CDP Facilities Descriptions.pdf
PDF 17 KB Posted
- Attached to
- CDP Armed Guard Security Services
- Solicitation number
- HSFEEM-12-R-0004
About this file
CDP Facility Description
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Center for Domestic Preparedness (CDP)
Facilities Information
CDP Headquarters, 61 Responder Drive:
A single two and one half story, CMU structure, comprising approximately 196,111 square feet of administrative, academic, and logistical space. The facility is sited on 12.29 acres and was constructed in two phases, 1977 and 1986. The facility is surrounded by a 10 foot high steel security fence with five pedestrian gates and six vehicle gates. These access points are protected with access control card readers, video surveillance and monitored by on site armed security officers. There is no emergency power for this facility other than for security services. An additional structure, i.e., Faith Wing, an attached three story, CMU structure, comprising approximately 37,729 square feet sited on two acres (+ or -) of property will become additional administrative and academic space following renovation. The existing security fence will be extended to enclose the Faith Wing property. This enclave is designated as a Federal Security Level (FSL) III facility.
Noble Training Facility, 490 Care Drive:
A four story, including basement, CMU structure, comprising approximately 166,976 square feet of administrative, medical service, academic, and logistical space. The facility is sited on 19.3 acres and was constructed in three phases, 1966, 1976, and 1988. Access to the facility is protected with an intrusion detection system (IDS) and video surveillance which is monitored on site by armed security officers. Emergency power is available and provided to the majority of the facility. This enclave is designated as a Federal Security Level (FSL) III facility.
Chemical, Ordnance, Biological, Chemical (COBRA) Training Facility, 801 Walt Phillips Road:
The fifteen CMU structures in this enclave comprise approximately 67,060 square feet of administrative, academic, chemical/biological agent storage/training, and logistical space and includes: a one and one half story administrative and academic building; a two story structure housing the chemical and biological laboratories, safety and training control centers, training bays, decontamination and laundry facilities, medical, mechanical, emergency power, air monitoring and filtration systems; a two story site operations and maintenance building; an incinerator structure; plus twelve other structures utilized for hands-on training, security and facility support. The entire enclave is protected by two security fences, with clear zones and an active barrier system, and is protected with intrusion detection systems and video surveillance monitored by on site armed security officers. The enclave is sited on 37.18 acres and was constructed in 1985. Emergency power, including redundant sources, is available and provided to the entire facility. This enclave is designated as a Federal Security Level (FSL) IV facility.
Advanced Responder Training Complex, Freemont Road, Goode Road, and Wall Street:
The six CMU structures in this enclave comprise approximately 153,147 square feet of administrative, academic, and logistics space, plus outdoor training venues. Access to three buildings, i.e., Buildings 503, 504, and 505, is protected with local annunciating intrusion detection systems (IDS); the remaining structures are equipped with appropriate locking devices but no IDS. Video surveillance of the Freemont Road frontage is monitored from Noble Training Facility. Armed security officers conduct periodic roving patrols of the enclave. The enclave is sited on 23 acres and was constructed in the 1970’s. There is no emergency power for this enclave. It is designated as a Federal Security Level (FSL) II facility.
Dormitory/Dining Facility/Lounge Complex, Straub Circle and Dekalb Court:
The nine CMU structures in this enclave comprise approximately 197,717 square feet of lodging, administrative and dining facility space. The complex is sited on approximately 17.81 acres and was constructed in 1988. The enclave is surrounded by 7 and 10 feet metal and chain link fence, with two pedestrian and six vehicle gates. The access points are protected with locking devices and video surveillance equipment monitored on site by armed security officers. Emergency power is available to two dormitories (19 and 21 Straub Circle) and the dining facility (17 Straub Circle). There are three additional inactive dormitory structures and two administrative structures adjacent to the complex that are currently leased by the CDP. These buildings will be added to this complex in the future. This complex is designated as a Federal Security Level (FSL) III facility.
Maintenance/Shipping/Receiving/Mailroom/Training Devices Fabrication Complex, 40 Twill Lane:
This enclave is a single one-story, wooden structure comprised of approximately 27,720 square feet of space divided into four zones, i.e., one each for: campus maintenance operations, shipping and receiving operations, mail room operations, and training devices fabrication. The complex is sited on approximately 3.14 acres and was constructed in 1942. The rear of the building is enclosed by a 10 foot high chain link fence with two vehicle gates. The access points are protected with locking devices, an intrusion detection system, and video surveillance equipment monitored at the dormitory/dining facility complex. There is no emergency power for this facility. This complex is designated as a Federal Security Level (FSL) II facility.
File details come from the government source that posted it. Updated .