Amendment 0010
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0010 03 August 2017 2117857***B29
6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE
USCG COMMAND
Surface Forces Logistics Centers, C&PD2-LREPL 1301 Clay Street, Suite 800N, Oakland, CA 94612
SAME AS BLOCK #6
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
TO ALL PROSPECTIVE OFFERORS
HSCG85-17-R-P45B29
9B. DATE (SEE ITEM 11)
25 April 2017
10A. MODIFICATION OF CONTRACT/ORDER
NO. ?
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUBJECT: RFP No. HSCG85-17-R-P45B29 USCGC BERTHOLF (WMSL 750), Dockside Repairs FQ1 FY18
SEE PAGE 2 FOR ADDITIONAL DESCRIPTION
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Wilma L. Estrada, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
HSCG85-17-R-P45B29
USCGC BERTHOLF (WMSL 750) Dockside Repairs FQ1 FY18 Amendment No. 0010
The purpose of this amendment is to:
1. Extend the solicitation end date from August 15, 2017 to August 25, 2017, 1:00 p.m. Pacific time.
2. Extend the Requests for Clarification end date from August 2, 2017 to August 11, 2017, 1:00 p.m.
Pacific time.
3. To reply to the following Requests for Clarification:
Question 1: This is in reference to the Specifications, Work Item D-18; Temporary Services, Dockside:
As Work Items D-18: Temporary Services, Dockside was deleted from the Specifications Revision 3, what services will be available to the contractor? Will contractor have to provide their own electricity, water, etc. for use during this availability?
Answer to Question 1: Contractor should refer to Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements.
Question 2: This is in reference to the Specifications, Work Item D-13; Refrigeration Plants, System Repairs: Work Item 13 and Question #11 of Amendment 3 directs contractor to include repair of leak in 1B reefer plant in proposal. Does the government have any additional information as to source of leak?
Answer to Question 2: There is no further information to provide about the leak. The following statement will be added to Paragraph 1.1 of this work item in the specifications as follows:
The contractor will be required to identify and repair the leak and submit a CFR detailing the location and repair plan for the leak.
The specifications will be revised at time of award to incorporate this change to this work item.
Question 3: This is in reference to the Specifications, Work Item D-06; Piping and Valve Insulation, Renew; Table 1: Six of the locations listed in Table 1 of work item has “0 LF” listed as the approximate length of piping insulation to be renewed. Is there updated data available for these locations or is the contractor to bid to this table as shown?
Answer to Question 3: Data is up-to-date. The contractor should bid according to lengths shown in the table.
Question 4: This is in reference to the Specifications, Work Item D-05; Compressed Air Receivers Clean, Inspect and Hydrotest; Paragraph 3.5 & Table 2: When contacting the manufacturers of the relief valves, Dante & Farris, we discovered that all the valves are long lead items, with the shortest lead time of 8-10 weeks and the longest lead time of 120 days. Per the revised, anticipated award date and period of performance, there is not enough time for the contractor to procure this specified material let alone install. Please advise as to how the USCG would like proceed.
Answer to Question 4: Work Item D-05, paragraph 3.5 of the specifications will be revised as follows:
3.5 Inspect and Test Relief Valves. Contractor shall inspect and test relief valves listed in the Table 2.
Paragraphs 3.5.1 through 3.5.4, referring to renewal of relief valves, will be deleted.
The specifications will be revised at time of award to incorporate these changes to this work item.