Blank_Schedule_B_CGC_THETIS_Rev-2.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- CGC THETIS DRYDOCK REPAIRS Federal contract opportunity
- Solicitation number
- HSCG80-13-R-P45936
About this file
CGC THETIS Blank Schedule B Rev-2
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF SUPPLIES AND SERVICES FOR: |
| USCGC THETIS (WMEC-270B) DRYDOCK AVAILABILITY FY 2013 |
| ITEM | DESCRIPTION | AFC | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Ultrasonic Testing (250 shots) | 45 | JOB | 1 | ||
| D-002 | Appendages (U/W), Leak Test | 45 | JOB | 1 | ||
| D-003 | Propulsion Shaft Fairwaters and Rope Guards, Inspect and Repair | 45 | JOB | 1 | ||
| D-004 | Fairwater for Starboard Stern Tube, Renew | 45 | JOB | 1 | ||
| D-005 | Appendages (U/W) - Internal, Preserve | 45 | JOB | 1 | ||
| D-006 | Voids (Non-Accessible), Leak Test | 45 | JOB | 1 | ||
| D-007 | Voids (Non-Accessible), Preserve Internal Surfaces | 45 | JOB | 1 | ||
| D-008 | Propulsion Shaft Seal (Mechanical and Inflatable) Assemblies, Overhaul | 45 | JOB | 1 | ||
| D-009 | Propulsion Shaft Bearings (External), Check Clearances | 45 | JOB | 1 | ||
| O-010 | Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box, Inspect and Service | 45 | Job | 1 | ||
| O-011 | Controllable Pitch Propeller Hub Assembly, Renew | 45 | JOB | 1 | ||
| D-012 | Fathometer Transducer, Renew | 42 | JOB | 1 | ||
| D-013 | Doppler Speed Log Transducer(s), Renew | 42 | JOB | 1 | ||
| D-014 | Sea Valves and Waster Pieces, Overhaul or Renew | 45 | JOB | 1 | ||
| D-015 | Sea Strainers - Duplex (All Sizes), Overhaul | 45 | JOB | 1 | ||
| D-016 | Sea Strainers - Simplex (All Sizes), Clean and Inspect | 45 | JOB | 1 | ||
| D-017 | Rudder Stock Bearings, Check Clearances | 45 | JOB | 1 | ||
| D-018 | Accessible Void(s), Preserve “100%” | 45 | JOB | 1 | ||
| D-019 | U/W Body, Preserve “100%” | 45 | JOB | 1 | ||
| D-020 | Hull Plating Freeboard, Preserve -“100%” | 30 | JOB | 1 | ||
| D-021 | Cathodic Protection / Zinc Anodes, Renew | 45 | JOB | 1 | ||
| D-022 | Drydocking | 45 | JOB | 1 | ||
| D-023 | Temporary Services, Provide | 45 | JOB | 1 | ||
| D-024 | #1 MDE Lube Oil Piping, Alignment | 45 | JOB | 1 | ||
| D-025 | Ventilation Ducting Insulation, Renew | 45 | JOB | 1 | ||
| D-026 | Dry Stores Tank Top, Repair | 45 | JOB | 1 | ||
| D-027 | Freeboard Knife Edge and Deck Ultrasonic Testing | 45 | JOB | 1 | ||
| D-028 | Hanger Superstructure Plating, Renew | 45 | JOB | 1 | ||
| O-029 | Perform Ultrasonic Thickness Measurements - Steel Plating (100 shots) | 45 | JOB | 1 | ||
| D-030 | Propulsion Shaft Coating, Inspect and Test | 45 | JOB | 1 | ||
| D-031 | Tanks (Ballast), Preservation, 100% | 45 | JOB | 1 | ||
| D-032 | Fin Stabilizers (Bearings, Packings, Stock/Blade), Repair or Renew | 45 | JOB | 1 | ||
| D-033 | Air Conditioning Chilled Water Pumps, Upgrade (AC&I) | 45 | Job | 1 | ||
| O-034 | Hull and Structural Plating - 1/4" to 3/4" Steel Plate, Renew | 45 | 4 SQ-FT | 1 | ||
| D-035 | Watertight Doors, Scuttles, and Hatches (Below 01 Level), Renew | 45 | Job | 1 | ||
| D-036 | Watertight Doors, Scuttles, and Hatches (01 Level and Above), Renew | 30 | Job | 1 | ||
| D-037 | Tanks (Potable Water), Preserve 100% | 45 | Job | 1 | ||
| O-038 | Controllable Pitch Propeller Hubs; Remove, Inspect and Reinstall | 45 | Job | 1 | ||
| O-00A | Composite Labor Rate | 45 | Hour | 1,115 | ||
| D-00B | GFP Report | - | NSP | EA | - | NSP |
| D-00C | Travel and Perdiem | JOB | ||||
| O-00Z | Laydays | 45 | Day | 5 | ||
| Total Price of Definite Items | - | - | - | |||
| Total Price of Option Items | - | - | - | |||
| Total Price of Definite and Optional Items | - | - | - |