Text version
TABLE OF CONTENTS
SCOPE OF SERVICES
PART 1-GENERAL REQUIREMENTS
PART 2-PRODUCTS
PART 3-EXECUTION
APPENDIX A- Tower Information & General Requirements
APPENDIX B- Tower Condition Assessment Form
PART 1-GENERAL REQUIREMENTS
1.1 APPLICABLE REFERENCES:
Inspections and/or maintenance shall be conducted in strict accordance with the industry standards, TIA-222-G: Structural Standard for Antennas, the U.S. Coast Guard Tower Manual, COMDINST M11000.4A, FAA AC 70/7460-1L and this scope of services. Other applicable references include ANSI Z359 (Fall Protection Code), 29 CFR Parts 1910 & 1926 (OSHA) and past inspection reports.
1.1.1 REFERENCE DOCUMENTS: Copies of all existing documentation and drawings relating to the towers will be made available at Coast Guard Civil Engineering Unit (CEU) Miami upon request.
1.2 WORK INCLUDED:
Work includes inspection and maintenance of free standing and guyed communication towers at multiple locations in the US. Not all towers require a full inspection and inspection report, and only require maintenance work. Specific requirements for each of the towers is listed in Appendix A. Note that some towers may be leased by the Coast Guard. Amplifying requirements for these leased towers are included in Appendix A.
1.2.1 PERFORMANCE PERIOD: The performance period of this contract shall be 100 days.
1.2.2 PURPOSE OF INSPECTIONS AND/OR MAINTENANCE: The primary purpose of the inspection is to detect and report conditions requiring maintenance or repair before such conditions become safety, structural or major maintenance problems. The Contractor shall climb and examine each tower to perform inspection services, minor maintenance, and repairs as outlined in these specifications.
1.2.3 DOCUMENTATION: Record, through color photography, instrumentation, and narrative, the present condition of the tower, guy systems, and appurtenances. Minor maintenance and repair will be performed on the towers as part of the tower inspection services.
1.2.4 IMMEDIATE SAFETY OR STRUCTURAL HAZARDS: If the Contractor identifies any discrepancy representing an immediate safety or structural hazard, then the Contractor shall immediately stop work and contact the Contracting Officer for direction.
1.3 SAFETY:
1.3.1 SAFETY STANDARDS: All work shall be carried out in accordance with strict safety standards. At a minimum, the requirements of 29 CFR 1926 (OSHA Construction Safety and Health Compliance) and ANSI Z359 (Fall Protection Code) shall be met. The Contractor shall also comply with the safety guidelines provided in the U.S. Coast Guard Tower Manual, COMDINST M11000.4A. Any Contractor personnel not in compliance with the safety regulations and representing a safety risk may be required by Coast Guard personnel to vacate the property until a resolution between the Contractor and Contracting Officer can be reached.
An example of a safety risk is personnel free-climbing and not demonstrating 100% fall protection.
1.3.2 SAFETY OBSERVER: The Contractor shall provide a qualified climber as a safety observer. The observer shall be familiar with dangers associated with energized towers and shall possess the ability to detect circumstances or conditions that present a shock or other hazard to personnel or property. This person shall be a qualified climber and shall have two-way radio or cellular phone communications with personnel working on the tower and local emergency response teams (i.e. local fire department).
1.3.3 COMMUNICATIONS EQUIPMENT: Provide communications equipment of a type and quantity satisfactory to provide communications between all work groups and the safety observer. The recommended equipment is VHF-FM two-way radios and cellular phones. A satellite phone is recommended to be carried at remote sites due to inadequate cell phone reception.
1.3.4 SAFETY BRIEFING: The project superintendent/foreman shall conduct a safety briefing on the job site prior to the start of work for all personnel to be employed on the job.
Government representatives may attend the briefing as well. Briefing shall address the safety issues relating to working on the tower and the evolutions to be conducted. During the briefing, it shall be discussed and understood who the Contractor’s designated safety observer will be.
Phone numbers or radio frequencies shall be exchanged at this briefing indicating the emergency response phone numbers of the Safety Observer and local emergency response teams (i.e. local fire department). The location and directions to the nearest medical care facility shall also be identified and addressed during the briefing.
1.3.5 WEATHER: Work at heights shall not be carried out when the ground level wind speed exceeds 23 mph, electrical storm activity is present or imminent, or when fog obscures clear visibility to the top of the tower.
1.3.6 SAFETY EQUIPMENT: Workers on the tower shall utilize Contractor furnished ANSI Z359 approved climber equipment to include body harness, shock absorbing lanyards, fall restraint lanyards, carabineers, and safety sleeves for towers with the safety rail installed.
Government owned safety gear shall not be used by the Contractor's employees. The Contractor shall maintain 100% fall protection at all times by assuring a fall arrest lanyard is attached to the body harness and structure anchorage at all times.
1.3.7 CONTRACTOR MATERIAL: The Contractor shall, at the end of each working day or in the event of inclement weather, secure all loose gear such as hoist lines and lifting rigs to prevent them from flapping in the wind or falling off the tower. No materials or equipment shall be dropped or thrown from the towers at any time. All tools shall be tethered to personnel on the tower at all times.
1.4 MISCELLANEOUS:
1.4.1 SITE MOBILIZATION: No less than 14 days prior to commencing travel to the tower sites listed, the Contractor shall contact the site POC for each tower site and the Contracting Officer Representative and provide a firm schedule, to include dates and times, so that the site POC and Contracting Officer Representative may make necessary arrangements for the work.
The Contractor shall ask the site POC about the existence of any specific items or peculiarities of the antenna tower system that should receive special attention during inspections or maintenance.
A list of site POCs is made available for the Contractor in Appendix A.
1.4.2 SITE DEMOBILIZATION: The Contractor shall contact the Contracting Officer Representative by e-mail or phone within 1 day of demobilizing from a site. The Contractor shall inform the Contracting Officer Representative that the Contractor has left the site, and shall provide remarks on major work accomplished and any issues encountered while on site.
1.4.3 ENERGIZED TOWERS: Climbing energized towers is not authorized. Contact the site POC to confirm the tower is not energized.
1.4.4 PROPER ID: All personnel shall carry proper identification (ID) when on site. Proper ID is defined as either the individual’s driver’s license or other Government issued ID. Individuals without proper ID will not be permitted on federal or leased property.
1.4.5 MILITARY INSTALLATIONS: Become familiar with and obey fire, traffic, and security regulations onboard military installations. Personnel shall not stray from the immediate area of work or from direct avenues of ingress and egress unless authorized in advance by the Contracting Officer. The Contractor’s equipment shall be conspicuously marked for identification.
1.4.6 UTILITIES: Contractor shall provide all of their own utilities, including electricity. All utilities shall be used in strict accordance with the manufacturer’s instructions and OSHA standards to include protecting workers at all times. Generators shall be properly maintained at all times as to prevent discharge of oil, gasoline, or diesel fuel. The Contractor is responsible for providing sanitary facilities in accordance with Federal, State, and Local regulations.
1.4.7 QUALIFICATION AND EXPERIENCE: All work under this contract shall be performed by firms having successful experience on tower projects of equal or greater scope and on towers or structures similar to those involved in this project. Personnel performing inspections and maintenance on guyed towers shall have a minimum of three years experience performing maintenance, inspections, and repairs on guyed communication towers. Personnel performing inspections on guyed towers shall have experience recording and adjusting guy tensions, tower alignment and twist in accordance with TIA-222-G Annex J & K.
1.4.8 RECEIPT OF MATERIALS: Shipment of materials, equipment, and supplies shall be addressed to the Contractor, not to the Government. Any deviations must have prior approval by the Contracting Officer before shipment. The Government is not responsible for damaged or lost material that occurs during shipment.
1.4.9 CLEANUP: Remove and transport debris and rubbish in a manner that will prevent spillage into the surrounding area; cleanup all job spillage. The Contractor shall be responsible for repair of any damage incurred to buildings, pavement, or landscaping as a result of work. All spent solvents and cleaning rags shall be disposed of in accordance with applicable regulations.
All debris shall be removed from the site. Upon completion of work, temporary platforms, scaffolds, tools and equipment shall be removed from the site. Comply with Federal, State, and Local hauling and disposal regulations. Used oil and oil soaked rags shall be managed in accordance with applicable Federal (40 CFR 279), State, and Local regulations. Used electrical equipment (bulbs) shall be managed in accordance with Universal Waste Rule Federal (40 CFR
273) and applicable state and local regulations.
1.4.10 ENVIRONMENTAL CONSIDERATIONS: The Contractor shall comply with all applicable Federal, State and Local laws and regulations for the protection of the environment, and shall be cognizant of Section 7 ESA and Migratory Bird Act compliance. The Contractor shall document that a survey to identify the presence or absence of protective birds and/or nesting is completed for each site. The Contractor shall immediately report to the Contracting Officer Representative any environmental issues encountered during performance of this work including, but not limited to, nesting birds on or in the immediate vicinity of the tower(s), historical and archaeological items or human skeletal remains discovered in the course of work, and site contamination. The Contractor shall avoid disturbing any natural or cultural resources during performance of this work, such as fish or wildlife habitat, wetlands, known cultural resources, or areas of natural vegetation. If a disturbance is required, the contractor shall obtain approval of the disturbance from the appropriate Coast Guard Environmental staff through the Contracting Officer Representative before the disturbance is initiated.
1.4.11 STORAGE AREA: If space is available, the Contractor will be provided a storage area in a location determined by the Contracting Officer Representative. The Contractor shall be responsible for restoring the area to its original condition at the completion of the work. The Contractor shall be responsible for repair of any damage incurred to buildings, pavement or landscaping as a result of storage activities.
1.4.12 WORKING HOURS: Regular working hours shall be between 7:30 AM and 5:00 PM, Monday through Friday, excluding government holidays. The contractor may request permission to work outside of regular hours to the Contracting Officer but must do so at least 2 weeks prior to such work. Work outside normal working hours may not be approved.
1.5 SUBMITTALS: The following submittals shall be made by the Contractor:
1.5.1 SCHEDULE OF VALUES: Within 30 days after contract award, the Contractor shall prepare and submit to the Contracting Officer a schedule of values. The schedule of values shall consist of a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, the unit prices, and the total prices. The schedule must be based upon the actual breakdown of the bid price.
1.5.2 PROGRESS SCHEDULE/ SITE VISIT ITINERARY: Submit a progress schedule (with the schedule of values) to the Contracting Officer in accordance with FAR Clause 52.236-15.
The Contractor shall provide the Contracting Officer schedule updates within one week of the change if the schedule changes.
1.5.3 OFF AIR PLAN: The US Coast Guard is required to request off-air time for access to DGPS sites 30 calendar days in advance. Contractor shall provide the Contracting Officer an off-air schedule within 30 calendar days after contract award and at least 45 days in advance of off air dates. The plan shall discuss when and for how long off-air time is needed. Any changes to the requested off-air date will require an additional 45 calendar day advanced notice prior to work.
1.5.4 SAFETY PLAN: The Contractor shall submit a safety plan that describes what measures will be taken to comply with the safety requirements outlined in 29 CFR Parts 1910 & 1926 (OSHA). The safety plan shall specifically address what training the workers will have on fall protection equipment and the risks of working on elevated structures. The safety plan shall include both work conducted under the Inspection Section of this document as well as the Maintenance Section of this document. The safety plan shall be submitted and approved by the Contracting Officer prior to the start of any work.
1.5.5 LIST OF WORKERS: The Contractor shall submit a list of all personnel who will be working on site to the Contracting Officer for approval. This list shall contain any prior experience for each worker in performance of similar work, OSHA training, and First Aid training. Only personnel on the approved list will be allowed on site.
1.5.6 FINAL REPORT: Prepare and submit (1) professional engineering report per tower. A registered Professional Civil or Structural Engineer shall review, sign, and stamp each final report. The report shall be submitted as an Adobe Acrobat Document (.pdf) and delivered on a CD-ROM to the Contracting Office within 30 days after completing work at the site, or after the draft comments phase as described in Section 1.5.6.1 below. The Contractor shall provide inspection or maintenance reports that comply with all the requirements described in Section
3.3 and 3.4 of this document.
1.5.6.1 FINAL REPORT DRAFT: The Contractor shall provide (1) draft inspection report and
(1) draft maintenance report within 30 days of completing work on the first tower to be inspected and the first tower to receive maintenance. These submissions do not require PE stamps. The Coast Guard shall have 15 days upon receipt of each report to review and comment on any content or lack of content within the reports. Once the comments phase is completed, the Contractor shall submit the final report to the Contracting Office within 30 days. The final report must follow requirements of Section 1.5.6 of this document.
1.5.7 SAFETY CLIMB SYSTEM: The Contractor shall provide the manufacturer’s data sheet for the wire rope safety climb system if installed instead of the Antenna Products galvanized tubular steel safety climb system. Notify the Contracting Officer immediately if the safety climb system is utilizing a 3/8 in 7x19 strand galvanized cable, with a top bracket assembly (including carrier clamps) purchased from Capital Safety between September 1, 2013 and May 14, 2014.
1.5.8 CERTIFICATES OF CALIBRATION: Submit certificates of calibration from a licensed independent testing lab showing calibration of any tension meters to be used. Time between certification and use shall not exceed 1 year.
1.6 TOWER LADDER SAFETY DEVICE (SAFETY CLIMBS): This information pertains to all safety climb replacements in this scope of services. Supply galvanized "Tubular Rail System" manufactured by Antenna Products Corporation, P.O. Box 520, Mineral Wells, TX 76067 phone (817) 325-3301. This ladder safety rail system is compatible with the standard climbing equipment currently used by Coast Guard maintenance personnel.
1.7 RF HAZARDS: Communication towers pose RF hazards. The Contractor shall insure that Contractor personnel exercise appropriate safety procedures at all times.
PART 2-PRODUCTS
2.1 CONTRACTOR PROVIDED ITEMS FOR TOWER MAINTENANCE: The Contractor shall furnish all equipment, instruments, tools, safety lines and harnesses, and other items necessary for accomplishment of these services. These shall include, but not be limited to the following:
a. Dielectric grease
b. 2-inch all weather corrosion protection tape
d. 1-inch filament tape
e. Cold galvanizing compound and applicator
f. Weatherproof permanent marker
g. Black enamel paint
h. Lighting system junction box gaskets
i. Impact Drill
j. Concrete Fasteners
k. Epoxy Adhesive
PART 3-EXECUTION
3.1 TOWER INSPECTION:
The Contractor shall inspect the towers, guy systems, anchors, and appurtenant antennas, and shall provide a written report, as specified. The Contractor shall provide all materials, equipment, and labor to perform the items specified herein.
3.1.1 STRUCTURAL:
3.1.1.1 All structural members of each tower shall be inspected and checked for safety hazards, deflection, deformation, looseness, missing items, twist, corrosion, and other deficiencies.
Inspection shall include tower legs, struts, bracing, diagonal rods, guys, platforms, gusset plates, connections, insulators, hardware, and other structural members and components.
3.1.1.2 All components of each tower shall be inspected and checked for corrosion, cracking, and damage. This shall include mounted sheaves, guides, rollers, outriggers, associated block assemblies, and bearings (sheave bearings and swing bearings) where installed. Check weep holes for excessive running rust.
3.1.1.3 All connections, splices, welds, bolts, nuts, and rivets shall be checked for deficiencies, defects, and looseness. Check a minimum of 15% of all structural bolts in various locations around the tower for looseness by tapping with hammer. Looseness shall not be checked by torquing with a wrench. If a bolt is loose make note on the report, explaining exact location.
Hand-tighten the bolt, measure its diameter and length for future replacement and note in report.
Spray paint the bolt with a black enamel paint to mark it for quick visual identification.
3.1.1.4 Inspect tower foundation for settlement, corrosion, cracking, or damage. Check condition of grout and anchor bolts.
3.1.1.5 All ladders, rungs, safety rails, and cages (where installed) shall be inspected and checked for full compliance with 29 CFR Parts 1910 and 1926, OSHA regulations.
3.1.1.6 Inspect and report the condition of the spacer gasket between tower sections at the leg flanges.
3.1.1.7 Inspect all surfaces of the tower to determine condition and thickness of the paint or galvanized coating. Check for areas of deterioration, galvanic action, or corrosion.
3.1.1.8 Inspect the aviation orange and white FAA paint scheme coating of the tower utilizing the In-Service Aviation Orange Color Tolerance Chart. The color should be sampled on the upper half of the structure, since weathering is greater there.
3.1.1.9 Inspect ball gaps, checking for corrosion and evidence of arcing.
3.1.1.10 Field verify all tower heights using an altimeter.
3.1.2 OBSTRUCTION LIGHTING AND ELECTRICAL SYSTEMS FOR LIGHTED
TOWERS
3.1.2.1 Re-lamp obstruction lamps and flashing beacons at all levels. Replace all incandescent bulbs in kind, unless specified for LED retrofit, as noted in Appendix A. All new bulbs shall be wiped with an alcohol rag prior to installation. Terminals should have dielectric grease on them to prevent corrosion. Do not replace LEDs that are currently installed on towers. Each light fixture shall be opened, the inside of the fixture wiped clean, the lens gasket wiped clean of old grease, and each lens wiped clean inside and out before closing. All gaskets shall be regreased using dielectric grease and the lenses securely closed. Dirty rags soaked in oil/grease shall be disposed of in accordance with Federal, State, and Local regulations.
3.1.2.2 Test all transfer relays in double obstruction lights by unscrewing the primary bulb after relamping, or by replacing the primary bulb first. Check beacon flashers and photocells for correct operation. Replace relays and photocells if found faulty. Any relays or bulbs containing mercury shall be disposed of in accordance with Federal, State, and Local regulations.
3.1.2.3 All lighting system junction boxes shall be opened, the insides wiped clean of dirt and debris, the drain holes cleared and the gaskets cleaned of all old silicone grease. Replace gaskets as needed due to weathering or any other deterioration. Each wire and connection board shall be inspected for proper operation and tightness. The gaskets on all boxes and the screw threads of each securing screw shall be re-greased using silicone grease before being securely closed. All cable glands on each junction box shall also be inspected for weather sealing and tightness.
3.1.2.4 The exposed electric cable for each lighting circuit shall be inspected over its full length for any splits, cuts or deterioration of the insulation. The lighting cables should be secured at maximum 4'-0" intervals. Any loose cable shall be taped to the tower leg in the following manner.
a. 2 turns of 2-inch all weather corrosion protection tape around cable and tower leg.
b. 3 turns of 1-inch filament tape over first layer.
c. 4 turns of 2-inch all weather corrosion protection tape over the filament tape.
d. Apply the last two turns with no tension
3.1.2.5 Check all conduit, conduit clamps, and conduit fittings. Inspect antenna feedlines.
Inspect auxiliary antennas and mounting hardware.
3.1.2.6 Using a megger/ohm meter, measure the insulation resistance of the tower lighting circuit cable conductors. Conductor resistance of each of the isolation transformer windings shall also be measured from the nearest junction box at the base platform. If either insulation resistance is measured at less than one (1) megohm, isolate and eliminate the fault to the extent possible by cleaning and minor repair.
3.1.2.7 Note that this section of the scope of work applies only to obstruction lights and flashing beacons. Signal equipment that is used for marine navigation does not fall under this section.
3.1.3 TOWER GROUND PLANE:
3.1.3.1 The Contractor is cautioned that an antenna ground wire system exists beneath many of the towers. Consult with the tower POC to determine if a ground plane is present at the tower to be inspected or worked on. Use of excessive heavy or tracked vehicles will not be permitted without approval from the Contracting Officer. The Contractor shall not excavate for ground plane inspection.
3.1.4 GROUNDING CONNECTIONS:
3.1.4.1 All ground straps shall be inspected. Each wire and ground rod shall be inspected where they appear above ground, or by removing PVC cap. Connections shall be inspected for breakage, broken joints, and corrosion. Any such defect shall be recorded and reported so as to enable the Coast Guard to locate and repair the defect.
3.1.5 BASE INSULATOR FOR TOWERS:
3.1.5.1 When applicable, inspect base insulators of the tower for cracks, oil leakage, or other visual damage. If any visual damage is observed or suspected, immediately notify the Contracting Officer. A written notification of the defect shall be submitted within 24 hours.
3.1.6 TOWER GUYS:
3.1.6.1 Inspect all structural guys and antenna arrays and their connections, including all turnbuckles, cable sockets, clevis pins, grounding connections, safety wiring, cotter pins, etc. All components should be thoroughly examined for evidence of corrosion, cracking, or deformation and signs of fatigue and wear. All tower guys and antenna arrays shall be inspected from the ground and from the towers, using high-powered binoculars. Special emphasis shall be given to all insulators, connections, and strand material. This work shall be completed during periods of clear skies so that the appropriate lighting is available for the visual observations. If visual inspection shows a need for further investigation by riding a guy wire, notify the Contracting Officer. Riding of guys will require a contract modification. Any damage or deterioration to guys shall be photographed and mapped on a sketch to indicate location and extent of damage.
The type, size, and material of guys shall be indicated.
3.1.6.2 All insulators and bushings shall be inspected for evidence of RF arcing and tracking from foreign contaminants for guyed towers.
3.1.6.3 All structural and radial guy wire connections on the tower and at the anchorage shall be inspected for guyed towers. Check pre-formed guy grips for deterioration, unraveling or loss of aluminum coating. Check for galvanic corrosion at all connections between dissimilar metals.
On any tower where the wire connector comes into direct contact with the soil, perform a sub-surface inspection on a minimum of (1) of the anchors below grade to the anchor block.
Photographs depicting anchor conditions and anchor location(s) in accordance with the Tower Manual (COMDTINST M11000.4A) shall be included in the report.
3.1.6.4 Fixed Top Loading Element (TLE): All TLE components for guyed towers shall be inspected from the ground using a telescope and from the tower using high-power binoculars.
Wire, conductors, jumpers, clamps, insulators, and other associated elements, components, connections, and hardware shall be inspected for corrosion, deterioration, abrasion, abnormalities, damage, deficiencies, and other defects. All discrepancies shall be detailed in the report.
3.1.7 GUY TENSIONS:
3.1.7.1 Measure and record the tensions near the anchors of all structural and radial guys for guyed towers. Adjust guys as necessary to bring tension, alignment, and twist values within tolerances. Tension values shall be within 5% of the values listed in tower erection and maintenance manuals for each individual tower. If attempts to bring tensions into allowable limits are unsuccessful, document and provide final tensions. Do not disconnect any guys without prior approval from the Contracting Officer. Guy tensions, before and after adjustment, shall be included in the tower inspection report in a tabular form. Do not adjust the guy tensions until the major maintenance on the tower has been completed.
3.1.7.2 All of the measurements and any guy tension adjustments shall be made with the wind from a constant direction (+/- 20 degrees), at a speed of less than 15 knots. Weather conditions including temperature, wind direction, and speed shall be recorded.
3.1.8 TOWER ALIGNMENT:
3.1.8.1 Measure and adjust as necessary the vertical alignment of the tower structures for tolerances as outlined in TIA-222-G. Tower vertical alignment shall be checked using the "One Leg" (triangulation) method. Alignment values plotted shall be the average of two (2) readings, one with the scope direct and the other with the scope inverted and then reversed. Plot sheets shall show the location of the tower center at each guy level and shall be submitted with the tower report, including the alignment values. Raw data and a description of the methods used shall be included in the Contractor's report.
3.1.9 TOWER TWIST:
3.1.9.1 Tower twist measurements shall be made by the "Leg Sighting" or "T-Square" method.
Twist values shall be measured in degrees clockwise or counter clockwise using the base platform as the zero reference. Twist markers shall be set at 1/2 degree (7'- 5") intervals 850 feet from the tower base. The Contractor will not be expected to adjust the tower twist, however, the Contractor shall ensure that the re-guying operations do not adversely impact the existing twist;
therefore the twist shall be measured and recorded.
3.2 MINOR MAINTENANCE:
The Contractor shall provide all materials, equipment, and labor, to perform the maintenance items specified herein.
3.2.1 MINOR CORROSION REPAIR: All areas on all towers that have minor corrosion shall be mechanically cleaned to bear metal and coated with a cold galvanizing compound. Use a liquid compound containing minimum 93% pure zinc in the dried film. The compound shall conform to Federal Specification DOD-P-21035A, Galvanizing Repair.
3.2.2 SAFETY PRECAUTIONS: Contractor shall take necessary precautions with appropriate respiratory devices when disturbing paint on the tower. Although none of the towers are known to have high levels of lead based paint, the Contractor shall assume all towers have been painted with led based paint. The Contractor shall comply with Federal, State, and Local regulations for disturbing, handling and disposal of lead based paint.
3.2.3 TOWER IDENTIFICATION NUMBER: All towers should have an identification number tag installed on the lowest 5 vertical feet of the tower structure or foundation. An example identification number tag is included as Figure (1) below. If it is predetermined that a tower does not have an identification number tag installed, a new tag may be provided by the Contracting
Officer Representative to the Contractor for installation. This tag shall be installed at the North West corner of the foundation using concrete fasteners and epoxy adhesive. If no tag is provided, the Contractor shall use a weatherproof permanent marker to label the tower with the appropriate identification number, as per Appendix A. The label numbers shall be 2” or greater, legible, easily visible, and should be located on the North West corner of the tower.
Figure 1- Tower Identification Number Tag
3.3 TOWER ASSESSMENT FORM:
3.3.1 The Contractor shall complete and return the Tower Assessment Form. An example form is provided in Appendix B, and an Adobe form will be provided to the contractor at the award of the contract. The form shall be included with the inspection report, and shall be emailed to the Contracting Officer Representative using the electronic Adobe form provided to the Contractor.
3.3.2 A response to each question on the Tower Assessment Form should be determined based on the criteria provided in each response description. Questions shall be answered indicating green, amber, or red for each category based on the text on the form. Photographic documentation and amplifying information in the comment block is required to support each condition assessment score of either 1 or 2. The Contractor may utilize photographic documentation provided in the tower inspection report for the Tower Assessment Form as well.
The Contractor shall use Appendix B as a guide to complete the Tower Assessment Forms with sufficient detail.
3.4 INSPECTION REPORTS:
A registered Professional Civil or Structural Engineer shall review, sign, and stamp each final report. The inspection report shall include, at a minimum, the following parts, and shall be arranged in the following order:
3.4.1 Cover Sheet: Include the name of the tower, the tower address/location, latitude/longitude of the base of the tower in decimal degrees (DDD.DDDDD°) format, tower height, tower type, inspection dates, name of inspectors and employer/subcontractor, the registered professional engineer's stamp and signature, and a 3” x 5” portrait style photograph of the tower.
3.4.2 General Comments: Provide a summary of overall tower condition with details on the structural integrity of the tower. Indicate if the tower has equipment that is not utilized that may be considered for removal.
3.4.3 Chronological Narrative: Provide a log of the period between the crew's daily arrival and departure from the work site. All significant events shall be noted, along with the time of occurrences, such as beginning and end of work, guy tension adjustments made, weather conditions etc.
3.4.4 Tower Components: Report on the physical condition of the tower, guy system, guy anchor system, and electrical system. This section should note any abnormal condition (corrosion, bent member, broken bolt, leaking junction box, lighting system, chipped insulator, flaking paint, damaged wiring, etc.) of various tower system components and identify their location. If the Option to perform guided wave ultrasonic testing of guy anchor rods for corrosion damage is exercised, provide at a minimum, a graph and explanation of ultrasonic testing results. Provide measurements of the thickest and thinnest subsurface section of the guy anchor rods.
3.4.5 Lighting System: Report on the physical condition of the lighting system.
3.4.6 Paint System: Provide an analysis of the present paint condition. Locate and record areas where paint is in poor condition, and where rust is found. Use the In-Service Aviation Orange Color Tolerance Chart if the tower is painted in the aviation orange and white FAA scheme.
Indicate the type of paint used, the extent of paint deterioration, the recommended time for repainting, as well as the type of paint to be used for corrective work. Close-up photographs and location of badly deteriorated paint conditions shall be submitted.
3.4.7 Tower Aspect: Provide documentation on the physical aspect of the tower with guy tension values, tower alignment plots, and twist data for the tower as first inspected and for final conditions when all work is complete.
3.4.8 Miscellaneous Inspection Items: Report on the condition of miscellaneous inspection items such as the base insulator, the tower foundation, etc.
3.4.9 Maintenance Accomplished: Describe all maintenance and repair items that were accomplished. Indicate what was done and the method used to complete the work.
3.4.10 Recommendations: Provide recommendations for the following categories of work:
a. Immediate repairs.
b. Routine maintenance and repair.
c. Modifications for OSHA compliance
Work items shall be cross-referenced to drawings, sketches, and/or photographs. Tower faces, legs, anchors, and other components shall be labeled in accordance with the Tower Manual (COMDTINST M11000.4A). Note any significant effects or consequences that could occur if the maintenance or repair work is not completed.
3.4.11 Cost Estimates: Provide detailed cost estimate for all repairs, repainting, modifications or maintenance work recommended above. Each element of work shall be a separate line item with details of labor, materials, and equipment costs. The size, make, and quantity of all items that require replacement shall be included with an estimate of man-hours required to perform each task. The cost estimates shall be complete in-place costs, and shall include overhead, profit, and applicable taxes. All cost estimates shall be given in current year costs.
3.4.12 Equipment Used: A list of tensioning equipment used shall be included in the report with description of type, manufacturer's name, capacity, precision, and last date of calibration.
3.4.13 Photographic documentation: Provide a photograph for each discrepancy at the tower site.
Photographs shall be labeled with the specific location on the tower where the discrepancy exists using the Tower Component Designation identified in Chapter 5 and 6 of the Coast Guard Tower Manual. Photographs shall also include height of the discrepancy. Provide before and after photographs for all maintenance completed on the tower. All photographs shall show the subject in sufficient detail and clarity to make proper evaluations. Photographs shall be 3-1/2" x 4-1/2" minimum size. Provide the photos via CD in the report package.
3.4.13.1 Provide a photograph of the tower identification tag installed on or in the vicinity of the tower. If no tag is previously installed, take a photograph of the installed tag or hand written location number as per Section 3.2.3 of this document. An example photograph of an identification tag is included as Figure 1.
3.4.13.2 Provide a photograph of the altimeter reading from the top of the tower.
3.4.14 Lighting System Inventory: Inventory the lighting system for each tower. Include the type of system (LED, incandescent), the total number of lighting levels and quantity of lamps at each level, lamp type, size (wattage), and model number in tabular format with the following columns:
Tower Name (From Appendix A)
Lighting System (LED, Incandescent)
Lighting Level/Qty (Total number of lighting levels & quantity at each level)
Lamp Type/Size/Model #
3.4.15 Tower Height Verification: Identify applicable heights for each tower in tabular format with the following columns:
Tower Name (From Appendix A)
Height of Foundation (Ground elevation to top of foundation)
Height of Base Insulator (Top of foundation to top of base insulator)
Height of Tower (Top of foundation or base insulator to top of tower)
Height of Highest Appurtenance (Top of tower to highest appurtenance)
Total Height (Ground elevation to highest appurtenance)
3.4.16 Tower Assessment Form: Include the Tower Assessment Form in each Inspection Report.
Complete in accordance with Section 3.3.
3.5 MAINTENANCE REPORTS
3.5.1 A maintenance report shall be provided for each tower that is scheduled for maintenance, rather than an inspection report. A registered Professional Civil or Structural Engineer shall review, sign, and stamp the final report. Maintenance reports are intended to be less extensive then inspection reports. Maintenance reports shall include the requirements of an inspection report with the following sections omitted:
3.4.4 Tower components
3.4.5 Lighting System
3.4.6 Paint system
3.4.7 Tower aspect (Unless maintenance done requires re-tensioning of guy wires)
3.4.8 Miscellaneous Inspection Items
3.4.11 Cost estimates
3.4.12 Equipment Used (Unless maintenance done requires re-tensioning of guy wires)
3.4.14 Lighting System Inventory
3.4.15 Tower Height Verification
3.4.16 Tower Assessment Form
*** END OF SCOPE OF SERVICES ***
Appendix A - Unit point of contacts, tower descriptions and addresses
1. R21 Tower Naples - 47562
Tower Information
a. 515’ GT
b. Leased tower
c. Lighting system unknown, do not relamp lighting.
Site POC Information:
Mr. Ben Otteni
C3CEN RMS PL
757-686-2175 Benjamin.M.Otteni@uscg.mil
Tower Address:
301 Tower Rd, Naples, FL 34113 26.053159N -81.702915W
Contractor Requirements:
a. General Inspection per section 3.1
b. Inspection Report
c. Only complete section 3.1.2.5 and 3.1.2.6 in section 3.1.2
d. Do not perform sub-surface inspection in section 3.1.6.3
e. Only measure and record tensions of all structural and radial guys in section 3.1.7
f. Only measure alignment, do not adjust as necessary in section 3.1.8
g. Do not execute section 3.2
2. DGPS Tower Kokole Point - 69859
a. 150’ GT
b. Lighting system unknown.
Tim Moore
DGPS PL
(757) 638-2785 Timothy.M.Moore@uscg.mil *Contact Tim Moore to schedule visit 45 days prior
Tower Address:
807 Kokole Point Rd Kekaha, HI 96752-9997 21.9849N 159.7584W
Contractor Requirements:
a. General Inspection per section 3.1
b. General Maintenance per Section 3.2
c. Inspection Report
3. DGPS Tower Penobscot - 52472
a. 295’ GT
b. Tower is lit.
DGPS PL
(757) 638-2785 Timothy.M.Moore@uscg.mil *Contact Tim Moore to schedule visit 45 days prior
Tower Address:
1125 Castine Road Penobscot, ME 04476-4070 44.451716N -68.771051W
Contractor Requirements:
a. General Inspection per section 3.1
4. CMD CEN Tower Sector Sault Ste Marie South - 17134
a. 200’ SST
b. Lighting system consists of steady burning sidelight level, one beacon fixture at top, and one strobe light fixture at top.
Site POC Information:
LTJG Brett Godiksen Strategic Operations Product Line, CEU Miami (305)-278-6737 Brett.R.Godiksen@uscg.mil
Tower Address:
Interstate 75 W Sault Ste. Marie, MI 49783-9391 46.440504N -84.387649W
Contractor Requirements:
a. General Inspection per section 3.1
b. General Maintenance per Section 3.2
c. Replace with LED lights to meet FAA requirements.
d. Inspection Report
5. CMD CEN Tower Sector San Francisco (Yerba Buena South) - 49877
a. 90’ SST
ELC3 Robert Pester Sector San Francisco EMO (415)-399-7316 Robert.E.Pester@uscg.mil
Tower Address:
Yerba Buena Island, Forest Road San Francisco, CA 94130 37.809855N -122.365354W
Contractor Requirements:
a. General Inspection per section 3.1
6. DGPS Tower Biorka Island- 27131
a. 150’ GT
DGPS PL
(757) 638-2785 Timothy.M.Moore@uscg.mil *Contact Tim Moore to schedule visit 45 days prior
Tower Address:
Tongass National Forest Sitka, AK 99835 56.853889N -135.533056W
Contractor Requirements:
a. General Inspection per section 3.1
7. CMD-CEN TOWER Hobucken- 10228
a. 100’ GT
b. The tower has no lighting system and does not require one.
LTJG Brett Godiksen Strategic Operations Product Line, CEU Miami (305)-278-6737 Brett.R.Godiksen@uscg.mil
Tower Address:
196 Highway 33 West Hobucken, NC 28537 35.247793N -76.593172W
Contractor Requirements:
a. The tower requires a thorough rust removal of 100% of the tower, followed by a 100% coating with zinc galvanization compound of 95% or higher.
b. Install a lightning protection system on the tower.
c. Repair bent cross members at 85’ and 89’.
d. Apply a protective sealant to the foundation.
e. Repair tower base plate and splitting on Leg A.
f. Maintenance Report
8. CMD-CEN TOWER Northport - 9723
a. 80’ SST
b. No lighting
ET2 Kafi Quashie ESD Moriches 631-395-4464 Kafi.K.Quashie@uscg.mil
Tower Address:
12 Lighthouse Rd.
Northport, NY 11768 40.653638N -73.397333W
Contractor Requirements:
a. Install proper lightning protection system.
b. Replace the safety climb rail in accordance with section 1.6. Ensure new system extends to within 3 ft of the bottom of the tower and meets OSHA requirements.
c. No ladder on approximately the bottom 20 ft of the tower. Extend current ladder system to the bottom of tower.
d. Replace three bent diagonal members at 61’, 62’ and 79’6”.
e. Maintenance Report
Date: Tower Name:
Assessor Name: Tower Number: DB Code:
Inspection Categories Green
(All conditions met) Amber
(At least one condition met, any remaining conditions are green)
Red (Any condition met)
N/A
-Tower is Self Supporting -Tension variance within 5% design tension at temp -Tower plumb with no twist
-Tension variance between 5 -25% design tension at temp -Tower plumb with no twist
-Tension variance outside 25% design tension at temp -Tower experiencing twist, or not plumb -Frayed or disconnected wires
-Tower is Self Supporting -All connections are satisfactory
-Significant corrosion -Minor deformation -Missing non structural connection components (pins, mousing, etc)
-Connection has failed or will likely fail -Major deformation
-Tower is Self Supporting -Insulator properly installed
-Insulator installed with glazed side up - insulators improperly interlocked. -insulator cracked/failed
-Tower is Self Supporting -Concrete, anchor rod and hardware show no signs of corrosion or deformation
-Structural integrity not compromised -Concrete experiencing minor spalling or cracking
- Steel is rusted, pitted or needs to be coated
- Structural integrity compromised
- >30% anchor rod material loss
-Concrete is structurally sound -No signs of erosion, steel corrosion or deformation
- Structural integrity not compromised -Connections showing signs of rust/corrosion -Ground radial deterioration
-Structural integrity compromised -Significant erosion under slab -Major concrete cracking/spalling affecting slab integrity
- Connections corroded, deformed or missing
-Base insulator structurally sound -Connection show no signs of corrosion/ deformation.
- Structural integrity not compromised -Hardware showing signs of minor corrosion/deformation -1-2 grounding wires broken
-Structural integrity compromised -Base insulator cracked/deformed and/or leaking oil -Hardware severely corroded/deformed or missing ->2 grounding wires broken
-Paint not req’d -Paint meets FAA standards -Paint fading: less than 70%
-Paint fading: 70% or more
- Significant deterioration (chipping/bubbling)
-Paint scheme does not meet FAA regulations, if applicable
-Structural integrity is sound -Structure does not demonstrate signs of rust or corrosion
-Structural integrity is not compromised -Safety rail, and/or ladder show minimal rust or corrosion
-Structural integrity is compromised -Tower legs deformed/significant rust from weep holes -Safety rail and ladder are not safe for use -Missing critical hardware
- Lighting system not required -Lighting system operating to FAA standards -Lighting and electrical systems intact
- Lighting system operating to FAA standards -Electrical equipment (i.e. cables, junction box) requires replacement
-Lighting system not operating to FAA standards
Comments (Mandatory for red conditions)
Guys: Connections (Thimbles, Turnbuckles, Take-up U-Bolts, Shackles, Pins, Bonding hardware)
Tower Assessment Checklist
Structure, including safety rail and ladder
Guys: Insulators
Guys: Anchor Conditions
Base insulators/Grounding
Foundation
Paint(reference AC 70/7460-1(series))
Lighting: Seals and bulbs/Junction Box & electricity (reference AC 70/7460-1(series))
Guys: tension condition affecting plumb and twist, and wire condition
| 2017 TMACC Seed Encl 2 SOW_Cover Page |
| 2017 TMACC Seed Encl 2 SOW |
| 2017 TMACC Seed Encl 2 SOW_Actual |
| FOR |
| TOWER INSPECTIONS, MAINTENANCE, & REPAIRS OF U.S. COAST GUARD TOWERS AT VARIOUS COAST GUARD SITES. |
| COMMANDING OFFICER |
| CIVIL ENGINEERING UNIT MIAMI |
| 15608 SW 117TH AVENUE |
| MIAMI, FLORIDA, 33177-1630 |
| *** END OF SCOPE OF SERVICES *** |
| 5225.91 1 - TMACC Seed Appendix B.PDF |
| Sheet1 |
| Text1: |
| Text2: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Guys: Tensions: 3 |
| Guys: Connections: 2 |
| Guys: Insulators: Off |
| Guys: Anchor Conditions: 0 |
| Foundation: 1 |
| Base Insulators: 0 |
| Paint: 0 |
| Structure: 0 |
| Lighting: 0 |