Attachment Y Site Breakout characteristics Rev 3b.xls
XLS spreadsheet 224 KB Posted
- Attached to
- Amendment 5 Federal contract opportunity
- Solicitation number
- HSBP1010R0054
About this file
Attachment Y added to the Statement of Work (SOW) Attachments
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HSBP1010R0054 Solicitation POST A00050001.pdf | ||
| HSBP1010R0054 Amendment A0005 - SF300001.pdf | ||
| SECTION IV Attachment IV.3 --- DHS 700-21.pdf | ||
| SECTION IV Attachment IV. 1 --- CLIN STRUCTURE.xls | XLS spreadsheet | |
| SECTION IV Attachment IV. 2--- Past Performance Exhibit A and B.doc | DOC document | |
| HSBP1010R0054 Solicitation POST A00004.pdf | ||
| Attachment Z-additional-tower-specs.pdf | ||
| Government Clarification on Industry Questions - A00004.doc | DOC document | |
| HSBP1010R0054 Amendment 0004 - SF 30.pdf | ||
| CBP-TACCOM-Houlton-8A-SOW_v4a_2010-0429 _2_.pdf | ||
| SF30_Amendment 3_HSBP1010R0054.pdf | ||
| Attachments to SOW.PDF | ||
| 8(a) CLIN STRUCTURE.xls | XLS spreadsheet | |
| HSBP1010R0054 - A00002 Dtd 4.26.10.pdf | ||
| HSBP1010R0054 - A00001.doc | DOC document | |
| RFP HSBP1010R0054.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
60 Site Characteristics
| Attachment Y | |||||||||||||||||||||||||||||||||||||||||||
| Site Location | Tower Requirements | Prefabricated Shelter Requirements (to include items with * ) | Generator Requirements | Automatic Transfer Switch Requirements | Propane Fuel Tank Requirements | Uninterruptible Power System Requirements | Transient Voltage Supression Requirements | Solar/Wind Power Equipment | Total Equipment per Site | ||||||||||||||||||||||||||||||||||
| Site Name | Tower Height Size | Ship To Location | Notional Delivery Order | Notional Delivery Date | Manufacturer | Model # | Price | Shelter Size | Ship To Location | Notional Delivery Order | Notional Delivery Date | Price | Generator Size * | Ship To Location | Notional Delivery Order | Notional Delivery Date | Price | ATS Size * | Ship To Location | Notional Delivery Order | Notional Delivery Date | Price | Tank Size | Ship To Location | Notional Delivery Order | Notional Delivery Date | Price | UPS Size * | Ship To Location | Notional Delivery Order | Notional Delivery Date | Price | TVSS Type * | Ship To Location | Notional Delivery Order | Notional Delivery Date | Price | Solar / Wind | Ship To Location | Notional Delivery Order | Notional Delivery Date | Price | |
| Bald Mtn. | 180' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | 12x32 | Site | 2/1/11 | 4/7/11 | $ - 0 | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| Benedicta | 180' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | 12x32 | Site | 2/1/11 | 4/7/11 | $ - 0 | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| Musquash Mtn. | 180' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | 12x32 | Site | 2/1/11 | 4/7/11 | $ - 0 | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| Norway Bluff (Solar) | 100' SST | Site | 1/15/11 | 3/11/11 | $ - 0 | 12x24 Integrated LW No AC Power | Site | 12/1/10 | 2/4/11 | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Spencer Mtn. (Solar) | 80' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | 12x24 Integrated LW No AC Power | Site | 12/1/10 | 2/4/11 | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| W. Kennebago Mtn (Solar) | 80' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | 12x24 Integrated LW No AC Power | Site | 12/1/10 | 2/4/11 | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| ** POE Portsmouth | 100' SST | Site | 1/15/11 | 3/11/11 | $ - 0 | 12x16 | Site | 2/1/11 | 4/7/11 | $ - 0 | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200 Amp | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| ** SM York | 180' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | 12x32 | Site | 2/1/11 | 4/7/11 | $ - 0 | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| ** Huntoon Mtn (Blinn Hill) | 180' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | 12x32 | Site | 2/1/11 | 4/7/11 | $ - 0 | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| ** SM Ossippee Mtn | 180' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | 12x32 | Site | 2/1/11 | 4/7/11 | $ - 0 | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| ** SM Gray RCC | 275' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | 12x32 | Site | 4/1/11 | 6/5/11 | $ - 0 | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| ** SM Pleasant Mtn | 80' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | 12x24 Integrated LW No AC Power | Site | 12/1/10 | 2/4/11 | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | TYPE 1 & 2 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||
| ** SM Spruce Mtn | 180' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | 12x32 | Site | 4/1/11 | 6/5/11 | $ - 0 | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| ** SM Whitten Hill | 180' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | 12x32 | Site | 4/1/11 | 6/5/11 | $ - 0 | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| ** SM Sugarloaf Mtn | 180' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | 12x32 | Site | 4/1/11 | 6/5/11 | $ - 0 | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| ** SM Eaton Mtn | 180' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | 12x32 | Site | 4/1/11 | 6/5/11 | $ - 0 | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| ** SM Mt Harris | 180' SST | Site | 6/1/11 | 7/26/11 | $ - 0 | 12x16 | Site | 2/1/11 | 4/7/11 | $ - 0 | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200 Amp | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| ** SM Bucks Harbor | 120' SST | Site | 6/15/11 | 8/9/11 | $ - 0 | 12x16 | Site | 2/1/11 | 4/7/11 | $ - 0 | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200 Amp | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| ** SM Passadumkeag | Existing Tower | $ - 0 | 12x32 | Site | 4/1/11 | 6/5/11 | $ - 0 | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | |||||||||
| ** SM No 9 Mtn | 275' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | 12x32 | Site | 4/1/11 | 6/5/11 | $ - 0 | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| ** SM Cyr Mtn | 180' SST | Site | 6/1/11 | 7/26/11 | $ - 0 | 12x32 | Site | 4/1/11 | 6/5/11 | $ - 0 | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| ** SM St. Francis | 180' SST | Site | 6/1/11 | 7/26/11 | $ - 0 | 12x24 Lightweight | Site | 6/1/11 | 8/5/11 | $ - 0 | 70 KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 300AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| CBP Coburn Mtn | 80' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | 12x24 Integrated LW No AC Power | Site | 12/1/10 | 2/4/11 | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| CBP Portland | Existing Tower | $ - 0 | Existing Site Improvement | $ - 0 | 25 KW | Site | 12/1/11 | 1/5/12 | $ - 0 | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | 20 kVA | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||
| CBP St. Pamphile | 80' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | 12x24 Integrated LW No AC Power | Site | 12/1/10 | 2/4/11 | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | Solar/Wind Plant see Specifications | Warehouse | 2/1/11 | 4/1/11 | $ - 0 | $ - 0 | ||||||||||||||
| Peekaboo Mtn | Existing Tower | $ - 0 | 12x16 | Site | 2/1/11 | 4/7/11 | $ - 0 | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | |||||||||
| POE Calais | 95' Monopole | Site | 2/1/11 | 3/28/11 | $ - 0 | Existing Site Improvement | $ - 0 | 25 KW | Site | 12/1/11 | 1/5/12 | $ - 0 | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | 10 kVA | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| POE Easton | 80' Monopole | Site | 12/1/11 | 1/25/12 | $ - 0 | External Cabinet | Site | 2/1/11 | 4/7/11 | $ - 0 | 25 Kw | Site | 12/1/11 | 1/5/12 | $ - 0 | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | 10 kVA | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | ||||||
| POE Forrest City | 200' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | Existing Site Improvement | $ - 0 | 25 KW | Site | 12/1/11 | 1/5/12 | $ - 0 | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | 10 kVA | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| POE Hamlin | 80' Monopole | Site | 12/1/11 | 1/25/12 | $ - 0 | Existing Site Improvement | $ - 0 | 25 KW | Site | 12/1/11 | 1/5/12 | $ - 0 | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | 10 kVA | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| POE Limestone | 80' Monopole | Site | 12/1/11 | 1/25/12 | $ - 0 | External Cabinet | Site | 2/1/11 | 4/7/11 | $ - 0 | 25 Kw | Site | 2/1/11 | 3/8/11 | $ - 0 | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | 10 kVA | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | ||||||
| POE Lubec | 120' MP | Site | 2/1/11 | 3/28/11 | $ - 0 | Existing Site Improvement | $ - 0 | 25 KW | Site | 2/1/11 | 3/8/11 | $ - 0 | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | 10 kVA | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| POE Orient | 80' Monopole | Site | 12/1/11 | 1/25/12 | $ - 0 | Existing Site Improvement | $ - 0 | 25 KW | Site | 2/1/11 | 3/8/11 | $ - 0 | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| POE St. Aurelie | 200' SST | Site | 6/15/11 | 8/9/11 | $ - 0 | 12x16 | Site | 4/1/11 | 6/5/11 | $ - 0 | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| POE Van Buren | COW | $ - 0 | COW | Site | 9/1/10 | 11/5/10 | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Rocky Mtn | 80' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | 12x24 Integrated LW No AC Power | Site | 3/1/11 | 5/5/11 | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| RVSS Deer Farm | 80' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | 12x16 | Site | 4/1/11 | 6/5/11 | $ - 0 | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| RVSS Fuller Road | 100' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | 12x16 | Site | 4/1/11 | 6/5/11 | $ - 0 | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| RVSS Parmachene | 220' SST | Site | 6/1/11 | 7/26/11 | $ - 0 | 12x24 Integrated LW No AC Power | Site | 3/1/11 | 5/5/11 | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| SM Camp Keyes | 135' SST | Site | 6/15/11 | 8/9/11 | $ - 0 | 12x16 | Site | 4/1/11 | 6/5/11 | $ - 0 | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| SM Clear Lake | 150' SST | Site | 6/15/11 | 8/9/11 | $ - 0 | 12x24 Integrated LW No AC Power | Site | 3/1/11 | 5/5/11 | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| SM Hatchet Mtn | 80' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | 12x16 | Site | 4/1/11 | 6/5/11 | $ - 0 | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||
| SM Portage lake | 120' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | Existing Site Improvement | $ - 0 | 25 KW | Site | 2/1/11 | 3/8/11 | $ - 0 | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| Spruce Mtn 2 | 120' SST | Site | 6/15/11 | 8/9/11 | $ - 0 | 12x24 Integrated LW No AC Power | Site | 3/1/11 | 5/5/11 | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| CBP Calais ME | Existing Tower | $ - 0 | Existing Site Improvement | $ - 0 | 25 KW | Site | 2/1/11 | 3/8/11 | $ - 0 | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| CBP Cooper | Existing Tower | $ - 0 | Existing Site Improvement | $ - 0 | N/A | $ - 0 | 200AMP | Warehouse | 2/1/10 | 3/8/10 | $ - 0 | N/A | $ - 0 | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| CBP Escourt | 80' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | 12x24 Integrated LW No AC Power | Site | 3/1/11 | 5/5/11 | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | Solar/Wind Plant see Specifications | Warehouse | 2/1/11 | 4/1/11 | $ - 0 | $ - 0 | ||||||||||||||
| CBP Hovey Hill | 80' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | Existing Site Improvement | $ - 0 | 25 KW | Site | 3/9/11 | 4/13/11 | $ - 0 | 200AMP | Warehouse | 2/1/10 | 3/8/10 | $ - 0 | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| CBP Parkhurst | 80' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | Existing Site Improvement | $ - 0 | 25 KW | Site | 3/9/11 | 4/13/11 | $ - 0 | 200AMP | Warehouse | 2/1/10 | 3/8/10 | $ - 0 | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| Lead Mtn | Existing Tower | $ - 0 | Existing Site Improvement | $ - 0 | N/A | $ - 0 | 200AMP | Warehouse | 2/1/10 | 3/8/10 | $ - 0 | N/A | $ - 0 | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| POE Coburn Gore | 100' Monopole | Site | 2/1/11 | 3/28/11 | $ - 0 | Existing Site Improvement | $ - 0 | 80 KW | Site | 3/9/11 | 4/13/11 | $ - 0 | 400AMP | Warehouse | 2/1/10 | 3/8/10 | $ - 0 | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| POE Fort Kent | 80' Monopole | Site | 2/1/11 | 3/28/11 | $ - 0 | Existing Site Improvement | $ - 0 | 25 KW | Site | 3/9/11 | 4/13/11 | $ - 0 | 200AMP | Warehouse | 2/1/10 | 3/8/10 | $ - 0 | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| POE Madawaska | 80' Monopole | Site | 2/1/11 | 3/28/11 | $ - 0 | Existing Site Improvement | $ - 0 | 25 KW | Site | 3/9/11 | 4/13/11 | $ - 0 | 200AMP | Warehouse | 2/1/10 | 3/8/10 | $ - 0 | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| POE St. Juste | 80' Monopole | Site | 2/1/11 | 3/28/11 | $ - 0 | Existing Site Improvement | $ - 0 | 25 KW | Site | 3/9/11 | 4/13/11 | $ - 0 | 200AMP | Warehouse | 2/1/10 | 3/8/10 | $ - 0 | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| Bull Hill (Garland) | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||
| Granite Hill (Cadillac Mtn.) | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||
| De Bouille Mtn. (Solar) | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||||||||
| Mt. Blue (Solar) | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||||||||
| New Sweden | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||
| Robinson Mtn | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | N/A | $ - 0 | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||
| * Note: Prefabricated shelters are to include items specified in column with * above |
Tower Requirements
| Site Location | Tower Requirements | ||||||
| Site Name | Tower Height Size | Ship To Location | Notional Delivery Order | Notional Delivery Date | Manufacturer | Model # | Price |
| Bald Mtn. | 180' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| Benedicta | 180' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| Musquash Mtn. | 180' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| Norway Bluff (Solar) | 100' SST | Site | 1/15/11 | 3/11/11 | $ - 0 | ||
| Spencer Mtn. (Solar) | 80' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| W. Kennebago Mtn (Solar) | 80' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| ** POE Portsmouth | 100' SST | Site | 1/15/11 | 3/11/11 | $ - 0 | ||
| ** SM York | 180' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| ** Huntoon Mtn (Blinn Hill) | 180' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| ** SM Ossippee Mtn | 180' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| ** SM Gray RCC | 275' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | ||
| ** SM Pleasant Mtn | 80' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| ** SM Spruce Mtn | 180' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | ||
| ** SM Whitten Hill | 180' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | ||
| ** SM Sugarloaf Mtn | 180' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | ||
| ** SM Eaton Mtn | 180' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | ||
| ** SM Mt Harris | 180' SST | Site | 6/1/11 | 7/26/11 | $ - 0 | ||
| ** SM Bucks Harbor | 120' SST | Site | 6/15/11 | 8/9/11 | $ - 0 | ||
| ** SM Passadumkeag | Existing Tower | $ - 0 | |||||
| ** SM No 9 Mtn | 275' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | ||
| ** SM Cyr Mtn | 180' SST | Site | 6/1/11 | 7/26/11 | $ - 0 | ||
| ** SM St. Francis | 180' SST | Site | 6/1/11 | 7/26/11 | $ - 0 | ||
| CBP Coburn Mtn | 80' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| CBP Portland | Existing Tower | $ - 0 | |||||
| CBP St. Pamphile | 80' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| Peekaboo Mtn | Existing Tower | $ - 0 | |||||
| POE Calais | 95' Monopole | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| POE Easton | 80' Monopole | Site | 12/1/11 | 1/25/12 | $ - 0 | ||
| POE Forrest City | 200' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| POE Hamlin | 80' Monopole | Site | 12/1/11 | 1/25/12 | $ - 0 | ||
| POE Limestone | 80' Monopole | Site | 12/1/11 | 1/25/12 | $ - 0 | ||
| POE Lubec | 120' MP | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| POE Orient | 80' Monopole | Site | 12/1/11 | 1/25/12 | $ - 0 | ||
| POE St. Aurelie | 200' SST | Site | 6/15/11 | 8/9/11 | $ - 0 | ||
| POE Van Buren | COW | $ - 0 | |||||
| Rocky Mtn | 80' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| RVSS Deer Farm | 80' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | ||
| RVSS Fuller Road | 100' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | ||
| RVSS Parmachene | 220' SST | Site | 6/1/11 | 7/26/11 | $ - 0 | ||
| SM Camp Keyes | 135' SST | Site | 6/15/11 | 8/9/11 | $ - 0 | ||
| SM Clear Lake | 150' SST | Site | 6/15/11 | 8/9/11 | $ - 0 | ||
| SM Hatchet Mtn | 80' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | ||
| SM Portage lake | 120' SST | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| Spruce Mtn 2 | 120' SST | Site | 6/15/11 | 8/9/11 | $ - 0 | ||
| CBP Calais ME | Existing Tower | $ - 0 | |||||
| CBP Cooper | Existing Tower | $ - 0 | |||||
| CBP Escourt | 80' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | ||
| CBP Hovey Hill | 80' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | ||
| CBP Parkhurst | 80' SST | Site | 4/1/11 | 5/26/11 | $ - 0 | ||
| Lead Mtn | Existing Tower | $ - 0 | |||||
| POE Coburn Gore | 100' Monopole | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| POE Fort Kent | 80' Monopole | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| POE Madawaska | 80' Monopole | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| POE St. Juste | 80' Monopole | Site | 2/1/11 | 3/28/11 | $ - 0 | ||
| Bull Hill (Garland) | N/A | $ - 0 | |||||
| Granite Hill (Cadillac Mtn.) | N/A | $ - 0 | |||||
| De Bouille Mtn. (Solar) | N/A | $ - 0 | |||||
| Mt. Blue (Solar) | N/A | $ - 0 | |||||
| New Sweden | N/A | $ - 0 | |||||
| Robinson Mtn | N/A | $ - 0 | |||||
| Total | $ - 0 | ||||||
| * Note: Prefabricated shelters are to include items specified in column with * above |
Shelter Requirements
| Site Location | Prefabricated Shelter Requirements (to include items with * ) | ||||||
| Site Name | Shelter Size | Ship To Location | Notional Delivery Order | Notional Delivery Date | Manufacturer | Model # | Price |
| Bald Mtn. | 12x32 | Site | 2/1/11 | 4/7/11 | $ - 0 | ||
| Benedicta | 12x32 | Site | 2/1/11 | 4/7/11 | $ - 0 | ||
| Musquash Mtn. | 12x32 | Site | 2/1/11 | 4/7/11 | $ - 0 | ||
| Norway Bluff (Solar) | 12x24 Integrated LW No AC Power | Site | 12/1/10 | 2/4/11 | $ - 0 | ||
| Spencer Mtn. (Solar) | 12x24 Integrated LW No AC Power | Site | 12/1/10 | 2/4/11 | $ - 0 | ||
| W. Kennebago Mtn (Solar) | 12x24 Integrated LW No AC Power | Site | 12/1/10 | 2/4/11 | $ - 0 | ||
| ** POE Portsmouth | 12x16 | Site | 2/1/11 | 4/7/11 | $ - 0 | ||
| ** SM York | 12x32 | Site | 2/1/11 | 4/7/11 | $ - 0 | ||
| ** Huntoon Mtn (Blinn Hill) | 12x32 | Site | 2/1/11 | 4/7/11 | $ - 0 | ||
| ** SM Ossippee Mtn | 12x32 | Site | 2/1/11 | 4/7/11 | $ - 0 | ||
| ** SM Gray RCC | 12x32 | Site | 4/1/11 | 6/5/11 | $ - 0 | ||
| ** SM Pleasant Mtn | 12x24 Integrated LW No AC Power | Site | 12/1/10 | 2/4/11 | $ - 0 | ||
| ** SM Spruce Mtn | 12x32 | Site | 4/1/11 | 6/5/11 | $ - 0 | ||
| ** SM Whitten Hill | 12x32 | Site | 4/1/11 | 6/5/11 | $ - 0 | ||
| ** SM Sugarloaf Mtn | 12x32 | Site | 4/1/11 | 6/5/11 | $ - 0 | ||
| ** SM Eaton Mtn | 12x32 | Site | 4/1/11 | 6/5/11 | $ - 0 | ||
| ** SM Mt Harris | 12x16 | Site | 2/1/11 | 4/7/11 | $ - 0 | ||
| ** SM Bucks Harbor | 12x16 | Site | 2/1/11 | 4/7/11 | $ - 0 | ||
| ** SM Passadumkeag | 12x32 | Site | 4/1/11 | 6/5/11 | $ - 0 | ||
| ** SM No 9 Mtn | 12x32 | Site | 4/1/11 | 6/5/11 | $ - 0 | ||
| ** SM Cyr Mtn | 12x32 | Site | 4/1/11 | 6/5/11 | $ - 0 | ||
| ** SM St. Francis | 12x24 Lightweight | Site | 6/1/11 | 8/5/11 | $ - 0 | ||
| CBP Coburn Mtn | 12x24 Integrated LW No AC Power | Site | 12/1/10 | 2/4/11 | $ - 0 | ||
| CBP Portland | Existing Site Improvement | $ - 0 | |||||
| CBP St. Pamphile | 12x24 Integrated LW No AC Power | Site | 12/1/10 | 2/4/11 | $ - 0 | ||
| Peekaboo Mtn | 12x16 | Site | 2/1/11 | 4/7/11 | $ - 0 | ||
| POE Calais | Existing Site Improvement | $ - 0 | |||||
| POE Easton | External Cabinet | Site | 2/1/11 | 4/7/11 | $ - 0 | ||
| POE Forrest City | Existing Site Improvement | $ - 0 | |||||
| POE Hamlin | Existing Site Improvement | $ - 0 | |||||
| POE Limestone | External Cabinet | Site | 2/1/11 | 4/7/11 | $ - 0 | ||
| POE Lubec | Existing Site Improvement | $ - 0 | |||||
| POE Orient | Existing Site Improvement | $ - 0 | |||||
| POE St. Aurelie | 12x16 | Site | 4/1/11 | 6/5/11 | $ - 0 | ||
| POE Van Buren | COW | Site | 9/1/10 | 11/5/10 | $ - 0 | ||
| Rocky Mtn | 12x24 Integrated LW No AC Power | Site | 3/1/11 | 5/5/11 | $ - 0 | ||
| RVSS Deer Farm | 12x16 | Site | 4/1/11 | 6/5/11 | $ - 0 | ||
| RVSS Fuller Road | 12x16 | Site | 4/1/11 | 6/5/11 | $ - 0 | ||
| RVSS Parmachene | 12x24 Integrated LW No AC Power | Site | 3/1/11 | 5/5/11 | $ - 0 | ||
| SM Camp Keyes | 12x16 | Site | 4/1/11 | 6/5/11 | $ - 0 | ||
| SM Clear Lake | 12x24 Integrated LW No AC Power | Site | 3/1/11 | 5/5/11 | $ - 0 | ||
| SM Hatchet Mtn | 12x16 | Site | 4/1/11 | 6/5/11 | $ - 0 | ||
| SM Portage lake | Existing Site Improvement | $ - 0 | |||||
| Spruce Mtn 2 | 12x24 Integrated LW No AC Power | Site | 3/1/11 | 5/5/11 | $ - 0 | ||
| CBP Calais ME | Existing Site Improvement | $ - 0 | |||||
| CBP Cooper | Existing Site Improvement | $ - 0 | |||||
| CBP Escourt | 12x24 Integrated LW No AC Power | Site | 3/1/11 | 5/5/11 | $ - 0 | ||
| CBP Hovey Hill | Existing Site Improvement | $ - 0 | |||||
| CBP Parkhurst | Existing Site Improvement | $ - 0 | |||||
| Lead Mtn | Existing Site Improvement | $ - 0 | |||||
| POE Coburn Gore | Existing Site Improvement | $ - 0 | |||||
| POE Fort Kent | Existing Site Improvement | $ - 0 | |||||
| POE Madawaska | Existing Site Improvement | $ - 0 | |||||
| POE St. Juste | Existing Site Improvement | $ - 0 | |||||
| Bull Hill (Garland) | N/A | $ - 0 | |||||
| Granite Hill (Cadillac Mtn.) | N/A | $ - 0 | |||||
| De Bouille Mtn. (Solar) | N/A | $ - 0 | |||||
| Mt. Blue (Solar) | N/A | $ - 0 | |||||
| New Sweden | N/A | $ - 0 | |||||
| Robinson Mtn | N/A | $ - 0 | |||||
| * Note: Prefabricated shelters are to include items specified in column with * above | Total | $ - 0 |
Generator Requirements
| Site Location | Generator Requirements | ||||||
| Site Name | Generator Size * | Ship To Location | Notional Delivery Order | Notional Delivery Date | Manufacturer | Model # | Price |
| Bald Mtn. | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| Benedicta | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| Musquash Mtn. | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| Norway Bluff (Solar) | N/A | $ - 0 | |||||
| Spencer Mtn. (Solar) | N/A | $ - 0 | |||||
| W. Kennebago Mtn (Solar) | N/A | $ - 0 | |||||
| ** POE Portsmouth | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM York | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** Huntoon Mtn (Blinn Hill) | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Ossippee Mtn | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Gray RCC | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Pleasant Mtn | N/A | $ - 0 | |||||
| ** SM Spruce Mtn | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Whitten Hill | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Sugarloaf Mtn | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Eaton Mtn | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Mt Harris | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Bucks Harbor | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Passadumkeag | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM No 9 Mtn | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Cyr Mtn | 100KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM St. Francis | 70 KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| CBP Coburn Mtn | N/A | $ - 0 | |||||
| CBP Portland | 25 KW | Site | 12/1/11 | 1/5/12 | $ - 0 | ||
| CBP St. Pamphile | N/A | $ - 0 | |||||
| Peekaboo Mtn | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| POE Calais | 25 KW | Site | 12/1/11 | 1/5/12 | $ - 0 | ||
| POE Easton | 25 Kw | Site | 12/1/11 | 1/5/12 | $ - 0 | ||
| POE Forrest City | 25 KW | Site | 12/1/11 | 1/5/12 | $ - 0 | ||
| POE Hamlin | 25 KW | Site | 12/1/11 | 1/5/12 | $ - 0 | ||
| POE Limestone | 25 Kw | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| POE Lubec | 25 KW | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| POE Orient | 25 KW | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| POE St. Aurelie | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| POE Van Buren | N/A | $ - 0 | |||||
| Rocky Mtn | N/A | $ - 0 | |||||
| RVSS Deer Farm | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| RVSS Fuller Road | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| RVSS Parmachene | N/A | $ - 0 | |||||
| SM Camp Keyes | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| SM Clear Lake | N/A | $ - 0 | |||||
| SM Hatchet Mtn | 50KW | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| SM Portage lake | 25 KW | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| Spruce Mtn 2 | N/A | $ - 0 | |||||
| CBP Calais ME | 25 KW | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| CBP Cooper | N/A | $ - 0 | |||||
| CBP Escourt | N/A | $ - 0 | |||||
| CBP Hovey Hill | 25 KW | Site | 3/9/11 | 4/13/11 | $ - 0 | ||
| CBP Parkhurst | 25 KW | Site | 3/9/11 | 4/13/11 | $ - 0 | ||
| Lead Mtn | N/A | $ - 0 | |||||
| POE Coburn Gore | 80 KW | Site | 3/9/11 | 4/13/11 | $ - 0 | ||
| POE Fort Kent | 25 KW | Site | 3/9/11 | 4/13/11 | $ - 0 | ||
| POE Madawaska | 25 KW | Site | 3/9/11 | 4/13/11 | $ - 0 | ||
| POE St. Juste | 25 KW | Site | 3/9/11 | 4/13/11 | $ - 0 | ||
| Bull Hill (Garland) | N/A | $ - 0 | |||||
| Granite Hill (Cadillac Mtn.) | N/A | $ - 0 | |||||
| De Bouille Mtn. (Solar) | N/A | $ - 0 | |||||
| Mt. Blue (Solar) | N/A | $ - 0 | |||||
| New Sweden | N/A | $ - 0 | |||||
| Robinson Mtn | N/A | $ - 0 | |||||
| * Note: Prefabricated shelters are to include items specified in column with * above | Total | $ - 0 |
ATS Requirements
| Site Location | Automatic Transfer Switch Requirements | ||||||
| Site Name | ATS Size * | Ship To Location | Notional Delivery Order | Notional Delivery Date | Manufacturer | Model # | Price |
| Bald Mtn. | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| Benedicta | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| Musquash Mtn. | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| Norway Bluff (Solar) | N/A | $ - 0 | |||||
| Spencer Mtn. (Solar) | N/A | $ - 0 | |||||
| W. Kennebago Mtn (Solar) | N/A | $ - 0 | |||||
| ** POE Portsmouth | 200 Amp | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM York | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** Huntoon Mtn (Blinn Hill) | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Ossippee Mtn | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Gray RCC | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Pleasant Mtn | N/A | $ - 0 | |||||
| ** SM Spruce Mtn | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Whitten Hill | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Sugarloaf Mtn | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Eaton Mtn | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Mt Harris | 200 Amp | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Bucks Harbor | 200 Amp | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Passadumkeag | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM No 9 Mtn | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Cyr Mtn | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM St. Francis | 300AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| CBP Coburn Mtn | N/A | $ - 0 | |||||
| CBP Portland | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | ||
| CBP St. Pamphile | N/A | $ - 0 | |||||
| Peekaboo Mtn | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| POE Calais | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | ||
| POE Easton | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | ||
| POE Forrest City | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | ||
| POE Hamlin | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | ||
| POE Limestone | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | ||
| POE Lubec | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | ||
| POE Orient | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | ||
| POE St. Aurelie | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| POE Van Buren | N/A | $ - 0 | |||||
| Rocky Mtn | N/A | $ - 0 | |||||
| RVSS Deer Farm | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| RVSS Fuller Road | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| RVSS Parmachene | N/A | $ - 0 | |||||
| SM Camp Keyes | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| SM Clear Lake | N/A | $ - 0 | |||||
| SM Hatchet Mtn | 200AMP | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| SM Portage lake | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | ||
| Spruce Mtn 2 | N/A | $ - 0 | |||||
| CBP Calais ME | 200AMP | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | ||
| CBP Cooper | 200AMP | Warehouse | 2/1/10 | 3/8/10 | $ - 0 | ||
| CBP Escourt | N/A | $ - 0 | |||||
| CBP Hovey Hill | 200AMP | Warehouse | 2/1/10 | 3/8/10 | $ - 0 | ||
| CBP Parkhurst | 200AMP | Warehouse | 2/1/10 | 3/8/10 | $ - 0 | ||
| Lead Mtn | 200AMP | Warehouse | 2/1/10 | 3/8/10 | $ - 0 | ||
| POE Coburn Gore | 400AMP | Warehouse | 2/1/10 | 3/8/10 | $ - 0 | ||
| POE Fort Kent | 200AMP | Warehouse | 2/1/10 | 3/8/10 | $ - 0 | ||
| POE Madawaska | 200AMP | Warehouse | 2/1/10 | 3/8/10 | $ - 0 | ||
| POE St. Juste | 200AMP | Warehouse | 2/1/10 | 3/8/10 | $ - 0 | ||
| Bull Hill (Garland) | N/A | $ - 0 | |||||
| Granite Hill (Cadillac Mtn.) | N/A | $ - 0 | |||||
| De Bouille Mtn. (Solar) | N/A | $ - 0 | |||||
| Mt. Blue (Solar) | N/A | $ - 0 | |||||
| New Sweden | N/A | $ - 0 | |||||
| Robinson Mtn | N/A | $ - 0 | |||||
| * Note: Prefabricated shelters are to include items specified in column with * above | Total | $ - 0 |
Propane Tank Requirements
| Site Location | Propane Fuel Tank Requirements | ||||||
| Site Name | Tank Size | Ship To Location | Notional Delivery Order | Notional Delivery Date | Manufacturer | Model # | Price |
| Bald Mtn. | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | ||
| Benedicta | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | ||
| Musquash Mtn. | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | ||
| Norway Bluff (Solar) | N/A | $ - 0 | |||||
| Spencer Mtn. (Solar) | N/A | $ - 0 | |||||
| W. Kennebago Mtn (Solar) | N/A | $ - 0 | |||||
| ** POE Portsmouth | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | ||
| ** SM York | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | ||
| ** Huntoon Mtn (Blinn Hill) | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | ||
| ** SM Ossippee Mtn | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | ||
| ** SM Gray RCC | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | ||
| ** SM Pleasant Mtn | N/A | $ - 0 | |||||
| ** SM Spruce Mtn | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | ||
| ** SM Whitten Hill | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | ||
| ** SM Sugarloaf Mtn | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | ||
| ** SM Eaton Mtn | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | ||
| ** SM Mt Harris | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | ||
| ** SM Bucks Harbor | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | ||
| ** SM Passadumkeag | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | ||
| ** SM No 9 Mtn | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | ||
| ** SM Cyr Mtn | 500 Gal. | Site | 12/1/10 | 1/5/11 | $ - 0 | ||
| ** SM St. Francis | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| CBP Coburn Mtn | N/A | $ - 0 | |||||
| CBP Portland | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| CBP St. Pamphile | N/A | $ - 0 | |||||
| Peekaboo Mtn | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| POE Calais | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| POE Easton | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| POE Forrest City | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| POE Hamlin | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| POE Limestone | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| POE Lubec | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| POE Orient | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| POE St. Aurelie | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| POE Van Buren | N/A | $ - 0 | |||||
| Rocky Mtn | N/A | $ - 0 | |||||
| RVSS Deer Farm | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| RVSS Fuller Road | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| RVSS Parmachene | N/A | $ - 0 | |||||
| SM Camp Keyes | 500 Gal. | Site | 2/1/11 | 3/8/11 | $ - 0 | ||
| SM Clear Lake | N/A | $ - 0 | |||||
| SM Hatchet Mtn | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | ||
| SM Portage lake | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | ||
| Spruce Mtn 2 | N/A | $ - 0 | |||||
| CBP Calais ME | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | ||
| CBP Cooper | N/A | $ - 0 | |||||
| CBP Escourt | N/A | $ - 0 | |||||
| CBP Hovey Hill | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | ||
| CBP Parkhurst | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | ||
| Lead Mtn | N/A | $ - 0 | |||||
| POE Coburn Gore | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | ||
| POE Fort Kent | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | ||
| POE Madawaska | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | ||
| POE St. Juste | 500 Gal. | Site | 4/1/11 | 5/6/11 | $ - 0 | ||
| Bull Hill (Garland) | N/A | $ - 0 | |||||
| Granite Hill (Cadillac Mtn.) | N/A | $ - 0 | |||||
| De Bouille Mtn. (Solar) | N/A | $ - 0 | |||||
| Mt. Blue (Solar) | N/A | $ - 0 | |||||
| New Sweden | N/A | $ - 0 | |||||
| Robinson Mtn | N/A | $ - 0 | |||||
| * Note: Prefabricated shelters are to include items specified in column with * above | Total | $ - 0 |
UPS Requirements
| Site Location | Uninterruptible Power System Requirements | ||||||
| Site Name | UPS Size * | Ship To Location | Notional Delivery Order | Notional Delivery Date | Manufacturer | Model # | Price |
| Bald Mtn. | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| Benedicta | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| Musquash Mtn. | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| Norway Bluff (Solar) | N/A | $ - 0 | |||||
| Spencer Mtn. (Solar) | N/A | $ - 0 | |||||
| W. Kennebago Mtn (Solar) | N/A | $ - 0 | |||||
| ** POE Portsmouth | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM York | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** Huntoon Mtn (Blinn Hill) | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Ossippee Mtn | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Gray RCC | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Pleasant Mtn | N/A | $ - 0 | |||||
| ** SM Spruce Mtn | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Whitten Hill | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Sugarloaf Mtn | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Eaton Mtn | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Mt Harris | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Bucks Harbor | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Passadumkeag | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM No 9 Mtn | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Cyr Mtn | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM St. Francis | 20 kVA x 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| CBP Coburn Mtn | N/A | $ - 0 | |||||
| CBP Portland | 20 kVA | $ - 0 | |||||
| CBP St. Pamphile | N/A | $ - 0 | |||||
| Peekaboo Mtn | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| POE Calais | 10 kVA | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | ||
| POE Easton | 10 kVA | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | ||
| POE Forrest City | 10 kVA | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | ||
| POE Hamlin | 10 kVA | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | ||
| POE Limestone | 10 kVA | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | ||
| POE Lubec | 10 kVA | Warehouse | 12/1/10 | 1/5/11 | $ - 0 | ||
| POE Orient | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | ||
| POE St. Aurelie | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| POE Van Buren | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | ||
| Rocky Mtn | N/A | $ - 0 | |||||
| RVSS Deer Farm | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| RVSS Fuller Road | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| RVSS Parmachene | N/A | $ - 0 | |||||
| SM Camp Keyes | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| SM Clear Lake | N/A | $ - 0 | |||||
| SM Hatchet Mtn | 20 kVA | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| SM Portage lake | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | ||
| Spruce Mtn 2 | N/A | $ - 0 | |||||
| CBP Calais ME | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | ||
| CBP Cooper | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | ||
| CBP Escourt | N/A | $ - 0 | |||||
| CBP Hovey Hill | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | ||
| CBP Parkhurst | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | ||
| Lead Mtn | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | ||
| POE Coburn Gore | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | ||
| POE Fort Kent | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | ||
| POE Madawaska | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | ||
| POE St. Juste | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | ||
| Bull Hill (Garland) | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | ||
| Granite Hill (Cadillac Mtn.) | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | ||
| De Bouille Mtn. (Solar) | N/A | $ - 0 | |||||
| Mt. Blue (Solar) | N/A | $ - 0 | |||||
| New Sweden | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | ||
| Robinson Mtn | 10 kVA | Warehouse | 2/1/11 | 3/8/11 | $ - 0 | ||
| * Note: Prefabricated shelters are to include items specified in column with * above | Total | $ - 0 |
TVS Requirements
| Site Location | Transient Voltage Supression Requirements | ||||||
| Site Name | TVSS Type * | Ship To Location | Notional Delivery Order | Notional Delivery Date | Manufacturer | Model # | Price |
| Bald Mtn. | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| Benedicta | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| Musquash Mtn. | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| Norway Bluff (Solar) | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| Spencer Mtn. (Solar) | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| W. Kennebago Mtn (Solar) | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** POE Portsmouth | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM York | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** Huntoon Mtn (Blinn Hill) | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Ossippee Mtn | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Gray RCC | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Pleasant Mtn | TYPE 1 & 2 | $ - 0 | |||||
| ** SM Spruce Mtn | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Whitten Hill | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Sugarloaf Mtn | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Eaton Mtn | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Mt Harris | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Bucks Harbor | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Passadumkeag | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM No 9 Mtn | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM Cyr Mtn | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| ** SM St. Francis | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| CBP Coburn Mtn | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| CBP Portland | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| CBP St. Pamphile | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| Peekaboo Mtn | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| POE Calais | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| POE Easton | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| POE Forrest City | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| POE Hamlin | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| POE Limestone | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| POE Lubec | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| POE Orient | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| POE St. Aurelie | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| POE Van Buren | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| Rocky Mtn | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| RVSS Deer Farm | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| RVSS Fuller Road | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| RVSS Parmachene | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| SM Camp Keyes | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| SM Clear Lake | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| SM Hatchet Mtn | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| SM Portage lake | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| Spruce Mtn 2 | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| CBP Calais ME | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| CBP Cooper | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| CBP Escourt | TYPE 1 & 2 | Incld. w/ Shelter | Incld. w/ Shelter | Incld. w/ Shelter | $ - 0 | ||
| CBP Hovey Hill | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| CBP Parkhurst | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| Lead Mtn | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| POE Coburn Gore | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| POE Fort Kent | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| POE Madawaska | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| POE St. Juste | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| Bull Hill (Garland) | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| Granite Hill (Cadillac Mtn.) | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| De Bouille Mtn. (Solar) | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| Mt. Blue (Solar) | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| New Sweden | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| Robinson Mtn | TYPE 1 & 2 | Warehouse | 12/1/10 | 2/15/11 | $ - 0 | ||
| * Note: Prefabricated shelters are to include items specified in column with * above | Total | $ - 0 |
Solar Wind Requirements
| Site Location | Solar/Wind Power Equipment | ||||||
| Site Name | Solar / Wind | Ship To Location | Notional Delivery Order | Notional Delivery Date | Manufacturer | Model # | Price |
| Bald Mtn. | $ - 0 | ||||||
| Benedicta | $ - 0 | ||||||
| Musquash Mtn. | $ - 0 | ||||||
| Norway Bluff (Solar) | $ - 0 | ||||||
| Spencer Mtn. (Solar) | $ - 0 | ||||||
| W. Kennebago Mtn (Solar) | $ - 0 | ||||||
| ** POE Portsmouth | $ - 0 | ||||||
| ** SM York | $ - 0 | ||||||
| ** Huntoon Mtn (Blinn Hill) | $ - 0 | ||||||
| ** SM Ossippee Mtn | $ - 0 | ||||||
| ** SM Gray RCC | $ - 0 | ||||||
| ** SM Pleasant Mtn | $ - 0 | ||||||
| ** SM Spruce Mtn | $ - 0 | ||||||
| ** SM Whitten Hill | $ - 0 | ||||||
| ** SM Sugarloaf Mtn | $ - 0 | ||||||
| ** SM Eaton Mtn | $ - 0 | ||||||
| ** SM Mt Harris | $ - 0 | ||||||
| ** SM Bucks Harbor | $ - 0 | ||||||
| ** SM Passadumkeag | $ - 0 | ||||||
| ** SM No 9 Mtn | $ - 0 | ||||||
| ** SM Cyr Mtn | $ - 0 | ||||||
| ** SM St. Francis | $ - 0 | ||||||
| CBP Coburn Mtn | $ - 0 | ||||||
| CBP Portland | $ - 0 | ||||||
| CBP St. Pamphile | Solar/Wind Plant see Specifications | Warehouse | 2/1/11 | 4/1/11 | $ - 0 | ||
| Peekaboo Mtn | $ - 0 | ||||||
| POE Calais | $ - 0 | ||||||
| POE Easton | $ - 0 | ||||||
| POE Forrest City | $ - 0 | ||||||
| POE Hamlin | $ - 0 | ||||||
| POE Limestone | $ - 0 | ||||||
| POE Lubec | $ - 0 | ||||||
| POE Orient | $ - 0 | ||||||
| POE St. Aurelie | $ - 0 | ||||||
| POE Van Buren | $ - 0 | ||||||
| Rocky Mtn | $ - 0 | ||||||
| RVSS Deer Farm | $ - 0 | ||||||
| RVSS Fuller Road | $ - 0 | ||||||
| RVSS Parmachene | $ - 0 | ||||||
| SM Camp Keyes | $ - 0 | ||||||
| SM Clear Lake | $ - 0 | ||||||
| SM Hatchet Mtn | $ - 0 | ||||||
| SM Portage lake | $ - 0 | ||||||
| Spruce Mtn 2 | $ - 0 | ||||||
| CBP Calais ME | $ - 0 | ||||||
| CBP Cooper | $ - 0 | ||||||
| CBP Escourt | Solar/Wind Plant see Specifications | Warehouse | 2/1/11 | 4/1/11 | $ - 0 | ||
| CBP Hovey Hill | $ - 0 | ||||||
| CBP Parkhurst | $ - 0 | ||||||
| Lead Mtn | $ - 0 | ||||||
| POE Coburn Gore | $ - 0 | ||||||
| POE Fort Kent | $ - 0 | ||||||
| POE Madawaska | $ - 0 | ||||||
| POE St. Juste | $ - 0 | ||||||
| Bull Hill (Garland) | $ - 0 | ||||||
| Granite Hill (Cadillac Mtn.) | $ - 0 | ||||||
| De Bouille Mtn. (Solar) | $ - 0 | ||||||
| Mt. Blue (Solar) | $ - 0 | ||||||
| New Sweden | $ - 0 | ||||||
| Robinson Mtn | $ - 0 | ||||||
| * Note: Prefabricated shelters are to include items specified in column with * above | Total | $ - 0 |
File details come from the government source that posted it. Updated .