ATTACHMENT 2 - Continuation of Combined Synopsis/Solicitation

View the file

Other files

File Type Posted
SF_30_(0003).doc DOC document
Page_2_-_Amendment_0003.doc DOC document
Amendment_0002.pdf PDF
Attachment_2_-_Solicitation_Continuation.doc DOC document
Amendment_0001.pdf PDF
Attachment_3_-_Request_for_Clarification.doc DOC document
Attachment_5_GOVERNMENT_PROPERTY_REPORT.doc DOC document
Attachment_1_-_MELLON_DD_FY15_Specification.pdf PDF
Attachment_4_-_NOTICE_TO_OFFERORS_(MELLON_DD).doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL

SOLICITATION NO. HSCG85-15-R-MELL15

DRY-DOCK AND REPAIRS OF CGC MELLON (WHEC 717)

SCHEDULE OF SUPPLIES/SERVICES -PRICES

CLIN 0001 – DEFINITE WORK ITEMS

These are the items that, if there is an award at all, will be awarded. The offer shall be evaluated to include the offer price for each definite item.

Item No.
DESCRIPTION
Unit of Issue
Price
D-01
Drydocking
1 JB
$
D-02
Temporary Services, Provide - Cutter
1 JB
$
D-03
Hull Plating (U/W Body), Inspect
1 JB
$
D-04
Hull Plating (U/W Body), Ultrasonic Testing
1 JB
$
D-05
U/W Body, Preserve (Partial - Condition A)
1 JB
$
D-07
Appendages (U/W), Leak Test
1 JB
$
D-08
Appendages (U/W) - Internal, Preserve
1 JB
$
D-09
Propulsion Shaft Fairwaters and Rope Guards Inspect and Repair
1 JB
$
D-10
Chain Lockers, Clean and Inspect
1 JB
$
D-11
Tanks (Ballast), Clean and Inspect
1 JB
$
D-13
Voids (Non-Accessible), Leak Test
1 JB
$
D-14
Voids (Non-Accessible), Internal Surfaces, Preserve
1 JB
$
D-15
Propulsion Shaft Coating Inspect And Test (Shafts In)
1 JB
$
D-17
Chain Locker, Preserve Partial
1 JB
$
D-18
Propulsion Shaft Seals (Mechanical) Inspect And Clean
1 JB
$
D-21
Propulsion Shaft Bearings (External), Check Clearances
1 JB
$
D-22
Hubs General Maintenance
1 JB
$
D-23
Controlable Pitch Propeller System Maintenance, (Liaaen)
1 JB
$
D-24
Propulsion Shafting Drift and Hub Renewal (Liaaen)
1 JB
$
D-30
Fathometer Transducer, General Maintenance
1 JB
$
D-31
Seawater Strainers (All Sizes), Minor Service and Inspect
1 JB
$
D-32
Rudder Assembly, Remove, Inspect and Reinstall
1 JB
$
D-33
Rudder Stock Bearing (Lower), Renew Both Port & Stbd
1 JB
$
D-34
Propulsion Shaft Alignment (Drydock), Check
1 JB
$
D-35
Thruster Unit (General), Overhaul
1 JB
$
D-36
Anchor Chain(s) and Ground Tackle, Inspect and Repair
1 JB
$
D-37
Cathodic Protection/Zincs, Renew
1 JB
$
D-38
Sea Valve (2.5 Inches And Smaller) Renewal
1 JB
$
D-39
Sea Valve (Larger Than 2.5 Inches) Overhaul
1 JB
$
D-40
Tanks (Mp Fuel Stowage), Clean And Inspect
1 JB
$
D-41
Tank (Dirty Oil), Clean and Inspect
1 JB
$
D-44
Tanks (Lube Oil), Clean and Inspect
1 JB
$
D-45
Tanks (Potable Water), Clean and Inspect
1 JB
$
D-47
Oily Waste Tank Striker Plate Pit Repair
1 JB
$
D-50
Engine Room Bilge Preservation Local Areas
1 JB
$
D-51
Bilge Preservation, Forward Pump Room
1 JB
$
D-52
Bow Thruster Compartment, Bulkhead and Bilge Preservation
1 JB
$
D-53
Hull Plating Freeboard, Preserve -“100%”
1 JB
$
D-54
Superstructure, Preserve “100%”
1 JB
$
D-55
BILGES (DC STORES) PRESERVE Partial and Stringer Renewal
1 JB
$
D-56
Elex Stiffener Renewal
1 JB
$
D-57
Chaffing Bar Renewal
1 JB
$
D-59
Vent Plenum Preservation
1 JB
$
D-60
Deck Drain Piping Repair
1 JB
$
D-61
Bow Thruster Compartment, Bulkhead Preservation
1 JB
$
D-62
Sea Trial Performance, Provide Support
1 JB
$
Total - All Definite Items
$

CLIN 0002 – OPTIONAL ITEMS

Optional items listed below will be awarded if inspection reports reveal the necessity for activation, but before 30 January 2015, see Contract Clause (21) entitled “Optional Items”.

Item No.
DESCRIPTION
Unit of Issue
Price
O-06
U/W Body, Preserve (100%) (Optional)
1 JB
$
O-12
Forward Peak Compartment, Preserve
1 JB
$
O-16
Propulsion Shaft Coating, Renew
1 JB
$
O-19
Propulsion Shaft Seals Mechanical Overhaul & Inflatable Seal Renewal
1 JB
$
O-20
Propulsion Shafting, Remove, Inspect, and Reinstall
1 JB
$
O-25
Propulsion Stern Tube Shaft Sleeves, Skim Cut
1 JB
$
O-26
Propulsion Tailshaft Sleeve, Skim Cut
1 JB
$
O-27
Propulsion Shaft Bearing (Aft Strut) Stave, Renew
1 JB
$
O-28
Propulsion Shaft Bearing (Fwd Strut and Ster Tube) Stave, Renewal
1 JB
$
O-29
Stern Tube Interior Surfaces, Preserve "100%"
1 JB
$
O-42
Tank (Dirty Oil) , Preserve “Partial”
1 JB
$
O-43
Tank (Dirty Oil), Preserve “100%”
1 JB
$
O-46
Tanks (Potable Water), Preserve "100%"
1 JB
$
O-48
Hull, Structural And Deck Plating - Steel Plate, Repair
1 JB
$
O-49
Plating And Structural, Ultrasonic Testing
1 JB
$
O-58
BPU Fairing Repair (Optional)
1 JB
$
Total - All Optional Items
$
Total - All Definite & Optional Items
$

CLIN 0003 - COMPOSITE LABOR HOUR RATE

The following labor hour rate shall be used in pricing all contract changes in accordance with the ADDENDA clause (18) entitled “COMPOSITE LABOR HOUR RATE.”

LABOR HOUR RATE
ESTIMATED QUANTITY**
EXTENDED AMOUNT*
$__________
per hour
6,096 hours
$________________

**NOTE: The estimated quantity and extended amount indicated above are for evaluation of offerss only. The proposed rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.

CLIN 0004 – LAY DAYS

Provide a price for dry dock Lay Days in accordance with HSAR 3052.217-94 (DEC 2003). The quoted price per day will apply to all lay days. The estimated quantity of 3 days is for evaluation purposes only.

PRICE PER DAY:

3 DAYS
EXTENDED AMOUNT:

ADDENDA

FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (MAY 2014)

(1) TIME OF PERFORMANCE: USCGC MELLON will be available for performance of the work under this contract during the period of 12 January 2015 through 20 March 2015. There is geographical restriction under this contract which states that the contractor will perform the contract within 200 road miles of the cutter’s home moorage in Seattle, WA.

(2)

PLACE OF PERFORMANCE

(1) All work under this contract will be performed at the Contractor’s provided dry-dock facility which has been certified in accordance with SFLC Standard Specification 8634, Jan 2009.

(2) The work to be performed on the cutter shall not be performed at any other location unless the Contracting officer approves a change in location in writing, in advance.

NOTE: The contractor must specify in the provision FAR 52.215-6 Place of Performance, the location of the facility where work is to be performed. If Contractor plans on using different shipyard, Contractor must state the location for thecutter will have the work performed. If this provision is not completed, the proposal may be considered non-responsive.

(3)

FAR 52.204-1 APPROVAL OF CONTRACT (DEC 1989)

This contract is subject to the written approval of the Section Chief, CPD, C&P2 and shall not be binding until so approved.

(4) FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.arnet.gov/far/index.html

Clause No.
Clause Title
Date
FAR 52.211-15
Defense Priority and Allocation Requirements
APR 2008
FAR 52,215-21
Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data- Modification
OCT 2010
FAR 52.223-3
Hazardous Material Identification and Material Safety Data
JAN 1997
FAR 52.223-12
Refrigeration Equipment and Air Conditioner
May 1995
FAR 52.242-2
Production Progress Reports
APR 1991
FAR 52.242-15
Stop-Work Order
AUG 1989
FAR 52.242-17
Government Delay in Work
APR 1984
FAR 52.245-1
Government Property Alternate 1 (APR 2012)
APR 2012
FAR 52.245-9
Use and Charges
APR 2012
FAR 52-246-2
Inspection of Services – Fixed Price
AUG 1996
FAR 52.246-4
Inspection of Services – Fixed-Price
AUG 1996
FAR 52.246-16
Responsibility for Supplies
APR 1984
FAR 52.247-55
F.O.B. Point for Delivery of Government Furnished Property
JUN 2003
HSAR 3052,205-70
Advertisement, Publicizing Awards and Releases
SEPT 2012
HSAR 3052.211-70
Index of Specification
DEC 2003
HSAR 3052.217-90
Delivery and Shifting of Vessel
DEC 2003
HSAR 3052.217-91
Performance
DEC 2003
HSAR 3052.217-92
Inspection and Manner of Doing Work
DEC 2003
HSAR 3052.217-93
Subcontracts
DEC 2003
HSAR 3052.217-4
Lay Days
DEC 2003
HSAR 3052.217-95
Liability and Insurance
DEC 2003
HSAR 3052.217-96
Title
DEC 2003
HSAR 3052.217-97
Discharge of Liens
DEC 2003
HSAR 3052.217-98
Delays
DEC 2003
HSAR 3052.217-99
Department of Labor Safety and Health Regulations for Ship Repair
DEC 2003
HSAR 3052.217-100
Guarantee (90 DAYS)
JUN 2006
HSAR 3052.219-70
Small Business Program Subcontracting Reporting
JUN 2006
HSAR 3052.219-71
DHS Mentor-Protégé Program
JUN 2006
HSAR 3052.222-70
Strikes or Picketing Affecting Timely Completion of the Contract Work
DEC 2003
HSAR 3052.222-90
Local Hire
JUN 2006
HSAR 3052.223-90
Accident and Fire Reporting
DEC 2003
HSAR 3052.242-70
Dissemination of Contract Information
DEC 2003
HSAR 3052.242-72
Contracting Officer’s Technical Representative
DEC 2003
HSAR 3052.245-70
Government Property Reports
DEC 2003

(5) HSAR 3052.223-70 REMOVAL OR DISPOSAL OF HAZARDOUS SUBSTANCES – APPLICABLE LICENSES AND PERMITS (JUN 2006)

The Contractor shall have all licenses and permits required by Federal, state, and local laws to perform hazardous substance(s) removal or disposal services. If the Contractor does not currently possess these documents, it shall obtain all requisite licenses and permits within 30 days after date of award. The Contractor shall provide evidence of said documents to the Contracting Officer or designated Government representative prior to commencement of work under the contract.

(End of clause)

(6).

FAR 52.223-11 OZONE-DEPLETING SUBSTANCES (May 2001)

(a) Definition. "Ozone-depleting substance," as used in this clause, means any substance the Environmental Protection Agency designates in 40 CFR Part 82 as--

(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform; or

(2) Class II, including, but not limited to hydrochlorofluorocarbons.

(b) The Contractor shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), and (d) and 40 CFR Part 82, Subpart E, as follows:

Warning

Contains (or manufactured with, if applicable) *_______, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.

· The Contractor shall insert the name of the substance(s).

(7).

FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS CONTRACTORS (DEC 2013) (a) Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.

(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.

(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.

(8)

HSAR 3052.204-71 CONTRACTOR EMPLOYEE ACCESS (JUN 2006)

(a) Sensitive Information, as used in this Chapter, means any information, the loss, misuse, disclosure, or unauthorized access to or modification of which could adversely affect the national or homeland security interest, or the conduct of Federal programs, or the privacy to which individuals are entitled under section 552a of title 5, United States Code (the Privacy Act), but which has not been specifically authorized under criteria established by an Executive Order or an Act of Congress to be kept secret in the interest of national defense, homeland security or foreign policy. This definition includes the following categories of information:

(1) Protected Critical Infrastructure Information (PCII) as set out in the Critical Infrastructure Information Act of 2002 (Title II, Subtitle B, of the Homeland Security Act, Public Law 107-296, 196 Stat. 2135), as amended, the implementing regulations thereto (Title 6, Code of Federal Regulations, Part 29) as amended, the applicable PCII Procedures Manual, as amended, and any supplementary guidance officially communicated by an authorized official of the Department of Homeland Security (including the PCII Program Manager or his/her designee);

(2) Sensitive Security Information (SSI), as defined in Title 49, Code of Federal Regulations, Part 1520, as amended, “Policies and Procedures of Safeguarding and Control of S SI,” as amended, and any supplementary guidance officially communicated by an authorized official of the Department of Homeland Security (including the Assistant Secretary for the Transportation Security Administration or his/her designee);

(3) Information designated as “For Official Use Only,” which is unclassified information of a sensitive nature and the unauthorized disclosure of which could adversely impact a person’s privacy or welfare, the conduct of Federal programs, or other programs or operations essential to the national or homeland security interest; and

(4) Any information that is designated “sensitive” or subject to other controls, safeguards or protections in accordance with subsequently adopted homeland security information handling procedures.

(b) “Information Technology Resources” include, but are not limited to, computer equipment, networking equipment, telecommunications equipment, cabling, network drives, computer drives, network software, computer software, software programs, intranet sites, and internet sites.

(c) Contractor employees working on this contract must complete such forms as may be necessary for security or other reasons, including the conduct of background investigations to determine suitability. Completed forms shall be submitted as directed by the Contracting Officer. Upon the Contracting Officer's request, the Contractor's employees shall be fingerprinted, or subject to other investigations as required. All contractor employees requiring recurring access to Government facilities or access to sensitive information or IT resources are required to have a favorably adjudicated background investigation prior to commencing work on this contract unless this requirement is waived under Departmental procedures.

(d) The Contracting Officer may require the contractor to prohibit individuals from working on the contract if the government deems their initial or continued employment contrary to the public interest for any reason, including, but not limited to, carelessness, insubordination, incompetence, or security concerns.

(e) Work under this contract may involve access to sensitive information. Therefore, the Contractor shall not disclose, orally or in writing, any sensitive information to any person unless authorized in writing by the Contracting Officer. For those contractor employees authorized access to sensitive information, the contractor shall ensure that these persons receive training concerning the protection and disclosure of sensitive information both during and after contract performance.

(f) The Contractor shall include the substance of this clause in all subcontracts at any tier where the subcontractor may have access to Government facilities, sensitive information, or resources.

(9).

HAZARDOUS WASTE

Contractors performing dockside ship repair work at Government facilities are required to comply with FAR 52.223-3, Hazardous Material Identification and Material Safety Data (JAN 1997) Alt I, the U.S. Coast Guard shipboard hazardous waste policy, as prescribed in COMDINST M16478.1B, and MLCA standard specifications. Disposal of all hazardous wastes shall be performed by the Contractor and the Contractor shall meet all federal and state requirements. The Contractor is also required to submit an acceptable hazardous waste management plan to the Port Engineer at the Arrival Conference. The plan will be reviewed by the facility hazardous waste manager. An acceptable plan must address, at a minimum, the following requirements:

(a) EPA and local authority hazardous waste generator ID numbers or registration of the Contractors, his transporters, and disposal facilities (TSDFs);

(b) An inventory of all hazardous chemicals, compounds and other agents brought aboard the facility accompanied by their respective Material Safety Data Sheets;

(c) A list of all anticipated hazardous wastes to be generated and a federal/state/local regulation cross reference list for those wastes;

(d) Waste collection and containment procedures;

(e) A hazardous material spill and cleanup plan including tools and materials that will be on hand and readily available to facility containment and cleanup;

(f) Training certification for the Contractor's hazardous waste manager.

The Contractor shall note the local environmental regulations in Boston, and for Boston Harbor, are more stringent than in many jurisdictions. As with all environmental regulations, it is the Contractor's responsibility to research, prepare for, and comply with, the local and state regulations.

All waste generated under the performance of this contract shall be disposed under ISC Boston's EPA hazardous waste generator ID number. The Contractor shall notify the Contracting Officer's Representative (COR) 24 hours prior to any waste removals, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays). All hazardous waste manifests shall be reviewed and signed by ISC Boston hazardous waste personnel. The point of contact for environmental issues is the Environmental Protection Specialist at ISC Boston (617)223-3387.

(10)

VOLATILE ORGANIC COMPOUNDS (VOC) REGULATIONS

(a) Contractors are required to comply with federal, state and local VOC compliance laws and regulations. Among other requirements, certain Contractors may also be required to operate pursuant to a Title V permit. The need for such a permit will depend on the provisions of the applicable state’s “State Implementation Plan” (SIP) and the type/quantity of the Contractor’s regulated emissions, including VOCs. Certain SIPs may also mandate certain Contractors to operate under the terms of a compliance plan intended to reduce VOC emissions.

(b) Contractors, therefore, must submit the following to the designated Port Engineer not later than two weeks after contract award:

(1) Copies of any federal, state or local permits required and applicable to the use or application of VOCs at Contractor’s facility or offsite work places;

(2) Copies of any compliance plans required and applicable to the use or application of VOCs at Contractor’s facility or offsite work places.

(c) If no federal, state or local permits or compliance plans are required and applicable to the use or application of VOCs at Contractor’s facility or offsite workplaces, then Contractor shall submit to the designated Port Engineer a letter, notarized under oath, that such documents are not required.

(d) Contractors will submit the following to the designated Port Engineer not later than two weeks after contract award: Data Sheets (MSDS) documents, certificates, specifications or any other manufacturing data verifying the VOC ratings of paints to be applied to the Cutter in accordance with MLCA Standard Spec 63000N, Section 5.3.1.

(11)

TELEPHONE CHARGE

The Commanding Officer of the Cutter will pay all toll charges and applicable taxes and surcharges for long-distance telephone calls placed by ship’s personnel. All other charges shall be borne by the Contractor.

(12)

ACCESSIBILITY OF CONTRACTOR'S FACILITY

The Contractor shall provide a facility accessible from a navigable waterway at which a ship of the characteristics described in the attached specification can, using its own propulsion, safely arrive, lie afloat and depart at all states of the tide and at any time day or night. The facility and its approaches shall have a minimum water depth of _18__ feet and a minimum vertical clearance of _115_ feet.

(13)

INSURANCE REQUIREMENTS

A.

The contractor shall be required to procure and thereafter maintain the following insurance:

1.

Ship Repairer's legal Liability insurance to insure the risks described in HSAR 3052.217-95, Liability and Insurance (DEC 2003), in the amount of $300,000.

2.

Comprehensive General Liability insurance to insure the risks described in HSAR 3052.217-95 Liability and Insurance (DEC 2003) in the amount of $300,000 on account of any one accident or occurrence with respect to each vessel, boat and barge upon which work is to be performed under this solicitation and the contract resulting there from.

3.

Full insurance coverage in accordance with the State Workman’s Compensation law and, 4.

Full insurance coverage in accordance with the United States Longshore and Harbor Workers’ Compensation Act.

B.

As evidence that he has obtained the insurance specified in this schedule, the contractor shall furnish the contracting officer with a certificate or certificates executed by an agent of the insurer authorized to execute such certificated. Such certificated shall be furnished before commencement of work. Each certificate shall state that (NAME OF INSURER) has insured (NAME OF CONTRACTOR), in accordance with the Liability and Insurance clause and the Insurance Requirements clause contained herein. Each certificate shall set forth that each policy of insurance represented thereby will expire on (DATE) and that each such policy contains the following clause:

“It is agreed that in the event of cancellation, or any material change in the policy adversely affecting the interest of the Government in the insurance, thirty (30) days prior written notice will be given to the Contracting Officer.”

C.

An Offeror who proposes to self-insure for and of the risks set forth in the Liability and Insurance clause and in the Insurance Requirements clause contained herein shall submit satisfactory evidence to permit the Contracting Officer to determine that the offer’s assets are sufficient for the risks set forth in such clauses. The offeror shall submit with his proposal two (2) certified copies of documents listing his assets and liabilities and such other information as deemed necessary by the offeror or as required by the Contracting Officer. For approval of self-insurance under the State Workmen’s Compensation Law and the United States Longshore and harbor Worker’s Compensation Act, evidence of qualifications as a self-insurer under the applicable compensation statue must be furnished to the Contracting Officer.

(14)

ACCESS TO VESSEL

(a) A reasonable number of officers, employees, and associates of the Government, or other Prime Contractors with the Government, and their subcontractors, shall, as authorized by the Contracting Officer, have, at all reasonable times, admission to the plant, and access to vessel(s) to perform and fulfill their respective obligations to the Government on a noninterference basis.

The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Contracting Officer, to be given admission to the Contractor's facilities and access to the vessel(s) and to office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of their respective responsibilities and reasonable to their performance. All such above personnel shall be required to comply with all Contractor rules and regulations governing personnel at its shipyard, including those relative to safety and security.

The Contractor further agrees, as authorized by the Contracting Officer, to afford to a reasonable number of officers, employees, and associates of bidders on other contemplated work, the same privileges of admission to the Contractor's plant and access to the vessel(s) on a noninterference basis subject to all Contractor rules and regulations governing personnel in its shipyard, including those relative to safety and security.

(15).

INDEMNIFICATION FOR ACCESS TO VESSELS

Notwithstanding any provision in the "Access to Vessels" clause, or any other clause of the contract, the Contractor agrees to allow officers, employees, and associates of the Government, or other Prime Contractors with the Government and their subcontractors, and officers, employees, and associates of quoters on other contemplated work, admission to the Contractor's facilities and access to the vessel without any further request for indemnification from any party, which has not been previously included in the contract price.

(16)

INSPECTIONS

Except as specified elsewhere, the U.S. Coast Guard shall rely on the Contractor to accomplish all inspection and testing needed to ensure that the work conforms to contract quality requirements.

Records of all inspection work by the Contractor shall be kept complete and available to the Government during the term of this contract and for such longer period as may be specified elsewhere in this contract.

The name and telephone number of the U.S. Coast Guard Inspector will be provided after the award of a contract resulting from this solicitation.

(17)

GROWTH WORK

(a) The Contractor shall not perform growth work without the Contracting Officer's authorization. Growth work is work within the scope of the contract, which has not been previously priced as a pre-priced CLIN. The Contracting Officer reserves the right to contract for growth work on the basis of a negotiated, firm, fixed price, when it is in the best interest of the Government. If a firm-fixed price contract is awarded, and during the performance period a repair within scope is identified but the Contracting Officer and Contractor are unable to agree on the cost of the work, a bilateral modification may be incorporated into the contract using a Time and Materials modification for this specific repair. In this situation, FAR 52.212-4, Alternate I, will be incorporated.

(b) The Contractor shall furnish a price breakdown directly to the Contracting Officer, itemized as required by the Contracting Officer, of any proposal submitted for a contract modification. Unless otherwise directed, the breakdown shall be submitted on an SFLC 002 proposal form provided at the arrival conference permitting an analysis of all materials, labor, equipment, subcontract, overhead costs, and profit covering all work involved in the change/modification whether such work was deleted, added or changed. Any amount claimed for subcontracts shall be supported by a separate, similar price breakdown. If the proposal includes a request for a time extension, justification shall be furnished with the proposal.

(18)

COMPOSITE LABOR RATE:

The composite labor rate offered shall be the sole labor hour rate used to price the Prime Contractor's direct labor hours for contract changes, i.e. growth work. The Contractor shall not receive any compensation in addition to this rate for the Prime Contractor's direct labor associated with such changes under this contract.

(a) The composite labor hour rate shall represent total compensation for the following:

(1) direct labor wages and salaries;

(2) all employee benefits including, but not limited to, paid leave, supplemental pay, insurance, retirement, savings, and legally required benefits;

(3) other direct costs associated with transit time, delay, disruption, expendable supplies, and equipment;

(4) all indirect costs such as overhead and general and administrative expense;

(5) any port or association fees, rents, or other levies;

(6) profit (fee); and

(7) all direct and indirect costs and profit associated with the following support functions:

Supervision Quality Assurance

Planning Engineering

Surveyors Worker Transit Time

Material Handling Testing

Cleaners Guards

Estimating Contract Administration

Transportation Drivers

Fire Watches

The composite labor hour rate will be applied to production labor hours only. Production labor hours include only those hours necessary and reasonable to perform direct production functions and do not include the hours expended on the support functions listed above. This exclusion of support function hours applies whether such support functions are normally charged directly or indirectly by the Contractor's accounting system. These support functions are to be priced into the composite labor rate quoted and shall not be separately compensated.

(c) The Quantity of Composite Labor hours indicated in the Schedule of Supplies/Services, is only an estimate and is an Optional Item pursuant to this solicitation. The Estimated Quantity represents the Government’s best estimate of the total number of additional hours that may be required throughout the contract. The Government may elect to exceed this value at the prices stated in the schedule and its discretion during performance of the contract. The inclusion of this item does not obligate the Government to exercise the item nor entitle the Contractor to compensation if not exercised.

(19)

DISCOVERIES AND CHANGES TO CONTRACT:

Condition Found Report, Change Orders and Quick Chits will be transmitted electronically by using email. The bullets below display the process of how these documents are to be followed for the duration of the contract performance period:

(a) Condition Found Report (CFR) - All readings and inspections are to be taken within 24 hours after the machinery or system is opened. All reports of reading and inspections required by the specifications shall be submitted to the COR in writing using a "Condition Found Report (CFR)" form, within 24 hours after the readings and/or inspections are made.

Promptness in taking and reporting readings is particularly important for underbody work items such as shaft bearing or rudder bearing clearances. Often during the progress of a work item, conditions are discovered by the contractor which are considered abnormal for reasons of safety, expected reliability, health, or habitability. These conditions must be brought to the attention of the Coast Guard using a CFR. Details provided by the Contractor in a CFR are important because the CFR may result in a contract change. To speed the contract change progress, the Contractor should include in his/her CFR the following details as a minimum:

(i) A sequential number.

(ii) The contract item which the "CFR" relates to.

(iii) A clear statement, definition, and description of the condition found, including but not limited to frame numbers, part numbers, materials and dimensions as appropriate.

(iv) A proposed or recommended repair to correct the defective condition.

(v) Indicate whether the report requires Cost Guard action, or if it is provided "for info" only. If action is required, indicate the response time required by the Coast Guard and whether or not a contract extension would be needed if the additional work is authorized.

(vi) A space on the form for the Coast Guard to make comments.

(vii) All CFR's willl be dated, submitted, and signed by a representative of the Contractor.

Contracting Officer’s Representative (COR) will respond to the Contractor’s within 24 hours of receiving a Condition Found Report. A copy of ALL condition found reports shall be retained in the Cutter’s file.

(b) Change Request Process will occur when the contemplated change is above $3,000.00 in the following order:

1. Condition Found Report-Generated by the contractor and provided to COR .

2. Condition Report Reply-Generated by the COR and provided to Contractor

3. Change Request- CR and IGE are generated by the COR and entered in the Contract Workbook. COR will assign the Change request number.

4. COR provides copy of Change Request to the Contractor

5. Contractor’s Proposal- Provided to the KO for the identified tasking on CR

6. Negotiations- If needed, take place to establish pricing

7. Approved Change Request- Forwarded to Contractor and COR by the KO Change Request must be submitted by the COR to the contractor within 24 hours after responding to the CFR. Contractor must submit proposal to the Contracting Officer within 72 hours receipt of the Change Request.

(c) Quick Chit Process will occur when the contemplated change is below $3,000.00 in the following order:

1. Condition Found Report-Generated by the contractor and provided to COR .

2. Condition Report Reply-Generated by the COR and provided to Contractor

3. Quick Chit – COR will go over the scope of work with the contractor and request to submit a proposal for the change

4. Contractor’s Proposal- Provided to the COR within 24 hours.

5. Negotiations – COR and Contractor’s representative will negotiate to establish pricing for the change. Once COR and Contractor agree on scope of work and associated costs, COR will assign a Quick Chit number and fill in agreed price.

6. Approved Change Request- COR to forward (via e-mail or fax) copies of agreed settlement to Contractor, and enter all information in to Contract Workbook.

A modification will be issued to incorporate and implement all changes made by change orders and quick chits.

(20)

CONTRACT DEFICIENCY REPORT

The Contracting Officer or Contracting Officer’s Representative (COR) may issue a Contract Deficiency Report (CDR), SFLC Form 005. The Contractor shall respond in writing within 24 hours of receipt, unless otherwise approved by the Contracting Officer, to the COR. The COR will comment on the Contractor's response and will forward the Deficiency Report and comments to the Contracting Officer, with a copy to the Contractor and Availability Program Manager. The Contracting Officer will render a final determination and provide it to the Contractor and COR in writing.

(21)

OPTIONAL ITEMS:

Optional items listed under CLIN 0002 of the Schedule of Items may be awarded if inspection reports reveal the necessity for activation, at the price proposed in the Contractor’s proposal and without any other consideration whatsoever. However, after midnight on 30 January 2015, the Contractor shall have the right to refuse to accept the award of such Optional Items.

Such award refusals shall bar neither the Government nor the Contractor from subsequently negotiating with each other for performance of the work embodied in the refused Optional Item/s.

Optional items shall be awarded by written notice to the Contractor through issuance of a contract modification (SF-30). Transmission of the SF-30 notice of exercise to the contractor via e-mail is authorized; for purposes of determining the exact time of e-mail transmission, the time, date, and year of transmission automatically applied to the e-mail and/or the e-mail transmission record of transmission at the contracting office shall govern. Evaluation of the Optional items will not obligate the Government.

(22) MAINTAINING, REPORTING, AND DISPOSING OF GOVERNMENT PROPERTY IN THE PERFORMANCE OF A SHIP REPAIR CONTRACT

1.

The Government Property Clause incorporated by reference delineates the Contractor's overall responsibility when taking possession of government property in performance of a contract. In performance of this contract the Contractor will be required to properly identify, track and control property within its possession. This includes, a) property furnished by the government (GFP) to the Contractor in conjunction with specific CLIN Items. These items and their values are listed in the specification, b) property that is pre-existing in a location that during the course of performance will be replaced or renewed.

2.

The items listed in the specification, as government furnished property will be provided in the quantities designated. Government furnished property may be provided in person by an official Coast Guard employee, shipment via commercial carrier, etc. The Contractor shall sign for all government furnished property using either a DD Form 1149, entitled, “Requisition and Invoice/Shipping Document” or a DD Form 1348, entitled, “Issue Release/Receipt Document”. A copy of the DD 1149 or DD 1348 must be sent within 48 hours of receipt of property, to the designated Government Property Administrator. The name of the individual assigned as Property Administrator will be furnished to the Contractor at time of award. The Contractor shall not take receipt of property that is not listed in the specification, has not been previously identified as becoming part of the contract (via contract modification) or which otherwise cannot be identified. Such irregularities shall be immediately reported to the Property Administrator.

3.

The Contractor shall complete the report provided herein, entitled, “Government Property Report”. This report is intended as a living document whereby relevant fields shall be filled in, maintained and kept current at all times. All property described in paragraph 1 (a and b) above shall be reported on the report. At contract completion the Contractor and the Property Administrator shall ensure that all fields are appropriately completed. A signature block is provided at the end of the report for both parties to attest to the report's accuracy and completeness. The Government Property Report shall clearly delineate the complete track that all Government property took over the course of the contract. This completed report must accompany the Contractor's final invoice. Final payment may be delayed, without penalty of interest, until such time as the report is received. A separate copy of the completed report and any final DD 1149s or DD 1348s executed, as a result of carrying out disposition instructions shall be provided to the Property Administrator.

4.

Pursuant to the Government Property Clause the authority to render disposition instructions of Government property associated with this contract is delegated to the Property Administrator. The Contractor shall comply with all instructions in the contract for the return of government property to the Coast Guard. This includes government property taken off the vessel (shafts, propellers, etc.), government property returned to the vessel (special tools, etc.) or surplus government property not used during performance of the contract.

(23)

SECURITY REQUIREMENTS

A.

For each affected Coast Guard facility, the Contractor shall provide a list of all on-site personnel, including sub-contractors (including second and third-tier subcontractors) and suppliers, to the Contracting Officer. The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to the Coast Guard facility. Contractor personnel will be restricted to designated working areas. Any personnel violating this policy may lose access to the Coast Guard facility. Contractor personnel shall have photo identification at all times while working on Coast Guard facilities.

B.

Contractor and delivery personnel may be required to present personal photo identification to gain access to a Coast Guard installation. If identification does not indicate United States citizenship, Coast Guard Security may require proof of the legal right to work in the United States. Contractor and delivery personnel also may be subjected to an immigration status and outstanding criminal warrants check.

C.

Contractors shall provide the Contracting Officer's Representative with 24 hours of advance notice of every delivery to the site (e.g., concrete, lumber, parts, etc.) and provide the company name, delivery person, and phone number of the firm(s) making deliveries. All vehicle access to government property requires vehicle registration and proof of liability insurance. Otherwise access to the Coast Guard facility may be denied.

(24)

CONTRACTING OFFICER’S AUTHORITY

No oral or written statement of any person other than the Contracting Officer will in any manner or degree modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred as a result thereof.

(25)

CONTRACTOR PERFORMANCE EVALUATION

The U.S. Coast Guard Surface Forces Logistic Center (SFLC) will monitor and evaluate the successful offeror’s past performance of this contract and prepare a Contractor Performance Assessment Report (CPAR) in accordance with FAR Part 42.15. All information contained in this assessment may be used, within the limitations of FAR 42.15, by the government for future source selections and in accordance with FAR 15.304, when past performance is an evaluation factor for award.

(b) NOTIFICATION: Upon completion of the contract, the contractor will be notified of the assessment. The contractor will be allowed 30 days to respond to the SLFC’s assessment of its performance entered into CPARS. The contractor’s response, if any, will be made part of the CPAR system at https://www.cpars.csd.disa.mil.

(c) INFORMATION: Information included in the CPAR may include, but is not limited to, the contractor’s record of conforming to contract requirements and to standards of good workmanship; the contractor’s record of forecasting and controlling costs; the contractor’s adherence to contract schedules, including the administrative aspects of performance; the contractor’s history of reasonable and cooperative behavior and commitment to customer s satisfaction; the contractor’s record of integrity and business ethics, and generally, the contractor’s business-like concern for the interest of the customer.

(d) RELEASE OF DATA: CPARS information is considered business sensitive and will not be released except: (1) to other Federal procurement activities which request it; (2) when SFLC must release pursuant to a Freedom of Information Act (FOIA) request; or (3) when prior written consent is requested and obtained from the contractor.

(26)

METHOD OF PAYMENT AND INVOICING INSTRUCTIONS

INVOICE SUBMISSION PROCESS:

1.

The Contractor shall prepare a proper invoice IAW FAR clause 52.212-4, and in addition to the information required by FAR 52.212-4(g) as cited in the contract. All invoices shall be itemized to correlate to the Schedule of Supplies/Services.

A.

The Government will make payment under this contract based on a percentage or stage of completion. The Contractor may invoice each contract line item (CLIN) as work progresses. The amount invoiced shall be calculated based on those prices stipulated in the contract Schedule of Supplies/Services as follows:

B.

A CLIN may not be invoiced until the percentage complete reaches 25 percent. Future invoices for that CLIN have no limitation as to the percentage of completion required before invoicing. (The minimum percentage of completion (25%) to be reached prior to billing each CLIN may be waived by the Contracting Officer on a case by case basis for large dollar CLINS.)

C.

In addition to the information required by FAR 52.212-4 (g) Invoices shall include:

1) Contract Number, Delivery Order/Task Order Number, DOC Number

2) Name and Address of the Contractor

3) Invoice Number and Invoice Date

4) DUNS Number

5) Name of the Contract Specialist and Contracting Officer’s

6) Invoice Routing Code (IRC): SFLC-2

7) Indicate Small Business Status

8) Indicate if Final Invoice. The Contractor’s final invoice submitted under the contract must be marked as follows: (THIS INVOICE CONSTITUTES THE FINAL INVOICE – UPON PAYMENT OF THIS INVOICE NO OTHER MONIES ARE DUE UNDER CONTRACT NUMBER (to be assigned upon contract award).

9) The percentage of completion for each CLIN identified;

10) Vessel name;

11) The overall percentage and dollar amount previously billed, currently billed and unbilled;

12) Shipping and Payment Terms;

13) Name, title, phone number, and mailing address of person to be notified in the event of a defective invoice.

All information must be included in an invoice for it to constitute a proper invoice. All improper invoices will be rejected which could delay payment.

2.

The Contractor shall forward invoices via e-mail Valerie.s.riverachase@uscg.mil or in person to the Contracting Officer’s Representative (COR).

3.

The COR shall review and verify invoices, sign the invoice and return the invoice to the Contractor.

4.

The Contractor shall complete the Contractor Invoice Submission Form (sample attached).

5.

The Contractor shall submit the Contractor Invoice Submission Form, a PDF file of the invoice, and any necessary documents for supplies or services via the U.S. Coast Guard Finance Center website at:

http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm Contractor Invoice Submission Form Directions: Please complete as much information as possible. All blocks in red text are required entries.

Note: Web-Invoices are accepted only for Coast Guard Contracts over the Simplified Acquisition Threshold (Document Type 24).

THIS WEB FORM IS NOT AN OFFICIAL INVOICE. THE OFFICIAL INVOICE MUST BE ATTACHED

Invoice Information Invoice Routing Code: (help) Invoice Number: (help) Contract Number: (help) Invoice Date: (help) BPA Number: (help) Invoice Amount: (help) Delivery/Task Order Number: (help) Discount Terms: %

Discount Days: Net Days: (help)

Company Information Attachment of Official Invoice Company Name: (help) DUNS: Plus 4: (help) Point of Contact Name: (help) Point of Contact Email: (help) Phone: (help) Fax: (help)

Please verify your entry on the next page. Attach invoice and any supporting documentation after verification.

· Attachment must be a single PDF file no larger than 3 MB. Grey-scale PDFs are not compatible. This will be our official invoice. Supporting documentation must be combined in the single PDF file or submitted to your contracting office separately via email.

· Need help creating a PDF file? Click here for instructions.

Bottom of Form

6.

The Contractor must select the correct Invoice Routing Code for timely invoice processing. The Invoice Routing Code for this contract is SFLC-2.

7.

Visit the U.S. Coast Guard Finance Center Website for instructions regarding invoice attachments. http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm 8.

A copy of the invoice and any supporting documentation shall also be e-mailed to the following individuals:

Valerie.s.riverachase@uscg.mil Additional work verbally agreed to by the parties that has not yet been incorporated into the contract by modification shall not be included in an invoice. Payments will not be made for any work to which a modification has not been properly executed. Invoices submitted for payment that includes such a request will be reduced by the unmodified amount

NOTE: 10% OF THE TOTAL CONTRACT PRICE WILL BE WITHHELD UNTIL ALL DELIVERABLES, REQUIRED BY THE CONTRACT, ARE RECEIVED AND ACCEPTED.

FURTHER CONSIDERATIONS WITH INVOICING:

In accordance with the Prompt Payment Act, for the purposes of determining a payment due date and the date on which interest will begin to accrue if a payment is late, a proper invoice shall be deemed to have been received:

(1) On the later of:

(i) For invoices that are mailed the date a proper invoice is actually received by the designated billing office and annotates the invoice with date of receipt at the time of receipt.

(ii) For invoices electronically transmitted by the contractor via web based submission, the date a transmission is received by the designated billing office, and receipt confirmation is provided to the designated recipient; or

(ii) The seventh day after the date on which the property is actually delivered or performance of the services is actually completed; unless—

a) The agency has actually accepted the property or services before the seventh day in which case the acceptance date shall substitute for the seventh day after the delivery date; or

b) A longer acceptance period is specified in the contract, in which case the date of actual acceptance or the date on which such longer acceptance period ends shall substitute for the seventh day after the delivery date;

(2) On the date placed on the invoice by the contractor, when the agency fails to annotate the invoice with date of receipt of the invoice at the time of receipt (such invoice must be a proper invoice); or

(3) On the date of delivery, when the contract specifies that the delivery ticket may serve as an invoice.

(4) Web based submission by the contractor and receipt confirmation does not reflect Government review or acceptance of the invoice.

(5) For inquiries and payment status please visit https://fincen.uscg.mil/secure/payment.htm The Data Universal Numbering System (DUNS) number is the primary identifier in System for Award Management(SAM), (see FAR 52.232-33, Payment by Electronic Funds Transfer – System for Award Management (JUL 2013)). Contractors are located and identified in SAM by their DUNS number. Therefore, to facilitate payment, the DUNS number shall be recorded on every invoice submitted to the U.S. Coast Guard.

All payments for partial performance rendered by the Government under this contract are based on the assumption that the Contractor will, in good faith, execute and honor all payment terms entered into between it, the Prime Contractor, and any subcontractor thereof in the performance of this contract. The Contractor hereby acknowledges the Government’s right to reduce or suspend progress payments based on non-payment in accordance with any payment terms of the subcontract agreement.

Any amount deemed not payable will be deducted from the Contractor’s invoice. Deducted amounts may be resubmitted on the next invoice for reconsideration

(27).

PROGRESS PAYMENTS

A.

The Contractor may invoice requesting progress payments without discount, other than any prompt payment discount offered, not more frequently than every two weeks.

B.

The invoice amount should reflect the percentage and dollar amount of completion established by the cutter's appropriate weekly progress report. Payments shall be derived from the accomplished percentage of completion as determined by the Contracting Officer.

C.

All material and work paid for by progress payments shall thereby become the sole property of the Government, but this provision shall not relieve the Contractor from the obligation to complete the requirements of the contract.

D.

The contractor shall be paid the remaining amount due upon completion and acceptance of all work under this contract.

(28) 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Items (JUL 2014)

(a) The…