SCHEDULE_OF_ITEMS-PRICES_(REVISED).xls
XLS spreadsheet 23 KB Posted
- Attached to
- Dockside Repairs of CGC MUNRO (WHEC 724)
- Solicitation number
- HSCG85-13-R-P45220
About this file
SCHEDULE OF ITEMS - PRICES (REVISED)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MUNRO__WHEC_378W__DS_MCJ_13R1.pdf | ||
| SF30-A001.pdf | ||
| Page_2_-_A001.doc | DOC document | |
| NOTICE_TO_OFFERORS_(MUNRO_DS).doc | DOC document | |
| HSCG85-13-R-P45220_CGC_MUNRO_Past_Performance_Questionnaire.doc | DOC document | |
| LIST_OF_ATTACHMENT_(MUNRO_DS).doc | DOC document | |
| 10_GOVERNMENT_PROPERTY_REPORT_(Attachment_5).doc | DOC document | |
| SF1449_(P45220).pdf | ||
| SCHEDULE_OF_ITEMS_-_PRICES.xls | XLS spreadsheet | |
| 2_Cover_Sheet_(MUNRO_DS).doc | DOC document | |
| Request_for_Clarification_(MUNRO_DS).doc | DOC document | |
| MUNRO__WHEC_378W__DS_MCJ_13R0.pdf | ||
| SOLICITATION_PKG_(MUNRO).doc | DOC document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF ITEMS - PRICES | ||||
| CLIN 0001 - DEFINITE ITEMS | ||||
| SCHEDULE OF ITEMS - PRICES FOR CGC MUNRO | QTY | UNIT | UNIT PRICE | EXTENDED PRICE |
| D-01, Vent Fans and Motors, Overhaul (Non-Machinery Spaces) | 1 | JB | $ | $ |
| D-02, Steam System Relief Valves, Overhaul or Renew | 1 | JB | $ | $ |
| D-03, Commissary Hoist, Level 2 Inspect and Repair | 1 | JB | $ | $ |
| D-04, Anchor Windlass, Level 2 Inspect and Repair | 1 | JB | $ | $ |
| D-05, Ammunition Elevator, Level 2 Inspect and Repair | 1 | JB | $ | $ |
| D-06, Temporary Services, Provide | 1 | JB | $ | $ |
| D-07, DELETED | DELETED | |||
| D-08, Stuffing Tube Renewal | 1 | JB | $ | $ |
| D-09, Vent Plenum Repair and Preservation - Main Deck | 1 | JB | $ | $ |
| D-10, Deck Preservation, Aft Fan Space | 1 | JB | $ | $ |
| D-11, Paint Locker Vent System Renewal | 1 | JB | $ | $ |
| D-12, Renew Grey Water Vent Check Valve | 1 | JB | $ | $ |
| D-13, Vent Plenum Repair and Preservation | 1 | JB | $ | $ |
| D-14, Emergency Gas Turbine Generator, Clean and Inspect | 1 | JB | $ | $ |
| D-15, UNREP Weight Handling Fittings, Inspect and Test | 1 | JB | $ | $ |
| D-16, Sewage Piping Renewal | 1 | JB | $ | $ |
| D-17, Comprised Air System Valves, Inspect and Test | 1 | JB | $ | $ |
| D-18, Pipe Insulation Renew | 1 | JB | $ | $ |
| D-19, Renew Fuel Oil Transfer Piping in Sewage Pump Room | 1 | JB | $ | $ |
| TOTAL AMOUNT DEFINITE ITEMS | $ | |||
| CLIN 0002 - COMPOSITE LABOR RATE | ||||
| Composite Labor Hour Rate Applicable to Contract Changes: | ||||
| Labor Hour Rate | $________ | |||
| Estimated Composite Labor Hour | 1069 | |||
| Extended Composite Labor Amount | $_______ |
&CSolicitation No. HSCG85-13-R-P45220 Dockside Repairs of CGC MUNRO (WHEC 724)
&CATTACHMENT 1 - REVISED
Sheet2
Sheet3
File details come from the government source that posted it. Updated .