AMENDMENT 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND 0004 TO SOL.doc | DOC document | |
| W24193-006_RecC.pdf | ||
| REV 1 Summary of Changes.pdf | ||
| 750-WMSL-582-501 Rev C.pdf | ||
| REVISED SCHEDULE B FOR AMEND 0003.doc | DOC document | |
| USCGC WAESCHE_Maintenance and Repair 1_March_2010_Rev 1.pdf | ||
| CAPTURE NET MODS.jpg | JPG image | |
| AMEND 0002 TO SOL.doc | DOC document | |
| AMEND 0001 TO SOL.doc | DOC document | |
| USCGC WAESCHE_Maintenance and Repair 1_March_2010_Rev 0.pdf | ||
| FINAL WASCHE MR 1 SOLICITATION.doc | DOC document | |
| PRESOLICITATION NOTICE.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE
| PAGE |
| OF PAGES |
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1 |
| 2 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| 0003 |
| 24 Dec 2009 |
| 21-10-850610940 |
| 6. ISSUED BY |
| CODE |
| HSCG85 |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
COMMANDER, USCG
Surface Forces Logistics Center 1301 Clay Street, Suite 807N Oakland, CA 94612
| 8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) |
| ( |
| 9.A AMENDMENT OF SOLICITATION NO. |
ALL PROSPECTIVE OFFERORS
HSCG85-10-R-610940
9B. DATE (SEE ITEM 11)
4 DEC 2009
| X |
| 10A. MODIFICATION OF CONTRACT/ORDER NO. |
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: FAR 52.212-4(c) and MUTUAL AGREEMENT OF THE PARTIES
D. OTHER (Specify type of modification and authority
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUBJECT: Solicitation HSCG85-10-R-610940 Maintenance & Repair Period 1 on USCGC WAESCHE
A. The purposes of this Amendment are to:
1. Provide REV-1 to the Specification. This Revision contains a Summary of Changes which will allow Offerors to identify the specifications (and portions thereof) which have been changed. One (1) revised Drawing, and One (1) new Reference are also provided as separate attachments to this amendment to the solicitation.
CONTINUED ON PAGE 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
JO ANN T. YAMANE
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
BY
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
30-105
STANDARD FORM 30 (REV. 10-83
2. To provide a REVISED SCHEDULE B: SUPPLIES OR SERVICES AND PRICES. The Schedule B provided with the Solicitation transposed the Nomenclature for D Items D-9 and D-10. NOTE ALSO THAT THE REVISED SPECIFICATIONS DELETES THE ENTIRE REQUIREMENT FOR CORRECTED D-9 “OVERHEAD LIGHTING FIXTURE MODS”. THEREFORE OFFERORS SHOULD NOT PRICE THIS D ITEM.
B. Offerors are reminded to acknowledge this Amendment by inserting their firms name in Block 8 and completing Blocks 15A, B, and C and returning a signed copy to the Contracting Officer.