SOLICITATION_PKG_(MUNRO).doc
DOC document 436 KB Posted
- Attached to
- Dockside Repairs of CGC MUNRO (WHEC 724)
- Solicitation number
- HSCG85-13-R-P45220
About this file
SOLICITATION PKG. - HSCG85-13-R-P45220
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MUNRO__WHEC_378W__DS_MCJ_13R1.pdf | ||
| SF30-A001.pdf | ||
| SCHEDULE_OF_ITEMS-PRICES_(REVISED).xls | XLS spreadsheet | |
| Page_2_-_A001.doc | DOC document | |
| NOTICE_TO_OFFERORS_(MUNRO_DS).doc | DOC document | |
| HSCG85-13-R-P45220_CGC_MUNRO_Past_Performance_Questionnaire.doc | DOC document | |
| LIST_OF_ATTACHMENT_(MUNRO_DS).doc | DOC document | |
| 10_GOVERNMENT_PROPERTY_REPORT_(Attachment_5).doc | DOC document | |
| SF1449_(P45220).pdf | ||
| SCHEDULE_OF_ITEMS_-_PRICES.xls | XLS spreadsheet | |
| 2_Cover_Sheet_(MUNRO_DS).doc | DOC document | |
| Request_for_Clarification_(MUNRO_DS).doc | DOC document | |
| MUNRO__WHEC_378W__DS_MCJ_13R0.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal
Solicitation No. HSCG85-13-R-P45220 Dockside Repairs of CGC MUNRO (WHEC 724)
NOTICE TO OFFERORS: Offerors must complete and submit all applicable items of this solicitation, with particular emphasis on Price Schedule, contract clauses, and FAR 52.212-3 – OFFEROR REPRESENTATIONS AND CERTIFICATIONS -- COMMERCIAL ITEM (Apr 2012)
DESCRIPTION OF WORK
(a) The Contractor shall furnish all necessary labor, materials, services, equipment, supplies, power, accessories, and other such things as are necessary, except as otherwise specified, to perform Dockside Repairs of CGC MUNRO (WHEC 724), in accordance with resultant contract and attached specifications, referenced as ATTACHMENT 2 .
(b) All work will be performed and accomplished at the cutter’s respective home moorage, CGC MUNRO in Kodiak, AK during the period of 27 March 2013 through 27 May 2013.
(c) Failure to read the specifications in their entirety will not relieve the offeror from the responsibility for properly estimating the difficulty or price of successfully performing the work. Failure to do so will be at the offeror 's risk. All proposals submitted in response to this solicitation shall stand firm for 60 calendar days from the response date of this solicitation.
ALL CONTRACTORS ARE RESPONSIBLE FOR VERIFYING THE RECEIPT OF THEIR PROPOSALS.
SCHEDULE OF ITEMS - SUPPLIES AND SERVICES – PRICES (SEE ATTACHMENT 1.
CLIN 0001: DEFINITE ITEMS
These are the items that, if there is an award at all, will be awarded. The offer shall be evaluated to include the offer price for each definite item. Utilize the attached electronic (MSExcel) “Schedule of Items” for submission of all pricing on this procurement. Base Contract Line Item Numbers (CLINs) are marked as “D” for Definitive. Submit the MSExcel “Schedule of Supplies” with your signed offer.
CLIN 0002 – COMPOSITE LABOR HOUR RATE APPLICABLE TO CONTRACT CHANGES
The labor hour rate shall be used in pricing all contract changes in accordance with the clause of Section H entitled “COMPOSITE LABOR HOUR RATE FOR CONTRACT CHANGES.”
NOTE: The estimated quantity and extended amount indicated above are for evaluation of proposals only. The quoted rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.
CONTRACT CLAUSES
(1) FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (Feb 2012)
ADDENDUM
(2) FAR 52.204-1 APPROVAL OF CONTRACT (Dec 1989) This contract is subject to the written approval of the Branch Chief, CPD, C&P2 and shall not be binding until so approved.
(End of Clause)
(3) FAR 52.232-18 AVAILABILITY OF FUNDS (Apr 1984) Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
(4) 52.232-99, Providing Accelerated Payment to Small Business Subcontractors
(DEVIATION) (AUG 2012)
This clause implements the temporary policy provided by OMB Policy Memorandum M-12-16, Providing Prompt Payment to Small Business Subcontractors, dated July 11, 2012.
(a) Upon receipt of accelerated payments from the Government, the contractor is required to make accelerated payments to small business subcontractors to the maximum extent practicable after receipt of a proper invoice and all proper documentation from the small business subcontractor.
(b) Include the substance of this clause, including this paragraph (b), in all subcontracts with small business concerns.
(c) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.
(End of Clause)
(5) FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.arnet.gov/far/index.html
| Clause No. |
| Clause Title |
| Date |
| FAR 52.242-2 |
| Production Progress Reports |
| APR 1991 |
| FAR 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| FAR 52.242-17 |
| Government Delay in Work |
| APR 1984 |
| FAR 52.245-1 |
| Government Property Alternate 1 (APR 2012) |
| APR 2012 |
| FAR 52.245-9 |
| Use and Charges |
| APR 2012 |
| FAR 52-246-2 |
| Inspection of Services – Fixed Price |
| AUG 1996 |
| FAR 52.246-4 |
| Inspection of Services – Fixed-Price |
| AUG 1996 |
| FAR 52.246-16 |
| Responsibility for Supplies |
| APR 1984 |
| FAR 52.247-55 |
| F.O.B. Point for Delivery of Government Furnished Property |
| JUN 2003 |
| HSAR 3052.211-70 |
| Index of Specification |
| DEC 2003 |
| HSAR 3052.217-90 |
| Delivery and Shifting of Vessel |
| DEC 2003 |
| HSAR 3052.217-91 |
| Performance |
| DEC 2003 |
| HSAR 3052.217-92 |
| Inspection and Manner of Doing Work |
| DEC 2003 |
| HSAR 3052.217-93 |
| Subcontracts |
| DEC 2003 |
| HSAR 3052.217-95 |
| Liability and Insurance |
| DEC 2003 |
| HSAR 3052.217-96 |
| Title |
| DEC 2003 |
| HSAR 3052.217-97 |
| Discharge of Liens |
| DEC 2003 |
| HSAR 3052.217-98 |
| Delays |
| DEC 2003 |
| HSAR 3052.217-99 |
| Department of Labor Safety and Health Regulations for Ship Repair |
| DEC 2003 |
| HSAR 3052.217-100 |
| Guarantee (90 DAYS) |
| JUN 2006 |
| HSAR 3052.219-70 |
| Small Business Program Subcontracting Reporting |
| JUN 2006 |
| HSAR 3052.222-70 |
| Strikes or Picketing Affecting Timely Completion of the Contract Work |
| DEC 2003 |
| HSAR 3052.222-90 |
| Local Hire |
| JUN 2006 |
| HSAR 3052.223-70 |
| Removal or Disposal of Hazardous Substances-Applicable Licenses and Permits (30 days) |
| JUN 2006 |
| HSAR 3052.223-90 |
| Accident and Fire Reporting |
| DEC 2003 |
| HSAR 3052.242-70 |
| Dissemination of Contract Information |
| DEC 2003 |
| HSAR 3052.242-72 |
| Contracting Officer’s Technical Representative |
| DEC 2003 |
| HSAR 3052.245-70 |
| Government Property Reports |
| DEC 2003 |
(6)
VOLATILE ORGANIC COMPOUNDS (VOC) REGULATIONS
(a) Contractors are required to comply with federal, state and local VOC compliance laws and regulations. Among other requirements, certain Contractors may also be required to operate pursuant to a Title V permit. The need for such a permit will depend on the provisions of the applicable state’s “State Implementation Plan” (SIP) and the type/quantity of the Contractor’s regulated emissions, including VOCs. Certain SIPs may also mandate certain Contractors to operate under the terms of a compliance plan intended to reduce VOC emissions.
(b) Contractors, therefore, must submit the following to the designated Port Engineer not later than two weeks after contract award:
(1) Copies of any federal, state or local permits required and applicable to the use or application of VOCs at Contractor’s facility or offsite work places;
( 2) Copies of any compliance plans required and applicable to the use or application of VOCs at Contractor’s facility or offsite work places.
(c) If no federal, state or local permits or compliance plans are required and applicable to the use or application of VOCs at Contractor’s facility or offsite workplaces, then Contractor shall submit to the designated Port Engineer a letter, notarized under oath, that such documents are not required.
(d) Contractors will submit the following to the designated Port Engineer not later than two weeks after contract award: Data Sheets (MSDS) documents, certificates, specifications or any other manufacturing data verifying the VOC ratings of paints to be applied to the Cutter in accordance with MLCA Standard Spec 63000N, Section 5.3.1.
(7)
INSURANCE REQUIREMENTS
A. The contractor shall be required to procure and thereafter maintain the following insurance:
(1) Ship repairer's legal liability insurance to insure the risks described in HSAR 3052.217-95, Liability and Insurance (DEC 2003), in the amount of $300,000.00.
(2) Comprehensive general liability insurance to insure the risks described in HSAR 3052.217-95 Liability and Insurance (DEC 2003), in the amount of $300,000.00 on account of any one accident or occurrence with respect to each vessel, boat and barge upon which work is to be performed under this solicitation and the contract resulting therefrom:
(3) Full insurance coverage in accordance with the State Workmen's Compensation law; and
(4) Full insurance coverage in accordance with the United States Longshore and Harbor Workers' Compensation Act.
B. As evidence that he has obtained the insurance specified in this schedule, the contractor shall furnish the contracting officer with a certificate or certificates executed by an agent of the insurer authorized to execute such certificates. Such certificate shall be furnished before commencement of work. Each certificate shall state that (NAME OF INSURER) has insured (NAME OF CONTRACTOR), in accordance with the Liability and Insurance clause and the Insurance Requirements clause contained herein. Each certificate shall set forth that each policy of insurance represented thereby will expire on (DATE) and that each such policy contains the following clause:
"It is agreed that in the event of cancellation, or any material change in the policy adversely affecting the interest of the Government in this insurance, thirty (30) days' prior written notice will be given to the Contracting Officer."
C. An Offeror who proposes to self-insure for any of the risks set forth in the Liability and Insurance clause and in the Insurance Requirements clause contained herein shall submit satisfactory evidence to permit the Contracting Officer to determine that the offeror’s assets are sufficient for the risks set forth in such clauses. The offeror shall submit with his proposal two (2) certified copies of documents listing his assets and liabilities and such other information as deemed necessary by the offeror or as required by the Contracting Officer. For approval of self-insurance under the State Workmen's Compensation Law and the United States Longshore and Harbor Workers' Compensation Act, evidence of qualifications as a self-insurer under the applicable compensation statute must be furnished to the contracting officer.
NOTE: The insurance certificate must provide the name of the US Coast Guard vessel and the contract and/or solicitation number as specifically insured.
(8)
ACCESS TO VESSEL
A. A reasonable number of officers, employees and associates of the Government, or other prime contractors with the Government, and their subcontractors, shall, as authorized by the Contracting Officer, have at all reasonable times, admission to the contractor’s facility, and access to the cutter to perform and fulfill their respective obligations to the Government on a noninterference basis. All such above personnel shall comply with all contractor rules and regulations governing personnel at its facility, including those relative to safety and security.
B. The contractor further agrees, as authorized by the Contracting Officer, to afford to a reasonable number of officers, employees, and associates of other offerors when inspecting contemplated work, the same privileges of admission to the contractor’s facility and access to the cutter on a noninterference basis, subject to all contractor rules governing personnel at its facility, including those relating to safety and security.
(9).
INDEMNIFICATION FOR ACCESS TO VESSELS
Notwithstanding any provision in the "Access to Vessels" clause, or any other clause of the contract, the Contractor agrees to allow officers, employees, and associates of the Government, or other Prime Contractors with the Government and their subcontractors, and officers, employees, and associates of offerors on other contemplated work, admission to the Contractor's facilities and access to the vessel without any further request for indemnification from any party, which has not been previously included in the contract price.
(10).
INSPECTIONS
Except as specified elsewhere, the U.S. Coast Guard shall rely on the Contractor to accomplish all inspection and testing needed to ensure that the work conforms to contract quality requirements. Records of all inspection work by the Contractor shall be kept complete and available to the Government during the term of this contract and for such longer period as may be specified elsewhere in this contract. The name and telephone number of the U.S. Coast Guard Inspector will be provided after the award of a contract resulting from this solicitation.
(11).
ADDITIONAL WORK
A. If the need for additional work develops, the Contractor must obtain authority orally or in writing from the Contracting Officer before proceeding with such work.
B. To the extent requested by the Contracting Officer, the Contractor shall prepare and submit written proposals for proposed change orders which may be required to include:
(1) A complete breakdown of labor hours and costs by labor category and phase of work as identified by the Contracting Officer;
(2) A complete breakdown of material costs showing material required, source (with point of contact), part number, unit and extended cost and contractor's material handling charge/profit; and
(3) A complete breakdown of labor and material as described above for each proposed subcontractor.
C. The contractor shall submit written proposals and breakdowns to the Contracting ficer via facsimile transmission.
(12).
COMPOSITE LABOR HOUR RATE FOR CONTRACT CHANGES
A. The composite labor hour rate offer in Schedule of Items-Supplies or Services – Prices shall be the sole labor hour rate used to price the prime contractor's direct labor hours for all contract changes, whether growth within scope or new work. The contractor shall not receive any compensation in addition to this rate for prime contractor's direct labor associated with changes under this contract.
B. The composite labor hour rate shall represent total compensation for the following: direct labor; any port or association fees, rents or other levies; all overhead and general and administrative costs; profit; and all direct and indirect costs and profit associated with following support functions:
Supervision Quality Assurance
Planning Engineering
Surveyors Fire Watch
Transportation/Drivers Worker Transit Time
Material Handling Testing
Cleaners Guards
Estimating Contract Administration
C. The composite labor hour rate will be used in pricing production labor hours, which shall include only those hours necessary and reasonable to perform direct production functions, and will not include the support functions listed above, whether such support functions are normally charged directly or indirectly by the contractor's accounting system. These support functions are to be priced into the composite labor rate and shall not be separately compensated.
D. This clause shall not affect the other rights of the parties under FAR 52.212-4, paragraph (c), CHANGES, including the right of the Contracting Officer to issue unilateral change orders, and the right of the contractor to request equitable adjustment.
E. The Estimated Quantity indicated by the Government in Schedule of Items, CLIN 0003 and CLIN 0006, is an estimate only, and the Extended Amount indicated by the offeror in these CLINs are not ordered by award of a contract pursuant to this solicitation. The Estimated Quantity represents the Government's best estimate of the total number of hours that will be required. The actual number of hours may be greater or less.
(13).
WELDING CERTIFICATIONS AND QUALIFICATIONS
This contract may contain welding line items as either Definitive or Optional Items. With his/her proposal the Contractor shall provide the necessary welding certifications and qualifications as required by the specification for the applicable work item(s), and MLCA/SFLC Standard Specification 0740_STD. Subsequent to contract award, the Government will require the contractor to submit applicable certifications and qualifications for any welding to be performed on any proposed change request.
(14).
DISCOVERIES AND CHANGES TO CONTRACT:
Condition Found Report, Change Orders and Quick Chits will be transmitted electronically by using email. The bullets below display the process of how these documents are to be followed for the duration of the contract performance period:
(a) Condition Found Report (CFR) - All readings and inspections are to be taken within 24 hours after the machinery or system is opened. All reports of reading and inspections required by the specifications shall be submitted to the COR in writing using a "Condition Found Report (CFR)" form, within 24 hours after the readings and/or inspections are made.
Promptness in taking and reporting readings is particularly important for underbody work items such as shaft bearing or rudder bearing clearances. Often during the progress of a work item, conditions are discovered by the contractor which are considered abnormal for reasons of safety, expected reliability, health, or habitability. These conditions must be brought to the attention of the Coast Guard using a CFR. Details provided by the Contractor in a CFR are important because the CFR may result in a contract change. To speed the contract change progress, the Contractor should include in his/her CFR the following details as a minimum:
(i) A sequential number.
(ii) The contract item which the "CFR" relates to.
(iii) A clear statement, definition, and description of the condition found, including but not limited to frame numbers, part numbers, materials and dimensions as appropriate.
(iv) A proposed or recommended repair to correct the defective condition.
(v) Indicate whether the report requires Cost Guard action, or if it is provided "for info" only. If action is required, indicate the response time required by the Coast Guard and whether or not a contract extension would be needed if the additional work is authorized.
(vi) A space on the form for the Coast Guard to make comments.
(vii) All CFR's willl be dated, submitted, and signed by a representative of the Contractor.
Contracting Officer’s Representative (COR) will respond to the Contractor’s within 24 hours of receiving a Condition Found Report. A copy of ALL condition found reports shall be retained in the Cutter’s file.
(b) Change Request Process will occur when the contemplated change is above $3,000.00 in the following order:
1. Condition Found Report-Generated by the contractor and provided to COR .
2. Condition Report Reply-Generated by the COR and provided to Contractor
3. Change Request- CR and IGE are generated by the COR and entered in the Contract Workbook. COR will assign the Change request number.
4. COR provides copy of Change Request to the Contractor
5. Contractor’s Proposal- Provided to the KO for the identified tasking on CR
6. Negotiations- If needed, take place to establish pricing
7. Approved Change Request- Forwarded to Contractor and COR by the KO Change Request must be submitted by the COR to the contractor within 24 hours after responding to the CFR. Contractor must submit proposal to the Contracting Officer within 72 hours receipt of the Change Request.
(c) Quick Chit Process will occur when the contemplated change is below $3,000.00 in the following order:
1. Condition Found Report-Generated by the contractor and provided to COR .
2. Condition Report Reply-Generated by the COR and provided to Contractor
3. Quick Chit – COR will go over the scope of work with the contractor and request to submit a proposal for the change
4. Contractor’s Proposal- Provided to the COR within 24 hours.
5. Negotiations – COR and Contractor’s representative will negotiate to establish pricing for the change. Once COR and Contractor agree on scope of work and associated costs, COR will assign a Quick Chit number and fill in agreed price.
6. Approved Change Request- COR to forward (via e-mail or fax) copies of agreed settlement to Contractor, and enter all information in to Contract Workbook.
A modification will be issued to incorporate and implement all changes made by change orders and quick chits.
(15).
MAINTAINING, REPORTING, AND DISPOSING OF GOVERNMENT PROPERTY IN THE PERFORMANCE OF A SHIP REPAIR CONTRACT
1.
The Government Property Clause incorporated by reference delineates the Contractor's overall responsibility when taking possession of government property in performance of a contract. In performance of this contract the Contractor will be required to properly identify, track and control property within its possession. This includes, a) property furnished by the government (GFP) to the Contractor in conjunction with specific CLIN Items. These items and their values are listed in the specification, b) property that is pre-existing in a location that during the course of performance will be replaced or renewed.
2.
The items listed in the specification, as government furnished property will be provided in the quantities designated. Government furnished property may be provided in person by an official Coast Guard employee, shipment via commercial carrier, etc. The Contractor shall sign for all government furnished property using either a DD Form 1149, entitled, “Requisition and Invoice/Shipping Document” or a DD Form 1348, entitled, “Issue Release/Receipt Document”. A copy of the DD 1149 or DD 1348 must be sent within 48 hours of receipt of property, to the designated Government Property Administrator. The name of the individual assigned as Property Administrator will be furnished to the Contractor at time of award. The Contractor shall not take receipt of property that is not listed in the specification, has not been previously identified as becoming part of the contract (via contract modification) or which otherwise cannot be identified. Such irregularities shall be immediately reported to the Property Administrator.
3. The Contractor shall complete the report provided herein, entitled, “Government Property Report”. This report is intended as a living document whereby relevant fields shall be filled in, maintained and kept current at all times. All property described in paragraph 1 (a and b) above shall be reported on the report. At contract completion the Contractor and the Property Administrator shall ensure that all fields are appropriately completed. A signature block is provided at the end of the report for both parties to attest to the report's accuracy and completeness. The Government Property Report shall clearly delineate the complete track that all Government property took over the course of the contract. This completed report must accompany the Contractor's final invoice. Final payment may be delayed, without penalty of interest, until such time as the report is received. A separate copy of the completed report and any final DD 1149s or DD 1348s executed, as a result of carrying out disposition instructions shall be provided to the Property Administrator.
4. Pursuant to the Government Property Clause the authority to render disposition instructions of Government property associated with this contract is delegated to the Property Administrator. The Contractor shall comply with all instructions in the contract for the return of government property to the Coast Guard. This includes government property taken off the vessel (shafts, propellers, etc.), government property returned to the vessel (special tools, etc.) or surplus government property not used during performance of the contract.
(16).
CONTRACTING OFFICER’S AUTHORITY
No oral or written statement of any person other than the Contracting Officer will in any manner or degree modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred as a result thereof.
(17)
CONTRACTOR PERFORMANCE EVALUATION
(a) The U.S. Coast Guard Surface Forces Logistic Center (SFLC) will monitor and evaluate the successful offeror’s past performance of this contract and prepare a Contractor Performance Assessment Report (CPAR) in accordance with FAR Part 42.15.
All information contained in this assessment may be used, within the limitations of FAR 42.15, by the government for future source selections and in accordance with FAR 15.304, when past performance is an evaluation factor for award.
(b) NOTIFICATION: Upon completion of the contract, the contractor will be notified of the assessment. The contractor will be allowed 30 days to respond to the SLFC’s assessment of its performance entered into CPARS. The contractor’s response, if any, will be made part of the CPAR system at https://www.cpars.csd.disa.mil.
(c) INFORMATION: Information included in the CPAR may include, but is not limited to, the contractor’s record of conforming to contract requirements and to standards of good workmanship; the contractor’s record of forecasting and controlling costs; the contractor’s adherence to contract schedules, including the administrative aspects of performance; the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction; the contractor’s record of integrity and business ethics, and generally, the contractor’s business-like concern for the interest of the customer.
(d) RELEASE OF DATA: CPARS information is considered business sensitive and will not be released except: (1) to other Federal procurement activities which request it; (2) when SFLC must release pursuant to a Freedom of Information Act (FOIA) request; or (3) when prior written consent is requested and obtained from the contractor.
(18).
SECURITY REQUIREMENTS
A.
For each affected Coast Guard facility, the Contractor shall provide a list of all on-site personnel, including sub-contractors (including second and third-tier subcontractors) and suppliers, to the Contracting Officer. The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to the Coast Guard facility. Contractor personnel will be restricted to designated working areas. Any personnel violating this policy may lose access to the Coast Guard facility. Contractor personnel shall have photo identification at all times while working on Coast Guard facilities.
B.
Contractor and delivery personnel may be required to present personal photo identification to gain access to a Coast Guard installation. If identification does not indicate United States citizenship, Coast Guard Security may require proof of the legal right to work in the United States. Contractor and delivery personnel also may be subjected to an immigration status and outstanding criminal warrants check.
C.
Contractors shall provide the Contracting Officer's Technical Representative with 24 hours of advance notice of every delivery to the site (e.g., concrete, lumber, parts, etc.) and provide the company name, delivery person, and phone number of the firm(s) making deliveries. All vehicle access to government property requires vehicle registration and proof of liability insurance. Otherwise access to the Coast Guard facility may be denied.
(19).
METHOD OF PAYMENT AND INVOICING INSTRUCTIONS
INVOICE SUBMISSION PROCESS:
1.
The Contractor shall prepare a proper invoice IAW FAR clause 52.212-4, and in addition to the information required by FAR 52.212-4(g) as cited in the contract. All invoices shall be itemized to correlate to the Schedule of Supplies/Services.
(A) The Government will make payment under this contract based on a percentage or stage of completion. The Contractor may invoice each contract line item (CLIN) as work progresses. The amount invoiced shall be calculated based on those prices stipulated in the contract Schedule of Supplies/Services as follows:
(B) A CLIN may not be invoiced until the percentage complete reaches 25 percent. Future invoices for that CLIN have no limitation as to the percentage of completion required before invoicing. (The minimum percentage of completion (25%) to be reached prior to billing each CLIN may be waived by the Contracting Officer on a case by case basis for large dollar CLINS.)
(C) In addition to the information required by FAR 52.212-4 (g) Invoices shall include:
1) Contract Number, Delivery Order/Task Order Number, DOC Number
2) Name and Address of the Contractor
3) Invoice Number and Invoice Date
4) DUNS Number
5) Name of the Contract Specialist and Contracting Officer’s
6) Invoice Routing Code (IRC): SFLC-2
7) Indicate Small Business Status
8) Indicate if Final Invoice. The Contractor’s final invoice submitted under the contract must be marked as follows: (THIS INVOICE CONSTITUTES THE FINAL INVOICE – UPON PAYMENT OF THIS INVOICE NO OTHER MONIES ARE DUE UNDER CONTRACT NUMBER (to be assigned upon contract award).
9) The percentage of completion for each CLIN identified;
10) Vessel name;
11) The overall percentage and dollar amount previously billed, currently billed and unbilled;
12) Shipping and Payment Terms;
13) Name, title, phone number, and mailing address of person to be notified in the event of a defective invoice.
All information must be included in an invoice for it to constitute a proper invoice. All improper invoices will be rejected which could delay payment.
2.
The Contractor shall forward invoices via e-mail Valerie.s.riverachase@uscg.mil or in person to the Contracting Officer’s Technical Representative (COR).
3.
The COR shall review and verify invoices, sign the invoice and return the invoice to the Contractor.
4.
The Contractor shall complete the Contractor Invoice Submission Form (sample attached).
5.
The Contractor shall submit the Contractor Invoice Submission Form, a PDF file of the invoice, and any necessary documents for supplies or services via the U.S. Coast Guard Finance Center website at:
http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm Contractor Invoice Submission Form Directions: Please complete as much information as possible. All blocks in red text are required entries.
Note: Web-Invoices are accepted only for Coast Guard Contracts over the Simplified Acquisition Threshold (Document Type 24).
THIS WEB FORM IS NOT AN OFFICIAL INVOICE. THE OFFICIAL INVOICE MUST BE ATTACHED
Invoice Information Invoice Routing Code: (help) Invoice Number: (help) Contract Number: (help) Invoice Date: (help) BPA Number: (help) Invoice Amount: (help) Delivery/Task Order Number: (help) Discount Terms: %
Discount Days: Net Days: (help)
Company Information Attachment of Official Invoice Company Name: (help) DUNS: Plus 4: (help) Point of Contact Name: (help) Point of Contact Email: (help) Phone: (help) Fax: (help)
Please verify your entry on the next page. Attach invoice and any supporting documentation after verification.
· Attachment must be a single PDF file no larger than 3 MB. Grey-scale PDFs are not compatible. This will be our official invoice. Supporting documentation must be combined in the single PDF file or submitted to your contracting office separately via email.
· Need help creating a PDF file? Click here for instructions.
Bottom of Form
6. The Contractor must select the correct Invoice Routing Code for timely invoice processing. The Invoice Routing Code for this contract is SFLC-2.
7.
Visit the U.S. Coast Guard Finance Center Website for instructions regarding invoice attachments. http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm 8.
A copy of the invoice and any supporting documentation shall also be e-mailed to the following individuals:
Valerie.s.riverachase@uscg.mil Additional work verbally agreed to by the parties that has not yet been incorporated into the contract by modification shall not be included in an invoice. Payments will not be made for any work to which a modification has not been properly executed. Invoices submitted for payment that includes such a request will be reduced by the unmodified amount
NOTE: 10% OF THE TOTAL CONTRACT PRICE WILL BE WITHHELD UNTIL ALL DELIVERABLES, REQUIRED BY THE CONTRACT, ARE RECEIVED AND ACCEPTED.
FURTHER CONSIDERATIONS WITH INVOICING:
In accordance with the Prompt Payment Act, for the purposes of determining a payment due date and the date on which interest will begin to accrue if a payment is late, a proper invoice shall be deemed to have been received:
(1) On the later of:
(i) For invoices that are mailed the date a proper invoice is actually received by the designated billing office and annotates the invoice with date of receipt at the time of receipt.
(ii) For invoices electronically transmitted by the contractor via web based submission, the date a transmission is received by the designated billing office, and receipt confirmation is provided to the designated recipient; or
(ii) The seventh day after the date on which the property is actually delivered or performance of the services is actually completed; unless—
a) The agency has actually accepted the property or services before the seventh day in which case the acceptance date shall substitute for the seventh day after the delivery date; or
b) A longer acceptance period is specified in the contract, in which case the date of actual acceptance or the date on which such longer acceptance period ends shall substitute for the seventh day after the delivery date;
(2) On the date placed on the invoice by the contractor, when the agency fails to annotate the invoice with date of receipt of the invoice at the time of receipt (such invoice must be a proper invoice); or
(3) On the date of delivery, when the contract specifies that the delivery ticket may serve as an invoice.
(4) Web based submission by the contractor and receipt confirmation does not reflect Government review or acceptance of the invoice.
(5) For inquiries and payment status please visit https://fincen.uscg.mil/secure/payment.htm The Data Universal Numbering System (DUNS) number is the primary identifier in Central Contractor Registration (CCR), (see FAR 52.232-33, Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003)). Contractors are located and identified in CCR by their DUNS number. Therefore, to facilitate payment, the DUNS number shall be recorded on every invoice submitted to the U.S. Coast Guard.
All payments for partial performance rendered by the Government under this contract are based on the assumption that the Contractor will, in good faith, execute and honor all payment terms entered into between it, the Prime Contractor, and any subcontractor thereof in the performance of this contract. The Contractor hereby acknowledges the Government’s right to reduce or suspend progress payments based on non-payment in accordance with any payment terms of the subcontract agreement.
Any amount deemed not payable will be deducted from the Contractor’s invoice. Deducted amounts may be resubmitted on the next invoice for reconsideration (20).
PROGRESS PAYMENTS
A. The Contractor may invoice requesting progress payments without discount, other than any prompt payment discount offered, not more frequently than every two weeks.
B. The invoice amount should reflect the percentage and dollar amount of completion established by the cutter's appropriate weekly progress report. Payments shall be derived from the accomplished percentage of completion as determined by the Contracting Officer.
C. All material and work paid for by progress payments shall thereby become the sole property of the Government, but this provision shall not relieve the Contractor from the obligation to complete the requirements of the contract.
D. The contractor shall be paid the remaining amount due upon completion and acceptance of all work under this contract.
(21).
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Items (NOV 2012) (a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C. 7104(g)).
___ Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).
(2) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Pub. L. 108-77, 108-78).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
X
(1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
_X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Aug 2012) (Pub. L. 109-282) (31 U.S.C. 6101 note).
__ (5) 52.204-11, American Recovery and Reinvestment Act—Reporting Requirements (Jul 2010) (Pub. L. 111-5).
X (6) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Dec 2010) (31 U.S.C. 6101 note).
X_ (7) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Feb 2012) (41 U.S.C. 2313).
__ (8) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (May 2012) (section 738 of Division C of Pub. L. 112-74, section 740 of Division C of Pub. L. 111-117, section 743 of Division D of Pub. L. 111-8, and section 745 of Division D of Pub. L. 110-161).
__ (9) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).
___ (10) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Jan 2011) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
__ (11) [Reserved] X_ (12)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644).
__ (ii) Alternate I (Nov 2011).
__ (iii) Alternate II (Nov 2011).
__ (13)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
__ (ii) Alternate I (Oct 1995) of 52.219-7.
__ (iii) Alternate II (Mar 2004) of 52.219-7.
X_ (14) 52.219-8, Utilization of Small Business Concerns (Jan 2011) (15 U.S.C. 637(d)(2) and (3)).
__ (15)(i) 52.219-9, Small Business Subcontracting Plan (Jan 2011) (15 U.S.C. 637(d)(4)).
__ (ii) Alternate I (Oct 2001) of 52.219-9.
__ (iii) Alternate II (Oct 2001) of 52.219-9.
__ (iv) Alternate III (Jul 2010) of 52.219-9.
__ (16) 52.219-13, Notice of Set-Aside of Orders (Nov 2011)(15 U.S.C. 644(r)).
X_ (17) 52.219-14, Limitations on Subcontracting (Nov 2011) (15 U.S.C. 637(a)(14)).
__ (18) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
__ (19)(i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (Oct 2008) (10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer).
__ (ii) Alternate I (June 2003) of 52.219-23.
__ (20) 52.219-25, Small Disadvantaged Business Participation Program—Disadvantaged Status and Reporting (Dec 2010) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).
__ (21) 52.219-26, Small Disadvantaged Business Participation Program— Incentive Subcontracting (Oct 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).
__ (22) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657 f).
X (23) 52.219-28, Post Award Small Business Program Rerepresentation (Apr 2012) (15 U.S.C. 632(a)(2)).
__ (24) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (Apr 2012) (15 U.S.C. 637(m)).
__ (25) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (Apr 2012) (15 U.S.C. 637(m)).
X (26) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
X (27) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Mar 2012) (E.O. 13126).
X (28) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).
X (29) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).
X (30) 52.222-35, Equal Opportunity for Veterans (Sep 2010)(38 U.S.C. 4212).
X_(31) 52.222-36, Affirmative Action for Workers with Disabilities (Oct 2010) (29 U.S.C. 793).
X (32) 52.222-37, Employment Reports on Veterans (Sep 2010) (38 U.S.C. 4212).
X (33) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
__ (34) 52.222-54, Employment Eligibility Verification (Jul 2012). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
X (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (36) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
__ (37)(i) 52.223-16, IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (Dec 2007) (E.O. 13423).
__ (ii) Alternate I (Dec 2007) of 52.223-16.
X (38) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).
__ (39) 52.225-1, Buy American Act—Supplies (Feb 2009) (41 U.S.C. 10a-10d).
__ (40)(i) 52.225-3, Buy American Act—Free Trade Agreements—Israeli Trade Act (Nov 2012) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43).
__ (ii) Alternate I (Mar 2012) of 52.225-3.
__ (iii) Alternate II (Mar 2012) of 52.225-3.
__ (iv) Alternate III (Nov 2012) of 52.225-3.
__ (41) 52.225-5, Trade Agreements (Nov 2012) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
X_ (42) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
__ (43) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
__ (44) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
__ (45) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).
__ (46) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).
X_ (47) 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration (Oct 2003) (31 U.S.C. 3332).
__ (48) 52.232-34, Payment by Electronic Funds Transfer—Other than Central Contractor Registration (May 1999) (31 U.S.C. 3332).
__ (49) 52.232-36, Payment by Third Party (Feb 2010) (31 U.S.C. 3332).
__ (50) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
__ (51)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
__ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.] __ (1) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).
__ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 1989) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
__ (3) 52.222-43, Fair Labor Standards Act and Service Contract Act—Price Adjustment (Multiple Year and Option Contracts) (Sep 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
__ (4) 52.222-44, Fair Labor Standards Act and Service Contract Act—Price Adjustment (Sep 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
__ (5) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (Nov 2007) (41 351, et seq.).
__ (6) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services—Requirements (Feb 2009) (41 U.S.C. 351, et seq.).
__ (7) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Mar 2009) (Pub. L. 110-247).
__ (8) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records—Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).
(ii) 52.219-8, Utilization of Small Business Concerns (Dec 2010) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iii) [Reserved]
(iv) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).
(v) 52.222-35, Equal Opportunity for Veterans (Sep 2010) (38 U.S.C. 4212).
(vi) 52.222-36, Affirmative Action for Workers with Disabilities (Oct 2010) (29 U.S.C. 793).
(vii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(viii) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).
(ix) 52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C. 7104(g)).
___Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).
(x) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (Nov 2007) (41 U.S.C. 351, et seq.).
(xi) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services-Requirements (Feb 2009) (41 U.S.C. 351, et seq.).
(xii) 52.222-54, Employment Eligibility Verification (Jul 2012).
(xiii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Mar 2009) (Pub. L. 110-247). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xiv) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(22).
3052.209-70 PROHIBITION ON CONTRACTS WITH CORPORATE
EXPATRIATES (JUN 2006)
(a) Prohibitions.
Section 835 of the Homeland Security Act, 6 U.S.C. 395, prohibits the Department of Homeland Security from entering into any contract with a foreign incorporated entity after November 25,2002, which is treated as an inverted domestic corporation as defined in this clause, or with any subsidiary of such an entity. The Secretary shall waive the prohibition with respect to any specific contract if the Secretary determines that the waiver is required in the interest of national security.
(b) Definitions. As used in this clause:
“Expanded Affiliated Group” means an…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .