Maple_Amend_6_Questions.docx
DOCX document 15 KB Posted
- Solicitation number
- HSCG85-16-Q-P45014
About this file
Amendment 6 Questions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Maple_Blank_SoS-REVISED_1.xlsx | XLSX spreadsheet | |
| Maple_Amendment_7.pdf | ||
| Maple_Amendment_7_Questions.docx | DOCX document | |
| Maple_Blank_SoS-REVISED_1.xlsx | XLSX spreadsheet | |
| Maple_Amendment_6.pdf | ||
| Maple_Amend_5_Questions.docx | DOCX document | |
| 3524_243_A.pdf | ||
| Maple_Amendment_5.pdf | ||
| Maple_Amend_4_Questions.docx | DOCX document | |
| MAPLE_AMENDMENT_4.pdf | ||
| MAPLE_(WLB_225B)_DS_FQ2_JMP_1600_Rev-1.pdf | ||
| MAPLE_(WLB_225B)_DS_FQ2_JMP_16E00_BLANK_SME_Rev-1.xlsx | XLSX spreadsheet | |
| Maple_Amend_3.pdf | ||
| Maple_Amendment_2.pdf | ||
| Amendment_1_SOLICITATION_ADDENDUM.docx | DOCX document | |
| Maple_Amend_1_Questions.doc | DOC document | |
| Maple_Amendment_1.pdf | ||
| Maple_Blank_SoS-REVISED.xlsx | XLSX spreadsheet | |
| GOVERNMENT_PROPERTY_REPORT.docx | DOCX document | |
| Maple_Blank_SoS.xlsx | XLSX spreadsheet | |
| MAPLE_(WLB_225B)_DS_FQ2_JMP_1600_Rev-0_12AUG15.pdf | ||
| Past_Performance_Questionnaire.docx | DOCX document | |
| RFQ_HSCG85-16-Q-P45014_MAPLE_DS_FY16.docx | DOCX document | |
| Request_for_Clarification.docx | DOCX document |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HSCG85-16-Q-P45014
USCGC MAPLE (WLB 207)
FY15 DRYDOCK AVAILABILITY
Amendment 6 QUESTIONS
1. CLIN 10: Buoy Crane Turret Fasteners Para: 1.2 & 3.2 Task #2
In the 3.2 Task# 2 Disassemble, Inspect, and Preserve it mentions to install GFP turret to pedestal fasteners, but in the 1.2 GFP list, these fasteners are not listed.
Does the USCG intend to supply these fasteners as GFP?
Response:
CG will provide pedestal fasteners. If CG is unable to provide pedestal fasteners CG will request a CR and have contractor provide.
2. CLIN 14: Potable Water Pump Room Deck, Preserve Para No. 3.1.4
Do interferences listed, including R/O foundation (and ballast tank entry), have to be removed in order to preserve & NDT the deck or as a result of a CFR in event that further repairs are found to be required as result of NDT inspection? Please clarify note under interferences.
Response:
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Water pumps (qty: 4).
Potable water pedestal.
Reverse osmosis (R/O) plant.
R/O pedestal and foundation.
Pipes.
3.2 Ultrasonic thickness (UT) measurement. After surface preparation and prior to coating application, the Contractor shall take a total of 20 UT measurements, in locations designated by the Coast Guard Inspector, in accordance with SFLC Std Spec 0740, Appendix C. Use Coast Guard Drawing Coast Guard Drawing as guidance. Submit a CIR.
If further repair are needed submit CFR.
3. CLIN 19: Sewage Piping, Renew
Reference folder for all drawings under “225B WLB 593” do not have workable drawings for contractor to use. Are these drawings available?
Response:
There are no alternate drawings. The most current drawings pertaining to this solicitation have been provided.
File details come from the government source that posted it. Updated .