HSFLGL-13-B-00004.pdf
PDF 1 MB Posted
- Attached to
- Renovate Building 64, FLETC, Glynco, GA
- Solicitation number
- HSFLGL13B00004
About this file
SF1442 Solicitation Form summary of work and clause package
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HSFLGL-13-B-00004_000003.pdf | ||
| HSFLGL-13-B-00004_000002.pdf | ||
| HSFLGL-13-B-00004_SF-30_Amendment_000001.pdf | ||
| FMD-42_DailyReport.pdf | ||
| DavisBaconWageRate.pdf | ||
| DHS_Form_700-3.pdf | ||
| FMD_-66SafetyVio.pdf | ||
| OF_306.pdf | ||
| Bldg_64_Asbestos_Rept_Acrobat_Pro.pdf | ||
| BadgeApp_SEM17.pdf | ||
| QuestionPublicTrust_SF85P.pdf | ||
| DHS_Form_11000-6.pdf | ||
| ConstructInvoice.pdf | ||
| 347_Instruction.pdf | ||
| Invoice_Cover.pdf | ||
| FormI-9.pdf | ||
| WH_347.pdf | ||
| DOLDavisBaconPoster.pdf | ||
| AffidavitIndividualSuretySF28-03.pdf | ||
| SF_1444.pdf | ||
| PerformanceBond_SF_25-96.pdf | ||
| Equal_Employment.pdf | ||
| Bid_Bond_SF_24-98.pdf | ||
| FMD-65Compliance.pdf | ||
| StandardForm1413.pdf | ||
| PaymentBond_SF_25A-98.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
13G0064C01
DEPARTMENT OF HOMELAND SECURITY
FEDERAL LAW ENFORCEMENT TRNG CTR
1131 CHAPEL CROSSING RD
BLDG: 93 ATTN: Sonya D. Armstrong
FLETC GL
GLYNCO GA 31524
Sonya Armstrong 912-267-2542 x
08/02/2013
HSFLGL-13-B-00004
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
PROJECT TITLE: RENOVATE BUILDING 64, FEDERAL LAW ENFORCEMENT TRAINING CENTER,
GLYNCO, GA
NAICS: 236220
SIZE STANDARD: $33.5 MILLION
1. This procurement is a 100% HubZone Set-Aside (Small Business HubZone).
2. The estimated cost of construction is between $5M - $10M.
3. Bids are due on Tuesday, September 3, 2013 at 3:00 PM (Eastern Time). The Bids will be publicly opened in Building 93, Room 111, at the Federal Law Enforcement
Training Center in Glynco, Georgia.
4. A Pre-Bid Conference/Site visit shall be held on Thursday, August 15, 2013 at
10:00 AM (Eastern Time). Bidders are Strongly Encouraged to Attend. See Section L for further details.
5. Facsimile Offers and/or Modifications to Offers are NOT authorized.
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
15 365 calendar days and complete it within ________________ ________________ calendar days after receiving
09/03/2013
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
DEPARTMENT OF HOMELAND SECURITY
FEDERAL LAW ENFORCEMENT TRNG CTR
1131 CHAPEL CROSSING RD
PRO BLDG 93
FLETC GL
ATTN: Sonya D. Armstrong
GLYNCO GA 31524
Sonya D. Armstrong
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 69
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
HSFLGL-13-B-00004
6. Telegraphic Offers are NOT authorized;
however, Timely telegraphic modifications to offers are authorized.
7. Technical inquiries must be submitted in writing within ten (10) calendar days prior to the receipt of Bids. Inquiries shall be submitted via email to sonya.armstrong@dhs.gov .
Late Submissions will NOT be addressed.
8. Offerors shall provide a statement of compliance with FAR 52.222-50, Combating Trafficking in Persons, requirements and confirm subcontractors will accomplish a statement of compliance upon award.
9. Acceptance of an Award certifies that the firm will comply with FAR 52.222-50, Combating Trafficking in Persons, by notifying all employees and subcontractors at all levels.
Delivery: 365 Calendar Days after Award.
FOB: Destination
0001 Provide all necessary management, quality control, labor, materials, and equipment to Renovate Building 64 at the Federal Law Enforcement Training Center, Glynco, GA as described in the attached project specifications and drawings.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
HSFLGL-13-B-00004
Section B Line Item Table Section C - Description/Specifications Section D – Packaging and Marking Section E - Inspection and Acceptance Section F - Deliveries or Performance Section G - Contract Administration Data Section H - Special Contract Requirements Section I - Contract Clauses Section J - List of Documents, Exhibits and Other Attachments Section K – Representations and Certifications Section L - Instructions, Conditions, and Notices to Bidders Section M - Evaluation Factors for Award
Section B - Supplies or Services/Prices
Line Item Table
Line Item Details
CLIN Description Quantity Unit Unit Price Amount 0001 Provide all necessary management, quality control, labor, materials, and equipment to Renovate Building 64 at the Federal Law Enforcement Training Center, Glynco, GA as described in the attached project specifications and drawings.
Total Amount for All Line Items:
Federal Law Enforcement Training Center 15 October 2012
RENOVATE AND RECONFIGURE BUILDING 64 01 11 00
Glynco, GA SUMMARY OF WORK
Section 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
01/08
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM E 2114 (2006a) Standard Terminology for
Sustainability Relative to the Performance of Buildings
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 13 (2010) Standard for the Installation of
Sprinkler Systems
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
Energy Star (1992; R 2006) Energy Star Energy Efficiency
Labeling System
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED (2009) Leadership in Energy and Environmental
Design(tm) Green Building Rating System for New Construction (LEED-NC)
1.2 DEFINITIONS
Definitions pertaining to sustainable development are as defined in ASTM E 2114, Section 01 57 50 TEMPORARY ENVIRONMENTAL CONTROLS, and as specified.
a. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.
b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.
c. "Operational performance" is the functional behavior of the building as a whole or of the building components.
d. "Sustainability" is the balance of environmental, economic, and societal considerations.
sdarmstrong Typewritten Text sdarmstrong Typewritten Text sdarmstrong Typewritten Text
Section 01 11 00 Page 2
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33
00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Upon receipt of Government Furnished Equipment, the Contractor shall submit records in accordance with paragraph entitled, "Government Furnished Property," of this section.
Submit the following items to the Contracting Officer:
Utility Outage Requests
Utility Connection Requests
Excavation Permits
SD-07 Certificates
Energy Performance Rating
1.4 WORK COVERED BY CONTRACT DOCUMENTS
1.4.1 Project Description
This project involves the renovation of Building 64. Building 64 is a three story building and contains 22,000 square feet. It currently functions as office space and its new function will also serve as office space. The existing facilities conditions are in poor condition. Multiple renovations have created layers of varying construction types and materials. Mechanical systems do not meet current codes and do not provide proper ventilation and comfort. The facility will be deconstructed down to its concrete structure that consist of concrete columns, floors, roof deck, and stair enclosures.
All existing architectural, plumbing, mechanical, and electrical systems shall be removed as indicated on the construction drawings. The new facility will be designed to LEED Silver Certification.
New site work will include sidewalks, renovated parking to accommodated ADA requirements, and a bike rack area at the covered rear entry. There are male and female shower facilities at the first floor restrooms for use by bike commuters. Site area disturbed by construction work will be graded and sodded.
The new exterior enclosure will consist of metal studs with painted interior gypsum board and exterior insulation and finish system. Spray applied insulation foam will be installed within the stud wall. New windows will be thermally broke aluminum with insulated low-e glazing and interior blinds.
Exterior doors will consist of insulated metal in metal frames and aluminum entry doors. A new standing seam metal roof will be installed over new structural steel and structural light gage framing. The roof system will sdarmstrong Typewritten Text sdarmstrong
Section 01 11 00 Page 3 contain spray applied insulation between the finished roof and a metal decking that is attached to the bottom of roof purlins.
Two new additions will be added. One addition houses an elevator with lobby and the other houses a mechanical room and provides cover over the rear building entrance. The addition housing the elevator will be constructed using a structural steel frame supported by spread and mat footings with metal stud infill, interior painted gypsum board and exterior insulation and finish system exterior. The mechanical room addition will be constructed using structural concrete masonry units with an exterior insulation and finish system finish at exterior. Both additions will have standing seam metal roofing systems. The elevator will travel four floors to access a newly created mechanical attic. The facility will be provided with ADA access ramps at front and rear entries. The existing exterior steps leading to stairwells will be removed and new ones constructed. The existing steps do not meet code requirements.
Interior partitions will be metal studs with painted gypsum board at both sides. Flooring will be a combination of ceramic tile, carpet, and vinyl composition tile. Carpeted areas and areas with vinyl composition tile will receive a 4" high rubber base. Areas with ceramic tile will receive a ceramic tile base or full wall tile. Selected areas will receive additional wall molding as indicated on the drawings. Ceilings in office areas will be lay-in acoustical tile with a revealed edge. Toilets, janitorial rooms, electrical and communication closets will receive a gypsum board finish.
Electrical and communication closets will be fire rated at least one hour.
All vertical chases for mechanical ductwork and elevator shaft will be fire rated at least one hour. The existing stair wells are solid 8" concrete and have a rating of at least one hour.
The FLETC campus has a district chilled water (CHW) system that currently serves Building 64. The existing 2" CHW branch piping serving the building will be replaced with larger diameter (4" size) piping to satisfy the proposed, increased load. Piping will be direct-buried, factory pre-insulated, Schedule 80 PVC with solvent welded joints. Design flow will be based on 44 degrees F CHW supply temperature and a 12 degrees F temperature differential with a 10 psi pressure differential across the supply and return mains. The FLETC campus also has a district steam system that originally serves Building 64. Currently, the district steam system is being decommissioned and a gas-fired condensing boiler is scheduled to be installed in the basement of the building. The existing steam to hot water converter and all associated steam piping is planned to be demolished under a separate project.
The heating and cooling air distribution for the building will be supplied by variable air volume air handling units. Exhaust has been provided for the restrooms, janitor closets, electrical rooms and elevator room per the code. Exhaust shall be through an energy recovery unit (ERV). Telephone and IT rooms will be provided with dedicated ductless split systems sized for the heat generated in the rooms. Air intake and exhaust louvers will be constructed of extruded aluminum with drainable blades and bird screens and be AMCA certified.
The building's mechanical systems will be controlled through a single, DDC, building automation system. Automated Logic Corporation will be the sole source for procuring the building's controls (sole source justification sdarmstrong Typewritten Text sdarmstrong
Section 01 11 00 Page 4 provided by FLETC). The control system will use BACnet (open) communications protocol for communication between DDC devices to allow multi-vendor interoperability and full communication and interface with the base wide ECMS. All hardware will conform to the BACnet Interoperability Guidelines.
A new 3" domestic water service branch will be extended from the site distribution main to the mechanical equipment room. A 2 1/2" reduced-pressure type backflow preventer will be installed just outside the mechanical equipment room (MER). A wireless water meter with remote monitoring will be provided. Based on the height of the water supply tower (90 ft), the available water pressure is approximately 35-38 psi. Therefore, a booster pump will be required. A packaged duplex pump system, with variable speed drive and pressure tank will be provided. All plumbing fixtures shall be low consumption, water conservation type. Floor mounted mop sinks will be provided in each janitor closet. The mop sink will have a wall faucet with vacuum breaker, hose thread and length of hose. A hanger for mops will be provided on the adjacent wall. The janitor closet will also have a floor drain with trap primer. Water connections will be provided in the employee breakroom kitchen area for beverage and coffee machines and other equipment such as icemakers and dishwashers requiring water. Inline filters will also be provided for beverage equipment supplies.
Fire Protection Water flow tests have been performed on March 6, 2012.
Existing hydrant #5349, located east of Building 64, has a flow of 873 gpm with a 50 psi static pressure and 22 psi residual pressure. The water supply lead in shall be sectionalized with a post indicator valve (PIV).
The PIV shall be in a location acceptable to the base fire department and at least 40 ft. from the structure. It shall be provided with a tamper switch electronically supervised by the fire alarm system. An approved backflow preventor shall be provided outside the building prior to any other fire protection system connections. Each floor will be zoned separately via a sprinkler riser serving sprinkler zones to be located in the corner of the central stair. Each floor shall be equipped with a separate isolation valve, flow switch, test/drain valve, and drain riser (GSA §7.17). The system will be hydraulically calculated as a Light Hazard Occupancy, with a density of
0.10 gpm/ft2 over the most remote 1,500 ft2 (NFPA 13, GSA §7.10) The system shall be a wet pipe system throughout (GSA §7.10) UL listed and FM approved, white, recessed, with white escutcheons. Sprinkler shall be installed to follow a pattern not to exceed 10 ft by 10 ft spacing. Sprinklers installed less than 7 feet above the floor or within electric, telecom, and IT closets or rooms shall be equipped with sprinkler guards (GSA §7.10). The elevator machine room shall be equipped with standard response sprinkler(s) as necessary and shall be provided with a separate isolation control valve, flow switch, and test/drain valves/drain pipe (GSA §7.10).
The electrical work in the building will consist of complete demolition of existing systems and installation of new building systems. New lighting, power distribution, and fire alarm systems will be installed.
Telecommunications systems shall consist of horizontal CAT 6 cabling throughout the facility, and raceways from the main telecommunications room to the existing exterior communications manhole through which the Owner will install their fiber optic and copper service cabling. Access controls shall consist of empty conduits and outlet boxes for the Owner's final installation of equipment.
sdarmstrong sdarmstrong
Section 01 11 00 Page 5
1.4.2 Location
The work shall be located at Building 64 at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia.
1.4.3 Environmental Permit
The Contractor shall provide all surveying layout and staking required and shall obtain all neccessary environmental permits as required by Glenn County Georgia.
1.5 PROJECT ENVIRONMENTAL GOALS
Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is to produce a building that meets the functional program needs and incorporates the principles of sustainability.
Specifically:
a. Preserve and restore the site ecosystem and biodiversity; avoid site degradation and erosion. Minimize offsite environmental impact.
b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.
c. Use environmentally preferable products and decrease toxicity level of materials used.
d. Use renewable energy and material resources.
e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended.
Consider the durability, maintainability, and flexibility of building systems.
f. Manage construction site and storage of materials to ensure no negative impact on the indoor environmental quality of the building.
g. Reduce construction waste through reuse, recycling, and supplier take-back.
1.5.1 Independent Verification
1.5.1.1 US Green Building Council (USGBC) - LEED(tm) Rating System
Provide work consistent with USGBC LEED-NC(tm) v2.2 (LEED), level silver requirements.
1.5.1.2 EPA Energy Performance Rating
Provide work consistent with drawings in order to meet Energy Star in accordance with design.
1.6 ON-SITE PERMITS
sdarmstrong Typewritten Text sdarmstrong Typewritten Text sdarmstrong
Section 01 11 00 Page 6
1.6.1 Utility Outage Requests and Utility Connection Requests
Notify the Contracting Officer at least 48 hours prior to starting excavation work. Contractor is responsible for marking and verifying all utilities not marked.
The Contractor shall verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated or specified to be removed or indicated in locations to be transversed by piping, ducts, and other work to be installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
Work shall be scheduled to hold outages to a minimum.
Utility outages and connections required during the prosecution of work that affect existing systems shall be arranged for at the convenience of the Government and shall be scheduled outside the regular working hours or on weekends.
Contractor shall not be entitled to additional payment for utility outages and connections required to be performed outside the regular work hours.
Requests for utility outages and connections shall be made in writing to the Contracting Officer at least 15 calendar days in advance of the time required. Each request shall state the system involved, area involved, approximate duration of outage, and the nature of work involved.
1.6.2 Excavation, and Burning Permits
ACTIVITY SUBMISSION DATE
Excavation Permits 30 calendar days prior to work
Permits shall be posted at a conspicuous location in the construction area.
Burning of trash or rubbish is not permitted on project site.
1.7 LOCATION OF UNDERGROUND FACILITIES
Scan the construction site with electromagnetic or sonic equipment, and mark the surface of the ground where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground obstruction not indicated to be specified or removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.7.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
PART 2 TITLE
sdarmstrong
Section 01 11 00 Page 7
Not used.
PART 3 TITLE
Not used.
-- End of Section --
Typewritten Text sdarmstrong
Section D – Packaging and Marking
D.1 PAYMENT OF POSTAGE AND FEES
The Contractor shall pay all postage and fees related to submitting information (including forms, reports, etc.) to the Contracting Officer.
D.2 MARKING
All information submitted to the Contracting Officer shall clearly indicate the contract number and name of the Contractor for which the information is being submitted.
END OF SECTION D
Section E - Inspection and Acceptance
52.246-1 Contractor Inspection Requirements. (APR 1984)
52.246-12 Inspection of Construction. (APR 1996)
52.246-21 Warranty of Construction. (MAR 1994)
END OF SECTION E
Section F - Deliveries or Performance
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 calendar days after Award. The time stated for completion shall include final cleanup of the premises.
(End of clause)
* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
52.211-12 Liquidated Damages - Construction. (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $595.24 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.211-13 Time Extensions. (SEP 2000)
52.242-17 Government Delay of Work. (APR 1984)
END OF SECTION F
Section G - Contract Administration Data
G.1 ACCOUNTING AND APPROPRIATION DATA
Funds have been reserved for this acquisition. The accounting appropriation data applicable for this acquisition will be provided in any resulting contract.
G.2 CONTRACTING OFFICER
Sonya Armstrong Federal Law Enforcement Training Center (FLETC) 1131 Chapel Crossing Road, Building 93, PRO-SSB Glynco, GA 31524
G.3 PAYMENT OFFICE ADDDRESS
Department of Homeland Security Federal Law Enforcement Training Center FLETC Finance Division/Contract Payments Building 66 Glynco, GA 31524 (See G.6 Invoices)
G.4 ROLE OF GOVERNMENT PERSONNEL IN CONTRACT ADMINISTRATION
G.4.1 Contracting Officer
The Contracting Officer has the overall responsibility for the administration of this contract. All communication pertaining to contractual or administrative matters under the contract shall be addressed to the Contracting Officer. The Contracting Officer alone, without delegation, is authorized to take actions on behalf of the Government to amend, modify or deviate from the contract terms, conditions, requirements, specifications, details and/or schedules. However, he may delegate certain other responsibilities to his authorized representatives.
G.4.2 Contracting Officer's Representative (COR)
a. The Contracting Officer will designate the Contracting Officer's Representative (COR) at time of award. The Contractor may direct all questions of a technical nature to the COR. On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer.
b. The COR's responsibility is to clarify technical requirements of the contract, as needed, to ensure understanding by the Contractor, and to provide the Contractor access to working data to assure useful expenditures of the Contractor's effort. The COR monitors the Contractor's performance through use of established surveillance procedures to ensure compliance with all technical requirements and informs the Contracting Officer/Administrator of all discrepancies and deviations noted.
c. The COR will provide no supervisory or instructional assistance to the Contractor's personnel.
d. The COR does NOT have the authority to enter into, modify and/or terminate the contract.
The COR is not empowered to make any commitments or changes which affect the contract price, terms, or delivery requirements. Any such proposed changes shall be brought to the immediate attention of the Contracting Officer for action, if necessary, and formal approval by contract modification. In the event that the Contractor accepts any change without the specified approval and written consent of the Contracting Officer, it will be at the Contractor's risk.
e. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment.
G.5 PAYMENT OFFICE ADDRESS
Department of Homeland Security FLETC, Budget & Finance Division/Contract Payments Building 66 (BFD) Glynco, GA 31524 (See G.6, Invoices)
G.6 INVOICES
a. All payments under this contract will be made by electronic funds transfer (EFT) in accordance with FAR 52.232.33, Payment by Electronic Funds Transfer—Central Contractor Registration (See Section I). An invoice is a written request for payment under the contract for supplies delivered or for service rendered. Invoices shall cite the contract number, quantity, price, and total amount of invoice. The Contractor shall use the forms found at Section J, Construction Contractor’s Invoice, for all requests for payment. In accordance with FAR Clause 52.232-5, Payments Under Fixed Price Construction Contracts (Section I), the Contractor shall furnish proper certification required by paragraph
(c) on progress payments. A copy of the certification is included in Section J.
b. Invoices shall be prepared by the Contractor and submitted and distributed as follows:
Original and one (1) copy:
Federal Law Enforcement Training Center Facilities Management Division Attn: Deborah Mobius Building 200 Glynco, GA 31524
One (1) copy to:
Federal Law Enforcement Training Center Attn: Sonya Armstrong Building 93, PRO-SSB Glynco, GA 31524
c. The Government will pay all invoices per the provisions of FAR 52.232-5, Payments Under Fixed Price Construction Contracts, and FAR 52.232-27 Prompt Payment for Construction Contracts (see Section I).
d. Payment will be based on invoices submitted by the Contractor for satisfactorily completed work. Upon verification of work actually performed and receipt of a proper invoice and any required contractor submittals, invoices will be processed for payment.
e. Submission of an invoice certifies that all employees and subcontractors have been notified of the United States Government’s zero tolerance policy regarding trafficking in persons, and the actions that will be taken for violations of this policy.
G.7 PAYMENT TO CONTRACTOR
a. The Provisions of the clause entitled "Payment Under Fixed-Price Construction Contracts" prescribed in FAR 52.232-5, see Section I, are supplemented as follows:
(1) In preparation of estimates, the Contracting Officer (CO) may authorize materials delivered to the site and preparatory work done to be taken in to consideration if these items are specifically identified in the accepted Schedule of Values (SOV) (if applicable) for the contract. The CO will only authorize payment for stored materials in the SOV that are considered high value; long lead or difficult to obtain; or are specialty items specifically manufactured for this project. Standard construction materials such as CMU block, conduit, wire, paint, etc. will be paid for upon satisfactory installation of the material.
Payment requests for authorized stored materials in the SOV must be accompanied by an invoice showing a detailed description, quantity, cost of the materials, and evidence of contractor payment for the materials.
If payment is authorized, the contractor will be paid the lesser of the material invoice amount, or the SOV line item amount. Any remaining SOV line item balance shall be redistributed to the material installation activity, or another activity as acceptable to the Contracting Officer. The contractor remains responsible at all times for the proper storage and protection of all materials. Retention will be withheld from future payment applications for improperly stored materials for which the contractor has been previously paid.
(2) The FLETC will not normally authorize payment for material stored off-site. In the event the FLETC and the contractor both agree that it is in interest of the project to consider payment for off-site material, the following conditions at minimum must be met:
a) Material properly stored in a bonded warehouse;
b) Submission of a paid invoice indicating the contractor has title to the material
c) Arrangements made for government representative to inventory the material
d) A defined material delivery date to the project
(3) In accordance with FAR 52.232-5, Payments under Fixed-Price Construction
Contracts, if the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. Once the construction progress reaches 85 percent completion, 10 percent retention will be withheld from all subsequent invoices until all work has been completed, close-out documents have been provided, and all punch list items have been completed and accepted by the Government.
b. No payment request (invoice) will be processed by the Contracting Officer when the Contractor's payroll submittals and/or those of any subcontractor are not current. This means the Contracting Officer must have in hand payroll submittals for the prime Contractor and all subcontractors up through and including the week immediately prior to the date on the invoice. Any invoice received wherein the Contractor has not adhered to this policy will be promptly returned to the Contractor and will not be processed until payroll submittals are brought up to date by the Contractor. DOL Form WH-347, Payroll, is at Section J.
G.8 FINAL PAYMENT
Final payment on the contract will not be made until all work is completed and accepted, all submittals have been received and approved, warranties received, and final cleanup of the premises is accomplished. Contractor’s Release, DHS Form 700-3, Section J, is required.
G.9 DAILY REPORT TO INSPECTOR
The Contractor’s Superintendent shall complete Form FTC-FMD-42, Daily Report to Inspector, Section J, for each day of work on the project. The Daily Report should contain a clear accounting of the time, location, type and quantity of work that took place.
The “Daily Report to Inspector” shall be turned into the Contracting Officer’s Representative by 10:00 a.m. of the following workday. It should be a clear log of what took place, who did it and the time they were there. All sections shall be filled out or a comment made indicating that this does not apply at this time. If the proper procedure is not followed, a “Contract Construction Compliance Notice” will accompany the returned document or in the case of no report, the “CCCN” will be your notification.
G.10 SPECIAL NOTE
Sections K, L and M of this solicitation will be physically removed from any resultant award;
however; Section K will be deemed to be incorporated by reference.
END OF SECTION G
Section H - Special Contract Requirements
H.1 DIRECTIVES, REGULATIONS, AND INSTRUCTIONS (JUL 2013)
a. The Contractor, its personnel, subcontractors, their personnel, and representatives shall become acquainted with and fully comply at all times with the Federal Law Enforcement Training Centers (FLETC) Regulations, Directives, and Instructions. Any individual shall be subject to removal from the Center for noncompliance.
b. In the event of a conflict between this contract and any FLETC Directive, Regulation or Instruction the contract prevails.
H.2 OPERATION ON THE FACILITY (JUL 2013)
H.2.1 Safety
a. The Contractor shall conduct the operation(s) under this contract in strict conformance with all FLETC safety directives and Federal, State, and local requirements and with all applicable provisions of 29 CFR Part 1910 and 1926 of the Occupational Safety and Health Act (OSHA).
b. The Contractor shall conform to all safety rules and requirements in effect on the award date of this contract and shall take such additional precautions as the Contracting Officer (CO) may reasonably require for safety and accident prevention purposes while performing any work under this contract. The Contractor agrees to take all reasonable steps and precautions to prevent accidents and preserve the life and health of Contractor and Government personnel performing in any way under this contract.
c. The Contractor shall make contract personnel available for Government furnished safety and occupational training for an estimate of two (2) hours to four (4) hours annually per individual.
Government furnished training may include Quality, Safety and Occupational requirements.
H.2.2 Accident Reports
Within 24-hours of occurrence, the Contractor shall prepare a report of all job-related accidents and injuries occurring on FLETC property. The Contractor shall deliver the report to the Contracting Officer Representative (COR). The Contractor shall maintain an accurate record of all accidents resulting in personal injury, death, trauma, or occupational illness or disease; exposure to hazardous materials (asbestos, lead, etc); and, all injuries reported on the Occupational Safety and Health Administration (OSHA) Form 300, Log of Work-Related Injuries and Illnesses.
H.2.3 Occupational Hazards
The Contractor shall comply with all elements of OSHA Safety and Health Standards and the FLETC Safety and Health Directives.
H.2.4 Fire Prevention
Contract personnel shall report fires immediately upon detection. The Contractor shall observe all OSHA, FLETC, and National Fire Prevention Association (NFPA) requirements for handling and storage of combustible supplies, materials, waste, and trash. If combustible materials are to be stored on the premises, the Contractor shall obtain Government approval, label the containers with the fire hazard potential of the materials and store the containers in fire-rated locking metal cabinets.
H.2.5 Traffic Regulations
Contractor and subcontractor personnel operating motor vehicles on the FLETC shall observe traffic regulations and posted speed limits except as defined elsewhere in this contract. The only exception to posted speed limits is passing jogging formations, when speed shall be reduced to 15 mph. Traffic laws are enforced on the Center and violations shall be assessed penalty points, which can result in revocation of driving privileges on Center.
H.2.6 Weapons
Contractor and subcontractor personnel are not permitted to bring privately owned firearms, weapons, or ammunition on the Center. This restriction includes handguns, rifles, shotguns, hunting bow and arrows, etc. All privately owned firearms, weapons, and ammunition must be surrendered/checked in at the main gate upon entry to the FLETC.
H.2.7 Supervision of Contractor Personnel
The Contractor's personnel shall remain under the Contractor's direct supervision at all times. Although the Government will coordinate direction within the scope of the contract, detailed instructions for the Contractor's personnel's performance and supervision shall remain the sole responsibility of the Contractor.
H.3 MEDICAL TREATMENT
a. Only emergency medical care is available in Government facilities to Contractor personnel who suffer on-the-job injury. The Government will NOT perform physical examinations on Contractor personnel except as specified elsewhere in this contract. Government emergency vehicles and medical personnel may be used as the first point of treatment in emergency situations affecting Contractor personnel suffering pain or whose life or limb may be in danger.
b. Transfer to other than Government medical treatment facilities shall be affected by the Local Rescue Squad or Security Vehicle as determined necessary by attending medical authorities. The Contractor shall render payment for care at the rates established by the CO as equitable with like services rendered in the local community. Upon receipt of a statement of charges, reimbursement will be made by the Contractor as a credit to the next billing invoice. Cost of these emergency services shall be incurred and borne by the Contractor as non-reimbursable by the Government.
H.4 SUBCONTRACTING
The Government reserves the right to approve or disapprove subcontractors for any work required by this contract. The Contractor shall obtain the CO's written approval of all subcontractors and provide copies of approved subcontracts.
H.5 ORDER OF WORK
The Contractor shall arrange the work so that it will not cause interference with the normal conduct of Government business or with the progress of other Contractors' projects. The Contractor shall submit all work schedules for approval by the COR. The Contractor shall adhere to the established schedules.
H.6 OTHER CONTRACTS
The Government may award third party contracts for additional work at or near the site of work under this contract. The Contractor shall fully cooperate with the other contractors and with Government employees and shall carefully adapt scheduling and performing the work under this contract to accommodate the additional work, heeding any direction that may be provided by the CO. The Contractor shall not commit or permit any act that will interfere with the performance of work by any other contractor or by Government employees.
H.7 DISRUPTION OF CONTRACTOR WORK SCHEDULE
The Contractor shall promptly notify the CO and the COR when it appears that Government activities or personnel or other contractor's projects are hindering the effective execution of its work efforts.
H.8 RIGHTS OF THE GOVERNMENT TO PERFORM FUNCTIONS WITH ITS OWN
PERSONNEL
a. The Government reserves the right to perform or supplement performance of contract functions with Government personnel during periods of disaster, war emergencies, police actions, or acts of God.
Such performance shall not constitute a breach of contract by the Government within the meaning of the contract clause entitled "Default".
b. The Contractor agrees under such circumstances to permit the Government to use any essential Contractor-furnished property. The Government will equitably compensate the Contractor for use of such property.
H.9 GOVERNMENT PERFORMANCE OF SERVICES DURING LABOR STRIKES
a. Because the services called for under this contract are of critical importance to the FLETC, the Government reserves the right to take over or supplement performance of this contract in the event of a labor strike by the Contractor's personnel which impairs the Contractor's ability to satisfactorily perform the contract. Under such circumstances and at the direction of the CO, the Contractor agrees not to interfere in any way with Government performance. The Contractor further agrees under such circumstances to permit the Government to use any essential contractor-furnished property. The Government will equitably compensate the Contractor for use of such property.
b. The Contractor will not be entitled to payment for any performance period, in part or in total, during which the Government assumes performance under this clause. This clause does not limit the Government's rights under any other clause of this contract, including but not limited to, "Default (Fixed-Price Supply and Services)", "Termination for Convenience of the Government (Fixed-Price)", and "Inspection of Services-Fixed-Price."
H.10 CONSERVATION
Contractor and subcontractor personnel shall actively participate in all energy conservation efforts and programs applicable to work performed under this contract. The Contractor shall instruct its personnel and subcontractors in utilities conservation policies.
H.11 LABOR RELATIONS
a. The Contractor shall maintain satisfactory labor relations with its personnel. Representatives of the Contracting Office will not participate in labor relation matters unless disputes develop that interfere with the proper performance of the contract, at which time the representative may endeavor to assist in settling the difficulty.
b. The Contractor shall provide the CO with a copy of any collective bargaining agreement applicable to personnel performing on this contract.
H.12 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND
CONSTRUCTION CONTRACTS
The Contractor shall provide a complete list of biobased products purchased to carry out the contract requirements at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts, on each anniversary date of award. The list shall be provided via the USDA report template at http://www.biopreferred.gov/FARReporting/FARReporting.xhtml.
Mark Harvison, 912-267-3484, mark.harvison@fletc.dhs.gov
H.13 PHOTOGRAPHY
No photography, of any nature, is allowed while on the FLETC without the written authorization of the CO. Submit photography requests to the CO at least two (2) business days prior to anticipated photo session.
H.14 CONDUCT OF PERSONNEL
The CO may require the Contractor to remove from the job site any individual under this contract for reasons of misconduct, security, suspected or found to be under the influence of alcohol, drugs, or other incapacitating agent. Contractor and subcontractor personnel shall be subject to dismissal from the premises upon determination by the CO that such action is in the best interests of the Government. The CO has the authority to bar individuals from the installation. Such removal from the job site or dismissal from the premises shall not relieve the Contractor of the requirement to provide sufficient personnel to perform the services as required by this performance work statement.
H.15 CONTRACTOR VEHICLES
a. All Contractor vehicles operated on Government property shall be in operable condition, maintained in good repair, and meet all local, State and Federal safety requirements. Vehicles found to be unsafe or unable to function as designed shall be removed from the job site immediately. Each vehicle operated by the Contractor under this contract shall, at all times, display a valid state license plate and safety inspection sticker, if applicable.
b. All Contractor vehicles shall be operated in accordance with the FLETC traffic regulations.
c. Should a vehicle fail to meet the standards, the Contractor shall be liable of any resultant delays (including jeopardizing their performance report rating on contract schedules).
d. The Contractor's name and telephone number shall be conspicuously legible on both sides of all Contractor vehicles and over-the-road equipment.
H.16 PERMITS
a. The Contractor shall without additional expense to the Government obtain all appointments, licenses, and permits required for the prosecution of the work and for compliance with all applicable Federal, State and local laws, regulations, and codes. Evidence of such shall be provided to the CO upon request.
b. The Contractor shall ensure that all Contractor personnel who will be driving a vehicle in support of this contract possess required license, prior to driving that vehicle. This specifically includes personnel operating FLETC Government owned vehicles in the performance of roles.
H.17 ENVIRONMENTAL PROTECTION
The Contractor shall comply with all applicable environmental protection requirements including all Federal, State and local laws and regulations. All environmental protection matters shall be coordinated with the CO or designated representative. In the event that a regulatory agency assesses a monetary fine against the Government for violations caused by the Contractor, or contractor equipment, personnel, etc., the Contractor shall reimburse the Government for that portion of the fine and associated costs for which the Contractor is responsible.
H.18 ACCESS TO BUILDINGS
It shall be the Contractor's responsibility, through the COR, to obtain access to buildings and to arrange for each room/area to be opened and closed as necessary in performance of contract requirements. The Contractor shall be responsible for safeguarding all Government property and securing facilities, equipment, and materials at the end of each work period.
H.19 KEY CONTROL
a. Keys to include keyless entry cards or other similar control devices will be issued to the Contractor as appropriate. The Contractor shall receive, service, and account for all keys issued for use in the performance of this contract. The Contractor shall develop a system of key control and submit the written plan for the CO's approval five (5) days prior to contract start. This plan shall become a part of the quality control plan. The Contractor's plan shall ensure that all keys and lock combinations issued to the Contractor by the Government are not lost, misplaced, or used by unauthorized persons.
b. Neither the Contractor, nor any Contractor personnel, shall duplicate or fabricate any Government key in its custody. Should replacement keys be required, the Contractor shall submit a WRITTEN REQUEST to the COR. The Contractor shall report loss or unauthorized duplication of Government issued keys to the CO or his/her designated representative within 48 hours of learning of the loss or duplication by Contractor and subcontractor personnel.
c. The Contractor shall control access to all Government provided lock combinations to preclude unauthorized entry. The Contractor shall immediately notify the COR when lock combinations have been compromised.
d. Should the security of a facility become compromised by the loss of a key by Contractor personnel, the Contractor shall be responsible for replacement cost for rekeying of locks or lock replacements as determined appropriate by the CO. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced and replacement cost borne by the Contractor.
e. Contractor personnel shall not allow anyone the use of any…