Q A 4/26/16
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&As
| Questions and Answers | ||||||
| ID# | Doc Ref | WBS (if apply) | Functional Area (Sort as needed) | Question (From emails, industry day, one on ones pertinent to all vendors) | Answer | Change noted in? |
| 1 | Generic | n/a | Aircraft Usage | If the vendor were to lease a jet to the Government, would the owner be able to make a few flights he already has booked in the next year? | No | |
| 2 | SOW | 2.2.6.5 | Interior Configuration | If the proposed aircraft has the required minimum of 12 passenger seats plus two three place divans for a total of 18 would the dual divan be acceptable since the minimum requirement of 12 has been meet? | Yes | SOW |
| 3 | SOW | 2.4.1.1 | Data Plan | How can the vendor determine onboard data usage for pricing? |
| There are data limits on plans depending how much usage the Government would have, and could cause expensive overages if they exceeded plan limits. | The Govt requires a minimum of 1.5 mbps of a worldwide broadband data link, and SOW will be revised. With respect to the broadband data link subscription, the Govt requires an unlimited data plan for domestic or international. Swift Broad band requirement will also be added to SOW and the Govt will utilize its own subcription. See additional subscription guidance. | SOW | ||||
| 4 | RFP | Contract Management | How would the Government handle damage to the aircraft that isn't in the lessee control? | |||
| For example the Government is overseas and another aircraft clips the wing and causes damage history to the leased aircraft. So now the Government will have to get that fixed and have an aircraft with a diminished value due to damage history. | Please refer to RFP Clause by Full text Attachment 7, HSAR clause 3052.228-91 "Loss of damage to leased aircraft" and 3052.228-92 "Fair market value of aircraft" | |||||
| 5 | Generic | Aircraft Usage | What is the Government's usage history from the previous contract that has leased the G-V? | United States Coast Guard typically uses 500 hrs per year per plane currently fielded out of AIRSTA Washington | ||
| 6 | Generic | Aircraft Registration | Are Aircraft other than N registered aircraft acceptable if they will be N registered at time of acceptance from the USCG? | No. | ||
| The proposed Aircraft needs to have been N registered throughout its life. | SOW | |||||
| 7 | SOW | 2.2 | Interior Configuration | Will the Government accept an Aircraft with only 14 passenger seats in the LOPA? | Yes. |
14 passenger seats, or 11 seats + 1 divan.
| 8 | SOW | Aircraft Usage | Will the Government provide an age requirement? | Yes. | ||
| The Contractor shall provide an aircraft that is no greater than 3 years old, has no greater than 3000 engine cycles, and no greater than 6000 landing cycles. | SOW | |||||
| 9 | SOW | 2.2 | Aircraft Registration | Would the Government consider adding a requirement that the aircraft will have always been N-registered, home-based in CONUS, and a maximum number of flight hours not to exceed 5,000 hours? | The proposed aircraft must have always been N registered. | |
| The aircraft does not have to be home-based in the United States. There are no maximum number of Flight Hours as a requirement. See above ID#8 | SOW | |||||
| 10 | SOW | 2.2 | Interior Configuration | Is the forward crew rest compartment a requirement or a preference? | No. |
The forward crew rest outside of the cabin is not required per the SOW.
| 11 | SOW | 2.2 | Interior Configuration | If the LOPA of a proposed G550 has a four place divan, are we correct in only counting them as passenger seating for 3 each? | Yes. See ID#2 & #7. | |
| 12 | SOW | 2.2 | Secure Data | In order to provide exact pricing, could the Government provide the secure communication specifications to the vendors? | No. The Govt does not own the specs, but see attached document for GFE guidance/SIPRNET info. | |
| The Government is providing the GFE. Vendors have to consider the most efficient installation solutions. See ID#66 | SOW | |||||
| 13 | SOW | 2.2.5 | Maintenance | Does scheduled and unscheduled maintenance combined count towards the 95% availability rate or only unscheduled maintenance? | No. |
See RFP section H.
14 SOW 2.2.5 Maintenance Section H (Performance Management) of the RFP states that: All maintenance actions shall be included in the performance metric calculations. Outside of any normal wear and tear, any downtime, which is caused by the aircraft entering scheduled maintenance, will not be included in computing Ao. What will be considered unscheduled downtime? Does this only include those maintenance issues that affect airworthiness? Can the Government provide more specific examples? Can the Movement provide a MEL? Unscheduled downtime shall be any time in which the aircraft is under repair and unable to perform its required mission without the Government's prior knowledge.
This does not only include items that affect airworthiness but any issue that the EO deems to be critical to mission success.
The Government does not have a MEL because the nature of each mission is unique.
Example: a trip to New York City from Washington D.C. may not require a galley (if something malfunctions), but a trip from Beijing to Honolulu will
| 15 | SOW | 2.2.9.4 | Data Plan | Does the proposed G550 only have to be capable of hosting data systems, fax, telephone, or TVs or does the proposal need to include actual service plans? If so, can the Government provide guidance on what level plans it desires for each, as there are multiple levels to choose from? | |
| Would the Government consider choosing these plans after award? | The Vendor must include a subscription plan for all onboard services, including data, fax, telephones, and TVs as part of the lease. |
Government requires fixed data plans to be included in the lease.The data plan offering will be considered as part of the overall lease price.
Data plans offered by the contractor shall include unlimited data. See subscription pricing attachment for additional guidance. Variable plans will be worked after award.
| 16 | SOW | 2.3.3 | Maintenance | Will the contractor be limited to perform maintenance only the repair facilities that hold a facilities security clearance? | The Government, per the SOW, requests Gulfstream approved repair facilities, which already have the appropriate clearances. | |
| 17 | SOW | 2.3.4 | Maintenance | Which programs are required? For example, should we price Engine Program, APU Program, Avionics Program, Tip to Tail Parts program, and RAPID programs? | ||
| Could the Government provide more details regarding the utilization of the ALMIS system? | The Government requires certain programs to be included in the lease. See refined SOW. ALMIS details will be provided to the winning vendor at award. It is a USCG inventory mgmt & tracking software. See additional subscription guidance. | SOW | ||||
| 18 | SOW | 2.7 | Training | Does the Government currently work with a training provider that they are satisfied with? | Yes. | |
| 19 | SOW | 2.2.10 | Training | Can the Government confirm training will be scheduled? | Yes. | |
| 20 | SOW | 2.2.13 | Government Re Configuration | Will the Government allow for paint to be performed in September 2016 after award but before operational ready? | No. |
The Aircraft shall be painted after award but prior to DD250 and be ready by Sept 2016 for use by the United States Coast Guard.
| 21 | SOW | 2.2.13 | Government Re Configuration | Would the Government consider making award by May 15 to ensure paint is complete by Acceptance? | The Government is trying to make the award as soon as possible. For bidding purposes, at this time all vendors should assume a Sept 15, 2016 acceptance date. | |
| 22 | SOW | 2.6 | Training | Please clarify the type of training is needed: PIC and/or SIC? | PIC. | |
| 23 | SOW | 2.6 | Training | Does the Government require Initial, Recurrent, and/or Differences Training in G550? | Yes. | |
| The Government requires a comprehensive, stand alone G550 training program. See updated Schedule B/SOW | CLIN B, SOW | |||||
| 24 | SOW | 2.6 | Training | Does the Government also require a Flight Engineer Training Certificate? | No. | |
| 25 | SOW | 2.6 | Training | With regards to Maintenance Training, does the Government require Maintenance Manager Training, Advanced Maintenance Trouble Shooting, Initial maintenance Training, Initial Airframe Maintenance Training, Initial Avionics Maintenance Training and/or Recurrent Maintenance Training? | Yes. | |
| See refined CLIN structure/SOW for updated training requirements. | SOW | |||||
| 26 | SOW | 6.1 | Security | Will the PM and Alt. PM be required to have this clearance in advance of the award? |
Will the USCG hold this clearance after award?
| What level clearance is required: Classified or TS? | No, but has to have applied for by award, and hold a minimum of "interim" clearance no more than 6 months after award. Vendor should hold. Secret clearance per the DD254. | SOW | ||||
| 27 | Generic | Government Re Configuration | Would the Government consider moving Acceptance ahead by two months to ensure ARCS, engineering study for communications modifications, and paint are completed per specifications? | The Government is trying to make the award as soon as possible. The Govt understands that there will be duration built in to complete the engineering study. For bidding purposes, all vendors should assume a Sept 15, 2016 acceptance date. | ||
| 28 | Generic | Contract Management | To lower the risk of bidding an aircraft in which the proposing team has no legal claim, will the Government require some good faith proof of deposit allowing for an acquisition from the team (defined as prime or sub) | Yes. Certificate of Registration (if owned) or Sales Agreement showing commitment to lease (if lease) of the aircraft with the proposed serial number or equivalent document proof. | ||
| The Government will require a tail number of serial number in order to ensure the vendor has legal authority to propose the aircraft in question. | RFP | |||||
| 29 | Generic | Aircraft Registration | With regards to the requirement that all proposed planes be N-registered, could the government clarify that this means N-registered for the lifetime of the aircraft? Also, should the aircraft be also owned only by a US citizen throughout its history? Several currently available N-registered G550s have foreign owners using an American based holding company. | The Aircraft must have been N registered throughout its life. No restrictions on ownership i.e the current CG-02 is British owned. We understand these aircrafts go through numerous ownership changes. As long as vendors provides the ownership info, any "risks" can be evaluated & addressed on case by case basis. | SOW | |
| 30 | Generic | Contract Management | Would the government consider a different NAICS code that permits a 500 employee size standard in order to increase the number prime competitors? | No. | ||
| 31 | SOW | Training | Is ADS-B training included in training for FANS1A? | No. The course name that covers FAN1A is "called CPDLC". | ||
| See refined CLIN structure for updated training requirements. | CLIN B, SOW | |||||
| 32 | SOW | Interior Configuration | Does the Government require special sound proofed requirements for the separated cabin? | No. |
A sliding door is sufficient for privacy purposes.
| The Government does not wish to incur any special sound proofing costs. | SOW | |||||
| 33 | SOW | Aircraft Usage | How does the Availability Ao factor rated for small items like microwave breaks. | See ID#14. | ||
| 34 | SOW | Maintenance | What constitutes "normal wear and tear?" | Normal wear and tear is defined as brakes, tires, wheels that need replacing through normal aircraft operation. | SOW | |
| 35 | SOW | Maintenance | What kind of response rate for parts support/logistics support? | The Government requires global logistics support around the clock per 2.3.5. Also see 2.3.6 of SOW for rapid response. | SOW | |
| 36 | SOW | Secure Data | Could the Government provide vendors with more insight regarding communications and avionics equipment, such as drawings for pin numbers? | See ID#12 | ||
| 37 | Generic | Schedule | May the vendor provide a temporary aircraft while the proposed plane in reconfigured? | No. | ||
| 38 | SOW | Interior Configuration | Will the Government require any reconfiguration of the interior seating require? | No. |
However, the Government reserves the right to refuse any aircraft at the KO's discretion prior to DD250 should the interior layout be deemed to bring discredit upon the United States Department of Homeland Security and the United States Coast Guard.
| In order to minimize significant reupholstery cost, the vendors should proactively search for G550s that serves this purposes. | SOW | |||||
| 39 | SOW | Interior Configuration | Does the Government require the galley be in front or back? | The Government has no preference | ||
| 40 | SOW | Interior Configuration | Does the Government have a requirement regarding the location of the separate cabin? | The Government has no preference | ||
| 41 | SOW | Interior Configuration | Does the Government require a minimum size for the aircraft's seats? | Yes. Seats must meet the mission needs per the SOW, and any OSHA or minimum FAA safety compliance. | ||
| 42 | SOW | Secure Data | Can the Government explain the TEMPEST testing? Can it be done outside? | See TEMPEST OPNAV instruction 5510.93F. Yes, it was done outside at NAVAIR for CG01-CG02. | ||
| 43 | SOW | Aircraft Usage | Does the Government require a Command & Control or Executive Transportation Aircraft? | The Government requires a Command and Control Aircraft in order to fulfill its requirement for a Long Range Command and Control Aircraft. | ||
| 44 | SOW | Aircraft Usage | What is the hour to cycle ratio? | Currently the Government operates at 0.75 hours per cycle. | ||
| 45 | SOW | Aircraft History | When does the Government expect major overhaul? | The Government expects to avoid any major overhauls during the POP of this lease. | ||
| 46 | Generic | Aircraft Usage | Does the Government expect a high turnover regarding crew rotations? | The Government estimates 25% total crew turnover per year, with a pool of 7-8 pilots. | ||
| 47 | SOW | Secure Data | Why does the Government require only one secure port? | One is required, although more would be preferred. The Government is not expecting substantial reconfiguration. | ||
| 48 | SOW | Maintenance | Does the Government plan to perform all regular maintenance checks at Air Station Washington with Coast Guard Personnel, and all major maintenance with Gulfstream? | Yes. | ||
| 49 | SOW | Maintenance | Since depot level maintenance varies at Gulfstream, will that result in a reduction in Aircraft availability? | Scheduled maintenance will never be counted against the contractor. Realistically, Gulfstream won't run over scheduled repair time. | ||
| 50 | RFP | Contract Management | Does the Government require insurance of $200 million in liability and covering hull? | See ID#4 | ||
| 51 | SOW | Training | Because course openings are hard to get at FSI and CAE, will the Government exercise its training needs and reserve classes early? | The Government plans exercising the training options as needed but will provide as much advance notice as possible. SOW allows early option exercise prior to DD250. | ||
| 52 | RFP | Contract Management | Would the Government provide any information needed if a vendor needs to qualify for the Aircraft loan? | The Government will only provide what was in the RFP package. | ||
| 53 | Generic | Contract Management | Does the Government have any plan to mitigate the vendors' risk that a selected Aircraft may be gone by the time of contract award? | The Government plans to make its award as soon as possible to mitigate this risk. | ||
| 54 | RFP | Contract Management | Will Govt add liquidated damages clause? | The Government will consider including such a clause in the final RFP. | RFP | |
| 55 | RFP | Schedule | Will the Government consider a 2 part acceptance? Initially accepting a partially configured plane and the fully configured one after? | No. |
The Government requires the aircraft fully configured with GFE & painted prior to DD250.
| 56 | SOW | Contract Management | Would the Government provide a budget guideline? | No. However, GFE install estimates based on actuals from CG01-CG02 provided. |
| 57 | RFP | Contract Management | Is monthly billing allowable? | Yes |
| 58 | Generic | Aircraft Usage | Is there a possibility that the Government will expend all 500 hours within the first 2 months of the base year? | Yes. |
The optional hourly usage CLIN will then be exercised in this contingency.
This is a highly unlikely scenario.
59 Generic Maintenance Is there a possibility that high initial use of the aircraft would expend all of the vendor's maintenance funds before the vendor has received sufficient payments on the aircraft lease? Yes.
The O&A clin will be exercised in this contingency, but the vendor is expected to budget and plan standard maintenance thorough life of the lease.
| 60 | SOW | Contract Management | Can the vendor on site PM do 8 hours in any combination, 2 hrs per day, one 8 hour day per week, etc.? | Yes. | |
| The Government requires a minimum of 8 hours per week is met and the PM is present for any maintenance. | SOW | ||||
| 61 | SOW | Secure Data | Is the STE III is a handset or full system? | The Government only requires a simple handset STE that is available in one location. |
The STE is not to be installed in the galley or the head.
62 SOW Secure Data Who will certify the Communications system? Does the vendor require ATO? Is there a operator on board? Who does CONOPs? The Government certifies its own system and provides ATO.
1 Coast Guard communications officer will always be on board the LRCCA.
The Government does its own CONOPs.
63 SOW Data Plan Is there play in combined resources i.e TV using the Internet service, as long as the Government can access worldwide News service like CSPAN, NBC, etc? No.
The TV service shall not be run over the same data stream as the onboard internet.
| 64 | SOW | Secure Data | Is SIPRNET single layer or multiple? | The Government requires only a single layer of SIPRNET. | SOW |
| 65 | SOW | Interior Configuration | Would the Government recommend where the GFE may be situated i.e "anywhere" versus closed compartment? Does the Government require that the GFE be visible at all times? | Yes. |
GFE shall be installed in an enclosed space, the exact location will be determined with winning vendor based on the aircraft proposed and after completion of the Gulfstream engineering study.
| 66 | SOW | Government Re Configuration | Is there an STC process for each change performed on aircraft | STCs can be retrieved from Gulfstream, or the STC vendor of concern. No, the Govt is not expecting new STC for the GFE installs, however, the engineering study will determine based on aircraft proposed. |
| 67 | SOW | Government Re Configuration | Is there stenciling required for the paint specification? Will the Government to provide one to the vendor? | No. |
No stencil will be required.
| 68 | SOW | Government Re Configuration | Is there a real CSO module on board? | No. | |
| No racks nor consoles are expected to be specially built, the communications system should be "plug and play" ready. See GFE pricing guidance. | SOW | ||||
| 69 | Generic | Aircraft Registration | Will the Government accept a plane that has a valid FAA rating, but is foreign owned and heavily corroded? | The vendor shall be responsible for all Corrosion mitigation. |
The vendor can bid any aircraft that meets the requirements of the contract prior to award.
| 70 | SOW | Maintenance | Are wheels included in the maintenance procedures covered by the Government along with brakes & tires? | Yes. | |
| Refer to refined SOW. | SOW | ||||
| 71 | SOW | Data Plan | Will the Government specify GoGo or any other internet service? | No. See ID#3. | |
| 72 | RFP | Contract Management | Can each vendor submit more than one proposal use several planes, or propose different pricing strategies on a single plane? | Yes. |
However, in LPTA, only the lowest cost technically acceptable proposal will be considered. The Govt highly recommends to those vendors that want to get their initial proposal "accepted", to use the assumptions we provided per the RFP and SOW of June 1st award and completion of all GFE installs/paint inclusive of the Gulfstream engineering study by Sept 15, 2016. We understand that this is a truly agressive schedule but is necessary for bidding purposes so that ALL VENDORS follow the same assumption. We also understand that there may be price impacts to this assumption. The proposal costs are necessary so that certain decisions can be made. For those vendors that would like to submit an "ALTERNATE" proposal, the Govt does not preclude this option.
| 73 | Generic | Aircraft Usage | What kind of landings are performed by USCG? | Landings are expected to be at various airports under suitable runway conditions. Includes Touch and Go. |
| 74 | SOW | Maintenance | Are IA or Part 145 certified Maintenance facilities acceptable? Is the use of vendors like Duncan, Westar, Appleton, or does it need the GD stamp? | The Government requires Gulfstream approved Maintenance facilities. |
| 75 | Generic | Contract Management | Can the vendor provide a replacement plane during the lease, after 3 years, for example? | Yes. |
Provided only that there is no disruption in service to the Government.
No additional funds will be provided by the Government.
76 Generic Maintenance How does the Government determine flight time? Is wheels up included? Yes.
Flight time is from Engine Start to 5 minutes after landing.
| 77 | SOW | 2.2.9.5 | Data Plan | Would the Government consider requiring Iridium SATCOM over cellular telephone and using an INMARSAT telephone as a backup since Iridium service is essentially available to the Government at no cost. | Yes, the Govt SOW requires cell phone service in the cockpit/cabin. The Govt is not going to subscribe to any particular account. See subscription additional guidance. | SOW | |
| 78 | SOW | 2.3.6 | Maintenance | Will the Government supply only the parts for the tires and brakes or is the Government also responsible for the labor associated with the tires and brakes as well? | Yes. | ||
| The Government will perform all labor on wheel, tires and brakes, no labor expense will be incurred upon the contractor. | SOW | ||||||
| 79 | SOW | 2.4.1.1 | Data Plan | What is the usage level / quantity required for the data plan? Is the contractor required to provide an unlimited data plan? | See ID#3. | ||
| 80 | SOW | 2.4.1.2 | Data Plan | Paragraph 2.4.1.2 of the SOW specifies Satellite television subscriptions but then adds “Aircell” which does not appear to have anything to do with this requirement. | See Refined SOW | SOW | |
| 81 | DD254 | Secure Data | DD254 requires comsec account but should also authorize/require comsec storage to be consistent? Courier service should also be authorized/required should the contractor need to ship comsec equipment internationally. | An account is needed but there should be no need for the vendor to ship COMSEC equipment. COMSEC gear is GFE and the USCG will take care or any necessary shipments/logistics. There may be instances ie. wiring repair, etc. thus, boxed is checked. | DD254 | ||
| 82 | SOW | Aircraft Usage | Will the USCG provide fuel/oil? | Yes, SOW rev accordingly. | SOW | ||
| 83 | RFP | Aircraft Registration | In addition to the requiring Offerors “to include proof of certificate of registration (if owned) or sales agreement showing commitment to lease (if lease)”, would the Government consider adding the following language: “or some other proof of purchase agreement and deposit in escrow for the proposed aircraft”? | Yes, words "or equivalent" will be added to RFP Sect L | RFP | ||
| 84 | RFP | Contract Management | It would really help a small business if the Coast Guard would participate/perform a pre-buy at the time of contract award so that there will be no surprises after the plane is reconfigured regarding the current configuration / maintenance level of the plane later. We do not have issues with the USCG changing things later, as long as there is no impact on payments. | The gov't does not require a special or official pre-buy at time of award or flight check event. We are satisfied with vendor pre-buy inspection. The govt will perform a site visit to view the aircraft/mod facility (see RFP edit) at technical evaluation phase if necessary. No formal inspection is conducted except prior to aircraft DD250. If your proposal has been accepted, it is assumed your aircraft is accepted. | RFP | ||
| 85 | RFP | Contract Management | Would it be possible to put a statement in there: "The USCG will exercise next year Options two months before the end of the current POP." This will lower your costs. | Edited 30 to 60 days for lease CLIN in 52.217-7 and under Option Exercise, 30 days for all other CLINs. | RFP | ||
| 86 | SOW | Aircraft Registration | On the 3 years old requirement, does the aircraft data plate need to have a date that is less than 3 years old based on the anticipated contract award date or can it be any aircraft that has a date not earlier than 2013? | Jan 1, 2013 and up acceptable | SOW | ||
| 87 | SOW | Aircraft Registration | For clarity on the aircraft age date…….should we be going by the airworthiness date (“green aircraft” date, in the assembly line still), or the in service date (the date that the warranties are driven by and the date the aircraft is delivered as complete). | In service date, Govt will clarify the Jan 1, 2013 date and up in SOW | SOW | ||
| 88 | SOW | Data Plan | The Ku band on the BBML Next Gen 3 or equivalent may not be sufficient for USCG purposes. Is the HSD-400 something the Govt would be interested in? | Yes, HSD-400 is still acceptable, however HS-700 is preferred if already incorporated, both will give us the required SOW functionality. We will let the vendor address accordingly based on their chosen aircraft. For either tranceivers, they need to be compatible with FANs overarching comm suite (MCS-7147 or better). | |||
| 89 | SOW | Secure Data | Does USCG need additional security capability i.e KG250 type? Does USCG need full secure communications? Accelerators? Router/Hub? Encryption? | The SIPRNET/SwiftBB/STE/Fax/APX are priced per SOW. The Govt will work with any pre-existing capabilities on the aircraft already if equal or better than what we are requiring per SOW. Any "additional" security capability should be priced in as options unless critically needed to complete mission. The KG250 is not listed as a SOW requirement. Accelerators i.e CNX-200 or equivalent is preferred if already installed on the proposed aircraft (but not a hard requirement). Additional encryption are not needed other than the crypto cards (USCG provide) utilized for SIPRNet. Special router i.e Satcom Direct SDR or the SDR Wifi Hub is also preferred but only if installed. We do not wish for vendors to incur unnecessary increase in costs. | |||
| 90 | SOW | Contract Management | In the SOW you reference CLIN 0003. This is the additional FH CLIN. Should it be 0002? | Yes, typo has been corrected for both CLIN 0002/0003 | SOW | ||
| 91 | RFP | Contract Management | For Volume III in the RFP it references a Standard Form 33 will be filled out and then it references the SF 1449. Are both forms required or just the 1449?? | Just SF1449, RFP will be corrected | RFP | ||
| 92 | RFP | Contract Management | Do you intend to change the delivery date requirement, given the requirement for the GS study or are you leaving it the same? | No, we have reached critical path in sked. USCG plans to mitigate sked risk by awarding early, if possible, to allow the awardee additional time to meet the Sept 15 DD250 due date per ID#21 and ID#27. In regards to concerns over the Gulfstream Eng. study, USCG is contracting with YOU, the prime vendor, and NOT with Gulfstream to meet the need dates. The study is just an "estimate" alone. See ID#72 if you have an "alternative" approach, recommend 1 compliant + 1 alternative. | |||
| 93 | SOW | Aircraft Registration | Would the Govt change the Jan 1, 2013 in service date if there are better older model candidates? | Per ID#72, recommend you use this 1 compliant + 1 alternative pricing approach. At this stage of our procurement we do not plan to shift any requirements except for issuing corrections. | |||
| 94 | SOW | Contract Management | I did not see the referenced "attached" USCG Paint Scheme in the list of final documents. | It was provided as an Attachment in initial draft RFP release | |||
| 95 | Generic | Contract Management | Please confirm that the Q&A's do not have any contractual effect unless the/any changes are made to the solicitation &/or SOW. | That is correct, Q&A's are guidance and if actual changes are made, they are denoted in the rightmost column of this excel sheet of the document revised. The same for the "guidance" documents provided, they are just guidance to help set expectations and not contractually binding. | |||
| 96 | Generic | Contract Management | Would you please share a copy of the current GV lease, or even a redacted version. Just trying to get a heads up on the expected language and clauses. | The current RFP was developed using the current lease contract as a template. So it does incorporate all the clauses and contract language that we have already vetted through legal and senior management. If a vendor needs a redacted copy of the current lease, it will have to be through our FOIA office. We will provide the POC info so that a vendor can contact them directly if the vendor desires to pay for that service. | |||
| 97 | DD254 | Secure Data | Statement of Work, section 2.2.12, requires TEMPEST. Although there is no current DD254 that has been provided as part of the final RFP, the DD254 included in the draft RFP denoted “No” requirement for TEMPEST under Item number 11. Does the USCG require TEMPEST and if so will it be denoted on the DD254 provided by the USCG? | DD254 corrected | DD254 | ||
| 98 | GFE | Government Re Configuration | In Attachment J-2, there is no quantity provided for the Cisco Switch, WS-C3560C-12PC-S. Can the USG provide a quantity for this line item and validate that the quantities of all other GFE line items are correct? | GFE corrected, 2 switches, 1 power supply | GFE | ||
| 99 | SOW | Government Re Configuration | SOW 2.2.4 requires delivery of an aircraft that is compliant to FAA next generation (ADS-B In and Out) mandates. Per discussions with the aircraft OEM, “ADS-B In” is not currently available to be installed on a G550 aircraft nor do we believe it is currently included as part of the FAA next generation mandate. Considering this, would the Government consider removing the “ADS-B In” requirement? | Yes, the minimum mandate is ADS-B out, SOW is corrected; however an aircraft that has ADS-B in already installed and ADS-B out is acceptable | SOW | ||
| 100 | RFP | Contract Management | Section L, B. Specific Instructions, 2. Volume II – Price Proposal states all information pertaining to the dollar value or rate value of cost or price shall be confined to the Price Volume. Section L, B. Specific Instructions, 3. Volume III (b) states RFP Section B, Supplies or Services and Price/Costs to be included in the Excel file provided. Is Section B to be provided in both Volume II, Price Proposal and Volume III, Contract Documentation? | That is correct, Sect B is only exemption and should be provided in Vol II and Vol III. Will clarify RFP. | RFP | ||
| 101 | Contract Management | If no proposal is deemed technically acceptable and compliant (i.e.…no proposal receives an acceptable rating for every non-price factor as required by RFP Section M.3), does the Government plan on making an award based on a non-compliant, alternative offer without providing a revised technical requirement to all parties? | If no one is "acceptable", we will amend RFP accordingly with new due date for relief. We are not allowed to award without compliant proposals. Any actions will be posted to FBO. | ||||
| 102 | Contract Management | If all technically compliant proposals are rejected per FAR 52.212-1, Instructions to Offerors – Commercial Items (g), does the Government plan on making an award based on a technically non-compliant, alternative proposal without providing a a revised technical requirement to all parties? | See answer above. | ||||
| 103 | Maintenance | Will the winning contractor have access to ASW parts pools, either USCG specific and/or other government operators, in order to speed repair times maximize operational availability? As an example, if an aileron actuator breaks and there is already a spare at ASW (which there likely would be as a common part for a GV and G550), will we have access to it (and then we'd replace it later)? | No, you'll have to subscribe to the Gulfstream Plane Parts, use the Gulfstream FAST team, or obtain the Gulfstream part per SOW 2.3.8. Only wheels, tires, and brakes can be used from our ASW inventory if necessary. There is no other parts pools. CG-01 is owned, maintained and funded separately. | ||||
| 104 | Maintenance | The GV and the G550 use many of the same tools and would our PM be able to share any tools the Coast Guard already owns to save the cost of building into the bid purchasing, potentially 2 sets of tools. The idea is that should a tool break, we could | |||||
| borrow a like-kind tool from the hangar supply. | Once the aircraft is DD250, all repairs should be performed at the Gulfstream approved maintenance facility, or if the Vendor is utilizing Gulfstream FAST. USCG ASW personnel will try their best to keep mission active, however we are counting on the vendor to handle all logistics to meet the 95% availability. The vendors are not expected to maintain their own set of tools or share tools w/ ASW. If vendors ship a critical part to us, ASW crew can install as long as we do not void any warranty or maintenance and with PM notification. | ||||||
| 105 | Contract Management | Is it acceptable to submit the redacted copy of all volumes in PDF format? This is the easiest format to conduct the redaction. | Yes |
Subscription Pricing
| This is a guidance document and is a sample of what "acceptable" subscriptions allowed. For items Airshow 4000 and below, the "CAPABILITY" must be built in. | ||||||
| Responsibility | Estimated | |||||
| Subscription | Type | Qty | At Delivery | Renewals | Price | Notes |
| Gulfstream Aircraft Company (GAC) PlaneParts | Aircraft | 1 | Contractor | Contractor | $10,000.00 | |
| Rolls Royce Corporate Care - Engines | Aircraft | 1 | Contractor | Contractor | $10,000.00 | |
| Honeywell MSP - APU | Aircraft | 1 | Contractor | Contractor | $10,000.00 | |
| Honeywell APU Tech Pubs (Technical Data) | Technical | 1 | Contractor | Contractor | $5,000.00 | |
| GAC Maintenance Library (Technical Data) Electronic Access via MyCMP | Technical | 1 | Contractor | Contractor | $5,000.00 | |
| GAC Maintenance Library (Technical Data) DVD/CD | Technical | 1 | Contractor | Contractor | $5,000.00 | |
| NDT Manual (Technical Data) | Technical | 1 | Contractor | Contractor | $5,000.00 | |
| Ground Handling & Service Handbook (Technical Data) | Technical | 1 | Contractor | Contractor | $5,000.00 | |
| GAC Pilot Operating Handbooks (Technical Data) Electronic Access | Technical | 9 | Contractor | Contractor | $5,000.00 | |
| GAC Pilot Operating Handbooks (Technical Data) Hardcopy | Technical | 2 | Contractor | Contractor | $5,000.00 | |
| Weight and Balance Data (Gulfstream Plan Balance) | Technical | 9 | Contractor | Contractor | $5,000.00 | |
| Airshow 4000 | Operational - depends on customer needs and aircraft configuration | 1 | Contractor | Contractor | $5,000.00 | |
| Broadband Satellite Internet (voice & data)-BBML Next Gen 3 or/equivalent | Operational - depends on customer needs and aircraft configuration | 1 | USG/Customer | USG/Customer | $5,000.00 | variable cost, deal at award |
| XM Sirius | Operational - depends on customer needs and aircraft configuration | 1 | Contractor | Contractor | $5,000.00 | |
| Secura Plane Security System | Operational - depends on customer needs and aircraft configuration | 1 | USG/Customer | USG/Customer | n/a | CG doesn't use these, but ok if built in, as long as capability there, Govt may choose to subscribe |
| Worldwide Navigation (Database,Charts,EGWPS) | Operational - depends on customer needs and aircraft configuration | 1 | Contractor | Contractor | $5,000.00 | |
| Datalink Communications-allows FANS1/A and CPDLC if other than GDC | Operational - depends on customer needs and aircraft configuration | 1 | USG/Customer | USG/Customer | $5,000.00 | CG will work with vendor |
| Honeywell GDC/via AFIS/DMU Flight Planning-UHF | Operational - depends on customer needs and aircraft configuration | 1 | USG/Customer | USG/Customer | n/a | CG doesn't need ARINC, but ok if built in, so if the chosen aircraft has ARINC, we would subscribe to that |
| SATCOM direct (most G550 comes with this)-if other than BBML type | Operational - depends on customer needs and aircraft configuration | 1 | USG/Customer | USG/Customer | n/a | variable cost, deal at award |
| Iridium-vendor provide capability | Operational - depends on customer needs and aircraft configuration | 1 | USG/Customer | USG/Customer | n/a | Govt will subscribe, see SOW update |
| SIPRNET/CGONE-vendor only provide capability | Operational - depends on customer needs and aircraft configuration | 1 | USG/Customer | USG/Customer | n/a | Govt will subscribe, see SOW update |
| Swift broadband (unless already included in BBML type)-capability only | Operational - depends on customer needs and aircraft configuration | 1 | USG/Customer | USG/Customer | n/a | Govt will subscribe |
| Aircell | Operational - depends on customer needs and aircraft configuration | 1 | Contractor | Contractor | $5,000.00 | see SOW update |
| Direct TV-equivalent | Operational - depends on customer needs and aircraft configuration | 1 | Contractor | Contractor | $5,000.00 | see SOW update |
| Total Annual Price | $105,000.00 | *prices were just to check | ||||
| formula |
GFE guidance
| GFE guidance (estimates only were based on prior work done on CG01 and current CG02) | |||
| Labor & Material | |||
| Overall | Labor category (can use multiple categories, not limited to one category, category used was just for estimating purposes) | Hardware cost (estimates) | |
| GFE 1 Siprnet install* | $155,000.00 | Gulfstream Aviation Installer to pull panels, mount, wire, reinstall panels (1 month), 2 cisco routers/1 parvus router & power supply, ancillary | Wiring, bolt, nuts, anchors,etc. |
| GFE 2 APX install | $150,000.00 | Gulfstream Aviation Installer to pull panels, mount, wire, reinstall panels (2 weeks), 1 LRU unit, ancillary | Wiring, bolt, nuts, anchors,etc. |
| GFE 3 Safe install | $150,000.00 | Gulfstream Welder, lifting fees for placement of safe, building a base, removing panels, reinstall panels, bolting, welding (1 week) | Bolt and anchors, souder material,etc. |
| GFE 4 STE install | $100,000.00 | Gulfstream Av. Installer to turn port on, or drill hole and wire? (1 week) | Wiring, bolt, nuts, anchors,etc. |
| GFE 5 Fax install | $100,000.00 | Gulfstream Av. Installer to turn port on, or drill hole and wire? (1 week) | Wiring, bolt, nuts, anchors,etc. |
| Total Gulfstream | $655,000.00 | ||
| *note the SIPRNET estimates were based on CG01, which was built with G-V, C37 capability and a CSO station. USCG does not have a solution for the a G550; but hoping it should be less in scope | |||
| The SIPRNET document attached provide some quidance, diagrams, etc. of the infrastructure required that was placed in CG-01. Gulfstream has the STCs majority. |
Pricing CLIN support
| Schedule B is how the Govt would like to price the effort on contract, however, the Government needs the following breakout to build up the final CLIN 0001 and CLIN 0002 price for evaluation purposes only. Prices shown estimates only for formula check. This is the minimum data we need. Variations authorized. | ||||
| Subtotal | Yearly Price | |||
| A/C vendor lease base price to USCG-Fixed Rate | 12 months | $500,000.00 | $30,000,000.00 | $6,000,000.00 |
| Hourly Rate CLIN 0001 | 500 | $1,500.00 | $3,750,000.00 | $750,000.00 |
| Hourly Rate CLIN 0003 | 200 | $1,300.00 | $260,000.00 | |
| Retrofit price | ||||
| GFE 1 Siprnet install | $155,000.00 | |||
| GFE 2 APX install | $150,000.00 | |||
| GFE 3 Safe install | $150,000.00 | |||
| GFE 4 STE install | $100,000.00 | |||
| GFE 5 Fax install | $100,000.00 | |||
| Overall GFE Retrofit costs | $655,000.00 | |||
| Gulfstream Engineering Study (estimate price in 2 mos for minimum) | $1,000,000.00 | |||
| Maintenance Costs | $1,000,000.00 | |||
| Insurance Costs-if apply | $1,000,000.00 | |||
| Subscription Costs | $105,000.00 | |||
| Paint & labor | $300,000.00 | |||
| Overall Other | $3,405,000.00 | |||
| Overall CLIN 00001 Price-includes deconfiguration fee breakout 5 GFE item + paint | $37,810,000.00 | |||
| Overall CLIN 00002 Option Price for 5 years | TBD | TBD | TBD | |
| Overall CLIN 00003 Price | 5 years | $260,000 | $1,300,000.00 | |
| Deconfiguration estimate based on past actuals from CG-02 | ||||
| Deconfiguration of GFE items (APX, STE, Fax, Safe, etc.) | $65,000 | 5 | $250,000 | |
| Deconfiguration of paint (removal) | $210,000 | 1 | $210,000 |