Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
HSCG50-16-R-PFDAH1; ASTORIA FAMILY HOUSING PHASE 2 SECTOR COLUMBIA RIVER, ASTORIA, OR.
The purpose of this amendment is to provide answers to PPIs.
USCG FDCC DET SEATTLE
915 SECOND AVE, RM 2664
SEATTLE, WASHINGTON 98174-1011
HSCG50-16-R-PFDAH1
1 6
09/28/2016
07/15/2016
HSCG50-16-R-PFDAH1
PPI 0004
Will the Offerors be required to include Owner’s Property / Builder’s All-Risk Insurance as part of their proposals?
ANSWER: The contractor shall procure and maintain insurance during the entire period of performance, in accordance with Federal Acquisition Regulation Clause No. 52.228-5 entitled “Insurance – Work on a Government Installation. Please review Solicitation, Section H.1, “Required Insurance”.
PPI 0005
Prevailing Wage Rates – We have some confusion over which rates we should be using. a. OR160033 – OR33 (Davis Bacon / Clatsop Co / Building) seems to fit the Maintenance Building; b. OR160033 – OR3 (David Bacon / Clatsop Co / Residential) seems to fit the Apartment Units; c. However, Section C of the RFP includes wages rates used for Astoria Family Housing Phase One contract (below) seem to contradict some of the rates found in these publications.; d. We understand that when a lack of classification is shown, we are to either propose rates and get them approved through Davis-Bacon, or fall back to BOLI rates. We are assuming the rates in Section 3 (listed above) were proposed and used for Phase 1. It’s clear that we should assume the wages in Section 3 where these classifications don’t show up in OR3 and OR33. Can you clarify how these rates were applied in Phase 1?
ANSWER: All work shall be performed in accordance with Wage Determination General Decision Number: OR160003 and OR160033.
Yes, missing labor classifications in OR3 were added to the previous Astoria Housing Project (HSCG50-14-C-PAH001) by the U.S. Department of Labor in accordance with 29 CFR 5.5(a)(1)(ii).
PPI 0006
Were the rates in Section C (above) applied to STRICTLY RESIDENTIAL work, or were they used on both RESIDENTIAL and BUILDING structures?
ANSWER: This applied to OR3 “RESIDENTIAL”. OR33 is for “BUILDING” and not applicable for Residential Construction. OR33 was included in the Solicitation for the previous Astoria Housing Construction project (HSCG50-14-C-PAH001) as it included option items for Construction Type:
“Building”, which was not exercised. The Labor Conformance rates in Solicitation, Section C are from the Astoria Family Housing Phase 1 project and are for informational/estimating purposes only.
PPI 0007
There’s some confusion on the (3) wages rates on the classifications below, please clarify:
a. A Common General Laborer breaks down in these (3) publications as follows: i. OR3 $11.00/hr + $0.00/hr in fringes; ii. OR33 $18.57/hr + $6.24/hr in fringes; iii. Sect 3 $24.84/hr + $10.86/hr in fringes Since there’s a classification for Common Laborer in both OR’s, why was there an additional pay rate issued?
ANSWER: This particular classification was for “Batt Insulation Installer”, which was identified as “Common General Laborer” in the U.S. Department of Labor’s wage decision. Please use the Wage Determination OR3 and OR33 and appropriate classification for pricing purposes.
b. A Plumber breaks down in these (3) publications as follows: i. OR3 no classification; ii. OR33 $27.32/hr + $ 9.86/hr in fringes iii. Sect C $39.71/hr + $19.44/hr in fringes Was the Section 3 rate applied to OR3, and if so, why is it more than the rate in OR33?
ANSWER: This applied to OR3 “RESIDENTIAL”. OR33 is for “BUILDING” and not applicable for Residential Construction. OR33 was included in the Solicitation for the previous Astoria Housing Construction project (HSCG50-14-C-PAH001) as it included option items for Construction Type:
“Building”, which was not exercised. The Labor Conformance rates in Solicitation, Section C are from the Astoria Family Housing Phase 1 project and are for informational/estimating purposes only.
c. A Painter breaks down in these (3) publications as follows: i. OR3 no classification; ii. OR33 $21.01/hr + $8.83/hr in fringes iii. Sect C $24.84/hr + $10.86/hr in fringes Was the Section 3 rate applied to OR3, and if so, why is it more than the rate in OR33?
ANSWER: This applied to OR3 “RESIDENTIAL”. OR33 is for “BUILDING” and not applicable for Residential Construction. OR33 was included in the Solicitation for the previous Astoria Housing Construction project (HSCG50-14-C-PAH001) as it included option items for Construction Type:
“Building”, which was not exercised. The Labor Conformance rates in Solicitation, Section C are from the Astoria Family Housing Phase 1 project and are for informational/estimating purposes only.
PPI 0008
d. A Drywall Finisher / Taper breaks down in these (3) publications as follows: i. OR3 no classification; ii.
OR33 $33.66/hr + $13.76/hr in fringes; iii. Sect C $24.84/hr + $10.86/hr in fringes Was the Section 3 rate applied to OR3, and if so, why is it more than the rate in OR33?
ANSWER: This applied to OR3 “RESIDENTIAL”. OR33 is for “BUILDING” and not applicable for Residential Construction. OR33 was included in the Solicitation for the previous Astoria Housing Construction project (HSCG50-14-C-PAH001) as it included option items for Construction Type:
“Building”, which was not exercised. The Labor Conformance rates in Solicitation, Section C are from the Astoria Family Housing Phase 1 project and are for informational/estimating purposes only.
PPI 0009
Confirm that all the following information in RFP is for reference only and that the D/B team is responsible for contracting these services for the project: a. Is a new Biological Survey required?
b. Are we required to perform new Hydrant Flow Tests?
c. Is the HERS Study Report for our use or shall we create another (see Appendix M)?
ANSWER: Yes, the D/B team is responsible for contracting services. A new Biological Survey is required.
PPI 0010
Is a Traffic Impact Analysis required per comments within the Environmental Review summary?
ANSWER: Yes, a Traffic Impact Analysis is required.
PPI 0011
Please Confirm: The only permits required on the project include those with the City of Astoria for the construction of the public road including: a. Storm water construction permit- does this also require an application to DEQ?
b. Soils and Erosion permit
c. Grading permit
d. Utilities within the ROW permit
ANSWER: The Designer of Record shall decide what permits are required.
PPI 0012
Per the city of Astoria Development Code: Shall the landscape design be reviewed by the City (Community Development Director) or are we to meet the requirements and “self-certify”?
ANSWER: The Contractor shall “self-certify”.
PPI 0013
Please confirm that the permit fees to be included are limited to the work associated with the road and utilities within the ROW.
ANSWER: Yes, permit fees are limited to road and utilities.
PPI 0014
Would the USGC like the Design Team to conduct another Green Charrette for Phase II? Or is the RFP provided LEED for Homes Program Review and Ecocharette, including the Master Plan and Stated Goals, still current and for our use in designing Phase II?
ANSWER: This phase is only requiring LEED Certified. DOR shall decide whether Green Charrette is required.
PPI 0015
Is LEED certification desirable or required for the housing maintenance building?
ANSWER: LEED Certified is required.
PPI 0016
Is the building/unit design in the RFP the approved final from Phase I? Or did the design change from schematic to final design? Do you want to change the design of the 3-bedroom units or do they work well?
ANSWER: 3-bedroom and 4-bedroom units work well. However, this phase has duplex units also.
DOR shall evaluate for function and use.
PPI 0017
Are we free to propose changes to the floor plans and elevations for the RFP? If we don’t modify designs for the RFP, may we do so after the award?
ANSWER: The RFP lists minimum requirements. Existing design meets these requirements.
Proposals shall be based on requirements.
PPI 0018
Section 01115 states that the 2-D renderings are due at Final Architectural Construction Design Submittal, but Section 01802 2.5.3 says renderings are due as part of the 35% design submittal. At what time in the design phase shall the renderings be created?
ANSWER: Provide renderings at 35% submittal phase.
PPI 0019
Respectfully requesting the record drawings for Phase 1: Specifically for the road and the detention vault structures/discharge.
ANSWER: PDF drawings have been included via amendment. Auto CADD drawings of the first 12 units will be provided after award.
PPI 0020
Respectfully requesting the record drawings for Phase 1?
ANSWER: PDF drawings have been included via amendment. Auto CADD drawings of the first 12 units will be provided after award.
PPI 0021
Would it be appropriate to contact City of Astoria Engineering Staff regarding the storm water drainage system and the expectations for inspection during construction?
ANSWER: Yes, this is acceptable.
PPI 0022
Since we know that there are a number of trees that will need to be removed on the north side of the existing gravel access road and substantial clearing of underbrush on the south side of the existing gravel access road, the ideal situation for providing a more accurate and efficient Topographic Survey would be to remove the trees and underbrush before performing the field work for the Topographic Survey. Would we be able to coordinate the removal of these trees and underbrush prior to performing the field portion of the Topographic Survey?
ANSWER: Successful Contractor’s Means and Methods to accomplish the work is allowed as long as it complies with the contract.
PPI 0023
In the specifications, it is noted that an As-Built Drawing will need to be prepared at the end of the project.
Will this As-Built Survey need to include only the constructed utilities, or rather will it also need to include the constructed roads, slopes and constructed building structures as well?
ANSWER: As-Builts and associated survey will be needed on all new work constructed under this project.
PPI 0024
Will an ALTA/ACSM Land Title Survey be required after construction is complete, or just the As-Built Drawing?
ANSWER: Yes, it will be required for the transfer of the road and utilities to the city.
PPI 0025
In addition to preparing legal descriptions and dedicating the proposed right-of-way, will the Land Surveyor be required to set survey monuments marking the dedicated right-of-way and file a Record of Survey Map with the Clatsop County Survey Department?
ANSWER: Yes, the Land Surveyor will be required to accomplish those tasks.
PPI 0026
Section 1800 (1.62) states “no permanent irrigation system will be allowed.” A temporary irrigation system for establishment is referred to as well as irrigation system inspections. Inquiry is as to instruction to design one way or another? (It is noted that this could be done as design/build as well.)
ANSWER: This is a Design-Build Contract. Contractor shall provide a method to establish landscaping per contract and not use permanent irrigation system.