Amendment 0006 dated 26 SEP 2016
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
HSCG50-16-R-PFDAH1; ASTORIA FAMILY HOUSING PHASE 2 SECTOR COLUMBIA RIVER, ASTORIA, OR.
The purpose of this amendment is to replace space criteria sheets for Maintenance Building; provide answers to PPIs; and provide Reference Documents (Astoria Phase IV, As-Builts).
USCG FDCC DET SEATTLE
915 SECOND AVE, RM 2664
SEATTLE, WASHINGTON 98174-1011
HSCG50-16-R-PFDAH1
1 2
09/26/2016
07/15/2016
HSCG50-16-R-PFDAH1
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
A. PRE PROPOSAL INQUIRY RESPONSES
PPI 0002
It appears that all application, acquisition and payment of permits is by the contractor, do you happen to have a list of required permits for this project? Approximate Cost?
ANSWER: The Designer of Record shall determine what permits are required to be in compliance with the requirements of the RFP and applicable State Federal and local requirements.
PPI 0003
There is also a note on page 72 of Section 1800 paragraph 1.18.3 of the RFP that says "The contractor shall obtain permission from the USCG prior to contacting or having any dialogue with any federal, state or local regulatory agency or entities regarding permitting requirements."
Do I have permission to contact the local agency's regarding requirements, or is there a process to get permission?
ANSWER: You have permission to contact agencies to determine what permits are required.
B. REVISIONS/CLARIFICATIONS FOR SPECIFICATIONS/DRAWINGS: ASTORIA
FAMILY HOSUING PHASE 2, USCG SECTOR COLUMBIA RIVER, ASTORIA OR
(ATTACHMENT J.4 OF THE SOLICITATION)
• Maintenance Building Layout and Space Criteria: The space criteria sheets for the Maintenance Building currently do not reflect the current layout. The Offeror shall replace the Maintenance Building Layout and Space Criteria Sheets for the Maintenance Building with the attached (to this amendment), “Maint Build Space Criteria and Layout 9-26-16.”
• Reference Drawings from Astoria Phase IV (“As-Builts”): “As-Builts” from Astoria Phase IV have been provided for informational purposes and are attached to this amendment.
All other terms and conditions remain unchanged. The Proposal due date IS NOT EXTENDED. Offerors are reminded to acknowledge receipt of this amendment in Block 19 of the SF 1442 submitted in response to the subject RFP.
END OF AMENDMENT