ATTACHMENT 2 – SCHEDULE OF SUPPLIES/SERVICES
CONTRACT NO. HSCG85-17-R-P45B29
Dockside Repairs of USCGC BERTHOLF (WMSL 750) FQ4 FY17
B.1
CLIN 0001 - DEFINITE ITEMS
These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.
ITEM
NO.
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| D-01 |
| Main Gas Turbine (MGT) Water Wash Tank, Clean, Inspect and Hydro |
| 1 |
| JB |
| $ |
| $ |
| D-02 |
| Main Propulsion Diesel Engine, Exhaust Piping, Commercial Clean |
| 1 |
| JB |
| $ |
| $ |
| D-03 |
| Propulsion Gas Turbine, Exhaust Piping, Commercial Clean |
| 1 |
| JB |
| $ |
| $ |
| D-04 |
| Ship Service Diesel Generator, Exhaust Piping, Commercial Clean |
| 1 |
| JB |
| $ |
| $ |
| D-05 |
| Circuit Breakers(Draw Out), Inspect and Test |
| 1 |
| JB |
| $ |
| $ |
| D-06 |
| Cascade Orificial Resistive Device, Clean and Inspect |
| 1 |
| JB |
| $ |
| $ |
| D-07 |
| Air Conditioning Plants, System Groom, Perform |
| 1 |
| JB |
| $ |
| $ |
| D-08 |
| Anchor Windlass Level 2 Inspect and Repair |
| 1 |
| JB |
| $ |
| $ |
| D-09 |
| Ship Service Diesel Generator No.3, Exhaust Valve, Renew & Exhaust Deck, Repair |
| 1 |
| JB |
| $ |
| $ |
| D-10 |
| Reverse Osmosis, Overhaul |
| 1 |
| JB |
| $ |
| $ |
| D-11 |
| Hot Water Tanks, Clean and Inspect |
| 1 |
| JB |
| $ |
| $ |
| D-12 |
| Compressed Air Receivers Clean, Inspect and Hydrotest |
| 1 |
| JB |
| $ |
| $ |
| D-13 |
| Cargo Handling Elevator, Annual Inspection and Test, Perform |
| 1 |
| JB |
| $ |
| $ |
| D-14 |
| Carriage Winch, Annual Inspection and Test |
| 1 |
| JB |
| $ |
| $ |
| D-15 |
| Helo Hangar Door, Inspect and Test |
| 1 |
| JB |
| $ |
| $ |
| D-16 |
| Oily Water Separator System, Groom |
| 1 |
| JB |
| $ |
| $ |
| D-17 |
| Cofferdam, Install |
| 1 |
| JB |
| $ |
| $ |
| D-18 |
| Temporary Services, Dockside, Home Pier |
| 1 |
| JB |
| $ |
| $ |
| D-19 |
| Incinerator Nozzle, Renew |
| 1 |
| JB |
| $ |
| $ |
| D-20 |
| Helo Hangar Door Curtain Assembly, Preserve (100 %) |
| 1 |
| JB |
| $ |
| $ |
| D-21 |
| Passing Window Frame, Renew |
| 1 |
| JB |
| $ |
| $ |
| D-22 |
| Salt Water Cooling Pipe, Renew |
| 1 |
| JB |
| $ |
| $ |
| D-23 |
| Deck Covering (Slip-Resistant), Renew |
| 1 |
| JB |
| $ |
| $ |
| D-24 |
| Refrigeration Plants, System Repairs |
| 1 |
| JB |
| $ |
| $ |
| D-25 |
| Flex Hose Assemblies, Renew |
| 1 |
| JB |
| $ |
| $ |
TOTAL AMOUNT OF ALL DEFINITE ITEMS
B.2
COMPOSITE LABOR HOUR RATE APPLICABLE TO CONTRACT CHANGES
The following labor hour rate shall be used in pricing all contract changes in accordance with ATTACHMENT 3, Section 13, Page 7, entitled "COMPOSITE LABOR RATE.”
LABOR HOUR RATE
ESTIMATED QUANTITY
1651 hours
EXTENDED AMOUNT
**NOTE: The estimated quantity and extended amount indicated above are for evaluation of proposals only. The proposed rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.