2011 TMACC Solicitation Rev p40 p42.pdf
PDF 32 KB Posted
- Solicitation number
- HSCG88-11-R-TMACC
About this file
Revised pages 40 and 42 of Solicitation
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP: HSCG88-11-R-TMACC
Amendment 0004 Date: September 30, 2011
C. Specific Instructions:
1. PART I – PRICE PROPOSAL – Submit original and one (1) copy
(a) SF-1442 Solicitation-Offer-Award: Offeror must complete Blocks 14 thru 20c on Page 5 Block 20a must be signed and must have on ORIGINAL signature. Stamped signatures are not acceptable. In doing so, the offeror accedes to the contract terms and conditions as written in this RFP. This constitutes the model contract.
(b) Section B “The schedule” Must show your proposal price for the seed project. Insert the proposed price in B.1. Failure to submit a price for the seed project may be cause for your offer to be rejected as non-responsive. The price for the seed project, with a breakdown of cost components (e.g. labor, material, equipment, subcontracts, overhead, bond, profit, and price) will be used to analyze prices. A bid bond will be required for the “seed project.”
(c) The contractor shall file Representations and Certifications in the Online Representations and Certifications Application (ORCA) and complete the representations and certifications found in Section K of the solicitation. The Contractor shall submit a copy of the ORCA representations and certifications (the complete ORCA record, not just the first page) and section K of the solicitation with their proposal.
(d) Completed Contractor Responsibility Questionnaire.
(e) SF30, Amendment of Solicitation/Modification of Contract (applicable if amendments are not acknowledged on reverse side of the SF 1442).
(f) Letter from offeror’s surety showing their project and aggregate bonding capacity.
2. PART II – PAST PERFORMANCE INFORMATION – Limited to no more than 3 pages per contract listed. Past performance information should address tower or antenna construction, repair, maintenance, design, or inspection. Past performance evaluations for other types of construction will not be considered. Submit original and (1) copy.
a) Quality and Satisfaction Rating for Contracts Completed in the Past Three Years:
Provide any information currently available (letters, metrics, customer surveys, independent surveys, etc.) which demonstrates customer satisfaction with overall job performance and quality of completed product for tower or antenna construction, repair, design, maintenance, or inspection. In addition, explain corrective actions taken in the past, if any, for substandard performance and any current performance problems such as cost overruns, extended performance periods, numerous warranty calls, etc.
(b) Past Performance Surveys: The Government will evaluate the quality and extent of offeror’s experience deemed relevant to the requirements of the RFP. The Government will use information submitted by the offeror and other sources such as other Federal Government offices and commercial sources, to assess experience. Provide a list of no more than ten (10) of the most relevant contracts performed for Federal agencies, other
RFP: HSCG88-11-R-TMACC
Amendment 0004 Date: September 30, 2011
(g) Key Personnel - Each offeror shall provide past performance information addressing the following factors (Page Limitation – 1 page per resume):
(h) Provide Resumes for Key Personnel. As a minimum the Key Personnel shall be identified and meet the following minimum standards:
i. Project Manager:
(1) Have a Bachelor of Science degree in Engineering.
(2) Have a minimum 5 years experience with tower construction and maintenance projects.
(3) Have a minimum work experience with managing tower dismantling, demolition or erection project with at least one tower greater than 200 ft. in height.
ii. Project Engineer (Tower Engineer)
(1) Have a Bachelor of Science degree in Engineering
(2) Have a minimum of 3 years experience in tower construction and maintenance projects.
(3) Have been assigned as project engineer at least 5 times with towers greater than 200 ft. in height.
iii. Tower Riggers
(1) Have worked on at least 5 towers greater than 200 ft. in height.
(2) Shall have completed a professional, certified tower climbing training program.
iv. Tower Inspector
(1) Have a minimum of 5 years experience inspecting towers.
(2) Have inspected at least 5 towers greater than 200 feet in height.
(3) Shall have completed a professional, certified tower climbing training program.
v. Supervisor (On-Site)
(1) Have a minimum of 5 years experience as a supervisor on site for all types of tower projects (all dollar amounts and heights of the towers).
(2) Have a minimum work experience with supervising a tower dismantling, demolition or erection project with at least one tower greater than 200 ft. in height.
vi. Tower Climber/Tower Worker
(1) Have climbed at least 5 towers greater than 200 feet in height.
(2) Shall have completed a professional, certified tower climbing training program.
vii. Electrician
| SECTION A |
| SOLICITATION/CONTRACT FORM |
| B.1 SEED PROJECT: FY2012 TOWER INSPECTION AND MINOR MAINTENANCE AT VARIOUS COAST GUARD SITES NATIONWIDE. |
| TOTAL PROPOSED PRICE (“Seed Project”) B.1: $___________________ |
| D.1 - PACKAGING AND MARKING |
| E.2 DAILY REPORTING REQUIREMENT |
| F.5 GUARANTEED MINIMUM AMOUNT |
| G.3 ADDRESS OF CORRESPONDENCE |
| H.7 VEHICLE PASSES |
| H.9 CERTIFICATION OF PAYMENTS-RELEASE OF CLAIM |
| H.10 SUBCONTRACT DATA |
| The Contractor shall submit an executed Statement and Acknowledgment Standard Form 1413, to the Contracting Officer for every subcontractor (including every subcontractor of the second or lower tier) that will be performing work at the construction site. This shall be done before the subcontractor begins work. This form provides an acknowledgment by the subcontractor that mandatory "flow-down" contract clauses have been included in this contract in accordance with FAR Clause 52.222-11. The Prime Contractors will be given copies of Form SF 1413 after award of a contract. Completing this form creates no contractual relationship between subcontractors and the Government. |
| H.20 INVOICING REQUIREMENTS |
| I.2 52.204-1 APPROVAL OF CONTRACT (DEC 1989) |
| M.5 CONTRACT AWARD |
File details come from the government source that posted it. Updated .