About this file

Attachment 7 - Material Approval Submittal

View the file

Other files

File Type Posted
TMACC_Amendment_0008.pdf PDF
TMACC_Amendment_0007.pdf PDF
TMACC_Amendment_0006.pdf PDF
6_-_TMACC_Past_Performance_Questionnaire_Amdt_0006.pdf PDF
TMACC_Amendment_0005.pdf PDF
TMACC_Amendment_0004.pdf PDF
WD_FL153.pdf PDF
WD_NY12.pdf PDF
WD_NC69.pdf PDF
WD_AK1.pdf PDF
WD_HI1.pdf PDF
WD_ME8.pdf PDF
TMACC_Amendment_0003.pdf PDF
WD_CA29.pdf PDF
WD_MI33.pdf PDF
9723_CMD-CEN_Tower_Northport_FY15_Photo_21.bmp BMP image
9723_CMD-CEN_Tower_Northport_FY15_Photo_22.bmp BMP image
9723_CMD-CEN_Tower_Northport_FY15_Photo_23.bmp BMP image
STA_EATONS_NECK_-_Final_Report.pdf PDF
TMACC_Amendment_0002.pdf PDF
10228_CMD-CEN_TOWER_Station_Hobucken_FY_15_Photo_7.bmp BMP image
2017_TMACC_SF1442_Amdt_0002.pdf PDF
10228_CMD-CEN_TOWER_Station_Hobucken_FY_15_Photo_8.bmp BMP image
10228_CMD-CEN_TOWER_Station_Hobucken_FY_15.pdf PDF
10228_Photo_1.PNG PNG image
10228_Photo_2.PNG PNG image
TMACC_Amendment_0001.pdf PDF
2017_TMACC_SF1442_Amdt_0001.pdf PDF
3_-_TMACC_Contractor_Responsibility.pdf PDF
TMACC_Solicitation.pdf PDF
6_-_TMACC_Past_Performance_Questionnaire.pdf PDF
5_-_TMACC_Pre-proposal_Inquiry.pdf PDF
1_-_TMACC_Seed_Project_SOW.pdf PDF
2_-_Seed_Project_Wages.pdf PDF
8_-_Fed_Reg_for_FAR_52_222-23.pdf PDF
4_-_TMACC_Experience_&_Project_Information_Form.pdf PDF
2017_TMACC_SF1442.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 7

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

TO (Contracting Officer) FROM DATE

CONTRACTING OFFICER

U.S. COAST GUARD

CIVIL ENGINEERING UNIT OAKLAND

1301 CLAY ST, STE 700N

OAKLAND, CA 94612

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

NEW RESUBMITTAL

PREVIOUS SUBMISSION NUMBER TASK ORDER NUMBER

TO BE COMPLETED BY CONTRACTOR

FOR GOVERNMENT USE ONLY

ITEM

NO.

SPECIFICATION SECTION /

PARA. NO. / DRAWING NO.

DESCRIPTION OF MATERIAL

(Include Type, Model Number, Catalog Number, Mfg., Etc.)

APPROVED

DIS-

APPROVED

SEE

REVERSE

INITIAL

TYPED OR PRINTED NAME SIGNATURE DATE

TO: (Contractor)

O Approved O Disapproval as indicated Above and Subject to Any Applicable Comments on the Reverse Side. Request Resubmittal on Disapproved Items Within __________ Days of Date Shown Below.

TYPED OR PRINTED NAME SIGNATURE DATE

Copy of reviewed form to be provided to the Contracting Officer

Attachment 7

COMMENTS

(Number to Correspond with Applicable Item Number on Reverse)

INSTRUCTIONS TO CONTRACTORS

1. The term “material” is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer’s Literature and Certificates and Samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 3 copies, signed, and provided to the Construction Manager with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form and the corresponding Submittal Register number contained in the specifications.

4. Requests submitted shall be numbered consecutively, by contract, in the space entitled “Submission No.” This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and date in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This Material Approval Submittal is not valid unless the Construction Manager signs it. This approval is required as called for under the terms of this contract.