Blank_Schedule_B_Rev-0_CGC_THETIS_.pdf

PDF 14 KB Posted

Attached to
CGC THETIS DRYDOCK REPAIRS Federal contract opportunity
Solicitation number
HSCG80-13-R-P45936
Issued by
Department of Homeland Security US Coast Guard

About this file

Schedule of Supplies

View the file

Other files for this federal contract opportunity

Other files attached to CGC THETIS DRYDOCK REPAIRS, newest first.
File Type Posted
Amendment_A00003_THETIS.pdf PDF
905-WMEC_588_10_6_A_C.pdf PDF
905-WMEC_801_29_2_-_-.pdf PDF
905-WMEC_588_10_6_B_C.pdf PDF
Blank_Schedule_B_CGC_THETIS_Rev-2.xlsx XLSX spreadsheet
905-WMEC_588_2_2_-_H.pdf PDF
905-WMEC_588_10_1_-_C.pdf PDF
CGC_THETIS_Spec_Rev-2.pdf PDF
905-WMEC_801_29_3_-_-.pdf PDF
905-WMEC_588_10_3_-_C.pdf PDF
905-WMEC_588_10_7_-_C.pdf PDF
905-WMEC_588_10_2_-_C.pdf PDF
905-WMEC_154_2_2_-_B.tiff TIFF file
905-WMEC_588_10_4_-_C.pdf PDF
905-WMEC_801_29_1_-_-.pdf PDF
CGC_THETIS_Second_Set_of_Question_and_Answers_Amend_00001.doc DOC document
905-WMEC_588_2_1_-_H.pdf PDF
905-WMEC_154_2_1_-_B.tiff TIFF file
905-WMEC_588_10_5_-_C.pdf PDF
SF30_Amendment_A00002_THETIS.pdf PDF
RFP_THETIS_Feb_6_2013.pdf PDF
SF30_Amendment_THETIS.pdf PDF
Blank_Schedule_B_Rev-1.pdf PDF
CGC_THETIS_First_Set_of_Question_and_Answers_Amend_00001.docx DOCX document
THETIS_Spec_Rev-1.pdf PDF
Performance_Questionnaire_based_on_CPARS_Template.docx DOCX document
CGC_THETIS_Rev-_Spec_18_Dec_12.pdf PDF
RFP_THETIS_Jan_17_2013.doc DOC document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM DESCRIPTION AFC UNIT PRICE UNIT QTY EXTENDED PRICE

D-001 Hull Plating (U/W Body), Ultrasonic Testing (250 shots) 45 JOB 1

D-002 Appendages (U/W), Leak Test 45 JOB 1

D-003 Propulsion Shaft Fairwaters and Rope Guards, Inspect and Repair 45 JOB 1

D-004 Fairwater for Starboard Stern Tube, Renew 45 JOB 1

D-005 Appendages (U/W) - Internal, Preserve 45 JOB 1

D-006 Voids (Non-Accessible), Leak Test 45 JOB 1

D-007 Voids (Non-Accessible), Preserve Internal Surfaces 45 JOB 1

D-008 Propulsion Shaft Seal (Mechanical and Inflatable) Assemblies, Overhaul 45 JOB 1

D-009 Propulsion Shaft Bearings (External), Check Clearances 45 JOB 1

O-010 Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box, Inspect and Service 45 Job 1

O-011 Controllable Pitch Propeller Hub Assembly, Renew 45 JOB 1

D-012 Fathometer Transducer, Renew 42 JOB 1

D-013 Doppler Speed Log Transducer(s), Renew 42 JOB 1

D-014 Sea Valves and Waster Pieces, Overhaul or Renew 45 JOB 1

D 015 Sea Strainers Duplex (All Sizes) Overhaul 45 JOB 1

SCHEDULE OF SUPPLIES AND SERVICES FOR:

USCGC THETIS (WMEC-270B) DRYDOCK AVAILABILITY FY 2013

THETIS (WMEC 270B) DD TEF 13ER0_Blank, Page 1 of 2

D-015 Sea Strainers - Duplex (All Sizes), Overhaul 45 JOB 1

D-016 Sea Strainers - Simplex (All Sizes), Clean and Inspect 45 JOB 1

D-017 Rudder Stock Bearings, Check Clearances 45 JOB 1

D-018 Accessible Void(s), Preserve “100%” 45 JOB 1

D-019 U/W Body, Preserve “100%” 45 JOB 1

D-020 Hull Plating Freeboard, Preserve -“100%” 30 JOB 1

D-021 Cathodic Protection / Zinc Anodes, Renew 45 JOB 1

D-022 Drydocking 45 JOB 1

D-023 Temporary Services, Provide 45 JOB 1

D-024 #1 MDE Lube Oil Piping, Alignment 45 JOB 1

D-025 Ventilation Ducting Insulation, Renew 45 JOB 1

D-026 Dry Stores Tank Top, Repair 45 JOB 1

D-027 Freeboard Knife Edge and Deck Ultrasonic Testing 45 JOB 1

D-028 Hanger Superstructure Plating, Renew 45 JOB 1

O-029 Perform Ultrasonic Thickness Measurements - Steel Plating (100 shots) 45 JOB 1

D-030 Propulsion Shaft Coating, Inspect and Test 45 JOB 1

THETIS (WMEC 270B) DD TEF 13ER0_Blank, Page 1 of 2

D-031 Tanks (Ballast), Preservation, 100% 45 JOB 1

D-032 Fin Stabilizers (Bearings, Packings, Stock/Blade), Repair or Renew 45 JOB 1

D-033 Air Conditioning Chilled Water Pumps, Upgrade (AC&I) 45 Job 1

O-034 Hull and Structural Plating - 1/4" to 3/4" Steel Plate, Renew 45 4 SQ-FT 1

D-035 Watertight Doors, Scuttles, and Hatches (Below 01 Level), Renew 30 Job 1

D-036 Watertight Doors, Scuttles, and Hatches (01 Level and Above), Renew 45 Job 1

D-037 Tanks (Potable Water), Preserve 100% 45 Job 1

O-038 Controllable Pitch Propeller Hubs; Remove, Inspect and Reinstall 45 Job 1

O-00A Composite Labor Rate 45 Hour 1,115

D-00B GFP Report - NSP EA - NSP

O-00Z Laydays 45 Day 5

Total Price of Definite Items - - -

Total Price of Option Items - - -

Total Price of Definite and Optional Items - - -

THETIS (WMEC 270B) DD TEF 13ER0_Blank, Page 2 of 2THETIS (WMEC 270B) DD TEF 13ER0_Blank, Page 2 of 2

Sheet1

File details come from the government source that posted it. Updated .