SCHEDULE_OF_ITEMS-PRICES_(REVISED).xls

XLS spreadsheet 23 KB Posted

Attached to
Dockside Repairs of CGC MUNRO (WHEC 724)
Solicitation number
HSCG85-13-R-P45220
Issued by

About this file

SCHEDULE OF ITEMS - PRICES (REVISED)

View the file

Other files

File Type Posted
MUNRO__WHEC_378W__DS_MCJ_13R1.pdf PDF
SF30-A001.pdf PDF
Page_2_-_A001.doc DOC document
NOTICE_TO_OFFERORS_(MUNRO_DS).doc DOC document
HSCG85-13-R-P45220_CGC_MUNRO_Past_Performance_Questionnaire.doc DOC document
LIST_OF_ATTACHMENT_(MUNRO_DS).doc DOC document
10_GOVERNMENT_PROPERTY_REPORT_(Attachment_5).doc DOC document
SF1449_(P45220).pdf PDF
SCHEDULE_OF_ITEMS_-_PRICES.xls XLS spreadsheet
2_Cover_Sheet_(MUNRO_DS).doc DOC document
Request_for_Clarification_(MUNRO_DS).doc DOC document
MUNRO__WHEC_378W__DS_MCJ_13R0.pdf PDF
SOLICITATION_PKG_(MUNRO).doc DOC document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF ITEMS - PRICES
CLIN 0001 - DEFINITE ITEMS
SCHEDULE OF ITEMS - PRICES FOR CGC MUNROQTYUNITUNIT PRICEEXTENDED PRICE
D-01, Vent Fans and Motors, Overhaul (Non-Machinery Spaces)1JB$$
D-02, Steam System Relief Valves, Overhaul or Renew1JB$$
D-03, Commissary Hoist, Level 2 Inspect and Repair1JB$$
D-04, Anchor Windlass, Level 2 Inspect and Repair1JB$$
D-05, Ammunition Elevator, Level 2 Inspect and Repair1JB$$
D-06, Temporary Services, Provide1JB$$
D-07, DELETEDDELETED
D-08, Stuffing Tube Renewal1JB$$
D-09, Vent Plenum Repair and Preservation - Main Deck1JB$$
D-10, Deck Preservation, Aft Fan Space1JB$$
D-11, Paint Locker Vent System Renewal1JB$$
D-12, Renew Grey Water Vent Check Valve1JB$$
D-13, Vent Plenum Repair and Preservation1JB$$
D-14, Emergency Gas Turbine Generator, Clean and Inspect1JB$$
D-15, UNREP Weight Handling Fittings, Inspect and Test1JB$$
D-16, Sewage Piping Renewal1JB$$
D-17, Comprised Air System Valves, Inspect and Test1JB$$
D-18, Pipe Insulation Renew1JB$$
D-19, Renew Fuel Oil Transfer Piping in Sewage Pump Room1JB$$
TOTAL AMOUNT DEFINITE ITEMS$
CLIN 0002 - COMPOSITE LABOR RATE
Composite Labor Hour Rate Applicable to Contract Changes:
Labor Hour Rate$________
Estimated Composite Labor Hour1069
Extended Composite Labor Amount$_______

&CSolicitation No. HSCG85-13-R-P45220 Dockside Repairs of CGC MUNRO (WHEC 724)

&CATTACHMENT 1 - REVISED

Sheet2

Sheet3

File details come from the government source that posted it. Updated .