Page_a_-_A0003.doc
DOC document 69 KB Posted
- Attached to
- DOCKSIDE REPAIRS OF CGC ALEX HALEY (WMEC 39)
- Solicitation number
- HSCG85-16-R-P45218
About this file
Page 2 of Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30-A003.pdf | ||
| ALEX_HALEY_(WMEC_282)_DS_FQ3_R1.pdf | ||
| ATTACHMENT_2_CONTRACT_CLAUSES_AND_SUPPLEMENTAL_TERMS_AND_CONDITIONS(REVISED).doc | DOC document | |
| SF30-A002.pdf | ||
| Page_a_-_A0002.doc | DOC document | |
| Attachment_4_-_Schedule_of_Items_(REVISED).doc | DOC document | |
| Page_a_-_A0001.doc | DOC document | |
| SF30-A001.pdf | ||
| ALEX_HALEY_(WMEC_282)_DS_FQ3_R0(011416).pdf | ||
| Attachment_4_-_Schedule_of_Items.doc | DOC document | |
| Attachment_3_-_Solicitations_Provisions.doc | DOC document | |
| Attachment_6-_GOVERNMENT_PROPERTY_REPORT.doc | DOC document | |
| ATTACHMENT_2_CONTRACT_CLAUSES_AND_SUPPLEMENTAL_TERMS_AND_CONDITIONS.doc | DOC document | |
| ATTACHMENT_5_-_Request_for_Clarification_Form.doc | DOC document | |
| ALEX_HALEY__WMEC_282__DS_FQ3_R0.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal
Solicitation No. HSCG85-16-R-P45218
Dockside Repairs of CGC ALEX HALEY (WMEC 39)
Amendment #0003
The purpose of this amendment is as follows:
a.
The following is a response to a Request for Clarifications:
QUESTION NO. 27: Work Item D-20, AMR Bilge Preservation, paragraph 3.5.1.1 & 3.5.3; 3.5.1.1 states contractor shall reference (SFLC 6310) Appendix B, “Bilges, Cofferdams, and Forepeaks, Steel” Option 1. This requirement requires a SSPC-SP11or a SSPC-SP WJ-2. But 3.5.3 states to power clean in accordance with SSPC-3. Concur with contractor that surface prep shall be in accordance with SSCP-SP 3, and what percentage of 3.3 Concerned Work Areas will require prep.
ANSWER: Concur with SFLC 6310, if power tool clean is used, it should be in accordance with SSPC-11. Paragraph 3.5.3 should read as follows: “Power tool clean in accordance with SSPC-11.” This will be 100% of the area mentioned in 3.3.
QUESTION NO. 28: Work item D-27, Modify Grey Water Piping, paragraph 4.1; 4.1 YARD Program. This specification incorporates the Coast Guard Yard ship check recommendations of “CGC ALEX HALEY SHIPCHECK REPORT, 282 WMEC CGC Alex Haley, Grey Water Piping Mods & Switchboard Safety Mods” under JO #0910-00-71H05, which in turn was in response to SFLC Activity 59687. Contractor requests a copy of this report.
ANSWER: Copy of this report will be provided upon receipt of the request via e-mail. Request for a copy of the report shall be made via e-mail to Valerie.S.Riverachase@uscg.mil.
b.
All other terms and conditions cited on the original solicitation will remain unchanged.
File details come from the government source that posted it. Updated .