Maple_Blank_SoS-REVISED_1.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- HSCG85-16-Q-P45014
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Maple_Amendment_7.pdf | ||
| Maple_Amendment_7_Questions.docx | DOCX document | |
| Maple_Blank_SoS-REVISED_1.xlsx | XLSX spreadsheet | |
| Maple_Amendment_6.pdf | ||
| Maple_Amend_6_Questions.docx | DOCX document | |
| Maple_Amend_5_Questions.docx | DOCX document | |
| 3524_243_A.pdf | ||
| Maple_Amendment_5.pdf | ||
| Maple_Amend_4_Questions.docx | DOCX document | |
| MAPLE_AMENDMENT_4.pdf | ||
| MAPLE_(WLB_225B)_DS_FQ2_JMP_1600_Rev-1.pdf | ||
| MAPLE_(WLB_225B)_DS_FQ2_JMP_16E00_BLANK_SME_Rev-1.xlsx | XLSX spreadsheet | |
| Maple_Amend_3.pdf | ||
| Maple_Amendment_2.pdf | ||
| Amendment_1_SOLICITATION_ADDENDUM.docx | DOCX document | |
| Maple_Amend_1_Questions.doc | DOC document | |
| Maple_Amendment_1.pdf | ||
| Maple_Blank_SoS-REVISED.xlsx | XLSX spreadsheet | |
| GOVERNMENT_PROPERTY_REPORT.docx | DOCX document | |
| Maple_Blank_SoS.xlsx | XLSX spreadsheet | |
| MAPLE_(WLB_225B)_DS_FQ2_JMP_1600_Rev-0_12AUG15.pdf | ||
| Past_Performance_Questionnaire.docx | DOCX document | |
| RFQ_HSCG85-16-Q-P45014_MAPLE_DS_FY16.docx | DOCX document | |
| Request_for_Clarification.docx | DOCX document |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PRICING SCHEDULE FOR: |
| USCGC MAPLE (WLB-225B) DOCKSIDE AVAILABILITY FY2016 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Thruster Generator Shaft Seal (Bulkhead), Renew | JOB | |||
| D-002 | Thruster Generator Clean & Inspect | JOB | |||
| D-003 | Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test | JOB | |||
| D-004 | Hydraulic Chain Stoppers, Inspect And Service | JOB | |||
| D-005 | Crossdeck Winches, Inspect and Service | JOB | |||
| D-006 | Hydraulic Inhaul Winch, Inspect and Service | JOB | |||
| D-007 | Mechanical Chain Stoppers, Inspect and Service | JOB | |||
| D-008 | Single Point Davit - RHIB, Inspect and Service | JOB | |||
| D-009 | Twin Pivot Arm Davit, Inspect and Service | JOB | |||
| D-010 | Buoy Crane, Inspect and Service | JOB | |||
| D-011 | Decks - Exterior, Preserve (“MIL-Spec/Flight Deck” System) | JOB | |||
| O-012 | Temporary Services, Provide - Cutter | JOB | |||
| O-013 | SSDG ISOLATION MOUNT RENEWAL | JOB | |||
| D-014 | Potable Water Pump Room Deck, Preserve | JOB | |||
| O-015 | Hydraulic Steering Cooler, Install | JOB | |||
| O-016 | Stack and Uptake Space, Install Safety Components | JOB | |||
| O-017 | Control Air Refrigerant Dehydrators, Replace | JOB | |||
| O-018 | Stack Lighting, Install, TCTO | JOB | |||
| D-019 | Sewage Piping, Renew | JOB | |||
| D-020 | Firemain Plugs, Renew | JOB | |||
| D-021 | Leslie Valves, Overhaul | JOB | |||
| D-022 | Sewage Valve, Renew | JOB | |||
| O-023 | Temporary Messing, Provide | JOB | |||
| D-024 | Sea Trial Performance, Support, Provide | JOB | |||
| D-025 | Over Head Hoist Weight Handling Gear Test | JOB | |||
| D-026 | Commissary Hoist, Level 2 Inspect and Repair | JOB | |||
| O-027 | Decks - Exterior, Preserve (“MIL-Spec/Flight Deck” System) AIR CASTLES | JOB | |||
| D-028 | SSDG HEAT EXCHANGER MODIFICATIONS | JOB | |||
| D-029 | Deck-Exterior (Buoy or Construction Deck) Preserve 100% | JOB | |||
| O-00A | Composite Labor Rate | Hour | 1700 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00C | Travel and Perdiem | JOB | |||
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |