Amendment Page 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit List.pdf | ||
| Amend0004.pdf | ||
| Wage Determination Amendment.doc | DOC document | |
| SF30 Amend3.pdf | ||
| Amendment Page 2.doc | DOC document | |
| ISCKODIAKINST 5100 3 Safety Manual _2_ - Copy.pdf | ||
| SF30 Amend2.pdf | ||
| Amendment Page 99.doc | DOC document | |
| Amend 0001 SF30.pdf | ||
| PAST PERFORMANCE.doc | DOC document | |
| Seed Project Half Size Drawings.pdf | ||
| MATOC laydown Area.pdf | ||
| ISCKODIAKINST 5100 3 Safety Manual | — | |
| KR Procedures Manual 15 june 2011.pdf | ||
| SF1442.pdf | ||
| UEG.pdf | ||
| Seed Project Specifications.pdf | ||
| HSCG50-11-R-PJT000.rtf | RTF text file | |
| Kodiak Standard Specs.doc | DOC document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HSCG50-11-R-PJT001
AMENDMENT 0001
PAGE 2OF 2PAGES
1..Make the following corrections to the Request For Proposal:
(PLEASE NOTE THAT ALL CHANGES MADE ARE SHOWN IN BOLD).
a. Remove Page 4 and Replace with the attached Page 4 Amendment 0001.
b. Remove Page 82 and Replace with the attached Page 82 Amendment 0001. Past Performance Questionnaire is attached as part of this amendment.
c. Correct Paragraph L.9 to read: A pre-proposal conference and site visit will be conducted at 1000 AM, 15 July 2011 in lieu of 1100 AM 15 July 2011
d. Cut and Paste: Page 95, Paragraph L.10.1.2 to read as follows:
L.10.1.2 The technical proposal shall be prepared in accordance with these instructions and shall be evaluated in accordance with the evaluation criteria in SECTION M, Evaluation Factors for Award. Technical proposals must include necessary information to enable the evaluators to form a definitive conclusion concerning the offeror’s ability to perform complete project management of required construction services. Technical proposals (Volume I) shall be limited twenty five (25) pages, excluding personnel resumes organization chart and past performance information outlined in Subfactor 3.1 (which is limited to 2 pages per contract described).
PLEASE NOTE THE CHANGES FOR THIS PARAGRAPH ARE INCLUDED IN THE ITALICIZED, BOLD AND UNDERLINED SECTION. It provides further clarification as to the documents which will do not count toward the total page count.
HSCG50-11-R-PJT001
AMENDMENT 0001
Section B – Supplies or Services and Price/Costs
B.1 The total combined value of all contracts awarded under this solicitation shall not exceed the overall contract maximum of $45 million for the entire contract period.
B.2 Seed Project
The offeror must provide a price proposal and bid bond for the seed project. The seed project will provide the basis for evaluation of the technical and price proposals for award of the contract. The government intends to award the seed project as a task order upon contract award. Refer to Section L for instructions on submitting your price and technical proposals. See Section M for Basis of Award.
The Seed Project Task Order completion date is 1 September 2012. The estimated price for the seed project is between $500,000 and $1,000,000.
B.3 Future Task Orders
Future task orders will be competed amongst the awardees subject to the contract ordering requirements shown in Sections F and I.
B.4 Schedule of Values
After the award of each task order, the contractor shall submit a schedule of values for progress payment purposes for task orders which have performance durations of more than 30 days.
HSCG50-11-R-PJT001
AMENDMENT 0001
Section J - List of Documents, Exhibits and Other Attachments
1. Documents:
a. Base Support Unit Kodiak Standard Construction Specifications dated February 1, 2010.
b. MATOCC Contractors’ Procedures Manual, dated 15 June 2011.
c. Contractor’s Environmental Guide, ISC Kodiak Complex, dated December 2002.
d.
CGISCKODIAKINST M5100.3, Safety and Health Program, dated 27 DEC 05.
e.
Seed Project Scope of Work f.
Wage Determination AK1 Modifications 0 through 28 dated 06/03/2011 g.
Seed Project Half Size Drawings h.
Past Performance Questionnaire, 3 pages.
2. Drawings/Sketches: