2_Cover_Sheet_(MUNRO_DS).doc

DOC document 112 KB Posted

Attached to
Dockside Repairs of CGC MUNRO (WHEC 724)
Solicitation number
HSCG85-13-R-P45220
Issued by

About this file

COVER SHEET - HSCG85-13-R-P45220

View the file

Other files

File Type Posted
MUNRO__WHEC_378W__DS_MCJ_13R1.pdf PDF
SF30-A001.pdf PDF
SCHEDULE_OF_ITEMS-PRICES_(REVISED).xls XLS spreadsheet
Page_2_-_A001.doc DOC document
NOTICE_TO_OFFERORS_(MUNRO_DS).doc DOC document
HSCG85-13-R-P45220_CGC_MUNRO_Past_Performance_Questionnaire.doc DOC document
LIST_OF_ATTACHMENT_(MUNRO_DS).doc DOC document
10_GOVERNMENT_PROPERTY_REPORT_(Attachment_5).doc DOC document
SF1449_(P45220).pdf PDF
SCHEDULE_OF_ITEMS_-_PRICES.xls XLS spreadsheet
Request_for_Clarification_(MUNRO_DS).doc DOC document
MUNRO__WHEC_378W__DS_MCJ_13R0.pdf PDF
SOLICITATION_PKG_(MUNRO).doc DOC document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE

Commander

U.S. Coast Guard

Surface Forces Logistics Center

CPD-C&P2-LREPL

1301 Clay Street, Suite 800N Oakland, CA 94610

REQUEST FOR PROPOSALS

HSCG85-13-R-P45220

Dockside Repairs of CGC MUNRO (WHEC 724)

CONTINUATION OF SF 1449 – BLOCKS 17a - 25

(1) Block 17a: Contractor shall include DUNS number.

(2) Block 17b: REMITTANCE ADDRESS: Payment will be made to the Financial Institution listed in Central Contractor Registration (CCR). To receive award Contractor must be registered in Central Contract Registration (CCR) http://www.ccr.gov.

(3) Block 19 through 24: SEE SCHEDULE OF SUPPLIES/SERVICES BELOW.

(4) Block 25: ACCOUNTING AND APPROPRIATION DATA: To be included on contract award document.

DESCRIPTION OF WORK:

(a) The Contractor shall furnish all necessary labor, material, services, equipment, supplies, power, accessories, and such other things as are necessary, except as otherwise specified, to perform dockside repairs and maintenance to the vessels, in accordance with this solicitation and attached specifications.

(b) Failure to read the specifications in their entirety will not relieve the offeror from the responsibility for properly estimating the difficulty or price of successfully performing the work. Failure to do so will be at the offeror 's risk. All proposals submitted in response to this solicitation shall stand firm for 60 calendar days from the response date of this solicitation.

ALL CONTRACTORS ARE RESPONSIBLE FOR VERIFYING THE RECEIPT OF THEIR PROPOSALS.

REQUIRED DOCUMENTS:

Each offeror shall furnish the information required by the solicitation, which includes:

1. Signed 1449 with offeror’s address, DUNS and other information completed.

2. Price Schedule filled out with a cost associated with each CLIN

3. Past Performance Documentation

4. Small Business Self Certification for applicable set-asides

5. Welding Certifications and Procedures

6. Proof of Insurance (Statement of Coverage from current Insurance carrier)

ONLY mailed proposals will be accepted. Faxed and e-mail proposals will not be accepted. Proposal should be submitted to the address shown on Block 9 of the SF-1449.

PLEASE NOTE: PROPOSALS THAT DO NOT INCLUDE ALL REQUIRED DOCUMENTS MAY BE CONSIDERED INCOMPLETE AND MAY NOT BE CONSIDERED.

TABLE OF CONTENTS

DESCRIPTION PAGE NUMBER

SF 1449, Solicitation/Contract/Order for Commercial Items 1

Continuation of SF 1449

Schedule of Items – Supplies/Services and Prices 2-3

(See Attachment 1)

Contract Clauses

FAR 52.212-4 Contract Terms and Conditions Addendum 3 – 19

FAR 52.212-5 Contract Terms and Conditions Required to Implement�Statutes and Executive Orders 19 - 31

Contract Documents/Exhibits and/or Attachments

See Separate List of Attachments

Solicitation Provisions

FAR 52.212-1 Instructions to Offerors Addendum 31 - 36

FAR 52.212-2 Evaluation Commercial Items, or other Evaluation

Factors for Award 36 - 38

FAR 52.212-3 Representations and Certifications-Commercial Items 38 - 59

File details come from the government source that posted it. Updated .