- HSFLGL13B00004
About this file
Amendment 000002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HSFLGL-13-B-00004_000003.pdf | ||
| HSFLGL-13-B-00004_SF-30_Amendment_000001.pdf | ||
| FMD-42_DailyReport.pdf | ||
| DavisBaconWageRate.pdf | ||
| DHS_Form_700-3.pdf | ||
| FMD_-66SafetyVio.pdf | ||
| OF_306.pdf | ||
| Bldg_64_Asbestos_Rept_Acrobat_Pro.pdf | ||
| BadgeApp_SEM17.pdf | ||
| QuestionPublicTrust_SF85P.pdf | ||
| DHS_Form_11000-6.pdf | ||
| ConstructInvoice.pdf | ||
| 347_Instruction.pdf | ||
| Invoice_Cover.pdf | ||
| FormI-9.pdf | ||
| WH_347.pdf | ||
| DOLDavisBaconPoster.pdf | ||
| HSFLGL-13-B-00004.pdf | ||
| AffidavitIndividualSuretySF28-03.pdf | ||
| SF_1444.pdf | ||
| PerformanceBond_SF_25-96.pdf | ||
| Equal_Employment.pdf | ||
| Bid_Bond_SF_24-98.pdf | ||
| FMD-65Compliance.pdf | ||
| StandardForm1413.pdf | ||
| PaymentBond_SF_25A-98.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
HSFLGL-13-B-00004
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
GLYNCO GA 31524
ATTN: Sonya D. Armstrong
FLETC GL
PRO BLDG 93
1131 CHAPEL CROSSING RD
FEDERAL LAW ENFORCEMENT TRNG CTR
DEPARTMENT OF HOMELAND SECURITY
GLYNCO GA 31524
FLETC GL
BLDG: 93 ATTN: Sonya D. Armstrong
1131 CHAPEL CROSSING RD
FEDERAL LAW ENFORCEMENT TRNG CTR
DEPARTMENT OF HOMELAND SECURITY
08/22/2013000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/02/2013
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
1. This Amendment 000002 provides the attached Questions and Answers which are hereby incorporated into the subject solicitation.
2. Bidders are reminded that all technical inquiries must be submitted in writing to the
Contracting Officer no later than 23 August 2013. Note: Corrects the typographical error of
2015 on Amendment 000001. Inquiries shall be sent via email to sonya.armstrong@dhs.gov .
3. Bid Date remains 3 September 2013, 3:00 P.M. Eastern Time at FLETC, Glynco, GA. If attending the formal bid opening, the bidder is required to notify the Contracting Officer via email no later than 30 August 2013, 1:00 P.M. Eastern Time to obtain a visitor pass.
Request must include Company Name, Full Name of Attendee, State whether the attendee is a
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Sonya D. Armstrong
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
HSFLGL-13-B-00004/000002
U.S. Citizen. Delay in providing this information may result in no access to the bid opening. It is the bidder's responsibility to ensure arrival to obtain the pass in sufficient time to attend the bid opening.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
HSFLGL-13-B-00004 Renovate Building 64, FLETC, Glynco, GA Questions and Answers Numbers 1 through 14: 8/22/13
1. Question regarding specification section 32 11 16 .16 paragraph 2.1 Subbase Course for Pervious Paving. This section states that we have to achieve a bearing ratio of 30 with the gradation of aggregate provided. Looking at the gradation there are no "fines" included in it and we do not feel that we would be able to achieve the bearing ratio required with this gradation. Is there another gradation of material or method that would be acceptable to the government for the installation of this base material? On other projects that we have installed pervious concrete paving, we have installed # 5 stone for the subbase course, but we were not required to achieve a bearing ratio.
Please advise if there any alternatives. Reply: Material shall meet ASTM per specification. #5 is acceptable if it meets the gradation table in paragraph 2.1.
2. Question: The Engineer didn't mention ALC in the control spec as per the solicitation, but I forgot he also needs to add that the Control Contractor shall be a "First Tier" subcontractor as we have been on 99% of all the other projects on the base. This is the same as the Fire Alarm Contractor.
Reply: Refer to spec 23 09 23.13 20 para 2.1: This calls for Automated Logic. Fire Alarm is also discussed in the spec section as stated above.
3. Question: Section 03 30 00, Cast-In-Place Concrete; Page 11, para 2.3.1, references Water - Cement ratio at 0.50. Page 13, para 2.4.2, requires a 0.45 Water - Cement ratio. (45% by weight) Which is correct? Reply: Provide water / cement ratio in accordance with Page13, para 2.4.2 (45% by weight).
4. There is no symbol or description for $M2 on sheet E001. There are approximately 55 of them on the EL Drawings. Please clarify. Reply: This is a wall switch with a dual technology and dual relay capability. SensorSwitch #WSD PDT 2P or technically equal.
5. There is no symbol or description for DSP on sheet E001. There are approximately 4 of them on Sheets EL100 & EL300. Please clarify. Reply: This is a 12-24 VAC/VDC low voltage dimmer capable of 0-10V Dimming.
6. There is no symbol or description for SP on sheet E001. There are approximately 2 of them on Sheets EL100 & EL300. Please clarify. Reply: This is a secondary power pack. SensorSwitch #SP20 or technically equal.
7. Sheet ED101 is a concrete ductbank required for all underground raceway (data, telephone, T.V., & Power) or just data & telephone? Reply: Data and Telephone. See ED101 detail 5. Electrical ductbank must be separate from Data and Telephone.
8. Sheet EL100 Details 2, 3, & 4 & Sheet EL200 Details 2 & 3. Are the relays actually contactors or is the intent to parallel relays (if needed) Reply: Contactors.
9. EP100 Detail 5 are the device plates supposed to be engraved or labeled? Reply: Detail 5/EP100 indicates that each wallplate be labeled with an engraved phenolic label containing ¼” high, black text identifying panelboard name, circuit number, switched, and unswitched.
10. EP100 Detail 5 are all receptacles plates labeled (or engraved) or just the office “QUAD” receptacles? Reply: All receptacle wallplates are to be labeled with an engraved phenolic label containing ¼” high, black text identifying panelboard name and circuit number.
11. EP100, EP200, & EP300 Key Notes 1&2. APC Netshelter AR3150 42U or Approved Equal.
APC Netshelter AR3150 42U or Approved Equal (containing patch panels). Is this equipment supposed to be furnished by the electrical contractor? Reply: Yes. See specifications for type of patch panels to be supplied.
12. EP100 Detail 2 and Sheet ES101. What size N3R Hinged Junction Box is required for the five-4” Conduits for fiber optics & the one-1 ½” for T.V. cable or do we size them per code? Reply: The Nema 3R hinged junction boxes shall be sized per NEC.
13. Typical for all EWH (electric water heaters). The drawings indicate a combination circuit breaker & motor starter. Can an enclosed circuit breaker or disconnect be used instead? Per manufacturer a motor starter is not required. Reply: The symbol for the water heaters was not in the legend. The symbol you are referring to has the top and bottom triangle shaded. The symbol next to the water heaters has the left and right triangles shaded. The symbol for the water heaters is a flush mounted circuit breaker style switch mounted adjacent to the water heater and labeled as water heater disconnect.
14. ES101 “EUS” Existing underground secondary to be demolished. Can the conduit be abandoned in place after conductors are removed or are removal of conduit required? Reply: Cut conduits off 18” below grade and abandon in place.
15. Please ref. drawing AE108 Section resilient accessories schedule…Please let us know the rooms where the CR & WB are required. Reply: In Corridors, Conference Rooms, Lobbies, and Break Rooms.
Federal Law Enforcement Training Center 15 October 2012
RENOVATE AND RECONFIGURE BUILDING 64 01 45 02
Glynco, GA CONTRACTOR QUALITY CONTROL
Section 01 45 02 Page 7
1.5 QC ORGANIZATION
1.5.1 QC Manager
1.5.1.1 Duties
Provide a QC Manager at the work site to implement and manage the QC program. The only duties and responsibilities of the QC Manager are to manage and implement the QC program on this Contract. The QC Manager is required to attend the QC Plan Meetings, Coordination and Mutual Understanding Meeting, conduct the QC meetings, perform the three phases of control, perform submittal review and approval, ensure testing is performed and provide QC certifications and documentation required in this Contract.
The QC Manager is responsible for managing and coordinating the three phases of control and documentation performed by testing laboratory personnel and any other inspection and testing personnel required by this Contract. The QC Manager is the manager of all QC activities.
1.5.1.2 Qualifications
A graduate of a four year accredited college or university program in one of the following disciplines: Engineering, Architecture, Construction Management, Engineering Technology, Building Construction, or Building Science, with a minimum of 10 years cumulative experience as a Project Superintendent, QC Manager, Project Manager, Project Engineer or Construction Manager on similar construction contracts which included the major trades that are part of this Contract. Similar construction contracts are defined to be of comparable cost, type and complexity of work and including the major trades that are part of this Contract. The individual shall have Federal construction contract experience and be familiar with the Federal contract administrative requirements and processes. The individual must possess and demonstrate extensive experience and a working knowledge in the full range of trades and disciplines typical to work under this contract (For example: architectural work and finishes, carpentry, structural steel, site layout, earthwork and storm drainage, environmental protection and site management, pavement, utilities, concrete, heating, ventilation and air conditioning, piping, plumbing, fire alarm and protection, electrical distribution systems, lighting, lightning protection, telecommunications and interior furnishings). In addition to the above experience and education requirements, the QC Manager shall have completed the course entitled "Construction Quality Management (CQM) for Contractors." If the QC Manager does not have a current certification, he/she shall obtain the CQM for Contractors course certification within 30 days of award. This course is periodically offered by the Naval Facilities Engineering Command and the Army Corps of Engineers. Contact these organizations for information on the next scheduled class. The individual must be familiar with the safety requirements of EM 385-1-1, and have experience in the areas of hazard identification, safety compliance, and sustainability. Computer proficiency is required in such software systems as Word, Excel, Outlook (e-mail) and Primavera. The individual must demonstrate a working knowledge of and familiarity with the Critical Path Network scheduling program. Requirement to substitute college degree: shall have 5 years of experience as QC Manager of which 2 years shall be Federal projects for similar construction projects such as renovation of buildings.
1.5.2 Superintendent
1.5.2.1 Duties