Attachment_4_-_Schedule_of_Items.doc

DOC document 218 KB Posted

Attached to
DOCKSIDE REPAIRS OF CGC ALEX HALEY (WMEC 39)
Solicitation number
HSCG85-16-R-P45218
Issued by

About this file

Attachment 4 - Schedule of Items - Prices

View the file

Other files

File Type Posted
Page_a_-_A0003.doc DOC document
SF30-A003.pdf PDF
ALEX_HALEY_(WMEC_282)_DS_FQ3_R1.pdf PDF
ATTACHMENT_2_CONTRACT_CLAUSES_AND_SUPPLEMENTAL_TERMS_AND_CONDITIONS(REVISED).doc DOC document
SF30-A002.pdf PDF
Page_a_-_A0002.doc DOC document
Attachment_4_-_Schedule_of_Items_(REVISED).doc DOC document
Page_a_-_A0001.doc DOC document
SF30-A001.pdf PDF
ALEX_HALEY_(WMEC_282)_DS_FQ3_R0(011416).pdf PDF
Attachment_3_-_Solicitations_Provisions.doc DOC document
Attachment_6-_GOVERNMENT_PROPERTY_REPORT.doc DOC document
ATTACHMENT_2_CONTRACT_CLAUSES_AND_SUPPLEMENTAL_TERMS_AND_CONDITIONS.doc DOC document
ATTACHMENT_5_-_Request_for_Clarification_Form.doc DOC document
ALEX_HALEY__WMEC_282__DS_FQ3_R0.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL

SOLICITATION NO. HSCG85-16-R-P45218

Dockside Repairs of CGC ALEX HALEY (WMEC 39)

SCHEDULE OF ITEMS – PRICES

Provide all labor, materials, and equipment, except as specified, to perform DOCKSIDE REPAIR OF CGC ALEX HALEY (WMEC 39) during the period of 26 April 2016 through 01 July 2016. All work will be performed at the cutter’s home moorage facility in Kodiak, AK or CGC ALEX HALEY will transit to a contractor’s shipyard in Alaska, Hawaii or U.S West Coast.

NOTE: Award of this procurement will be made contingent to funds availability. FAR 52.232-18, Availability of Funds (APR 1984), is hereby incorporated by reference (see page 4, Attachment 2, Continuation of Combined Synopsis /Solicitation – Clauses). No award will be made until funds are available.

These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.

CLIN 0001 - DEFINITE ITEMS

D-ITEM NO.
Description
QTY
UNIT
AMOUNT
D-03
42 Man Berthing, Refurbish
1
JOB
$
D-04
Crews Head 12-19-1-L, Refurbish
1
JOB
$
D-05
Grey water Holding Tank(s), Clean and Inspect
1
JOB
$
D-06
Sewage Holding Tanks, Clean & Inspect
1
JOB
$
D-12
Grey water Transfer Pumps Overhaul
1
JOB
$
D-13
Circuit Breakers (60 HZ) Inspect & Test
1
JOB
$
D-14
Circuit Breakers (400 Hz) Inspect & Test
1
JOB
$
D-15
Vent Duct Renewal, Various Compartments
1
JOB
$
D-16
Fan Room, Preservation
1
JOB
$
D-17
Vane Axial Fan Overhaul
1
JOB
$
D-18
Boiler Exhaust Stacks, Clean and Inspect
1
JOB
$
D-19
AMR Vent Plenum; Preservation
1
JOB
$
D-20
Auxiliary Machinery Room Bilge Preservation Lead Paint
1
JOB
$
D-21
Engine Room Bilge Preservation Lead Paint
1
JOB
$
D-22
SSDG Exhaust Stacks Commercial Clean
1
JOB
$
D-24
Welin-Lambie Davit Installation
1
JOB
$
D-25
Tanks (MP Fuel Stowage and Overflow), Clean
1
JOB
$
D-26
Fuel Tank Man Hole Ring Support Coaming, Renew
1
JOB
$
D-27
Grey Water Piping, Modify
1
JOB
$
TOTAL AMOUNT OF DEFINITE ITEMS
$

CLIN 0002 – OPTIONAL ITEMS

Optional items listed below will be awarded if inspection reports reveal the necessity for activation, but before 10 May 2016, see Contract Clause (21) entitled “Optional Items”.

Item No.
DESCRIPTION
Unit of Issue
Price
O-01
Temporary Services, Dockside, Contractor Facility
1 JB
$
O-02
Temporary Services, Dockside, Coast Guard Base Kodiak
1 JB
$
O-07
Tanks (Grey Water Holding), Preserve “Partial”
1 JB
$
O-08
Tanks (Grey Water Holding), Preserve “100%”
1 JB
$
O-09
Tanks (Sewage Holding), Preserve “Partial”
1 JB
$
O-10
Tanks (Sewage Holding), Preserve “100%”
1 JB
$
O-11
Hull, Structural and Deck Plating – Steel Plate, Repair
1 JB
$
O-23
Boiler Exhaust Pipe, Renew Section
1 JB
$

TOTAL AMOUNT OF OPTIONAL ITEMS

TOTAL AMOUNT OF DEFINITE & OPTIONAL ITEMS

CLIN 0002 - COMPOSITE LABOR HOUR RATE

The following labor hour rate shall be used in pricing all contract changes in accordance with the ADDENDA clause (17) entitled “COMPOSITE LABOR HOUR RATE.”

LABOR HOUR RATE
ESTIMATED QUANTITY**
EXTENDED AMOUNT*
$__________
per hour
4117 hours
$________________

**NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The proposed rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.

ATTACHMENT 4

File details come from the government source that posted it. Updated .