance.

Handwritten responses are sufficient. It is requested that the individual(s) responsible for the administrative oversight of the project (e.g. security specialist, COR, COTR, etc.)

respond to this questionnaire. More than one copy of the questionnaire may be submitted if responses from more than one individual are appropriate.

Upon completion of the survey, please email to Christopher.Kelly@hq.dhs.gov. If you have any questions, please call Christopher Kelly at (215)521-2259. We appreciate your efforts on our behalf.

CONTRACT NO. OR PROJECT TITLE: _____________________________________

PERIOD OF PERFORMANCE TO

INCLUDE ALL OPTION PERIODS:_________________________________________

TOTAL PROJECT VALUE TO

INCLUDE ALL OPTION PERIODS: _________________________________________

ANNUAL NO. OF PROTECTIVE SECURITY OFFICER

HOURS:_________________________________________

Please provide a brief description of the scope of this project so that we determine any similarities to this contract:

mailto:Christopher.Kelly@hq.dhs.gov

QUESTIONS

PERFORMANCE:

Please provide your comments on the Contractor’s performance in the following areas:

1. How consistent is the Contractor in providing required staffing at each post of duty?

Comments:

2. How consistent is the Contractor in providing employees who report to duty properly groomed, uniformed, and equipped?

Comments:

3. How consistent is the Contractor in keeping training records, certifications, and related documentation complete, accurate, and current?

Comments:

4. Discuss the overall level of professionalism, attentiveness, and bearing of the Contractor's workforce.

Comments:

5. How effective is the Contractor in identifying potential problems and resolving them on his own?

Comments:

6. How effectively does the Contractor respond to problems presented to him by owner and tenant representatives?

Comments:

7. Discuss the Contractor’s quality control of the project.

Comments:

8. Discuss the Contractor’s overall management of the project

9. Discuss the Contractor’s ability to seamlessly transition or phase-in under a newly awarded contract (if applicable):

10. Discuss the Contactor’s ability to provide the level of supervision sufficient to ensure effective performance by the productive Protective Security Officers over the course of the Contract.

11. Did this contract require the contractor to submit a subcontracting plan? If so, has the contractor been making a good faith effort to meet the subcontracting goals contained within the plan? (NOTE: The individual completing this questionnaire may need to contact the cognizant contracting officer in order to ascertain whether the contractor is meeting subcontracting goals.)

12. If you had a choice, would you hire this Contractor again? Why or why not?

13. In summary, would you describe the quality of the Contractor's services and overall performance as:

a. _____ Highly Acceptable – Based on the contractor’s performance under this project, the level of risk associated with this vendor is substantially less than the level expected from a competent vendor.

b. _____ Acceptable – Based on the contractor’s performance under this project, the level of risk associated with this vendor is no more than the level expected from a competent vendor.

c. _____ Unacceptable – Based on the contractor’s performance under this project, the level of risk associated with this vendor is greater than the level normally expected from a competent vendor.

Your Name: ______________________________ Your Position: ______________________________ Company: ______________________________ Telephone No: ______________________________ Fax: ______________________________ E-mail address: ______________________________

Binder 1
Table of Contents R-00012
Binder All
SF1449
Binder All
Binder All
Binder All
Binder All
Binder1
Binder1
Draft RFP Package 1
Final RFP Package
New RFP Package R1
New RFP Package
Binder1
Contract Clauses part 2 R2
Pursuant to the clause entitled, Continuity of Critical Contractor Deliverables [Services] in the Event of an Emergency (October 2009), the Government may unilaterally exercise these CLINs in the event of an emergency event. The CLINs will be funded ...
2. UContractor Use of DHS Form 139, or Approved Alternate
11. INSURANCE REQUIREMENT
FAR 52.216-19 ORDER LIMITATIONS (OCT 1995)
FAR 52.216-22 INDEFINITE QUANTITY (OCT 1995)
MINIMUM and MAXIMUM QUANTITIES
CONTINUITY OF CRITICAL CONTRACTOR DELIVERABLES [SERVICES ] IN THE EVENT OF AN EMERGENCY (October 2009)
FY17 SOW Boilerplate (Oct 2016) version 1.3
1 Introduction
1.1 General Information
1.2 Federal Protective Service
1.3 Acronyms
1.4 Federal Management Regulations (FMR) and Other Applicable Documents
1.5 Security Manual and Resource Tool (SMART) Book (Formerly the Security Guard Information Manual (SGIM)
2 Contract Transition
2.1 Phase – In
2.2 Phase – Out of Contract and Continuity of Services
2.3 Conferences and Meetings
3 Plans
3.1 General
3.2 Transition Plan
3.3 Training Plan
3.4 Quality Control Plan
3.5 Continuity of Operations (COOP) Plan
4 Authority and Jurisdiction; Licenses and Permits; and Adherence to Laws
4.1 General Information
4.2 Privacy Requirements
5 PSO Qualifications
5.1 General Information
5.2 Medical and Physical Qualifications
5.2.1 General Information
5.2.2 Pre-Employment Examinations
5.2.3 Drug Screening
5.3 Fitness Determinations
5.4 Entry on Duty (EOD) Decisions
5.5 Favorable Determinations
5.6 Unfavorable Determinations
5.7 Security Clearances
5.8 Security Clearance Requirements
5.9 Security Clearance Determinations
6 Training
6.1 General Information
6.2 Training Schedule
6.3 Training Certifications
6.4 Training Requirements
6.5 Automated External Defibrillator (AED), Cardiopulmonary Resuscitation (CPR), First Aid, or Emergency Medical Technician (EMT)
6.6 Weapons Training and Qualification
6.6.1 General Information
6.6.2 Firearms Training
6.6.3 Firearms Qualification
6.6.4 Transitional Weapon Training and Qualification
6.6.5 Weapon Platform Training and Qualification
6.6.6 Intermediate Weapons Training
6.7 National Weapons Detection Training Program (NWDTP) using Train-the-Trainer Method
6.7.1 Definitions
6.7.2 NWDTP Instructors
6.7.3 NWDTP Instructor Training and Certification Requirements
6.7.4 PSO Training and Certification Requirements
6.7.5 Reporting Requirements and Deliverables
6.8 Government-Provided Training
6.8.1 Scheduling of Government-Provided Training and Testing
6.8.2 Orientation Training

6.9 Other Special Training

7 Contractor and PSO Files
7.1 Master Certification List
7.2 Personnel Files
7.3 Audit of Personnel Files
8 Waivers and Deferments
9 Required Services
9.1 Order of Precedence
9.2 Post Orders
9.3 Time and Attendance
9.4 FPS 139, Record of Time of Arrival and Departure from Buildings (During Security Hours)
9.5 Post Tracking System (PTS)
9.6 Reports, Records, and Testimony
9.7 Post Types
9.8 Typical Post Duties
9.8.11 Traffic Control
9.8.12 Receipt, Use and Safeguarding of Keys
9.8.13 Security and Safety Systems
9.8.14 Rules and Regulations Governing Conduct on Federal Property
9.8.15 Physical Security, Law, and Order
9.8.16 Hazardous Conditions
9.8.17 Response to Injury or Illness
9.8.18 Civil Disturbances
9.8.19 Emergencies
9.8.20 Primary Security Responses
9.8.21 Additional Duties
10 Conduct of Contractor Personnel
10.1 General Information
10.2 Reporting Adverse Information
10.3 Government Directed Removal of Contractor Employees
10.4 Contract Employee Reinstatements
11 Key Personnel
11.1 General Information
11.2 Contract Manager
11.3 Training Instructors
11.4 NWDTP Instructor Qualifications
12 Operations
12.1 Work Site
12.1.1 Schedule
12.1.2 Breaks
12.1.3 Compliance
12.2 Contract Effort Required
12.2.1 Productive Hours
12.2.2 Reserve Forces
12.2.3 (Not Applicable) - Emergency Security Services (ESS)
12.2.4 Temporary Additional Service (TAS)
12.2.5 Supervision
12.2.6 Incident Reporting
12.2.7 Open Post
13 Government-Provided Equipment
13.1 General Information
13.2 Use of Government–Provided Equipment
13.3 Accountability of Government Equipment
13.4 Safeguarding Government Equipment
13.5 DHS HSPD-12 Personal Identity Verification (PIV) Cards
13.6 NWDTP Equipment
14 Contractor-Provided Equipment
14.1 General Information
14.2 Communications Equipment
14.3 Vehicles
14.4 Firearms, Ammunition, and Intermediate Weapons
14.5 Personal Protective Equipment (PPE)
14.6 Uniforms and Grooming
14.7 Supplementary Equipment
15 Quality Control, Quality Assurance, and Performance Evaluations
15.1 Quality Control
15.2 Quality Assurance
16 Exhibits and Attachments List
17 Deliverables
Binder2
Final RFP Package
New RFP Package R1
New RFP Package
Binder2
Exibit Part 1
RFP Package
RFP Package
RFP creation Revised
RFP creation Revised
RFP creation
RFP Package Part 2
Attachment 2 - Exhibits
Exhibit 1_List of Req Forms 09152016
Exhibit 2 Contractor Information Worksheet (CIW) V4 Feb 2015
Exhibit 3_DHS Form 11000-6 09152016
Exhibit 3
NON-DISCLOSURE AGREEMENT
WITNESS:
Exhibit 4_DHS Form 11000-9 091502016
DISCLOSURE AND AUTHORIZATION PERTAINING TO CONSUMER REPORTS
Exhibit 5 A Lautenberg Fact Sheet 09152016
QUALIFICATION INQUIRY – Prospective New FPS LEO
REQUALIFICATION INQUIRY – Current FPS LEOs
THE LAW
Exhibit 5_ Lautenberg Nov 2 2016
Exhibit 5
Exhibit 6_List of Req Trng 09142016
Exhibit 7_Contractor's Certification 09152016
Exhibit 7a_Personal_Data_Validation 09152016
Employee's Name
Employee's SSN
Contractor's Name
Authorized Contractor Representative
Authorized Contractor Representative Signature (Required)
Exhibit 7b_Preemployment_Requirement_Validation 09152016
Exhibit 7b Contractor's Validation of
Exhibit 8_CPT 09142016
1. Basic Training
1. Basic Training (cont)
2. Refresher Training
3. Weapons Training
a. Firearm Qualification Course (Handgun)
Marksmanship Ratings: 220-230 = Marksman; 231-240 = Sharpshooter; 241-249 = Expert; 250 = Distinguished Expert
b. Firearm Qualification Course Shotgun (cont)
4. NATIONAL WEAPONS DETECTION TRAINING PROGRAM (NWDTP)
Exhibit 9_GPT 09142016
1. Orientation Training
1. Orientation Training (cont.)
Exhibit 9A_Screening Operations Assessment 09152016
Facility/Screening Station Overview:
Additional Comments:
Additional Comments:
Additional Comments:
Additional Comments:
17-R-00012 Exhibit 10_CPE Limited NWDTP
Exhibit Part 3
RFP Package
RFP Package
RFP creation Revised
RFP creation Revised
RFP creation
RFP Package Part 2
Attachment 2 - Exhibits
Exhibit 11_GPE 09022016
1. DHS HSPD-12 Personal Identity Verification (PIV) Card Application Process
B. Sponsorship.
C. Enrollment.
2. Other Government-Provided Equipment
Exhibit 11A GPE Supplementary Equip 09022016
Exhibit 11A
Exhibit 11B Lost Stolen PIV Procedures 0902106
Exhibit 12, Physicians Certification 09152016
Critical Tasks
PSO Functions and Tasks
PSO Tasks and Functions
GETTING STARTED
During Test: It is important for the administrator to;
REQUIRED EQUIPMENT
Level 1: Three minutes at 18 Steps per minute
TERMINATE TEST IF CANDIDATE DOES NOT FEEL HE/SHE CAN COMPLETE SIX MINUTES
SCORING THE STEPMILL TEST
METmax = [HRR * 7 - 1}/(FHR - RHR)] + 1
REQUIRED EQUIPMENT
Level 1: Three minutes at three miles per hour, 2.0% incline Level 2: Three minutes at three miles per hour, 7.0% incline
TERMINATE TEST IF CANDIDATE DOES NOT FEEL HE/SHE CAN COMPLETE SIX MINUTES.
SCORING THE TREADMILL TEST
METmax = HRR [(MET Cost of Stage) - 1] + 1 FHR - RHR
Calculations: Estimating Resting Heart Rate*
Smart Book - master cert - PSO Outline
RFP Package
RFP Package
RFP creation Revised
Attachment 1
1
2
3
Attachment_2 Revised
2014 Format

Attachment_3 Revised

Past projects and performance
RFP Package
RFP Package
RFP creation Revised 1
RFP Package Part 3
Attachment 3 - Past Project Form
ATTACHMENT 3
PAST PROJECT FORM
Instructions for Completing the Past Project Form
Attachment 4 - Past Performance Questionaire
ATTACHMENT 4
PAST PERFORMANCE QUESTIONNAIRE
Solicitation: HSHQEC-17-R-00012
NAME OF CONTRACTOR REQUESTING THE REFERENCE: __________________
CONTRACT NO. OR PROJECT TITLE: _____________________________________
QUESTIONS
PERFORMANCE:
1. How consistent is the Contractor in providing required staffing at each post of duty?
2. How consistent is the Contractor in providing employees who report to duty properly groomed, uniformed, and equipped?
3. How consistent is the Contractor in keeping training records, certifications, and related documentation complete, accurate, and current?
4. Discuss the overall level of professionalism, attentiveness, and bearing of the Contractor's workforce.
5. How effective is the Contractor in identifying potential problems and resolving them on his own?
6. How effectively does the Contractor respond to problems presented to him by owner and tenant representatives?
7. Discuss the Contractor’s quality control of the project.
8. Discuss the Contractor’s overall management of the project
9. Discuss the Contractor’s ability to seamlessly transition or phase-in under a newly awarded contract (if applicable):
10. Discuss the Contactor’s ability to provide the level of supervision sufficient to ensure effective performance by the productive Protective Security Officers over the course of the Contract.
11. Did this contract require the contractor to submit a subcontracting plan? If so, has the contractor been making a good faith effort to meet the subcontracting goals contained within the plan? (NOTE: The individual completing this questionnaire ma...
12. If you had a choice, would you hire this Contractor again? Why or why not?
13. In summary, would you describe the quality of the Contractor's services and overall performance as:
Combine CBAs
CBA-2009-2893, Revision 5 (DC0001)
Scanned from a Xerox Multifunction Printer
CBA 2009-2893, Revision 5 (DC0001)
CBA 2009-2893 Revision 4 (DC00001)
Heating Plant Appendix 2
Heating Plant
CBA-2010-3968, Revision 9 (DC0719)
Scanned from a Xerox Multifunction Printer
CBA 2010-3968, Revision 8 (DC0719)
CBA 2010-3968, Revision 8 (DC0719)
Signed Half Street Appendix
1015 Half Street CBA signed 2015
CBA-2017-10493 (DC0365)
Scanned from a Xerox Multifunction Printer
DC0365 CBA
CBA-2017-10494 (DC0467)
Scanned from a Xerox Multifunction Printer
DC0467 CBA
Binder3
Final RFP Package
other attachments
RFP Package
RFP Package
RFP creation Revised 1
RFP Package Part 3
Attachment 6 - Price Element Breakdown
Model for Price Realism
Attachment 6A - Price Element Breakdown Instructions
Attachment 7 - Award Approval Request
Attachment 8 - Field Level Supervision Exhibit
Supervision

Attachment 9 - Proposal Submission Checklist - May 2017 Version

Attachment 10 Seniority List
DC0365
Binder 2
Binder All
Binder All
Solicitation Provisions R3
Proposal Submission Requirements
Price Proposal
Basis for Selection
Notice of Award
Questions
FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

File details come from the government source that posted it.