Amend_A00004_HSCG40-16-R-60021_Crane_-_Questions.pdf
PDF 316 KB Posted
- Attached to
- Crane, Pedestal Mounted, Telescoping Boom and PLC-based Integrated Crane Control System (ICCS)
- Solicitation number
- HSCG40-16-R-60021
About this file
Amend A00004 - Submission Instructions clarification and answers to questions
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 3
2. AMENDMENT/MODIFICAITON NO.
A00004
3. EFFECTIVE DATE
03/21/16
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USCG Surface Forces Logistics Center
CPD3-SSP-ISVS
707 E. Ordnance Road, Suite 410 Baltimore, MD 21226 e-mail: Linda.B.Lassiter@ucsg.mil
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICIATION NO.
HSCG40-16-R-60021 ✘
9B. DATED (SEE ITEM 11)
02/18/16
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
N/A
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See Attached Pages 2-3
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Kelly Wyatt
Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243 mailto:Linda.B.Lassiter@ucsg.mil
Page | 2
Solicitation No: HSCG40-16-R-60021 Amendment No: A00004
14A. Amendment A00004 is issued to provide Rev A to the 225' WLB Crane and ICCS Procurement Specification, clarify proposal submittal instructions, and respond to the following questions submitted in response to this solicitation:
QUESTION: Where is it indicated in the specification that the crane or winches must be rated for Personnel Handling? Amendment A00003 response indicated that hoist winches and the crane are to be rated for Personnel Handling in accordance with API-2C.
ANSWER: Manned lifting is an option for API-2C. This is not required for the ATON crane.
QUESTION: Is the PLC Control Panel located in Pedestal?
ANSWER: Yes
QUESTION: Will the Panel have to fit through the 24.50” x 36.5” oval hole in the pedestal?
Are there any other restrictions inside the pedestal that we need to be aware of? Can several control panels be used if required?
ANSWER: See SK-TB150512, Sheet #8. The panel will have to fit through the opening.
Multiple control panels are acceptable.
QUESTION: We understand that the local controls for the (4) Cross Deck Winches, the Rising Sheave Chain Stoppers, the Cargo Hatch Door and the Buoy Chain Winch and level Wind Arm are located in the Buoy Deck Equipment Control Panels (BDCP) Port & Starboard. It is the intention that these local controls be replaced or used as provided?
ANSWER: The local controls will be replaced by the vendor. Clarification for Section 3.12.4.f of the Specification. The PORT and STBD BDCPs will only contain the following controls:
1. Control switch Local / Remote
2. Control location indicator
3. Chain Stopper Raise / Lower for either PORT or STBD
4. Chain Winch PAY-IN / PAY-OUT
5. Chain Winch Level Wind Arm PORT / STBD
6. Panel Heater Control ON / OFF
7. Cargo Hatch OPEN / CLOSE
8. Cargo Hatch DOG / UNDOG The (4) Cross Deck Winches will be controlled locally at each cross deck location on the deck. Appendix A of the Specification, Crane Control System Functions chart, will be updated to clarify.
QUESTION: Section 4.1.2 Quality Assurance Plan, references “Section E of the contract”.
Please provide Section E so we may understand the requirements.
Page | 3
ANSWER: Section E is located in the solicitation which is posted on FedBizOps.
QUESTION: The solicitation instructions ask for a draft quality assurance plan where “certification of critical production personnel such as welders, riggers, and machinist” are required. Welders are certified by a third party but what is anticipated for the production personnel, riggers and machinist
ANSWER: Resumes, industrial certifications and training records for critical production personnel, riggers, and machinists are acceptable.
QUESTION: Clarify the definition of “working load limit” and whether or not dynamic factors have been applied to the 20t and 5t lifting capacity requirements.
ANSWER: See Table 3.1-1. Dynamic factors have not been applied to the Working Load Limit capacities of the main and auxiliary lines (20t and 5t respectively).
14B. RFP Section L.3, Paragraph (a) - change to read "Facsimile and e-mail submission of proposals are not acceptable".
14C. Offerors are required to sign and return one copy of this Amendment with their proposal.
Failure to return a signed copy may render the proposal unacceptable and the proposal may be eliminated from further consideration.
14D. The due date for receipt of proposals remains unchanged. The due date for receipt of proposals is April 12, 2016 at 2:00 PM EST.
(END OF AMENDMENT NUMBER A00004)