MUNRO__WHEC_378W__DS_MCJ_13R1.pdf

PDF 4 MB Posted

Attached to
Dockside Repairs of CGC MUNRO (WHEC 724)
Solicitation number
HSCG85-13-R-P45220
Issued by

About this file

SPECIFICATION -Revision 1

View the file

Other files

File Type Posted
SF30-A001.pdf PDF
SCHEDULE_OF_ITEMS-PRICES_(REVISED).xls XLS spreadsheet
Page_2_-_A001.doc DOC document
NOTICE_TO_OFFERORS_(MUNRO_DS).doc DOC document
HSCG85-13-R-P45220_CGC_MUNRO_Past_Performance_Questionnaire.doc DOC document
LIST_OF_ATTACHMENT_(MUNRO_DS).doc DOC document
10_GOVERNMENT_PROPERTY_REPORT_(Attachment_5).doc DOC document
SF1449_(P45220).pdf PDF
SCHEDULE_OF_ITEMS_-_PRICES.xls XLS spreadsheet
2_Cover_Sheet_(MUNRO_DS).doc DOC document
Request_for_Clarification_(MUNRO_DS).doc DOC document
MUNRO__WHEC_378W__DS_MCJ_13R0.pdf PDF
SOLICITATION_PKG_(MUNRO).doc DOC document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC MUNRO (WHEC 724)

378 FOOT W HIGH ENDURANCE CUTTER

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2013

Developed By: Mark C Jorgensen

(Rev-1, 02 Jan 2013)

USCGC MUNRO (WHEC-378W) DOCKSIDE AVAILABILITY FY2013

ii (Rev-1)

TABLE OF CONTENTS

Revisions Record ...................................................................................................................................................... iii Consolidated List of References ............................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................................ vii Consolidated List of Critical Inspection Items ....................................................................................................... viii General Requirements .............................................................................................................................................. ix WORK ITEM 1: Vent Fans and Motors, Overhaul (Non-Machinery Spaces) WORK ITEM 2: Steam System Relief Valves, Overhaul or Renew WORK ITEM 3: Commissary Hoist, Level 2 Inspect and Repair WORK ITEM 4: Anchor Windlass, Level 2 Inspect and Repair WORK ITEM 5: Ammunition Elevator, Level 2 Inspect & Repair WORK ITEM 6: Temporary Services, Provide WORK ITEM 7: Fan Coil Unit Renewal WORK ITEM 8: Stuffing Tube Renewal WORK ITEM 9: Vent Plenum Repair and Preservation – Main Deck WORK ITEM 10: Deck Preservation, Aft Fan Space WORK ITEM 11: Paint Locker Vent System Renewal WORK ITEM 12: Renew Grey Water Vent Check Valve WORK ITEM 13: Vent Plenum Repair and Preservation WORK ITEM 14: Emergency Gas Turbine Generator, Clean and Inspect WORK ITEM 15: UNREP Weight Handling Fittings, Inspect & Test WORK ITEM 16: Sewage Piping Renewal WORK ITEM 18: Pipe Insulation; Renew WORK ITEM 19: Renew Fuel Oil Transfer Piping In Sewage Pump Room iii (Rev-1)

Revisions Record

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

2 Jan 2013 1 3 In Paragraphs 2 and 3.6.6.1, referenced CG Dwg 378-FRAM- W 624-1.

2 Jan 2013 1 15 Created a Para 5 to more identify the Static Load Test Data Sheet as the “Enclosed Figure” referenced in Para3.4.4

2 Jan 2013 1 19 Consolidated Paragraphs 3.4.2 & 3.4.3. Added requirement for Contractor to submit a CFR in paragraph 3.4.2. Slightly revised Paragraph 3.5.1 to more clearly identify section of piping to be repaired.

2 Jan 2013 1 7 Deleted work item, due to lack of availability of government furnished material

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-1)

Consolidated List of References

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:

• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::

www.gpoaccess.gov

The Government is aware of the following internet web links where contractors may procure commercial specifications:

• American Welding Society (AWS): http://www.awspubs.com/index.php

• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

• NFPA: http://www.nfpa.org

• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

Coast Guard Drawing 378 FRAM-W 534-001, Rev E, Steam and Condensate System Diagram Coast Guard Drawing 378 FRAM-W 572-003, Rev A, Commissary Hoist Arrangement & Details Coast Guard Drawing 378 FRAM-W 712-001, Rev B; 76MM Ammo Hoist Arrangement & Details Coast Guard Drawing 378-FRAM-W 131-1, Rev -, Main Deck Plating & Framing FORWARD Coast Guard Drawing 378-FRAM-W 131-2, Rev -, Main Deck Plating & Framing Aft Coast Guard Drawing 378-FRAM-W 506-1, Rev C, Diagram of Vents Sounding Tubes & Overflows Coast Guard Drawing 378-FRAM-W 508-1, Rev C, Insulation Schedule Coast Guard Drawing 378-FRAM-W 512-1, Rev K, HVAC LINE Diagram Coast Guard Drawing 378-FRAM-W 512-10, Rev -, HVAC Instal & Construction Dets Coast Guard Drawing 378-FRAM-W 512-10, Rev F, HVAC Instal & Construction Dets Coast Guard Drawing 378-FRAM-W 512-11, Rev -, HVAC a&D Forward Frame 72 Coast Guard Drawing 378-FRAM-W 512-17, Rev L, HVAC a&D FR 120-176 Above Main Deck Coast Guard Drawing 378-FRAM-W 512-20, Rev E, HVAC a&D Engine Room & Control Booth Coast Guard Drawing 378-FRAM-W 512-27, Rev C, HVAC Valves and Reach Rods Coast Guard Drawing 378-FRAM-W 526-3, Rev F, Weather Deck & Misc Drains Aft FR 175 Coast Guard Drawing 378-FRAM-W 571-1, Rev -, Replenishment At Sea, Fuel At Sea & Tas Coast Guard Drawing 378-FRAM-W 571-2, Rev -, Replenishment At Sea a&D Frame 248-1/2 Coast Guard Drawing 378-FRAM-W 571-4, Rev -, Replenishment At Sea a&DFR182 Port & Stbd Coast Guard Drawing 378-FRAM-W 581-6, Rev -; CAPSTAN – WINDLASS ASSY Coast Guard Drawing 378-FRAM-W 593-1, Rev B, Diagram Sewage & Transfer Coast Guard Drawing 378-FRAM-W 593-2, Rev D, Sewage and Transfer Sys Fwd FR 192 a&D v (Rev-1)

Coast Guard Drawing 378-FRAM-W 593-3, Rev D, Sewage and Transfer Sys Aft Frame 192 a&D Coast Guard Drawing 378-FRAM-W 602-2, Rev -, Hull Label Plates Coast Guard Drawing 378-FRAM-W 645-1, Joiner Doors Coast Guard Drawing 378-FRAM-W 801-1, Rev -, Booklet of General Plans Coast Guard Drawing 378-FRAM-W 801-1, Rev F, Booklet of General Plans Coast Guard Drawing 378-FRAM-W 801-1, Rev G; Booklet of General Plans Coast Guard Drawing FL 1204-3, Rev -, Welded Padeyes & Links (Supercedes Fl-1204-2)

COAST GUARD PUBLICATIONS

CG Tech Pub 3280A; Manufacturers Instruction Book, SWBS Group(s) 572-582 Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors

Manual Coast Guard Technical Publication (TP) 3263B, 15-SEP-93, Ship Service Diesel Generator - Model 8-

645E2 - (Part 2) Coast Guard Technical Publication (TP) 3280A, Feb 2007, Manufacturers Instruction Book, SWBS

Group(s) 572-582, 378’ WHEC Class Cutters Coast Guard Technical Publication (TP) 3282B, Manufacturer's Instruction Book, SWBS Group(s) 712 Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, Jan 2009, General

Requirements Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, Jan 2009, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3041, Jan 2009, Shipboard

Electrical Cable Test Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3042, Jan 2009, Shipboard

Electrical Cable Removal, Relocation, Splice, Repair, And Installation Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 6341, Jan 2009, Install New

Deck Covering Systems Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), Jan 2009, Overhaul

AC Electrical Motors Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 5000, Jan 2009, Inspect, Repair, And Test Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), Jan 2009, Provide

Temporary Services

OTHER REFERENCES

American National Standards Institute (ANSI) B16.11, 2005, Forged Fittings, Socket-Welding and

Threaded American Society for Testing and Materials (ASTM), F1508, 1 May 2004, Standard Specification for

Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface

Profile of Blast Cleaned Steel Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Contractors Environmental Guide, ISC Kodiak Complex (Copy to submitted to the Contractor by the KO upon contract award?)

vi (Rev-1)

Federal Specification (Fed Spec) HH-P-151, Mar 1991, Rubber-Sheet, Cloth Insert Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper-Aluminum Alloy Bar, Rod, Plate, Sheet, Strip, WIRE, Forgings, And Structural and Special Shaped Sections Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement International Standard Organization (ISO) 2953, 1999, Mechanical Vibration, Balancing Machines, Description and Evaluation MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning MIL-D-16791, Jan 1993, Detergents, General Purpose (Liquid Nonionic) MIL-F-1183, May 1987, Fittings, Pipe, Cast Bronze, Silver-Brazing, General Specifications for Military Specification MIL-DTL-23549, Feb 2007, Grease, General Purpose MIL-PRF-1149, Jun 1998, Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness MIL-PRF-24139, Rev A, Amd 3, 3/12/1987; Grease, Multipurpose, Water Resistant MIL-STD-1627, Sep 1994, Bending of Pipe or Tube for Ship Piping Systems MIL-STD-2003-3, Sep 2009, Electric Plant Installation, Standard Methods for Surface Ships &

Submarines (Penetrations) MIL-T-16420, Sep 1988, Tube, Copper-Nickel Alloy, Seamless and Welded (Copper Alloy Numbers 715 and 706) Naval Ship's Technical Manual (NSTM) Chapter 505, Dec 2006, Piping Systems NAVSEA Drawing 804-5773932, Rev A, Acoustic & Thermal Insulation for Ducts Installation Details NAVSEA Dwg 803-1385866, Penetrations; Bulkhead and Deck NAVSEA Dwg 803-6397256, Access, Covers, Ventilation Quick Acting NAVSEA Dwg 804-1385781, Pipe Hangers for Surface Ships (Superseding NAVSEA Dwg. 810-

1385781) NAVSEA Dwg 804-1749102, Vent Closure, WT, Mod R, Round NAVSEA Dwg 810-1385880, Fittings, Cu-Ni Alloy, Slip on Sleeve Society of Automotive Engineers (SAE) J2360, 11/1/1998; Lubricating Oil, Gear Multipurpose (Metric)

Military Use The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel

Surfaces Prepared by Dry Abrasive Blast Cleaning The Society for Protective Coatings (SSPC)/NACE Joint Surface Preparation Standard SSPC-SP

10/NACE No.2, 2004, Near-White Blast Cleaning The Society for Protective Coatings SSPC-SP 1, 11/1/2004; Solvent Cleaning The Society for Protective Coatings SSPC-SP 10/NACE No.2, Rev -, 11/1/2004; Near-White Blast

Cleaning The Society for Protective Coatings SSPC-SP 3, 11/1/2004; Power Tool Cleaning The Society for Protective Coatings SSPC-SP 3, Rev -, 11/1/2004; Power Tool Cleaning The Society for Protective Coatings SSPC-SP 6/NACE No.3, Rev -, 11/1/2004; Commercial Blast

Cleaning vii (Rev-1)

Consolidated List of Government-furnished Property

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM

DESCRIPTION

NSN/PN QTY ESTIMATED

COST

($/UNIT)

7 N Fan Coil Conditioner, Size V3 12.8M Btu/Hr as required

McIntyre Engineering Co.

S/N 6625-138 & 6625-146

2 ea.

7 N Thermostat 2 ea.

7 N Humidistat 2 ea.

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter viii (Rev-1)

Consolidated List of Critical Inspection Items

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph

3.2.6.5 (Inspection report particulars)):

Work Item Title

5 Ammunition Hoists and Elevators, Level 1 Inspect and Test ix (Rev-1)

00000_PWB_0312_FLT

REC_0000_FLT_ Commercial Project @ ISC Kodiak, Alaska (0212)

General Requirements

1. SCOPE

1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.

2. REFERENCES

COAST GUARD DRAWINGS

None.

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and

Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes

OTHER REFERENCES

ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface

Profile of Blast Cleaned Steel Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel

Surfaces Prepared by Dry Abrasive Blast Cleaning Contractors Environmental Guide, ISC Kodiak Complex (Copy to submitted to the Contractor by the KO upon contract award?)

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Contractor-provided fire extinguishers. The Contractor shall provide portable fire extinguishers.

3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

3.4 HW disposal. The contractor shall comply with the detailed instructions of the Contractors Environmental Guide, ISC Kodiak Complex. Submit the required Hazard Communications (HAZCOM) Plan to the COTR at the Arrival Conference.

x (Rev-1)

3.5 Interim changes and additions to SFLC Std Spec 0000. The Contractor shall be aware of the following interim changes and additions to the 2009 Edition of SFLC Std Spec 0000:

3.5.1 Acronyms and term definitions – paragraph 1.3 (Acronym and term definitions).

3.5.1.1 The term “COTR” has been replaced with “COR”, which is defined as follows:

“COR”: Contracting Officer’s Representative – the person delegated by the KO as the on-scene representative for matters concerning performance of work; this includes correctness, timeliness, and quality of the Contractor’s work. Normally, the CO/OINC is designated the COR.”

3.5.1.2 Definition addition for the term “Ungrounded, as follows:

• “Ungrounded”: A power system where all of the current-carrying conductors and windings

(including any neutral connection) are insulated from ground. In contrast, a generator or transformer in which at least one conductor or point (usually the midpoint or corner of a delta winding or the common center of a wye winding) is intentionally grounded, either solidly or through an impedance, is considered grounded. Note that the distinction concerns only current-carrying conductors; for both ungrounded and grounded power systems, non-current carrying metal parts and equipment grounding conductors are always bonded to earth ground for personnel safety. At non-Governmental facilities, dockside wye connected transformer secondary windings are almost always grounded and are generally not suitable for connection to a Coast Guard cutter without a separate Contractor furnished isolation transformer.”

3.5.2 Changes to paragraph 3.2.4 2.3 (QP-1 Inspector or Tech Rep duties).

“3.2.4.2.3 QP 1 Inspector or Tech Rep duties.

3.2.4.2.3.1 The Coating Inspector for the “QP 1-certified” Contractor or the Contractor-provided NACE-certified Tech Rep shall remain on site, to perform the following duties, as applicable, for each work item that involves preservation of “critical-coated surfaces”:

• Verify inspection instrument calibration.

• Verify and approve the suitability of ambient conditions before surface preparation is begun, and before each coat of paint is applied.

• Verify all aspects of surface preparation – including, but not limited to:

o Cleanliness of compressed air.

o Adequacy of solvent cleaning.

o Proper handling of blast media.

o Actual surface preparation procedure.

• Inspect and approve final surface preparation, before application of primer coat.

• Supervise and approve coating system preparation and application procedures, including but not limited to: mixing and thinning, stripe coating application, spray techniques, and film thickness measurements and recordings.

• Determine when applied coats have sufficiently cured for overcoating, or for system service resumption (see paragraph A2.1.18 (Critical drying time requirements)).

• Complete and sign the quality assurance (QA) inspection forms (see QA-1 thru QA-5), provided in Appendix A (Requirements for Preservation of Ship Structures) of this document.

• Submit all completed QA inspection forms to the COR (through the Contractor), upon xi (Rev-1) completion of work.

3.2.4.2.3.2 The Contractor shall ensure the NACE Inspector is formally informed - via suitable subcontract documentation- and is willing and able to perform of all duties listed above. Submit documentation of this contract and assumption of duties to the KO at the Arrival Conference.”

3.5.3 Changes to contents of paragraph 3.2.5 (Planning document).

“3.2.5 Planning document. The Contractor shall generate a legible Planning Document (PD) with the following characteristics:

• Graphical in format (see Fig. 1 (Sample Planning Document Submittal)).

• Shows overall period of performance for each CLIN, with start and stop dates of major sub-tasks.

• Contains due dates for Critical Inspection Reports (CIR) and any events requiring Coast

Guard Inspector presence.

• Identifies all work item time periods that require OEM Tech Rep assistance.

• Identifies the “critical paths” for the project.

• Shows calculations for the “float” along the critical paths and labels the critical paths with the number of delay days the critical paths can absorb without affecting the final delivery date.

NOTE

Float is the number of days that the critical paths can be delayed without affecting the final delivery date.

3.2.5.1 Ensure that the PD also includes the names, contact information, and written commitment from all Tech Reps required by the Contract - indicating they are available for work during the proposed time period.

3.2.5.2 Submit a preliminary electronic copy of the PD to the COR - for Government review - no later than one week after contract award.

3.2.5.3 Submit 3 copies of the PD to the COR, 15 days prior to the start of the performance period, and at all weekly Progress Meetings.

NOTE

A separate document, specifically prepared for the Government is not desired or required. A copy or summary of the Contractor’s internal scheduling document is preferred.

FIG. 1 - SAMPLE PLANNING DOCUMENT SUBMITTAL

ID Task Name 1 Overhaul Anchors & Anchor Chains 2 Remove from Cutter

3 Inspect & Measure Chains

4 Submit Critical Inspection Report

5 Preserve Anchors & Chains

6 Reinstall to Cutter

W T F S S M T W T F S S M T W T F S S M T W T F S S M Mar 18, '01 Mar 25, '01 Apr 1, '01 Apr 8

ID Task Name 1 Overhaul Anchors & Anchor Chains 2 Remove from Cutter

3 Inspect & Measure Chains

4 Submit Critical Inspection Report

5 Preserve Anchors & Chains

6 Reinstall to Cutter

W T F S S M T W T F S S M T W T F S S M T W T F S S M Mar 18, '01 Mar 25, '01 Apr 1, '01 Apr 8 xii (Rev-1)

3.2.5.4 When the critical path extends beyond or encroaches upon the final delivery date, provide a resource constraint and scheduling evaluation of the critical path before any request for extension will be entertained. Submit the resource constraint and scheduling evaluation via a CFR.

NOTE

The intent of the resource constraint and scheduling evaluation is to identify the resources necessary to ‘crash’ the critical path or make adjustments to the production schedule to meet the delivery date in lieu of a project extension.”

3.5.4 Additional sub-paragraphs to paragraph to 3.2.6.5 (Inspection report particulars).

“3.2.6.5.3 CFR tracking system. The Contractor shall create and maintain a CFR tracking system for the project. At a minimum, ensure that the CFR tracking system shall list all required reports, broken down by the following:

• Work item and paragraph number.

• Due dates.

• Submission dates.

• CFR/CIR submission number.

3.2.6.5.3.1 Be aware that the COR will respond via the CFR reply as to whether the CIR/CFR ‘fully’ or ‘partially’ satisfied the inspection and reporting requirements in the associated work item.

3.2.6.5.3.2 When submitting a CFR, ensure that the applicable work item and paragraph number for which the inspection report is being submitted is included on the CFR.

3.2.6.5.3.3 Submit a copy of the CFR tracking sheet to the COR at the arrival conference.

3.2.6.5.3.4 At a minimum the Contractor shall update and submit a copy of the CFR tracking sheet to the COR the day before each weekly progress meeting. At the required CFR due date, submit the CFR tracking sheet to the COR via a CFR for review and formal archiving with the project records.”

3.5.5 Changes to contents of paragraph 3.2.11.1 (Sanitary facilities for vessel-personnel due to disruption of grey water and sewage systems).

“3.2.11.1 (Sanitary facilities for vessel-personnel due to disruption of grey water and sewage systems.

When the shipboard grey water and sewage systems are disrupted due to repairs required by contract work, the Contractor shall provide vessel-personnel with a sanitary facility, within a five minute walking distance from the vessel, to include the amenities listed in Table II (Sanitary Facility Amenities). Ensure the following:

• Shower stalls are equipped with privacy screens.

• Sinks are provided with fresh hot and cold water.

• Electrical convenience GFI receptacles, in accordance with NFPA 70, National Electric

Code (NEC), are located in vicinity of sinks.

• Toilets have doors or privacy dividers.

• Lockers are capable of being locked.”

3.5.6 Changes to contents of paragraph 3.3.2.1.1 (Water depth).

xiii (Rev-1)

“3.3.2.1.1 Water depth. Ensure that water depth is sufficient at the pier to allow the vessel's lowest underwater appendage to clear the bottom by at least two feet at:

• Ordinary low water mark on non-tidal rivers.

• At all tide conditions predicted during the availability for tidal rivers and other navigable waterways (Bay, Lake, etc.).”

3.5.7 Electrical compliance planning.

“3.3.14 Electrical compliance planning. For cutter availabilities, the Contractor shall submit to the KO the following electrical compliance planning documentation during the pre-award phase of the contract.

3.3.14 1 Shore power. When ungrounded shore power is to be provided per SFLC Std Spec 8635, provide a one line electrical diagram showing how such power will be supplied, including the winding and grounding configuration and rating of any generator or isolation transformer. For drydock availabilities, separate diagrams should be submitted for waterborne and non-waterborne periods.

3.3.14.2 Arc welding. When electric arc welding is to be performed per SFLC Std Spec 0740 while the vessel is waterborne, provide a diagram showing the general proposed location of each welding machine, the grounding configuration of each machine, and the return current conductor size and length. For drydock availabilities, separate diagrams may be necessary for waterborne and non-waterborne periods.

3.3.14.3 Hull bonding and lightning protection. For work periods while the vessel is not waterborne, provide a diagram showing how the hull grounding straps required by SFLC Std Spec 8635 will be sized (length and gauge) and connected.

3.3.14.4 Tool and equipment power. Provide a diagram showing how Contractor tool and equipment power will be supplied and distributed for dockside and shipboard use in accordance with SFLC Std Spec 0450. For drydock availabilities, separate diagrams should be submitted for waterborne and non-waterborne periods.”

3.5.8 Changes to paragraph to A2.1.1.3 (Document submission).

“A2.1.1.3 Document submission.

A2.1.1.3.1 For all work involving preservation of “critical-coated surfaces”, ensure the following is submitted to the COR at the Arrival Conference, for each coating system intended to be applied:

• Coating system manufacturer’s name.

• Product data sheets.

• MSDS.

• COC.

A2.1.1.3.2 Documentation shall be broken out by work item, to also include the following information:

• Brand name.

• Color.

• Intended mil thickness.

• Time between coats.

• Intended final cure time prior to immersion or full duty rating, as applicable.

xiv (Rev-1)

A2.1.1.3.3 For work involving preservation of surfaces not designated as “critical-coated surfaces”, submit all product data sheets, MSDS, and COC to the COR, prior to commencement of work.”

3.5.9 Requirements changes to paragraphs A2.1.5 (Tenting) and A2.1.6 (Ambient condition control).

“A2.1.5 Tenting and ambient condition control – “for critical-coated surfaces”.

A2.1.5.1 When the ambient condition parameters necessary for full paint cure or to meet environmental conditions, as required in paragraph A.2.1.4 (Ambient condition parameters), cannot be met for successful application and curing of “critical-coated” surface coating systems, the Contractor shall provide the following, at no additional cost to the Government:

• Suitable tenting, as applicable, for exterior surface preservation.

• Suitable ambient condition control equipment, which may include, but not be limited to the below-listed, to create and maintain ambient conditions recommended by the coating system’s manufacturer, and facilitate successful coating application and curing.

o AC system.

o Heaters.

o Blowers.

o Dehumidifiers.

A2.1.5.2 Submit an ambient condition control plan to the COR within 24 hours prior to initiating ambient condition control process

NOTE

The Contractor is expected to be aware of the advent of environmental conditions that are adverse to preservation of critical-coated surfaces and include all costs in

3.5.10 Pre-surface preparation requirements – additional to paragraph A2.1.7 (Pre-surface preparation requirements).

“A2.1.7.4 Coupon test. In order to ensure production of required surface profile, the Contractor shall accomplish the following, tasks, whenever abrasive-blasting is required in a work item:

A2.1.7.4.1 Conduct a performance test on all abrasive blasting operations on a Contractor- provided test coupon, prior to starting abrasive blasting operations on the vessel. Use a new metal plate, of the same metal type and material properties as the area to be blasted, steel or aluminum plate, as applicable. For steel plates, the new plate shall have the mill scale intact and the plate will be in a Rust Grade "A" condition, per the SSPC-VIS 1 visual standard cards. No existing anchor profile, other than the surface irregularities from the manufacturing process are permitted on the test coupon. The test coupon shall be flat, with nothing welded to the side used for the anchor profile test, no thinner than a 1/8-inch plate and measuring no smaller than 1-foot by 1-foot. The test coupon shall be affixed so as to not permit excessive movement during the performance test.

CAUTION!

Do not affix the coupon to the vessel nor shall the blast media from the performance test strike the vessel during the test

A2.1.7.4.2 Ensure that the abrasive blasting operation test on the test coupon is with the very same setup that will be used to blast the vessel. The setup shall include, but not be limited to:

xv (Rev-1)

• The abrasive media to be used (material and media size).

• Nozzle size and type (straight bore, high velocity nozzle, angle nozzle...).

• Delivery rate and pressure settings.

A2.1.7.4.3 Blast an one-square foot area on one side of the test coupon to the abrasive surface preparation standard specified in the applicable work item and perform an anchor profile test of the blasted surface in accordance with ASTM D4417, method A or C. Notify the COR in advance of the abrasive blasting operation test, to permit the witnessing of the test by appropriate Coast Guard personnel. Submit a CFR documenting the results of the abrasive blasting operation test. CFR shall include at a minimum, the following:

• Area of the vessel that the verified setup will be used to abrasive blast with.

• The abrasive media used.

• The nozzle size and type.

• The delivery rate and pressure.

• The test coupon starting properties (material type and surface conditions).

• The resultant anchor profile readings from the test.

NOTES

1. Ultra high pressure water jetting does not create an anchor profile and is exempt from the anchor profile test coupon check.

2. The reverse side of the test coupon may be used for the subsequent test, provided that the conditions in paragraph A2.1.7.4 (Coupon test) are met.

A2.1.7.4.3 Repeat the abrasive blasting operation test in the following instances:

• The setup, as defined in paragraph A2.1.7.4.1 is changed.

• The resultant anchor profile readings observed on the vessel are outside the specified anchor profile range.

• Media is changed from MIL-A-22262 to CID A-A-59316 or vice versa.

• The supplier of the abrasive blasting media changes, regardless if the new source for the media has the same specifications.

• When Directed by the COR.

NOTE

A performance test of the abrasive blasting operations on a test coupon and measuring the anchor profile prior to performing the operation on the cutter, in order to confirmed that the anchor profile range that the operation is going to produce. An abrasive blasting operation test is prudent, as there are enough variables in the equipment setup and media properties that the resulting anchor profiles from one contractor to the next vary significantly.

3.5.11 Post-surface preparation requirements - additional to paragraph A2.1.8 (Post-surface preparation requirements).

A2.1.8.8 Substrate profile measurements - during and post-surface preparation. In order to ensure production of required surface profile, the Contractor shall accomplish the following tasks, whenever abrasive-blasting is required in a work item for complete preservation of a ”critical-coated” surface:

xvi (Rev-1)

A2.1.8.8.1 During surface preparation by abrasive blasting or waterjetting operations, spot check the existing anchor profile per 500-square feet, in order to 'project' the need to manage the excessive anchor inspect for both excessive and insufficient anchor profiles . When the Contractor elects to prepare a substrate by waterjetting, the Contractor shall inspect the substrate for areas of insufficient or excessive anchor profile, both visually and in accordance with ASTM D4417, Method A or C. Submit a CFR detailing the location, square footage, measured anchor profiles, and the anchor profile range required for the applicable coating system.

A2.1.8.8 2 Post completion of surface preparation, measure the profile of the resultant bare surfaces, in accordance with ASTM D4417, Method A or C.”

3.5.12 Caution verbiages – additional to paragraph A2.1.18 (Critical drying and cure time requirements).

“CAUTIONS!

1. Hard cure times or cure time prior to immersion for any “critical coated system” shall be met as published on the Product Data Sheets available online. No early undocking or relaxation of these published requirements is permitted without prior approval from the KO. Coating system manufacturer’s Sales or Technical Representatives may not relax these requirements. Painting and curing of all tank coating systems (except for tanks that are inboard and not touching the skin of the vessel (side and/or bottom) shall occur while the cutter is out of the water.

2. CAPAC systems shall not be energized until full cure of all underwater paint systems has occurred.”

3.5.13 Preservation Plan.

“A2.2 Preservation Plan (PP). The contractor shall submit a PP to the COR at the arrival conference, to allow for review of all work items pertaining to the preservation of the vessel. At a minimum, PP shall include the following and be broken down by work item:

• Coatings to be applied – listed by manufacturer and product identification numbers.

• Target wet and dry film thickness values.

• Authorized reducers/solvents - including maximum percent by volume for reducers/solvents.

• Colors by FED-STD-595 color number.

• Application method for each coat.

• Application pressure and nozzle size requirements listed on the manufacturer’s product data sheet(s).

• Minimum recoat windows for applying subsequent coats, maximum recoat windows to apply subsequent coats, adjusted for anticipated temperatures.

• Any special instructions or environmental limits listed by the coating manufacturer.

• Intended final cure times prior to immersion or full duty rating (as applicable).”

3.5.14 Changes to paragraph B2.2.3.3.1.

“B2.2.3.3.1 Do not release lead or lead-contaminated materials into the environment. Conduct periodic air monitoring (as appropriate) for lead in the worker’s breathing zone, during the course of any abatement work involving lead containing materials, to prevent exposure at or above the PEL. Submit results of all air monitoring samples to the COR, within 24 hours of completion of sampling.”

3.5.15 Booming requirements during the offload or on-load of petroleum products.

xvii (Rev-1)

“B2.2.10 Booming requirements during the offload or load of petroleum products. The Contractor shall provide a containment boom system and boom off the cutter during all petroleum cargo on-loads and offloads. The cutter shall be boomed off by the contractor during both shipyard functions and the final bunkering of the cutter by ship's force. The contractor is responsible to provide the labor to deploy and recover the boom during all operations, including operations conducted by ship's force. The containment boom shall at a minimum, fullly encapsulate the cutter from the pier wall in front of the cutter to the pier wall at the stern of the cutter. When moored alongside a pier that does not provide a fully intact pier wall that will contain a spill, the containment boom shall wrap completely around the cutter on all sides to provide spill containment. For tug and barge configurations, the containment boom shall encapsulate both the cutter and the barge, as applicable.”

4. NOTES

4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp

4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

xviii (Rev-1)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name Hull # Work Item # Work Item Title

Location of Work (incl. frame #’s) Area (sqft)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).

Verify surface anchor profile using ASTM D4417-Methods B or C against COMDTINST M10360.3. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.

threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Name of QP-1/NACE Inspector Signature Cert. # Date / Time xix (Rev-1)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE &

TIME

ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…)

LOCATION

(Frame &

Deck, relation to equipment, etc.)

TEMPERATURE % REL.

HUMID-

ITY DEW PT. SURFACE AMBIENT ΔT

| DP - Surface | xx (Rev-1)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

Location of Work (Frame References) Area (sqft)

SURFACE PREPARATION METHOD

PROFILE ACHIEVED (mils) Min Max Mean

SSPC-SP-10/NACE No. 2 SSPC-SP-12/NACE No. 5

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

Abrasive Manufacturer and Sieve Size: _________________________________

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________ xxi (Rev-1)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

SURFACE PREPARATION METHOD

PROFILE ACHIEVED (mils) Min Max Mean

SSPC-SP-10/NACE No. 2 SSPC-SP-12/NACE No. 5

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

Abrasive Manufacturer and Sieve Size: _________________________________

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location.

When an area is divided into separate sections, maintain a separate log for each section.

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):

_____ mils _____ mils _____ mils _____ mils _____ mils xxii (Rev-1)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15

DATE TEST LOCATIONS CONDUCTIVITY

(microsiemens/cm) xxiii (Rev-1)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

Coating Mfg Product Name Batch # Induction Time

Coating System Sequence (Primer/Touchup/3rd Coat, etc.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2

SPOT 1 2 3 4 5 AVERAGE

VALUE

*BASE METAL

READING (BMR)

*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5

Overall Avg. DFT

ADJUSTMENTS

1 Avg. BMR Deviation 3 Before

Adjustments After Adjustments

Avg.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5

Overall Avg. DFT

ADJUSTMENTS

1 Avg. BMR Deviation 3 Before

Adjustments After Adjustments

Avg.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5

Overall Avg. DFT

ADJUSTMENTS

1 Avg. BMR Deviation 3 Before

Adjustments After Adjustments

Avg.

Application Method (Airless, Conventional Spray, Rolled) Average DFT xxiv (Rev-1)

This page was left blank intentionally. Do not delete.

1 (Rev-1)

51220_0310_FLT

REC_51220_FLT_378’ WHEC ‘W’ Class (ALL) (0609)

WORK ITEM 1: Vent Fans and Motors, Overhaul (Non-Machinery Spaces)

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to overhaul the below-designated vaneaxial fan and motor assemblies:

ITEM NAME LOCATION DESCRIPTION

Fan, Vaneaxial 2-308-1 Fan Room 2-304-1-Q 2-311-3 Supply Fan Fan, Vaneaxial 2-329-1 Steering Gear Rom, 2-320-0-E 2-331-1 Supply Fan Fan, Vaneaxial 01-207-2 Fan Plenum, 01-203-2-Q 01-207-0 Supply Fan Fan, Vaneaxial 1-282-1 Fan Room, 1-281-1-Q 1-282-1 Fan Fan, Vaneaxial 01-207-1 Fan Plenum, 01-203-1-Q 01-207-1 Supply Fan Fan, Vaneaxial 2-39-1 Fan Room, 2-32-1-Q 2-39-1 Fan

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 378 FRAM-W-512-004, Rev D, HVAC Fan List Coast Guard Drawing 378 FRAM-W-512-011, Rev K, HVAC A&D Fwd Frame 72 Coast Guard Drawing 378 FRAM-W-512-015, Rev K, HVAC A&D Aft Frame 256 Below Mn Dk Coast Guard Drawing 378 FRAM-W-512-018, Rev K, HVAC A&D Aft Frame 136-234 Above Mn Dk Coast Guard Drawing 378 FRAM-W-512-020, Rev E, HVAC A&D Engine Room and Control Booth

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General

Requirements Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), Jan 2009, Overhaul

AC Electrical Motors

OTHER REFERENCES

ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging International Standard Organization (ISO) 2953, 1999, Mechanical Vibration, Balancing Machines, Description and Evaluation

2 (Rev-1)

3. REQUIREMENTS

3.1 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):

• Duct work.

• Electrical wiring.

3.2 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of each fan and motor assembly, to demonstrate existing operational condition.

Measure and record each fan’s CFM output; compare readings against manufacturer’s rated tolerances. Submit a

CFR.

3.3 Removal. The Contractor shall remove each designated fan and motor assembly from the vessel and package it for delivery to and from a suitable repair facility, in accordance with ASTM D3951.

3.4 Overhaul requirements. The Contractor shall accomplish the following tasks for each ventilation fan and motor assembly, using the drawings listed in Paragraph 2 as guidance.

3.4.1 Fan.

3.4.1.1 Clean the interior and exterior fan assembly surfaces, including housing, fan blade, and end bell surfaces by first using suction, then with a soapy water solution, and followed by a thorough rinsing of all metal surfaces.

Ensure that there are no cleaning fluid residues or injurious effects on cleaned surfaces.

3.4.1.2 Prepare and coat the fan casing surfaces using the coating system specified for “Machinery, Operating Temperatures Under 200oF, Unmachined Surfaces”, in COMDTINST M10360.3, Appendix B (Cutters and Boats Interior Painting Systems). Select finish/top coat color to match existing adjacent surfaces.

3.4.1.3 After surface preparation and before surface coating, visually inspect the fan assembly surfaces including bearing surfaces for cracks, areas of distortion, and deterioration. Submit a CFR.

3.4.2 Motor overhaul requirements. Accomplish the following tasks for each designated motor:

3.4.2.1 Clean, inspect, and test the motor, in accordance with SFLC Std Spec 3020.

3.4.2.2 Preserve the motor casing using the coating system specified for “Machinery, Operating Temperatures Under 200oF”, in COMDTINST M10360.3, Appendix B (Cutters and Boats Interior Painting Systems). Select finish/top coat color to match existing adjacent surfaces.

3.4.2.3 If a Change Request has been released and authorized, accomplish each of following additional tasks

• Varnish-treat the motor.

• Rewind the rotor.

• Rewind the stator.

3.5 Fan and motor assembly restoration. The Contractor shall reassemble each fan and motor assembly; couple the fan to the motor assembly using new stainless steel hardware.

3 (Rev-1)

NOTE

Angular misalignment of shaft couplings shall not exceed a total indicator reading of 0.001 inch for each inch of radius of the coupling hub.

3.5.1 Dynamic balancing and documentation. Dynamically balance the rotating elements along with associated equipment as a unit (i.e.: fan blade and motor installed and in casing), in accordance with ISO 2953. Submit a written balance report.

3.5.2 Reinstallation. Reinstall the fan/motor assembly into its associated fan space using new rubber vibration dampers, gaskets, resilient mounts, fan connectors and rings (as applicable) in the ductwork; restore all ductwork to original condition and configuration upon completion of dynamic balance. Reconnect electrical leads with nut and bolt lugs; wrap with electrical tape.

3.6 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of each fan and motor assembly to prove satisfactory operating condition at both high and low speeds, in the correct direction, with no excessive vibration. Measure and record the overhauled vaneaxial fan’s CFM output to verify it is within the manufacturer’s rated tolerances. Submit a CFR.

This section is not applicable to this work item.

4 (Rev-1)

53400_1011_FLT

REC_53400_FLT_378’ WHEC ‘W’ Class (ALL) (0309)

WORK ITEM 2: Steam System Relief Valves,…