HSBP1010R0054 Solicitation POST A00050001.pdf
PDF 25 MB Posted
- Attached to
- Amendment 5 Federal contract opportunity
- Solicitation number
- HSBP1010R0054
About this file
The purpose of this amendment is to revise the SF1449 (offerors' responses section) to be parallel with section I.4 of the solicitation. Also to remove FAR clause 52.232-36 from the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HSBP1010R0054 Amendment A0005 - SF300001.pdf | ||
| SECTION IV Attachment IV.3 --- DHS 700-21.pdf | ||
| SECTION IV Attachment IV. 1 --- CLIN STRUCTURE.xls | XLS spreadsheet | |
| SECTION IV Attachment IV. 2--- Past Performance Exhibit A and B.doc | DOC document | |
| HSBP1010R0054 Solicitation POST A00004.pdf | ||
| Attachment Y Site Breakout characteristics Rev 3b.xls | XLS spreadsheet | |
| Attachment Z-additional-tower-specs.pdf | ||
| Government Clarification on Industry Questions - A00004.doc | DOC document | |
| HSBP1010R0054 Amendment 0004 - SF 30.pdf | ||
| CBP-TACCOM-Houlton-8A-SOW_v4a_2010-0429 _2_.pdf | ||
| SF30_Amendment 3_HSBP1010R0054.pdf | ||
| Attachments to SOW.PDF | ||
| 8(a) CLIN STRUCTURE.xls | XLS spreadsheet | |
| HSBP1010R0054 - A00002 Dtd 4.26.10.pdf | ||
| HSBP1010R0054 - A00001.doc | DOC document | |
| RFP HSBP1010R0054.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal
HSBPIOIOR0054
POST A00005 Changes
Tactical Communications Modernization Houlton, Maine Focus Area
May 2010
U.S. Department of Homeland Security U.S. Customs and Border Protection
Enterprise Contracting Office Washington, D.C.
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE 1 OF
OFFEROR TO COMPLETE BLOCKS 12,17,23,24, & 30 0020055094
2. CONTRACT NO. 3. AWARD/EFFECTIVE 4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE DATE
00/00/0000 HSBP1 01 OR0054 04/16/2010
a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATEI
7. FOR SOLICITATION
calls) LOCAL TIME
INFORMATION CALL: 05/17/2010
Jason W. Bush (202)344-3137 4:00PM EST
9. ISSUED BY CODE 7014 10. THIS ACQUISITION IS
DHS-Customs and Border Protection oUNRESTRICTED OR DSETASIDE: 100 %FOR:
Department of Homeland Security oSMALL BUSINESS o EMERGING SMALL
1300 Pennsylvania AVE, NW NAICS: 541519 o HUBZONE SMALL
BUSINESS
Procurement Directorate-NP 1310 BUSINESS SIZE STANDARD: oSERVICE-DISABLED VETERAN-
Washington, DC 20229 OWNED SMALL BUSINESS ~8(A)
11. DELIVERY FOR FOB DESTINA- 12. DISCOUNT TERMS 13b. RATING liON UNLESS BLOCK IS o 13a. THIS CONTRACT IS A
MARKED RATED ORDER UNDER
DPAS (15 CFR 700) 14. METHOD OF SOLICITATIONo SEE SCHEDULE DRFQ DIFB ~RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE I
See Attached Delivery Schedule DHS-Customs and Border Protection
Department of Homeland Security
17a. CONTRACTOR! CODEI I FACILITY 18a. PAYMENT WILL BE MADE BY CODE I
OFFEROR CODE
DHS-Customs and Border Protection National Finance Center
PO Box 68908 TELEPHONE NO. Indianapolis IN 46268o 17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
OFFER BELOW IS CHECKED o SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM NO. SCHEDULE OF SUPPLIESISERVICES QUANTITY UNIT UNIT PRICE AMOUNT
20 Supply Chain Management Services 1 EA
30 Comm Equipment & Materials (See Attached) 1 EA
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only) o 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADOENDA o 2lb. CONTRACTIPURCHASE ORDER INCORPORATES BY REFERENCE FAR 52212-4. FAR 52.212-515 ATTACHED. ADDENDA o ARE ~ ARE NOT ATTACHEDo ARE ~ ARE NOT ATTACHED o 28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _2__ o 29. AWARD OF CONTRACT: REF. OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED . YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5). INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFERORICONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
M.L. McDaniel
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 312005)
Prescribed by GSA - FAR (48 CFR) 53.212
Page of Page 2 2
Requisition Number:
0020055094
Award/Eff. Date 00/00/0000
THE ENSUING CONTRACT WILL BE FUNDED IN WHOLE BY AMERICAN REINVESTMENT
AND RECOVERY ACT FUNDING WHICH HAS ADDITIONAL REPORTING REQUIREMENTS.
PLEASE REVIEW THE REPORTING REQUIREMENTS at https:l/www.acquisition.gov/comp/far/html/Subpart%20415.html.
U.S. Customs and Border Protection (CBP) has a requirement for Enterprise Network Technology Services under our Wireless Technology Programs for Tactical Communications Branch. This requirement is set aside for 8a competition. Vendors are required to submit a technical and management approach, past performance and a separate price quotation for the effort described in the attached statement of work (SOW).
Responses are due no later than 4:00 PM EST, Washington, DC time on Monday, May 17, 2010.
There will be no exceptions to the time and date on which responses are due, unless determined otherwise by the Government.
The Contractor shall submit a price proposal, with no page restriction, for a Firm Fixed Price Contract that provides supply and supply chain management services to satisfy CBP's requirements for a 24 month period of performance.
The Government may require an oral presentation if it is determined to be beneficial to the evaluation.
Any questions regarding this solicitation shall be submitted directly to Jason Bush at Jason.w.bush@dhs.gov no later than 4:00 PM EST, Washington, DC time on Monday May 17, 2010.
The offerors' responses (technical proposal, past performance and price quotation) shall be submitted in electronic form to Jason.W.Bush@dhs.gov. In addition to the electronic submission, one original paper copy, six paper copies and two copies of electronic media (CD-ROM) shall be submitted to Jason Bush, Contract Specialist and M.L McDaniel, Contracting Officer. To reiterate, one electronic copy, one original paper copy, six paper copies, and two electronic media (CD-ROM) copies of responses to this request for proposals are due on May 17, 2010 at 4:00 p.m. EST.
(reference Section 1.4of the RFP) mailto:Jason.w.bush@dhs.gov mailto:Jason.W.Bush@dhs.gov.
1.000 1.000
DELIVER TO: ITEM # QTY DELIVERY DATE
Please see
See Site Locations in Attachment Y 20 1.000 attachment Y Please see
30 1.000 attachment Y
RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY AND IS ISSUED IN
ACCORDANCE WITH THE GUIDANCE FOR THE AMERICAN RECOVERY AND REINVESTMENT ACT OF
2009 (ARRA).
Each offeror's proposal submitted in response to this solicitation shall be prepared in two volumes: Volume I - Technical Proposal and Volume II - Price Proposal. Each volume shall be separate and complete in itself so that evaluation of one may be accomplished independently from evaluation of the other.
The proposals shall be submitted for Volumes I and II, in electronic submission, one original paper copy, six paper copies) and electronic media (CD-ROM, two copies) to the individual designated to receive proposals in the solicitation.) Responses to this request for proposals are due on May 17, 2010 at 4:00 p.m. EST.
U.S. Customs and Border Protection Office of Administration Office of Procurement 1901 South Bell Street, 8th Floor Arlington, VA 20598
Proposals must be prepared in accordance with these instructions and provide all required information in the format specified. The required format is designed to ensure submission of information essential to the understanding and comprehensive evaluation of the offeror's proposal. There is no intent to limit the contents of proposals: the instructions permit inclusion of any additional data or information an offeror deems pertinent.
Formats Electronic applications: written documents, MS Word 2003; spreadsheets, MS Excel 2003 with formulas included; project plans/schedules, MS Project 2003; and portable document format, Adobe Acrobat 7 Professional; computer-aided design (CAD) documents, Visio 2003.
Font size shall be Times New Romans, in no smaller than 12 point for text, 10 point for spreadsheets and tables and any font size for graphics as long as they are legible.
Page Limits The Volume I Technical Proposal is limited to 20 pages. Pages beyond this number will not be read or evaluated.
When both sides of a sheet display printed material, it shall be counted as 2 pages (single-sided preferable).
Printed pages and illustrations shall be legible and no larger than 11" x 17" foldouts as appropriate for the subject matter. Foldouts are considered part of the page limitations, shall be printed on one side only, and shall count as two pages. All pages must be numbered sequentially. Included in the page count are separate pages providing graphics, charts, illustrations, and pictures. Title pages, cover pages, table of contents, Executive Summary, section dividers, resumes, construction drawings, specification sheets, and technical bill of materials (80M) will not count in page limits.
Failure of a proposal to comply with these instructions may be grounds for exclusion of the proposal from further consideration.
The Technical Proposal shall be prepared in such a manner as to enable the Government reviewers to make a thorough evaluation and arrive at a sound determination of whether the proposal meets all technical requirements of the solicitation. To this end, the Technical Proposal should be sufficiently specific, detailed, and complete as to clearly and fully demonstrate that the offeror has a thorough understanding of the requirements set forth in the solicitation. The Contractor must submit an explanation of its proposed technical approach in conjunction with the tasks to be performed in achieving the project objectives. Proposals which merely offer to perform in accordance with the Government's requirements or which merely paraphrase the requirements document, or use phrases such as, "standard engineering practices will be employed," or "well established techniques will be employed," etc. may be considered non-compliant and ineligible for award.
A letter that formally transmits the proposal and states in general terms how the offeror meets the solicitation requirements.
In this section, the offer will be summarized, highlighting salient features of the proposal, including a description of the offeror's approach and plans to satisfy and support requirements of this solicitation.
The technical approach shall address the topics listed below and be in as much detail as the offeror considers necessary to fully explain the proposed technical approach or method. It must be a clear and concise presentation that includes, but is not limited to, the requirements of the Statement of Work. The Technical Proposal should reflect a clear understanding of the nature of the work being undertaken. It shall clearly describe all subfactors described in the Evaluation Criteria:
The Offeror's Technical and Management approach will be evaluated based on the assessed strengths, weaknesses, deficiencies, and risks of each offerors proposal. Subfactor ratings will be individually evaluated.
Subfactor ratings will be rolled up into an overall rating for the Technical Factor.
Ability to meet requirements and quality of technical and management approach proposed for the SOW requirements - the offeror's proposal will be evaluated in order to determine its understanding of the requirements.
The Offeror shall demonstrate its approach to procure the equipment listed resulting in the "best value" for the Government. The Offeror shall demonstrate its approach to conduct quality assessments of the equipment being procured while ensuring best pricing methodology (e.g., contracts being used to procure equipment, volume discount approaches). The Quality Assurance Plan to be submitted with the technical proposal shall be evaluated based on this approach. The offeror shall also submit a contractor-revised Bill of Materials with the proposal that indicates the proposed manufacturer and model of the equipment to be provided. Vendors shall provide specification sheets for all equipment listed in the BOM; this will not be counted against the page count.
Offeror shall demonstrate its management approach and methodology to effectively management the project. The Offeror shall be evaluated for their approach in these key factors:
• Coordination with and status reporting to TACCOM
• Program Management and Risk Mitigation
• Scheduling and sequencing -- ensuring that equipment is available when needed
• Recovery Act Reporting Requirements
Past Performance - Quality of past performance for recent, similar contracts/orders with other federal agencies (may also include past performance information for partner(s), if applicable) - The Offeror's proposal will be evaluated based on the experience with meeting requirements that are similar in size and scope of the requirements of this proposal.
Vendors shall identify up to three (3) contracts/task orders with the Federal Government and/or commercial customers that demonstrate recent and relevant past performance, documenting the success of the technical approach with relevant past performance. Recent is defined as within the last three years. Relevant is defined as work similar in complexity and magnitude of the work described in the SOW.
Include project name and description, contract number and/or order number, period of performance and client/agency technical and contractual points of contact information. Provide Attachment IV.2 of the RFP to your three references.
Include a brief narrative as to why you deem the reference to be relevant to this effort.
The CBP may also consider information obtained through other sources. Past performance information will be utilized to determine the quality of the vendor's past performance as it relates to the probability of success for the required effort.
The Government will evaluate the offerors' price proposals to determine reasonableness. Prices that are determined to be either unreasonably high or unrealistically low in relation to Independent Government Cost Estimate may result in the overall proposal being considered unacceptable.
Section 6-Assumptions, Exceptions, and Deviations The offeror shall state all assumptions, exceptions, and deviations at the end of Volume I. For every instance where the offeror does not propose to comply with or agree to a requirement, the offeror shall propose an alternative and describe its reasoning therefore.
The offeror shall provide all price tables in Microsoft Excel 2003®. This volume shall consist of the sections as outlined and described below.
A clear table of contents with page numbers referenced shall be included. The CUN Structure Tables will be included in this section with prices for each CUN included. The CUN Tables are Attachment IV.1 to the RFP.
Standard Form 1449, Solicitation/Contract/Order for Commercial Items, (SF 1449) is being used for this solicitation. This form is used by the Government as a Request for Proposal and upon submission by the offeror it becomes the offeror's proposal. As such, it is an "offer" which can be unilaterally accepted by the Contracting Officer and awarded on said SF 1449. The offeror's proposal and the Government's acceptance form the contract. Therefore, the following points must be strictly adhered to by the offeror in submitting the proposal:
(SF 1449) When completed and signed by the offeror, the SF 1449 constitutes the offeror's acceptance of the terms and conditions of the proposed contract. Therefore, the form must be executed by representatives of the offeror authorized to commit the offeror to contractual obligations.
Offerors shall sign the SF 1449 in Block #30.
Three (3) originally executed copies of Standard Form 1449 (with Blocks 12,17,23,24 & 30); and Section 111.3fully executed shall be submitted.
The SF 1449 must be executed by a representative of the offeror authorized to commit the offeror to contractual obligations. The authority to sign a proposal, but not an offer, subject to unilateral acceptance and award, is not sufficient authorization to sign the SF 1449.
UNDER NO CIRCUMSTANCES MAKE ALTERATIONS OR CHANGES TO THE SF 1449 OR THE
RELATED PAGES WHICH ARE A PART OF THE ENCLOSED REQUEST FOR PROPOSAL AND
PROPOSAL PACKET. Offerors are to complete those parts that require items such as prices, place of performance, etc., when such items are called for in the enclosed request for proposal. A place is provided to insert such information.
Section 3 - Representations & Certifications Please reference 111.4in Section III Solicitation Provisions beginning on page 25
Any exceptions taken with respect to the clauses in the solicitation shall be noted. For the purpose of facilitating discussions, for every instance where the offeror does not propose to comply with or agree to a requirement, the offeror shall propose an alternative and describe its reasoning therefore.
The objective of this statement of work (SOW) is to obtain an effective and efficient Supply and Supply Chain Management (SSCM) solution for the Houlton Focus Area. The solution shall enable the successful provisioning of open market, commercial communications site equipment for the United States Customs and Border Protection (CBP) for various geographic locations within the CBP Houlton Focus Area 1 within the State of Maine.
The purpose of this SOW is to describe the equipment that the Contractor will provide to CBP, associated with supplying and supply chain management of communication site equipment, shelters and materials needed for the modernization of CBP's Land Mobile Radio (LMR) system in the Houlton Focus Area, within the State of Maine.
The Contractor shall provide all personnel, equipment, materials, supplies, travel and delivery logistics necessary to accomplish the tasks described herein.
I Focus Areas follow the geographic boundaries ofCBP Border Patrol sectors, but include the operations of Border Patrol, Field Operations, and Air & Marine.
Updated 05/07/10 5
All applicable documents within this SOW will be provided by the Government upon request and/or at the time of award, and are incorporated by reference.
1. American National Standards Institute (ANSI) / Telecommunications Industry Association (TIA) Publication 222-G (Structural Standards for Steel Antenna Towers and Antenna Supporting Structures), including addendum (TIAIANSI 222-G-1) (http://www.tiaonline.org/standards/)
2. Motorola R56 Standards and Guidelines for Communications Sites
3. DHS Form 700-21 Material Inspection Acceptance and Receiving Report
CBP operates LMR systems within the Houlton Focus Area in the State of Maine. The CBP Tactical Communications (TACCOM) Project Office has completed detailed designs for the modernization of LMR systems in this Focus Area. In order to implement this design, CBP needs communication site equipment to be acquired and delivered to locations within the Houlton Focus Area as indicated in Appendix A of this SOW.
The Contractor shall participate in a project kick-off meeting in the Washington, DC area within 14 calendar days of award with all involved parties to discuss specific aspects of the equipment provision.
The Project Kickoff Meeting will include both the Government and Contractor key project participants.
The Government and the Contractor will mutually agree upon the date, time, and location of the meeting.
The objectives of this meeting include:
• Introduce all project participants
• Review the roles of the project participants
• Review the overall project scope and objectives
• Review the integrated project schedule
• Review the Contractor-revised Bill of Materials (80M)
The 80M shall detail the equipment and materials needed to meet the equipment provisions identified in Appendix A of this SOW.
• Equipment and materials, as identified in the 80M
• Delivery of equipment and materials to locations identified in the delivery schedule and Statement of Work.
• Quality assurance (QA) of the delivered equipment and materials through successful acceptance and transfer of equipment and materials, including manufacturers warranties, to the Government or its designee.
Equipment and delivery: Acquisition of required equipment and materials. The Contractor shall provide supply chain management for all equipment and materials delivered under this SOW. The delivery points for the equipment and materials under this SOW are specified in Appendix A of this SOW.
Quality Assurance (QA) review: The Contractor shall follow a QA review process of all equipment and materials in accordance with its Quality Assurance Plan (as described in section 6.0 of this SOW) and will ensure compliance with industry and government best practices. All deliveries must be accompanied by the DHS acceptance form [DHS Form 700-21]. The Contractor shall resolve any deficiencies in the delivery of provided equipment and materials within thirty (30) calendar days upon notification by the
Government. The Government will notify the Contractor within thirty (30) calendar days of delivery of unsatisfactory equipment and/or materials.
It should be noted that equipment and materials delivery to communication sites may require the use of high clearance trailers, and might not be accessible by "low boy" style trailers. The Contractor shall deliver the equipment and materials to some remote sites and is responsible for considering some remote site locations may not be accessible via improved roads. Site coordinates are provided in the Statement of Work.
It also should be noted that to deliver equipment and materials to some remote site locations may necessitate transshipping through Canada. Like Section 8.3 of this SOW, the Contractor shall be responsible for preparing the appropriate documentation to facilitate the exit from and re-entry to the United States of any equipment and materials that are transshipped through Canada. Likewise, the Contractor is responsible for adhering to any requirements of the Canadian Border Services Agency, including but not limited to preparing the appropriate documentation to facilitate the movement of any equipment and materials transshipped through Canada.
The Contractor shall provide the Government with a minimum of two (2) electronic copies and two (2) hard copies of the manufacturer documentation for all equipment and materials provided under this SOW.
This documentation shall include:
• Manufacturers' Equipment Installation and Maintenance Manuals where applicable
• Manufacturers' documentation (including specifications and design limits)
• Commercial warranty information for all equipment and materials.
For the purposes of equipment and materials provision, acceptance is defined as the point where the COTR or their designee signs off on the completed DHS Form 700-21. For equipment and materials drop shipped to applicable sites in Appendix A, the Government will acknowledge receipt at time of delivery.
This does not imply acceptance by the Government, but it does initiate the thirty (30) calendar days for the Government to notify the Contractor of unsatisfactory equipment and/or materials. This task will be deemed complete when the Government (COTR or their designee) inspects the delivered equipment and materials and signs a Final DHS Form 700-21 Material Inspection Acceptance and Receiving Report.
All work performed by the Contractor will be inspected by the Government COTR or other Contracting Officer's designated inspector for compliance, completion, and acceptance. The Contractor shall correct all noted discrepancies within thirty (30) calendar days after notification by the Government. In the event that inspections reveal noncompliance, the Government reserves the right to accept or reject Contractor materials. The Contractor shall correct all discrepancies that result in rejection as noted by the Government, at no additional cost to the Government.
Throughout the contract period, the government reserves the right to perform random inspections and/or to contract with other organizations to perform inspection services to ensure the Government's interest is protected.
The Contractor shall submit monthly project status reports (PSRs) that summarize the Contractor's completed and planned activities as well as any anticipated project risks. Each PSR shall provide performance tracking and reporting, and a status toward completion of work in progress at the time of the PSR's delivery. These PSRs shall include what has been bought, what has been shipped, what has been delivered, and what has been accepted by the Government or its designee. These PSRs should also contain open items (discrepancies) pending resolution for the purpose of follow-up actions to ensure that all problems are being tracked and addressed as specified. Upon request of the Government, the Contractor shall provide PSRs on a more frequent, mutually agreeable basis.
In addition, meetings/teleconferences will be held with the Contractor on an as-needed basis. Recent PSRs will be used during these meetings to guide the discussion.
All materials and information developed or produced for this project, including but not limited to drawings, documents, presentations and databases are the property of the Government. At the conclusion of the project, all materials developed by the Contractor (to include all data, documents, work sheets and other working documentation) shall become the exclusive property of CBP.
The contractor shall successfully complete the tasks identified within this SOW. All equipment and materials described and/or required within this SOW shall be required deliverables.
Based on the tasks described within this SOW, and in addition to the required equipment and materials, the required deliverables for this project are shown in Table 5.1. Contractor format is acceptable for all deliverable items, unless otherwise specified.
Table 5.1 Required Deliverables
Refer-enced Freq- DeliveredDeliverable Title SOW Due Date(s) Sectio uency to:
n Initial: with
1) All equipment and materials described and/or proposal required within this SOW shall be required 4.1 Monthly submission; COTR deliverables. Final 30 calendar days after award.
2) Equipment and Delivery Documentation:
Manufacturer-provided documentation (installation, maintenance, and specifications), warranty lAW with Projectdocumentation and acceptance/QA documentation. 4.3 Once COTR To be delivered in electronic and paper form, using Finalization
Microsoft Word, Excel, Visio and/or AUTOCAD formats.
3) Project Status Reports. To be delivered in 1st Monday of electronic and paper form, using Microsoft Word, 4.4 monthly each month after COTR Excel and Proiect formats. award.
4) Quality Assurance Plan. To be delivered in Initial: with proposal. CO,electronic and paper form, using Microsoft Word, 6.1 Once Final 30 calendar COTRExcel and Project formats. days after award.
5) Risk Management Plan. To be delivered in Initial: with proposal. CO,electronic and paper form, using Microsoft Word, 6.2 Once Final 30 calendar COTRExcel and Project formats. days after award
The Contractor shall produce and maintain a Quality Assurance Plan that describes the processes, procedures and controls that will be used to assure consistently high quality performance in the deliverables provided to the Government.
Within 30 calendar days after contract award, the Contractor shall submit for approval its Quality Assurance Plan, which shall be consistent with and further detail the approach contained in the
Contractor's proposal. The plan, as approved by the CO, and COTR shall be incorporated into the contract as a compliance document.
Any issues, risks, or changes identified during the course of performing this SOW shall be reported to the COTR in writing.
The Contractor shall produce and maintain a Risk Management Plan that describes the processes, procedures and controls that will be used to identify, characterize and mitigate risks associated with the Contractor's efforts to successfully provide the deliverables described within this SOW.
Within 30 calendar days after contract award, the Contractor shall submit for approval its Risk Management Plan, which shall be consistent with and further detail the approach contained in the Contractor's proposal. The plan, as approved by the CO, and COTR shall be incorporated into the contract as a compliance document.
At a minimum, the Contractor's Risk Management Plan shall cover the following aspects of addressing risks:
• Identify and document;
• Assess impact and prioritize;
• Assign responsibility;
• Monitor and report progress;
• Communicate issue resolution.
A mutually agreed issue escalation process will be defined at the outset of project, and shall be included in the Contractor's Risk Management Plan.
The Contractor shall comply with Government administrative, physical and technical security controls to ensure that the Federal Government's security requirements are met. During the course of this task, the Contractor shall not use, disclose, or reproduce data, which bears a restrictive legend, other than as required in the performance of this work associated with this SOW. The Contractor and its personnel shall be required to sign a non-disclosure agreement prior to working on this task.
Contractors hired for work within the United States or its territories and possessions, and who require access to Government owned or controlled facilities, information systems, security items or products and/or sensitive but unclassified information shall either be U.S. Citizens or have lawful permanent resident status.
Contractor staff supporting this project (including staff from any and all subcontractors used on the effort) shall be U.S. Citizens, or have lawful permanent resident status, and shall be free of criminal convictions.
New Year's Day Martin Luther King's Birthday Presidents' Day Memorial Day
Labor Day Columbus Day Veterans Day Thanksgiving Day
When any such day falls on a Saturday the preceding Friday is observed. When any such day falls on a Sunday, the following Monday is observed. Observance of such days by Government personnel shall not be cause for an extension to the delivery schedule or period of performance or adjustment to the price, except as set forth in the task order.
Except for designated around-the-clock or emergency operations, the Contractor personnel will be, without written consent from the COTR, unable to perform on site under this task order with CBP on the holidays set forth above.
In the event CBP grants administrative leave to its Government employees, at the site, on-site Contractor personnel shall also be dismissed if the site is being closed, however, the Contractor shall continue to provide sufficient personnel to perform around-the-clock requirements of critical efforts already in progress or scheduled and shall be guided by the instructions issued by the CO or her/his duly appointed representative.
Government transportation of Contractor personnel via Government vehicles to and from existing and proposed RF sites is not authorized. Therefore, the Contractor is required to pre-coordinate all travel related activities in advance to mitigate project delays. The Contractor will be responsible for identifying and securing its own mode of transportation, separate from the Government. The Contractor shall take all reasonable safety precautions when traveling to and visiting RF sites or other sites of interest and will arrange for directions and access. The Contractor shall also be responsible to ensure that means of transportation adequate for the size of the party is available on time per the project schedule.
Since access to some of the applicable sites listed in Appendix A will necessitate entry into Canada and re-entry into the U.S., Contractor staff delivering equipment and materials or performing work at any of the applicable sites listed in Appendix A (including staff from any and all subcontractors used) shall hold personal identification document(s) for entry into Canada and re-entry into the U.S. that comply with the Western Hemisphere Travel Initiative.
All equipment shall be "Free on Board" (FOB) to the destination points within the Houlton Focus Area, as indicated in the table below. Delivery of items such as equipment enclosures, towers and generators will be coordinated to achieve "Just In Time" (JIT) delivery to designated construction staging locations for the corresponding sites. Specific delivery locations will be reviewed during the project kickoff.
The information provided in this appendix is organized as follows:
• Table 1 provides a list of sites, including the site name and site coordinates (latitude and longitude) for the locations where equipment will be delivered under this SOW.
• Table 2 provides summary quantities and descriptions for the equipment required within this SOW. Also provided in table 1 is a reference to an attachment file (attachments A through X, and attachment Z) that contains the detailed specifications for each item type in the table.
• Attachment Y contains the detailed equipment and delivery schedule requirements for each site.
# Site Latitude Longitude Tower Height Solar Site Collocation Site
(deg:min:sec) (deg:min:sec)
1 cbp_ calais me ne012 45° 01' 44.9" N 67° 19' 23.3" W Use existing tower 2 cbp_ coburn mtn 45° 28' 6.2" N 70° 01' 35.9" W New 80' SST X 3 Alternate - sm cooper 44° 59' 15.3" N 67° 28' 08.0" W New 180' SST 4 poe-calais 45° 11' 26.3" N 67° 16' 59.8" W New 95' Mono 5 poe-coburn _gore jcorrected) 45° 22' 42.4" N 70° 48' 23.7" W Needs new tower (verify) 6 poe-forest city 45° 39' 45.2" N 67° 43' 43.7" W New 200' SST 7 poe-fort kent 47° 14' 53.0" N 68° 36' 11.0" W New 80' SST 8 poe-hamlin 47° 03' 41.0" N 67° 41' 26.0" W New 80' Mono 9 poe-limestone 46° 55' 29.0" N 67° 41' 24.0" W New 80' Mono 10 poe-Iubec 44° 51' 31.9" N 66° 58' 55.5" W New 120' Mono 11 poe-madawaska 47° 21' 31.0" N 68° 19' 43.0" W New 80' Mono 12 poe-orient 45° 49' 01.4" N 67° 46' 54.9" W New 80' Mono 13 poe-st juste _(corrected) 46° 32' 44.0" N 70° 01' 26.5" W New 80' Mono 14 poe-ste aurelie 46° 12' 27.4" N 70° 16' 31.7" W New 200' SST 15 poe-van_buren 47° 09' 32.0" N 67° 55' 59.0" W Proposed COW (cell on wheels)
55' crank up
16 sm bald mtn 44° 39' 29.8" N 68° 36' 19.1" W New 180' SST X 17 sm new sweden 46° 56' 44.4" N 68° 6' 41.7" W New 180' SST X 18 lead mountain 44° 51' 53.5" N 68° 6' 38.1" W Existinq 80' SST 19 cbp escourt 47° 23' 15.2" N 69° 11' 30.7" W New 80' SST 20 cbp hovey hill 46° 06' 44.6" N 67° 46' 54.9" W New 80' SST 21 cbp parkhurst 46° 44' 26.4" N 67° 56' 07.2" W New 80' SST 22 Alternate - South Portland 43° 38' 20.36" N 70° 18' 34.26" W New 180' SST 23 cbp st pamphile 46° 49' 57.0" N 69° 41' 29.9" W New 80' SST X 24 poe-easton 46° 36' 01.0" N 67° 41' 19.0" W New 80' Mono 25 rvss deer farm 47° 15' 09.0" N 68° 3' 22.5" W New 80' SST 26 rvss fuller road 46° 40' 28.3" N 67° 48' 4.4" W New 180' SST
# Site Latitude Longitude Tower Height Solar Site Collocation Site(deg:min:sec) (deg:min:sec)
27 Alternate - Oxbow Township 45° 15' 2.4" N 70° 57' 28.7" W New 100' SST 28 sm benedicta 45047' 18.3" N 680 24' 39.8" W New 180' SST X
120' existing tower to be 29 Alt - Garland DOT 3 miles away 45004' 01.45" N 690 09' 59.09" W analyzed X 30 Alternate - Ellsworth 44° 31' 17.07" N 68° 23' 40.22" W Existing 330' SST 31 Alternate - Granite Hill 440 18' 29.9" N 69049' 59" W New 180' SST X 32 sm clear lake mtn 46031' 30.0" N 69008' 28.0" W New 150' SST 33 sm de-bouille mtn 46058' 05.9" N 680 52' 22.4" W New 70' SST X X 34 sm hatchet mtn 44015' 40.7" N 69010' 34.8" W New 80' SST 35 sm mt blue 44043' 41.2" N 70020' 31.2" W New 80' SST X X 36 sm musQuash mtn 45023' 21.3" N 67047' 48.0" W Existinq 180' may need replacinq X 37 sm norway-bluff 46024' 41.0" N 68056' 27.0" W New 100' SST X X 38 sm _portage lake 46046' 35.9" N 680 28' 08.4" W New 120' SST 39 sm robinson mtn 460 l' 34.3" N 680 15' 3.9" W New 180' SST X 40 sm spencer mtn 450 46' 32.2" N 69026' 37.7" W New 80' SST X X 41 sm w kennebago mtn 4506' 28.0" N 70049' 00.0" W New 80' SST X X 42 peekaboo mtn 45046' 5.8" N 670 52' 19.2" W Use existing 150' guyed 43 rocky-mountain 47011' 30.0" N 69016' 54.0" W New 80' SST X 44 spruce2 mtn 45036' 0.0" N 67040' 25.0" W New 120' SST 45 poe-portsmouth 43004' 58.1" N 70049' 0.0" W New 100' SST 46 Alternate - SM Huntoon 44002' 14.3" N 690 40' 8.3" W New 180' SST X 47 sm bucks harbor 440 38' 38.3" N 67023' 13.0" W New 180' SST 48 Alternate - SM Cyr DOT 47018' 27.4" N 680 15' 38.6" W New 120' SST X 49 sm eaton mtn 440 45' 53.3" N 690 37' 30.6" W New 180' SST X 50 smgray rcc 43055' 47.1" N 70021' 07.3" W New 275' SST X 51 sm mt harris 440 39' 5.2" N 6909' 23.9" W Existing 180' SST 52 sm no 9 mtn 460 25' 15.8" N 680 l' 27.6" W New 275' SST X 53 sm ossipee mtn 430 35' 16.2" N 70044' 22.7" W New 180' SST X 54 sm_passadumkeag (whcf-fm) 450 07' 46.0" N 68021' 28.0" W New tower @ alt location on X same property
55 sm pleasant mtn 44001' 36.3" N 70049' 19.2" W New 80' SST X X 56 sm saint francis 47010' 8.1" N 68051' 50.2" W New 180' SST X
# Site Latitude Longitude Tower Height Solar Site Collocation Site(deg:min:sec) (deg:min:sec)
57 sm spruce mtn 44° 24' 28.0" N 70° 35' 4.0" W New 80' SST X 58 sm suqarloaf mtn 45° 01' 54.2" N 70° 18' 46.2" W New 180' SST 59 sm whitten hill 44° 06' 7.1" N 70° 0' 17.3" W New 180' SST X 60 sm york 43° 10' 3.0" N 70° 38' 39.0" W New 120' SST X
Notes:
1) Tower Loads (Non-Collocated): All non-collocated towers will have a maximum of six (6) Omni antennas and four (4) 6 ft. parabolic dishes.
80' Tower loading example:
Three (3) Omni antennas located at 80' and three (3) Omni antennas located at 50'.
Two (2) 6 ft. parabolic dishes located at 70' and parabolic dishes located at 40'
3) Tower Loads '(COllocated): All collocated towers will have a maximum of twelve (12) Omni antennas and eight (8) 6 ft. parabolic dishes.
180' Tower loading example:
Omni Antennas: Three (3) Omni antennas located at each of the following heights: 180', 150', 130' and 100'.
Parabolic Dishes: Two (2) 6 ft. parabolic dishes located at each of the following heights: 170', 140', 120', and 90'.
File Name Qty Description Attachment
Ref.
22 UPS, 12KVA/8.4KW, 7 MIN RUN A
22 Incld.Option - CONTROL MODULE A
22 Incld.Option - 4KVA/2.8KW POWER MODULE A
22 Incld.Option - BATTERY MODULE A
22 Incld.Option - MBB MAINT BYPASS CABINET A
9 12' X 16' BLDG, INCLS UPS & GE with Freight (prefabricated and delivered to site as one unit) B
12' X 24' BLDG, Lightweight Construction, INCLS UPS & GEN with Freight (prefabricated and delivered to site as C one unit)
11 12' X 24' BLDG, Lightweight Construction no UPS & GEN with Freight (prefabricated and delivered to site as one D unit)
14 12' X 32' BLDG, INCLS UPS & GE with Freight (prefabricated and delivered to site as one unit) E
1 Cell On Wheels (2 Bay) wI Freight - to include all options (prefabricated and delivered to site as one unit) F
2 External Cabinets (1 Bay) wI Freight - to include all options G
15 25KW LP VAPOR GENERATOR, 1PH, OUTDOOR - (primary Power Rating of 28Kw) - to include all options H
1 80KW LP VAPOR GENERATOR, OUTDOOR - (Primary Power Rating of 80Kw) - to include all options I
15 ATS, 200A, 120/240V 1-PH, NEMA 1 ENCLOSURE J
1 ATS,400A, 120/240V 1-PH, NEMA 1 ENCLOSURE J
25 Transient Voltage Surge Suppressor TYPE 1 - 120/240 VAC SINGLE PHASE K
25 Transient Voltage Surge Suppressor TYPE 2 - 120/240 VAC SINGLE PHASE K
11 80'SS Tower to incld. freight, two Pipemounts, two 6' Sidearm (Univ), Lightning Rod L
File Name Qty Description Attachment
Ref.
3 1OO'SSTower to incld. freight, two Pipemounts, two 6' Sidearm (Univ), Lightning Rod M
3 120'SS Tower to incld. freight, two Pipemounts, two 6' Sidearm (Univ), Lightning Rod N
1 135.3'SS Towerto incld. freight, two Pipemounts, two 6' Sidearm (Univ), Lightning Rod a 1 150'SS Tower to incld. freight, two Pipemounts, two 6' Sidearm (Univ), Lightning Rod P
2 200'SS Tower to incld. freight, two Pipemounts, two 6' Sidearm (Univ), Lightning Rod, FAA Code E-1 Dual Lt Q
1 220'SS Tower to incld. freight, two Pipemounts, two 6' Sidearm (Univ), Lightning Rod, FAA Code E-1 Dual Lt R
80'Monopole Tower to incld. Freight, one 4-Way Clamp Ring, two Clamp Ring Standoff Arm, two 4-6' Dishmount, Lght S Rod
95'Monopole Tower to incld. Freight, one 4-Way Clamp Ring, two Clamp Ring Standoff Arm, one 4-6' Dishmount, Lght T Rod
1 100' Monopole Tower to incld. Freight, one 4-Way Clamp Ring, two Clamp Ring Standoff Arm, Lght Rod U
1 120'Monopole Tower to incld. Freight, one 4-Way Clamp Ring, two Clamp Ring Standoff Arm, Lght Rod V
13 180'SS Tower to incld. freight, two Pipemounts, two 6' Sidearm (Univ), Lightning Rod Z
2 275'SS Tower to incld. freight, two Pipemounts, two 6' Sidearm (Univ), Lightning Rod, FAA Code E-1 Dual Lt Z
40 Fuel Tank (500 Gal), On-Site Delivery W
1 Supply and Supply Chain Management
2 Solar System Equipment - Custom Assembly X
***Schedule, Item Types and Quantities Specified are Based on a Notional Deployment Schedule and Preliminary Design Do Not Order***
AES
ANSI
BOM
CBP
CUN
CO
COTR
DHS
EFT
EIT
FOB
GFE
lAW
IPS
JIT
LMR
MD
OAST
OBP
ODC
OIT
PM
PSR
QA
R56
RF
SOW
SSCM
TIA
TO
TRM
Advanced Encryption Services American National Standards Institute Bill of Materials Customs and Border Protection Contract Line Item Number Contracting Officer Contracting Officer's Technical Representative Department of Homeland Security Electronic Funds Transfer Electronic and Information Technology Free on Board Government Furnished Equipment In Accordance With Integrated Project Schedule Just in Time Land Mobile Radio Management Directive Office on Accessible Systems and Technology Office of Border Patrol Other Direct Cost Office of Information and Technology Project Manager Project Status Report Quality Assurance Motorola R-56 Standards and Guidelines for Communications Sites Radio Frequency Statement of Work Supply and Supply Chain Management Telecommunications Industry Association Task Order Technical Reference Model
A. Uninterrupted Power Supply B. Prefabricated Concrete 12' x 16' Shelter with Power System C. Prefabricated 12' x 24' Lightweight Shelter wi Power System D. Prefabricated 12' x 24' Lightweight Shelter wi Power Distribution E. Prefabricated Concrete 12' x 32' Shelter wi Power System F. Cell on Wheels - General Specifications G. Outdoor Cabinet Specifications H. 28 KW (Prime Power Rating) GENERATOR APPLOCATION & ENGINNERING DATA I. 80 KW (Prime Power Rating) GENERATOR APPLICATION & ENGINEERING DATA J. Automatic Transfer Switch 100-800 K. Transient Voltage Surge Suppression L. 80 Foot Self Supporting Tower (SST) Specifications M. 100 Foot Self Supporting Tower (SST) Specifications N. 120 Foot Self Supporting Tower (SST) Specifications O. 135 Foot Self Supporting Tower (SST) Specifications P. 150 Foot Self Supporting Tower (SST) Specifications Q. 200 Foot Self Supporting Tower (SST) Specifications R. 220 Foot Self Supporting Tower (SST) Specifications S. 80 Foot Monopole Specifications
1. 95 Foot Monopole Specifications U. 100 Foot Monopole Specifications V. 120 Foot Monopole Specifications W. Fuel Tank Specifications
x. Solar Assembly Component Specifications Y. Site Breakout Characteristics Z. Additional Tower Specifications
*Please note Attachments A - Yare not directly attached within the RFP and may be found with the RFP document package and notice details.
11.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
Also, the full text of a clause may be accessed electronically at this/these address(es):
11.2 52.212-4 CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS (MAR 2009)
11.3 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-CENTRAL CONTRACTOR
REGISTRATION (OCT 2003)
11.4 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT
STATUTES OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (FEB 2010) ALTERNATE
II (DEC 2009)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).
[] Alternate I (AUG 2007) of 52.222-50 (22 U.S.C. 7104(g)).
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108- 78)
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriatej
[Yj (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (SEP 2006), with Alternate I (OCT 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).
[Yj (2) 52.203-13, Contractor Code of Business Ethics and Conduct (DEC 2008) (Pub. L. 110- 252, Title VI, Chapter 1 (41 U.S.C. 251 note)).
[Yj (3) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (MAR 2009) (Section 1553 of Pub. L. 111-5). Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
[Yj (4) 52.204-11, American Recovery and Reinvestment Act-Reporting Requirements . (MAR 2009) (Pub. L. 111-5). .
[] (5) 52.219-3, Notice of Total HUBZone Set-Aside (JAN 1999) (15 U.S.C. 657a).
[J (6) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (JUL 2005) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
[J (7) [Reserved]
[Y] (8) (i) 52.219-6, Notice of Total Small Business Set-Aside (JUN 2003) (15 U.S.C. 644).
[J (ii) Alternate I (OCT 1995) of 52.219-6.
[J (iii) Alternate II (MAR 2004) of 52.219-6.
[J (9) (i) 52.219-7, Notice of Partial Small Business Set-Aside (JUN 2003) (15 U.S.C. 644).
[J (ii) Alternate I (OCT 1995) of 52.219-7.
[J (iii) Alternate II (MAR 2004) of 52.219-7.
[Y] (10) 52.219-8, Utilization of Small Business Concerns (MAY 2004) (15 U.S.C. 637(d)(2) and (3)).
[J (11) (i) 52.219-9, Small Business Subcontracting Plan (APR 2008) (15 U.S.C. 637(d)(4).
[J (ii) Alternate I (OCT 2001) of 52.219-9.
[J (iii) Alternate II (OCT 2001) of 52.219-9.
[Y] (12) 52.219-14, Limitations on Subcontracting (DEC 1996) (15 U.S.C. 637(a)(14)).
[J (13) 52.219-16, Liquidated Damages--Subcontracting Plan (JAN 1999) (15 U.s.C.
637( d)(4)(F)(i)).
[J (14)(i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (OCT 2008) (10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer).
[J (15) 52.219-25, Small Disadvantaged Business Participation Program--Disadvantaged Status and Reporting (APR 2008) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).
[J (16) 52.219-26, Small Disadvantaged Business Participation Program--Incentive Subcontracting (OCT 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).
[J (17) 52.219-27, Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside
(MAY 2004).
[J (18) 52.219-28, Post Award Small Business Program Rerepresentation (APR 2009) (15 U.S.C. 632(a)(2)).
[Y] (20) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (AUG 2009) (E.O. 13126).
[] (23) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (SEP 2006) (38 U.S.C. 4212).
[] (24) 52.222-36, Affirmative Action for Workers with Disabilities (JUN 1998) (29 U.S.C. 793).
[] (25) 52.222-37, Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (SEP 2006) (38 U.S.C. 4212).
[Yj (26) 52.222-54, Employment Eligibility Verification (JAN 2009). (Executive Order 12989).
(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
[] (27)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Products Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[] (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[] (28) 52.223-15, Energy Efficiency in Energy--Consuming Products (DEC 2007) (42 U.S.C.
8259b).
[] (29)(i) 52.223-16, IEEE 1689 Standard for the Environmental Assessment of Personal Computer Products (DEC 2007) (E.O. 13423).
[] (ii) Alternate I (DEC 2007) of 52.223-16.
[Yj (30) 52.225-1, Buy American Act--Supplies (FEB 2009) (41 U.S.C. 1Oa-1Od).
[] (31)(i) 52.225-3, Buy American Act Free Trade Agreements--Israeli Trade Act (JUN 2009) (41 U.S.C. 10a-10d, 19 U.S.C. 3301 note, 19 U.s.C. 2112 note, 19 U.S.C. 3805 note, Pub.
L. 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, and 110-138).
[] (ii) Alternate I (JAN 2004) of 52.225-3.
[] (iii) Alternate II (JAN 2004) of 52.225-3.
[] (32) 52.225-5, Trade Agreements (AUG 2009) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
[] (33) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.o.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
[] (35) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007)
[] (36) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).
[] (37) 52.232-30, Installment Payments for Commercial Items (OCT 1995) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).
[Y] (38) 52.232-33, Payment by Electronic Funds Transfer--Central Contractor Registration
(OCT 2003) (31 U.S.C. 3332).
[] (39) 52.232-34, Payment by Electronic Funds Transfer--Other than Central Contractor Registration (MAY 1999) (31 U.S.C. 3332).
[Y] (41) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).
[] (42)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631).
[] (ii) Alternate I (APR 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
[] (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 1989) (29 U.S.C. 206 and 41 U.S.C. 351, et seq).
[] (3) 52.222-43, Fair Labor Standards Act and Service Contract Act--Price Adjustment (MUltiple Year and Option Contracts) (SEP 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq).
[] (4) 52.222-44, Fair Labor Standards Act and Service Contract Act--Price Adjustment (SEP 2009) (29 U.S.C. 206 and 41 U.S.C.