Attachment_1_Price_Schedule_CLINs_170002_A3.xls
XLS spreadsheet 91 KB Posted
- Solicitation number
- HSCG44-17-R-170002
About this file
Attachment 1 - Price Schedule CLIN Structure / HSCG44-17-R-170002 / Amendment 0003
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover Sheet
| Attachment 1 |
| Price Schedule/CLIN Structure |
| HSCG44-17-R-170002 |
| Amendment 0003 |
CLINs
| Price Schedule/CLIN Structure | ||||||
| CLIN | Description | Estimated Quantity | Unit | Firm-Fixed Unit Price | Amount | |
| 0001 | Contract Work Breakdown Structure, Deliverable A001, PWS Section 4.2 | 1 | EACH | $0.00 | ||
| 0002 | Integrated Project Schedule (IPS), Deliverable A002, PWS Section 4.3 | |||||
| (CLIN 0002 will be included in each Task Order) | 12 | JOB | NSP | NSP | ||
| 0003 | Information Assurance Compliance Report/ Radio Control System Prohibited Protocol Certification, Deliverable A003, PWS Section 4.4 | 1 | EACH | $0.00 | ||
| 0004 | Integration, PWS Section 4.5, including: |
Radio Control System (RCS) Integration with Base Stations, PWS Section 4.5.1 Factory Acceptance Test Procedure, Deliverable A004, PWS Section 4.5.2 Factory Acceptance Test of the Radio Control System, PWS Section 4.5.3
| Factory Acceptance Test Report, Deliverable A005, PWS Section 4.5.4 | 1 | JOB | $0.00 | ||
| 0005 | Customer Communications Package, Deliverables A013-01 - A013-32, PWS Section 4.8 | 32 | EACH | $0.00 | |
| GENERAL DYNAMICS | |||||
| 0006 | Radio Control System installation at General Dynamics. The Radio Control System shall include: |
• a primary Radio/Console Control and Audio Route/Record/Replay System (free-standing 19” rack(s) and UPS back up included)
• a secondary Radio/Console Control and Audio Route/Record/Replay System (free-standing 19” rack(s) and UPS back up included)
• two operator consoles, one sector and one station (shall include console furniture and UPS back up)
• UPS back up for all equipment shall provide a minimum of 30 minutes of run time when commercial power is lost.
| PWS Section 4.6 / see PWS Section 6.0 for Technical Specifications | 1 | JOB | $0.00 | ||
| 0007 | Site Survey-General Dynamics, PWS Section 4.6.1, including: | ||||
| General Dynamics Site Survey Report, Deliverable A006-01, PWS Section 4.6.1 | 1 | JOB | $0.00 | ||
| 0008 | General Dynamics Installation Plan, Deliverable A007-01, PWS Section 4.6.2 | 1 | EACH | $0.00 | |
| 0009 | Radio Control System Bill of Materials-General Dynamics, Deliverable A008-01, PWS Section 4.6.3 | 1 | EACH | $0.00 | |
| 0010 | System Operational Verification Test (SOVT)-General Dynamics, PWS Section 4.6.4, including: |
SOVT Plan, Deliverable A009-01, PWS Section 4.6.4
| SOVT Report, Deliverable A010-01, PWS Section 4.6.4 | 1 | JOB | $0.00 | ||
| 0011 | Radio Control System Support Documentation-General Dynamics, Deliverable A011-01, PWS Section 4.6.5 | 1 | EACH | $0.00 | |
| 0012 | RCS Operator and Maintenance Training-General Dynamics, PWS Section 4.6.6, including: | ||||
| Radio Control System Training Manuals, Deliverable A012-01, PWS Section 4.6.6 | 1 | JOB | $0.00 | ||
| 0013 | Radio Control System Interface Control Document, Deliverable A014, PWS Section 4.6.7 | 1 | EACH | $0.00 | |
| C3CEN | |||||
| 0014 | Radio Control System installation at USCG C3CEN. The Radio Control System shall include |
• one primary Radio/Console Control and Audio Route/Record/Replay System (free-standing 19” rack(s) and UPS back up included)
• two operator consoles, one sector and one station (shall include console furniture and UPS back up)
• UPS back up for all equipment shall provide a minimum of 30 minutes of run time when commercial power is lost.
| PWS Section 4.7 / see PWS Section 6.0 for Technical Specifications | 1 | JOB | $0.00 | ||
| 0015 | Site Survey-C3CEN, PWS Section 4.7.1, including: | ||||
| C3CEN Site Survey Report, Deliverable A006-02, PWS Section 4.7.1 | 1 | JOB | $0.00 | ||
| 0016 | C3CEN Installation Plan, Deliverable A007-02, PWS Section 4.7.2 | 1 | EACH | $0.00 | |
| 0017 | Radio Control System Bill of Materials-C3CEN, Deliverable A008-02, PWS Section 4.7.3 | 1 | EACH | $0.00 | |
| 0018 | System Operational Verification Test (SOVT)-C3CEN, PWS Section 4.7.4, including: |
SOVT Plan, Deliverable A009-02, PWS Section 4.7.4
| SOVT Report, Deliverable A010-02, PWS Section 4.7.4 | 1 | JOB | $0.00 | ||
| 0019 | Radio Control System Support Documentation-C3CEN, Deliverable A011-02, PWS Section 4.7.5 | 1 | EACH | $0.00 | |
| 0020 | RCS Operator and Maintenance Training-C3CEN, PWS Section 4.7.6, including: | ||||
| Radio Control System Training Manuals, Deliverable A012-02, PWS Section 4.7.6 | 1 | JOB | $0.00 | ||
| ATLANTIC ISLANDS REGION (Sector San Juan) | |||||
| 0021 | A primary Radio/Console Control and Audio Route/Record/Replay System (with free-standing 19” rack(s) and UPS back up included) installed within Sector San Juan. PWS Section 4.10 / see PWS Section 6.0 for Technical Specifications | 1 | JOB | $0.00 | |
| 0022 | A secondary hot standby Radio/Console Control and Audio Route/Record/Replay System (with free-standing 19” rack(s) and UPS back up included) installed at another location within Sector San Juan. PWS Section 4.10 / see PWS Section 6.0 for Technical Specifications | 1 | JOB | $0.00 | |
| 0023 | Operator consoles installed at the SCC and stations within Sector San Juan (with console furniture and UPS back up) and remote site monitoring equipment installed at all RFFs. PWS Section 4.10 / See PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector. | 1 | JOB | $0.00 | |
| 0024 | Site Survey-Sector San Juan, PWS Section 4.10.1, including: | ||||
| Sector San Juan Site Survey Report, Deliverable A006-03, PWS Section 4.10.1 | 1 | JOB | $0.00 | ||
| 0025 | Sector San Juan Installation Plan, Deliverable A007-03, PWS Section 4.10.2 | 1 | EACH | $0.00 | |
| 0026 | Radio Control System Bill of Materials-Sector San Juan, Deliverable A008-03, PWS Section 4.10.3 | 1 | EACH | $0.00 | |
| 0027 | System Operational Verification Test (SOVT)-Sector San Juan, PWS Section 4.10.4, including: |
SOVT Plan, Deliverable A009-03, PWS Section 4.10.4
| SOVT Report, Deliverable A010-03, PWS Section 4.10.4 | 1 | JOB | $0.00 | ||
| 0028 | RCS Operator Training-Sector San Juan, PWS Section 4.10.5, including: | ||||
| Radio Control System Training Manuals, Deliverable A012-03, PWS Section 4.10.5 | 1 | JOB | $0.00 | ||
| PACIFIC ISLANDS REGION (Sectors Honolulu and Guam) | |||||
| 0029 | A primary Radio/Console Control and Audio Route/Record/Replay System (with free-standing 19” rack(s) and UPS back up included) installed within one sector of the Pacific Islands Region (determination made after site survey). PWS Section 4.10 / see PWS Section 6.0 for Technical Specifications | 1 | JOB | $0.00 | |
| 0030 | A primary Radio/Console Control and Audio Route/Record/Replay System (with free-standing 19” rack(s) and UPS back up included) or a secondary hot standby Radio/Console Control and Audio Route/Record/Replay System (with free-standing 19” rack(s) and UPS back up included) installed within the other sector of the Pacific Islands Region (determination made after site survey). PWS Section 4.10 / see PWS Section 6.0 for Technical Specifications | 1 | JOB | $0.00 | |
| 0031 | Operator consoles installed at the SCC and stations within Sector Honolulu (with console furniture and UPS back up) and remote site monitoring equipment installed at all RFFs. PWS Section 4.10 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector. | 1 | JOB | $0.00 | |
| 0032 | Operator consoles installed at the SCC and stations within Sector Guam (with console furniture and UPS back up) and remote site monitoring equipment installed at all RFFs. PWS Section 4.10 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector. | 1 | JOB | $0.00 | |
| 0033 | Site Survey-Sector Honolulu, PWS Section 4.10.6, including: | ||||
| Sector Honolulu Site Survey Report, Deliverables A006-04, PWS Section 4.10.6 | 1 | JOB | $0.00 | ||
| 0034 | Sector Honolulu Installation Plan, Deliverable A007-04, PWS Section 4.10.7 | 1 | EACH | $0.00 | |
| 0035 | Radio Control System Bill of Materials-Sector Honolulu, Deliverable A008-04, PWS Section 4.10.8 | 1 | EACH | $0.00 | |
| 0036 | System Operational Verification Test (SOVT)-Sector Honolulu, PWS Section 4.10.9, including: |
SOVT Plan-Sector Honolulu, Deliverable A009-04, PWS Section 4.10.9
| SOVT Report-Sector Honolulu, Deliverable A010-04, PWS Section 4.10.9 | 1 | JOB | $0.00 | ||
| 0037 | RCS Operator Training-Sector Honolulu, PWS Section 4.10.10, including: | ||||
| Radio Control System Training Manuals, Deliverable A012-04, PWS Section 4.10.10 | 1 | JOB | $0.00 | ||
| 0038 | Site Survey-Sector Guam, PWS Section 4.10.6, including: | ||||
| Sector Guam Site Survey Report, Deliverables A006-05, PWS Section 4.10.6 | 1 | JOB | $0.00 | ||
| 0039 | Sector Guam Installation Plan, Deliverable A007-05, PWS Section 4.10.7 | 1 | EACH | $0.00 | |
| 0040 | Radio Control System Bill of Materials-Sector Guam, Deliverable A008-05, PWS Section 4.10.8 | 1 | EACH | $0.00 | |
| 0041 | System Operational Verification Test (SOVT)-Sector Guam, PWS Section 4.10.9, including: |
SOVT Plan-Sector Guam, Deliverable A009-05, PWS Section 4.10.9
| SOVT Report-Sector Guam, Deliverable A010-05, PWS Section 4.10.9 | 1 | JOB | $0.00 | ||
| 0042 | RCS Operator Training-Sector Guam, PWS Section 4.10.10, including: | ||||
| Radio Control System Training Manuals, Deliverable A012-05, PWS Section 4.10.10 | 1 | JOB | $0.00 | ||
| NORTHEAST REGION | |||||
| 0043 | A primary Radio/Console Control and Audio Route/Record/Replay System (with free-standing 19” rack(s) and UPS back up included) installed at one sector within the Northeast Region (location based on site survey recommendations). PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications | 1 | JOB | $0.00 | |
| 0044 | A secondary hot standby Radio/Console Control and Audio Route/Record/Replay System (with free-standing 19” rack(s) and UPS back up included) installed at a different sector within the Northeast Region (location based on site survey recommendations). PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications | 1 | JOB | $0.00 | |
| 0045 | Operator consoles installed at the SCC and stations within Sector Boston (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Boston RFF. (Sector Boston already has UPS back up.) PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector. | 1 | JOB | $0.00 | |
| 0046 | Operator consoles installed at the SCC and stations within Sector Long Island Sound (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Long Island Sound RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector. | 1 | JOB | $0.00 | |
| 0047 | Operator consoles installed at the SCC and stations within Sector New York (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector New York RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector. | 1 | JOB | $0.00 | |
| 0048 | Operator consoles installed at the SCC and stations within Sector Northern New England (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Northern New England RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector. | 1 | JOB | $0.00 | |
| 0049 | Operator consoles installed at the SCC and stations within Sector Southeastern New England (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Southeastern New England RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector. | 1 | JOB | $0.00 | |
| 0050 | Operator consoles installed at VTC New York (with console furniture and UPS back up), remote site monitoring equipment installed at VTS remote sites, and any required base station adapters at remote sites. (VTS Remote Sites: Sewaren, Port Morris, Ward's Island, Bank Street, Mariners Harbor, Governors Island, and Sandy Hook) PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles | 1 | JOB | $0.00 | |
| 0051 | Site Survey-Northeast Region, PWS Section 4.11.1, including: | ||||
| Northeast Region Site Survey Report, Deliverables A006-06, PWS Section 4.11.1 | 1 | JOB | $0.00 | ||
| 0052 | Northeast Region Installation Plan, Deliverable A007-06, PWS Section 4.11.2 | 1 | EACH | $0.00 | |
| 0053 | Radio Control System Bill of Materials-Northeast Region, Deliverable A008-06, PWS Section 4.11.3 | 1 | EACH | $0.00 | |
| 0054 | System Operational Verification Test (SOVT)-Northeast Region, PWS Section 4.11.4, including: |
SOVT Plan-Northeast Region, Deliverable A009-06, PWS Section 4.11.4
| SOVT Report-Northeast Region, Deliverable A010-06, PWS Section 4.11.4 | 1 | JOB | $0.00 | ||
| 0055 | RCS Operator Training-Northeast Region, PWS Section 4.11.5, including: | ||||
| Radio Control System Training Manuals, Deliverable A012-06, PWS Section 4.11.5 | 1 | JOB | $0.00 | ||
| SOUTHEAST REGION | |||||
| 0056 | A primary Radio/Console Control and Audio Route/Record/Replay System (with free-standing 19” rack(s) and UPS back up included) installed at one sector within the Southeast Region (location based on site survey recommendations). PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications | 1 | JOB | $0.00 | |
| 0057 | A secondary hot standby Radio/Console Control and Audio Route/Record/Replay System (with free-standing 19” rack(s) and UPS back up included) installed at a different sector within the Southeast Region (location based on site survey recommendations). PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications | 1 | JOB | $0.00 | |
| 0058 | Operator consoles installed at the SCC and stations within Sector Baltimore (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Baltimore RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0059 | Operator consoles installed at the SCC and stations within Sector Charleston (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Charleston RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0060 | Operator consoles installed at the SCC and stations within Sector Delaware Bay (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Delaware Bay RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector. | 1 | JOB | $0.00 | |
| 0061 | Operator consoles installed at the SCC and stations within Sector Hampton Roads (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Hampton Roads RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0062 | Operator consoles installed at the SCC and stations within Sector Jacksonville (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Jacksonville RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector. | 1 | JOB | $0.00 | |
| 0063 | Operator consoles installed at the SCC and stations within Sector North Carolina (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector North Carolina RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector. | 1 | JOB | $0.00 | |
| 0064 | Site Survey-Southeast Region, PWS Section 4.11.1, including: | ||||
| Southeast Region Site Survey Report, Deliverables A006-07, PWS Section 4.11.1 | 1 | JOB | $0.00 | ||
| 0065 | Southeast Region Installation Plan, Deliverable A007-07, PWS Section 4.11.2 | 1 | EACH | $0.00 | |
| 0066 | Radio Control System Bill of Materials-Southeast Region, Deliverable A008-07, PWS Section 4.11.3 | 1 | EACH | $0.00 | |
| 0067 | System Operational Verification Test (SOVT)-Southeast Region, PWS Section 4.11.4, including: |
SOVT Plan-Southeast Region, Deliverable A009-07, PWS Section 4.11.4
| SOVT Report-Southeast Region, Deliverable A010-07, PWS Section 4.11.4 | 1 | JOB | $0.00 | ||
| 0068 | RCS Operator Training-Southeast Region, PWS Section 4.11.5, including: | ||||
| Radio Control System Training Manuals, Deliverable A012-07, PWS Section 4.11.5 | 1 | JOB | $0.00 | ||
| GREAT LAKES REGION | |||||
| 0069 | A primary Radio/Console Control and Audio Route/Record/Replay System (with free-standing 19” rack(s) and UPS back up included) installed at one sector within the Great Lakes Region (location based on site survey recommendations). PWS Section 4.11 / see PWS Section 6.0 for Technical Specification | 1 | JOB | $0.00 | |
| 0070 | A secondary hot standby Radio/Console Control and Audio Route/Record/Replay System (with free-standing 19” rack(s) and UPS back up included) installed at a different sector within the Great Lakes Region (location based on site survey recommendations). PWS Section 4.11 / see PWS Section 6.0 for Technical Specification | 1 | JOB | $0.00 | |
| 0071 | Operator consoles installed at the SCC and stations within Sector Buffalo (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Buffalo RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0072 | Operator consoles installed at the SCC and stations within Sector Detroit (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Detroit RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0073 | Operator consoles installed at the SCC and stations within Sector Lake Michigan (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Lake Michigan RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0074 | Operator consoles installed at the SCC and stations within Sector Sault Ste. Marie (with console furniture and UPS back up)and remote site monitoring and adapter equipment installed at each Sector Sault Ste. Marie RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0075 | Operator consoles installed at VTC Sault Ste Marie (with console furniture and UPS back up), remote site monitoring equipment installed at VTS remote sites, and any required base station adapters at remote sites. (VTS Remote Sites: Sault High Site and Goetzville High Site) PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0076 | Site Survey-Great Lakes Region, PWS Section 4.11.1, including: | ||||
| Great Lakes Region Site Survey Report, Deliverables A006-08, PWS Section 4.11.1 | 1 | JOB | $0.00 | ||
| 0077 | Great Lakes Region Installation Plan, Deliverable A007-08, PWS Section 4.11.2 | 1 | EACH | $0.00 | |
| 0078 | Radio Control System Bill of Materials-Great Lakes Region, Deliverable A008-08, PWS Section 4.11.3 | 1 | EACH | $0.00 | |
| 0079 | System Operational Verification Test (SOVT)-Great Lakes Region, PWS Section 4.11.4, including: |
SOVT Plan-Great Lakes Region, Deliverable A009-08, PWS Section 4.11.4
| SOVT Report-Great Lakes Region, Deliverable A010-08, PWS Section 4.11.4 | 1 | JOB | $0.00 | ||
| 0080 | RCS Operator Training-Great Lakes Region, PWS Section 4.11.5, including: | ||||
| Radio Control System Training Manuals, Deliverable A012-08, PWS Section 4.11.5 | 1 | JOB | $0.00 | ||
| GULF COAST REGION | |||||
| 0081 | A primary Radio/Console Control and Audio Route/Record/Replay System (with free-standing 19” rack(s) and UPS back up included) installed at one sector within the Gulf Coast Region (location based on site survey recommendations). PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications | 1 | JOB | $0.00 | |
| 0082 | A secondary hot standby Radio/Console Control and Audio Route/Record/Replay System (with free-standing 19” rack(s) and UPS back up included) installed at a different sector within the Gulf Coast Region (location based on site survey recommendations). PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications | 1 | JOB | $0.00 | |
| 0083 | Operator consoles installed at the SCC and stations within Sector Corpus Christi (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Corpus Christi RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0084 | Operator consoles installed at the SCC and stations within Sector Houston-Galveston (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Houston-Galveston RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0085 | Operator consoles installed at the SCC and stations within Sector Key West (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Key West RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0086 | Operator consoles installed at the SCC and stations within Sector Miami (with console furniture and UPS back up)and remote site monitoring and adapter equipment installed at each Sector Miami RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0087 | Operator consoles installed at the SCC and stations within Sector Mobile (with console furniture and UPS back up)and remote site monitoring and adapter equipment installed at each Sector Mobile RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0088 | Operator consoles installed at the SCC and stations within Sector New Orleans(with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector New Orleans RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0089 | Operator consoles installed at the SCC and stations within Sector Saint Petersburg (with console furniture and UPS back up)and remote site monitoring and adapter equipment installed at each Sector Saint Petersburg RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0090 | Operator consoles installed at VTC Houston (with console furniture and UPS back up), remote site monitoring equipment installed at VTS remote sites, and any required base station adapters at remote sites. (VTS Remote Sites: Lynchburg Ferry, Morgans Point, Galveston Tower, and Station Houston.) PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles | 1 | JOB | $0.00 | |
| 0091 | Operator consoles installed at VTC Berwick Bay (with console furniture and UPS back up). PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles | 1 | JOB | $0.00 | |
| 0092 | Operator consoles installed at VTC Lower Mississippi River (with console furniture and UPS back up), remote site monitoring equipment installed at VTS remote sites, and any required base station adapters at remote sites. (VTS Remote Sites: Venice, Point Ala Hache, Vacherie, Baton Rouge (Zachary), Governor Nicholls, Marrero (MM100), and Westwego) PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles | 1 | JOB | $0.00 | |
| 0093 | Operator consoles installed at VTC Port Arthur (with console furniture and UPS back up), remote site monitoring equipment installed at VTS remote sites, and any required base station adapters at remote sites. (VTS Remote Sites: Texas Point and Port Neches Tower) PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles | 1 | JOB | $0.00 | |
| 0094 | Site Survey-Gulf Coast Region, PWS Section 4.11.1, including: | ||||
| Gulf Coast Region Site Survey Report, Deliverables A006-09, PWS Section 4.11.1 | 1 | JOB | $0.00 | ||
| 0095 | Gulf Coast Region Installation Plan, Deliverable A007-09, PWS Section 4.11.2 | 1 | EACH | $0.00 | |
| 0096 | Radio Control System Bill of Materials-Gulf Coast Region, Deliverable A008-09, PWS Section 4.11.3 | 1 | EACH | $0.00 | |
| 0097 | System Operational Verification Test (SOVT)-Gulf Coast Region, PWS Section 4.11.4, including: |
SOVT Plan-Gulf Coast Region, Deliverable A009-09, PWS Section 4.11.4
| SOVT Report-Gulf Coast Region, Deliverable A010-09, PWS Section 4.11.4 | 1 | JOB | $0.00 | ||
| 0098 | RCS Operator Training-Gulf Coast Region, PWS Section 4.11.5, including: | ||||
| Radio Control System Training Manuals, Deliverable A012-09, PWS Section 4.11.5 | 1 | JOB | $0.00 | ||
| WEST COAST REGION | |||||
| 0099 | A primary Radio/Console Control and Audio Route/Record/Replay System (with free-standing 19” rack(s) and UPS back up included) installed at one sector within the West Coast Region (location based on site survey recommendations). PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications | 1 | JOB | $0.00 | |
| 0100 | A secondary hot standby Radio/Console Control and Audio Route/Record/Replay System (with free-standing 19” rack(s) and UPS back up included) installed at a different sector within the West Coast Region (location based on site survey recommendations). PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications | 1 | JOB | $0.00 | |
| 0101 | Operator consoles installed at the SCC and stations within Sector Columbia River (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Columbia River RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0102 | Operator consoles installed at the SCC and stations within Sector Humboldt Bay (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Humboldt Bay RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0103 | Operator consoles installed at SCC and stations within Sector LA-Long Beach (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector LA-Long Beach RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0104 | Operator consoles installed at the SCC and stations within Sector North Bend (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector North Bend RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0105 | Operator consoles installed at the SCC and stations within Sector Puget Sound (with console furniture and UPS back up) and remote site monitoring and adapter equipment installed at each Sector Puget Sound RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0106 | Operator consoles installed at the SCC and stations within Sector San Diego (with console furniture and UPS back up)and remote site monitoring and adapter equipment installed at each Sector San Diego RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0107 | Operator consoles installed at the SCC and stations within Sector San Francisco (with console furniture and UPS back up)and remote site monitoring and adapter equipment installed at each Sector San Francisco RFF. PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles within the Sector | 1 | JOB | $0.00 | |
| 0108 | Operator consoles installed at VTC Seattle (with console furniture and UPS back up), remote site monitoring equipment installed at VTS remote sites, and any required base station adapters at remote sites. (VTS Remote Sites: Bahokus Peak, Gold Mountain, Mount Constitution, Mount Erie, Mukilteo, Pearson Creek, Pier 36, Point No Point, Point Wilson, Port Angeles, Ruston (PT Defiance), South Mountain, Village Point, West Point, and Mount Newton) PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles | 1 | JOB | $0.00 | |
| 0109 | Operator consoles installed at VTC San Francisco (with console furniture and UPS back up), remote site monitoring equipment installed at VTS remote sites, and any required base station adapters at remote sites. (VTS Remote Sites: Yerba Buena Island, Pt Bonita, Mt Tamalpais, and Bay Point) PWS Section 4.11 / see PWS Section 6.0 for Technical Specifications / Reference PWS Addendum A for number of Operator Consoles | 1 | JOB | $0.00 | |
| 0110 | Site Survey-West Coast Region, PWS Section 4.11.1, including: | ||||
| West Coast Region Site Survey Report, Deliverables A006-10, PWS Section 4.11.1 | 1 | JOB | $0.00 | ||
| 0111 | West Coast Region Installation Plan, Deliverable A007-10, PWS Section 4.11.2 | 1 | EACH | $0.00 | |
| 0112 | Radio Control System Bill of Materials-West Coast Region, Deliverable A008-10, PWS Section 4.11.3 | 1 | EACH | $0.00 | |
| 0113 | System Operational Verification Test (SOVT)-West Coast Region, PWS Section 4.11.4, including: |
SOVT Plan-West Coast Region, Deliverable A009-10, PWS Section 4.11.4
| SOVT Report-West Coast Region, Deliverable A010-10, PWS Section 4.11.4 | 1 | JOB | $0.00 | |
| 0114 | RCS Operator Training-West Coast Region, PWS Section 4.11.5, including: | |||
| Radio Control System Training Manuals, Deliverable A012-10, PWS Section 4.11.5 | 1 | JOB | $0.00 | |
| TOTAL (not including travel) | $0.00 | |||
| TRAVEL | ||||
| Travel Not-To-Exceed Contract Ceiling Amount (See Section 1.2.3 of the Contract; Travel costs will be negotiated at the Task Order level and added to Task Orders as firm-fixed price CLINs) | $900,000.00 | |||
| *All Firm-Fixed Unit Prices shall include all supplies and services required, excluding travel costs. |