Attachment_L-07_RFP_Logistics_Excel_Pricing_Workbook_(9-28-15).xlsx
XLSX spreadsheet 258 KB Posted
- Attached to
- TEAMS RFP Logistics
- Solicitation number
- HQ0147-15-R-0021
- Issued by
-
DOD Missile Defense Agency
About this file
Attachment L-07 EPW
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Roll-Up
| PRIME CONTRACTOR COST ROLL-UP | |||||||||||
| Contractor: | Insert contractor name | ||||||||||
| HQ0147-15-R-0021 - Logistics | |||||||||||
| Stakeholder | CLIN | Description | CFY 1 | CFY 2 | CFY 3 | CFY 4 | CFY 5 | CFY 6 | Total | Crosscheck | Unreconciled |
| ALL | All CLINs | Labor Hours | 1,100 | 2,200 | 2,200 | 2,200 | 2,200 | 1,100 | 11,000 | 11,000 | - 0 |
| Labor | $7,333 | $17,860 | $21,245 | $24,469 | $27,619 | $13,773 | $112,298 | $112,298 | $0 | ||
| IWTA | $1,016 | $2,614 | $3,223 | $4,542 | $7,033 | $4,103 | $22,531 | $109,378 | $0 | ||
| Subcontracts | $5,953 | $14,520 | $17,289 | $19,487 | $20,220 | $9,377 | $86,847 | ||||
| Subcontractor Fee | $232 | $566 | $674 | $750 | $787 | $375 | $3,385 | $3,385 | $0 | ||
| Procurement Overhead | $309 | $754 | $898 | $1,012 | $1,050 | $488 | $4,512 | ||||
| G&A | $751 | $1,845 | $2,208 | $2,579 | $2,909 | $1,434 | $11,727 | ||||
| Total Labor Cost | $15,595 | $38,159 | $45,539 | $52,839 | $59,618 | $29,550 | $241,300 | ||||
| Fixed Fee | $768 | $1,880 | $2,243 | $2,604 | $2,942 | $1,459 | $11,896 | ||||
| Total CPFF | $16,363 | $40,039 | $47,782 | $55,444 | $62,559 | $31,008 | $253,196 | ||||
| Surge break-out | |||||||||||
| 0001,1001,2001,0011 | Total Travel | $3,353,000 | Cost | $5,880,952 | |||||||
| 0002,1002,2002 | Total ODCs | $15,000 | Fee % | 5% | |||||||
| 0003 | Total Surge | $6,175,000 | Fixed Fee | $294,048 | |||||||
| SUBTOTAL ALL CLINS | $9,796,196 | Total CPFF | $6,175,000 | ||||||||
| 3001 | Cost for Option to extend services (see FAR Clause 52.217-8) | $29,550 | |||||||||
| 3001 | Fee for Option to extend services (see FAR Clause 52.217-8) | $1,458.73 | |||||||||
| TOTAL ALL CLINS | $9,827,204 | ||||||||||
| Error Check | Good | Good | Good | Good | Good | Good | Good |
| This tab rolls up the labor hours, labor cost, IWTA cost, subcontract cost, and subcontract fee by CLIN. | |||||||
| RFP-specified amounts are used for Travel, ODCs, and Surge. | |||||||
| Procurement, overhead, G&A and Fee rates are carried forward (linked) from the Rates tab. | |||||||
| Procurement overhead, G&A on non-labor costs, and fixed fee is calculated on this tab. | |||||||
| Offerors, IWTAs and major subcontractors must correct and tailor to eliminate errors and to conform to their estimating and accounting systems so that each rate/factor calculation uses the correct allocation base. | |||||||
| Prime offerors may NOT propose fee on subcontractor fee. | |||||||
| Column Index Reference | 5 | 6 | 7 | 8 | 9 | 10 | |
| Rates Applied Below | Procurement Overhead | 5.00% | 5.00% | 5.00% | 5.00% | 5.00% | 5.00% |
| G&A | 10.00% | 10.00% | 10.00% | 10.00% | 10.00% | 10.00% | |
| Fixed Fee | 5.00% |
| AB | 0101 | Labor Hours | 100 | 200 | 200 | 100 | 0 | 0 | 600 |
| Labor | $871 | $2,033 | $2,344 | $1,319 | $0 | $0 | $6,567 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $581 | $1,452 | $1,758 | $1,026 | $0 | $0 | $4,817 | ||
| Subcontractor Fee | $23 | $58 | $70 | $41 | $0 | $0 | $193 | ||
| Procurement Overhead | $30 | $76 | $91 | $53 | $0 | $0 | $250 | ||
| G&A | $63 | $159 | $192 | $112 | $0 | $0 | $526 | ||
| Total Labor Cost | $1,569 | $3,777 | $4,456 | $2,551 | $0 | $0 | $12,353 | ||
| Fixed Fee | $77 | $186 | $219 | $125 | $0 | $0 | $608 | ||
| Total CPFF | $1,646 | $3,963 | $4,676 | $2,676 | $0 | $0 | $12,961 |
| 1101 | Labor Hours | 0 | 0 | 0 | 100 | 100 | 0 | 200 |
| Labor | $0 | $0 | $0 | $952 | $1,099 | $0 | $2,051 | |
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Subcontracts | $0 | $0 | $0 | $1,319 | $1,465 | $0 | $2,784 | |
| Subcontractor Fee | $0 | $0 | $0 | $53 | $59 | $0 | $111 | |
| Procurement Overhead | $0 | $0 | $0 | $69 | $76 | $0 | $145 | |
| G&A | $0 | $0 | $0 | $144 | $160 | $0 | $304 | |
| Total Labor Cost | $0 | $0 | $0 | $2,536 | $2,859 | $0 | $5,395 | |
| Fixed Fee | $0 | $0 | $0 | $124 | $140 | $0 | $264 | |
| Total CPFF | $0 | $0 | $0 | $2,661 | $2,999 | $0 | $5,659 |
| 2101 | Labor Hours | 0 | 0 | 0 | 0 | 100 | 100 | 200 |
| Labor | $0 | $0 | $0 | $0 | $1,099 | $1,099 | $2,198 | |
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Subcontracts | $0 | $0 | $0 | $0 | $1,172 | $1,172 | $2,344 | |
| Subcontractor Fee | $0 | $0 | $0 | $0 | $47 | $47 | $94 | |
| Procurement Overhead | $0 | $0 | $0 | $0 | $61 | $61 | $122 | |
| G&A | $0 | $0 | $0 | $0 | $128 | $128 | $256 | |
| Total Labor Cost | $0 | $0 | $0 | $0 | $2,507 | $2,507 | $5,014 | |
| Fixed Fee | $0 | $0 | $0 | $0 | $123 | $123 | $246 | |
| Total CPFF | $0 | $0 | $0 | $0 | $2,630 | $2,630 | $5,260 |
All Total CPFF $1,646 $3,963 $4,676 $5,337 $5,629 $2,630 $23,880
| DE | 0102 | Labor Hours | 100 | 200 | 200 | 100 | 0 | 0 | 600 |
| Labor | $581 | $1,452 | $1,758 | $1,026 | $0 | $0 | $4,817 | ||
| IWTA | $508 | $1,307 | $1,612 | $952 | $0 | $0 | $4,379 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| G&A | $51 | $131 | $161 | $95 | $0 | $0 | $438 | ||
| Total Labor Cost | $1,140 | $2,889 | $3,531 | $2,073 | $0 | $0 | $9,634 | ||
| Fixed Fee | $57 | $144 | $177 | $104 | $0 | $0 | $482 | ||
| Total CPFF | $1,197 | $3,034 | $3,708 | $2,177 | $0 | $0 | $10,115 |
| AB | 1102 | Labor Hours | 0 | 0 | 0 | 100 | 100 | 0 | 200 |
| Labor | $0 | $0 | $0 | $1,319 | $1,465 | $0 | $2,784 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $0 | $0 | $0 | $1,026 | $1,172 | $0 | $2,198 | ||
| Subcontractor Fee | $0 | $0 | $0 | $41 | $47 | $0 | $88 | ||
| Procurement Overhead | $0 | $0 | $0 | $53 | $61 | $0 | $114 | ||
| G&A | $0 | $0 | $0 | $112 | $128 | $0 | $240 | ||
| Total Labor Cost | $0 | $0 | $0 | $2,551 | $2,873 | $0 | $5,424 | ||
| Fixed Fee | $0 | $0 | $0 | $125 | $141 | $0 | $267 | ||
| Total CPFF | $0 | $0 | $0 | $2,676 | $3,015 | $0 | $5,691 |
| AB | 2102 | Labor Hours | 0 | 0 | 0 | 0 | 100 | 100 | 200 |
| Labor | $0 | $0 | $0 | $0 | $1,099 | $1,099 | $2,198 | ||
| IWTA | $0 | $0 | $0 | $0 | $1,465 | $1,465 | $2,930 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| G&A | $0 | $0 | $0 | $0 | $147 | $147 | $293 | ||
| Total Labor Cost | $0 | $0 | $0 | $0 | $2,711 | $2,711 | $5,421 | ||
| Fixed Fee | $0 | $0 | $0 | $0 | $136 | $136 | $271 | ||
| Total CPFF | $0 | $0 | $0 | $0 | $2,846 | $2,846 | $5,692 |
AB All Total CPFF $1,197 $3,034 $3,708 $4,853 $5,861 $2,846 $21,498
| DPF | 0103 | Labor Hours | 100 | 200 | 200 | 100 | 0 | 0 | 600 |
| Labor | $871 | $2,033 | $2,344 | $1,319 | $0 | $0 | $6,567 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $508 | $1,307 | $1,612 | $952 | $0 | $0 | $4,379 | ||
| Subcontractor Fee | $20 | $52 | $64 | $38 | $0 | $0 | $175 | ||
| Procurement Overhead | $26 | $68 | $84 | $50 | $0 | $0 | $228 | ||
| G&A | $55 | $143 | $176 | $104 | $0 | $0 | $478 | ||
| Total Labor Cost | $1,482 | $3,603 | $4,280 | $2,463 | $0 | $0 | $11,827 | ||
| Fixed Fee | $73 | $178 | $211 | $121 | $0 | $0 | $583 | ||
| Total CPFF | $1,555 | $3,780 | $4,491 | $2,584 | $0 | $0 | $12,410 |
| BC | 1103 | Labor Hours | 0 | 0 | 0 | 100 | 100 | 0 | 200 |
| Labor | $0 | $0 | $0 | $1,026 | $1,172 | $0 | $2,198 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $0 | $0 | $0 | $952 | $1,099 | $0 | $2,051 | ||
| Subcontractor Fee | $0 | $0 | $0 | $29 | $33 | $0 | $62 | ||
| Procurement Overhead | $0 | $0 | $0 | $49 | $57 | $0 | $106 | ||
| G&A | $0 | $0 | $0 | $103 | $119 | $0 | $222 | ||
| Total Labor Cost | $0 | $0 | $0 | $2,159 | $2,479 | $0 | $4,638 | ||
| Fixed Fee | $0 | $0 | $0 | $107 | $122 | $0 | $229 | ||
| Total CPFF | $0 | $0 | $0 | $2,265 | $2,602 | $0 | $4,867 |
| BC | 2103 | Labor Hours | 0 | 0 | 0 | 0 | 100 | 100 | 200 |
| Labor | $0 | $0 | $0 | $0 | $1,465 | $1,465 | $2,930 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $1,172 | $1,172 | $2,344 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $47 | $47 | $94 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $61 | $61 | $122 | ||
| G&A | $0 | $0 | $0 | $0 | $128 | $128 | $256 | ||
| Total Labor Cost | $0 | $0 | $0 | $0 | $2,873 | $2,873 | $5,746 | ||
| Fixed Fee | $0 | $0 | $0 | $0 | $141 | $141 | $283 | ||
| Total CPFF | $0 | $0 | $0 | $0 | $3,015 | $3,015 | $6,029 |
BC All Total CPFF $1,555 $3,780 $4,491 $4,849 $5,616 $3,015 $23,306
| DPL | 0104 | Labor Hours | 100 | 200 | 200 | 100 | 0 | 0 | 600 |
| Labor | $581 | $1,452 | $1,758 | $1,026 | $0 | $0 | $4,817 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $871 | $2,033 | $2,344 | $1,319 | $0 | $0 | $6,567 | ||
| Subcontractor Fee | $35 | $81 | $94 | $53 | $0 | $0 | $263 | ||
| Procurement Overhead | $45 | $106 | $122 | $69 | $0 | $0 | $341 | ||
| G&A | $95 | $222 | $256 | $144 | $0 | $0 | $717 | ||
| Total Labor Cost | $1,627 | $3,894 | $4,574 | $2,610 | $0 | $0 | $12,705 | ||
| Fixed Fee | $80 | $191 | $224 | $128 | $0 | $0 | $622 | ||
| Total CPFF | $1,707 | $4,084 | $4,798 | $2,737 | $0 | $0 | $13,327 |
| DPL | 1104 | Labor Hours | 0 | 0 | 0 | 100 | 100 | 0 | 200 |
| Labor | $0 | $0 | $0 | $1,319 | $1,465 | $0 | $2,784 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $0 | $0 | $0 | $952 | $1,099 | $0 | $2,051 | ||
| Subcontractor Fee | $0 | $0 | $0 | $38 | $44 | $0 | $82 | ||
| Procurement Overhead | $0 | $0 | $0 | $50 | $57 | $0 | $107 | ||
| G&A | $0 | $0 | $0 | $104 | $120 | $0 | $224 | ||
| Total Labor Cost | $0 | $0 | $0 | $2,463 | $2,785 | $0 | $5,248 | ||
| Fixed Fee | $0 | $0 | $0 | $121 | $137 | $0 | $258 | ||
| Total CPFF | $0 | $0 | $0 | $2,584 | $2,922 | $0 | $5,506 |
| DPL | 2104 | Labor Hours | 0 | 0 | 0 | 0 | 100 | 100 | 200 |
| Labor | $0 | $0 | $0 | $0 | $1,172 | $1,172 | $2,344 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $1,099 | $1,099 | $2,198 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $44 | $44 | $88 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $57 | $57 | $114 | ||
| G&A | $0 | $0 | $0 | $0 | $120 | $120 | $240 | ||
| Total Labor Cost | $0 | $0 | $0 | $0 | $2,492 | $2,492 | $4,984 | ||
| Fixed Fee | $0 | $0 | $0 | $0 | $122 | $122 | $245 | ||
| Total CPFF | $0 | $0 | $0 | $0 | $2,615 | $2,615 | $5,229 |
DPL All Total CPFF $1,707 $4,084 $4,798 $5,321 $5,537 $2,615 $24,062
| DT | 0105 | Labor Hours | 100 | 200 | 200 | 100 | 0 | 0 | 600 |
| Labor | $508 | $1,307 | $1,612 | $952 | $0 | $0 | $4,379 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $581 | $1,452 | $1,758 | $1,026 | $0 | $0 | $4,817 | ||
| Subcontractor Fee | $23 | $58 | $70 | $41 | $0 | $0 | $193 | ||
| Procurement Overhead | $30 | $76 | $91 | $53 | $0 | $0 | $250 | ||
| G&A | $63 | $159 | $192 | $112 | $0 | $0 | $526 | ||
| Total Labor Cost | $1,206 | $3,051 | $3,724 | $2,184 | $0 | $0 | $10,165 | ||
| Fixed Fee | $59 | $150 | $183 | $107 | $0 | $0 | $499 | ||
| Total CPFF | $1,265 | $3,201 | $3,906 | $2,292 | $0 | $0 | $10,664 |
| DTR | 1105 | Labor Hours | 0 | 0 | 0 | 100 | 100 | 0 | 200 |
| Labor | $0 | $0 | $0 | $1,026 | $1,172 | $0 | $2,198 | ||
| IWTA | $0 | $0 | $0 | $1,319 | $1,465 | $0 | $2,784 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| G&A | $0 | $0 | $0 | $132 | $147 | $0 | $278 | ||
| Total Labor Cost | $0 | $0 | $0 | $2,476 | $2,784 | $0 | $5,260 | ||
| Fixed Fee | $0 | $0 | $0 | $124 | $139 | $0 | $263 | ||
| Total CPFF | $0 | $0 | $0 | $2,600 | $2,923 | $0 | $5,523 |
| DTR | 2105 | Labor Hours | 0 | 0 | 0 | 0 | 100 | 100 | 200 |
| Labor | $0 | $0 | $0 | $0 | $1,465 | $1,465 | $2,930 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $1,099 | $1,099 | $2,198 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $44 | $44 | $88 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $57 | $57 | $114 | ||
| G&A | $0 | $0 | $0 | $0 | $120 | $120 | $240 | ||
| Total Labor Cost | $0 | $0 | $0 | $0 | $2,785 | $2,785 | $5,570 | ||
| Fixed Fee | $0 | $0 | $0 | $0 | $137 | $137 | $274 | ||
| Total CPFF | $0 | $0 | $0 | $0 | $2,922 | $2,922 | $5,845 |
DTR All Total CPFF $1,265 $3,201 $3,906 $4,892 $5,845 $2,922 $22,031
| GD | 0106 | Labor Hours | 100 | 200 | 200 | 100 | 0 | 0 | 600 |
| Labor | $508 | $1,307 | $1,612 | $952 | $0 | $0 | $4,379 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $871 | $2,033 | $2,344 | $1,319 | $0 | $0 | $6,567 | ||
| Subcontractor Fee | $35 | $81 | $94 | $53 | $0 | $0 | $263 | ||
| Procurement Overhead | $45 | $106 | $122 | $69 | $0 | $0 | $341 | ||
| G&A | $95 | $222 | $256 | $144 | $0 | $0 | $717 | ||
| Total Labor Cost | $1,555 | $3,749 | $4,428 | $2,536 | $0 | $0 | $12,267 | ||
| Fixed Fee | $76 | $183 | $217 | $124 | $0 | $0 | $600 | ||
| Total CPFF | $1,631 | $3,932 | $4,644 | $2,661 | $0 | $0 | $12,868 |
| DV | 1106 | Labor Hours | 0 | 0 | 0 | 100 | 100 | 0 | 200 |
| Labor | $0 | $0 | $0 | $952 | $1,099 | $0 | $2,051 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $0 | $0 | $0 | $1,026 | $1,172 | $0 | $2,198 | ||
| Subcontractor Fee | $0 | $0 | $0 | $41 | $47 | $0 | $88 | ||
| Procurement Overhead | $0 | $0 | $0 | $53 | $61 | $0 | $114 | ||
| G&A | $0 | $0 | $0 | $112 | $128 | $0 | $240 | ||
| Total Labor Cost | $0 | $0 | $0 | $2,184 | $2,507 | $0 | $4,691 | ||
| Fixed Fee | $0 | $0 | $0 | $107 | $123 | $0 | $230 | ||
| Total CPFF | $0 | $0 | $0 | $2,292 | $2,630 | $0 | $4,921 |
| DV | 2106 | Labor Hours | 0 | 0 | 0 | 0 | 100 | 100 | 200 |
| Labor | $0 | $0 | $0 | $0 | $1,172 | $1,172 | $2,344 | ||
| IWTA | $0 | $0 | $0 | $0 | $1,465 | $1,465 | $2,930 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| G&A | $0 | $0 | $0 | $0 | $147 | $147 | $293 | ||
| Total Labor Cost | $0 | $0 | $0 | $0 | $2,784 | $2,784 | $5,568 | ||
| Fixed Fee | $0 | $0 | $0 | $0 | $139 | $139 | $278 | ||
| Total CPFF | $0 | $0 | $0 | $0 | $2,923 | $2,923 | $5,846 |
DV All Total CPFF $1,631 $3,932 $4,644 $4,952 $5,553 $2,923 $23,635
| GM | 0107 | Labor Hours | 100 | 200 | 200 | 100 | 0 | 0 | 600 |
| Labor | $871 | $2,033 | $2,344 | $1,319 | $0 | $0 | $6,567 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $581 | $1,452 | $1,758 | $1,026 | $0 | $0 | $4,817 | ||
| Subcontractor Fee | $17 | $44 | $53 | $31 | $0 | $0 | $145 | ||
| Procurement Overhead | $30 | $75 | $91 | $53 | $0 | $0 | $248 | ||
| G&A | $63 | $157 | $190 | $111 | $0 | $0 | $521 | ||
| Total Labor Cost | $1,562 | $3,760 | $4,436 | $2,539 | $0 | $0 | $12,297 | ||
| Fixed Fee | $77 | $186 | $219 | $125 | $0 | $0 | $608 | ||
| Total CPFF | $1,639 | $3,946 | $4,655 | $2,664 | $0 | $0 | $12,905 |
| GM | 1107 | Labor Hours | 0 | 0 | 0 | 100 | 100 | 0 | 200 |
| Labor | $0 | $0 | $0 | $952 | $1,099 | $0 | $2,051 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $0 | $0 | $0 | $1,319 | $1,465 | $0 | $2,784 | ||
| Subcontractor Fee | $0 | $0 | $0 | $53 | $59 | $0 | $111 | ||
| Procurement Overhead | $0 | $0 | $0 | $69 | $76 | $0 | $145 | ||
| G&A | $0 | $0 | $0 | $144 | $160 | $0 | $304 | ||
| Total Labor Cost | $0 | $0 | $0 | $2,536 | $2,859 | $0 | $5,395 | ||
| Fixed Fee | $0 | $0 | $0 | $124 | $140 | $0 | $264 | ||
| Total CPFF | $0 | $0 | $0 | $2,661 | $2,999 | $0 | $5,659 |
| GM | 2107 | Labor Hours | 0 | 0 | 0 | 0 | 100 | 100 | 200 |
| Labor | $0 | $0 | $0 | $0 | $1,099 | $1,099 | $2,198 | ||
| IWTA | $0 | $0 | $0 | $0 | $1,172 | $1,172 | $2,344 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| G&A | $0 | $0 | $0 | $0 | $117 | $117 | $234 | ||
| Total Labor Cost | $0 | $0 | $0 | $0 | $2,388 | $2,388 | $4,777 | ||
| Fixed Fee | $0 | $0 | $0 | $0 | $119 | $119 | $239 | ||
| Total CPFF | $0 | $0 | $0 | $0 | $2,508 | $2,508 | $5,015 |
GM All Total CPFF $1,639 $3,946 $4,655 $5,325 $5,507 $2,508 $23,580
| SN | 0108 | Labor Hours | 100 | 200 | 200 | 100 | 0 | 0 | 600 |
| Labor | $581 | $1,452 | $1,758 | $1,026 | $0 | $0 | $4,817 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $508 | $1,307 | $1,612 | $952 | $0 | $0 | $4,379 | ||
| Subcontractor Fee | $20 | $52 | $64 | $38 | $0 | $0 | $175 | ||
| Procurement Overhead | $26 | $68 | $84 | $50 | $0 | $0 | $228 | ||
| G&A | $55 | $143 | $176 | $104 | $0 | $0 | $478 | ||
| Total Labor Cost | $1,191 | $3,022 | $3,694 | $2,170 | $0 | $0 | $10,077 | ||
| Fixed Fee | $59 | $148 | $181 | $107 | $0 | $0 | $495 | ||
| Total CPFF | $1,250 | $3,170 | $3,876 | $2,276 | $0 | $0 | $10,572 |
| SN | 1108 | Labor Hours | 0 | 0 | 0 | 100 | 100 | 0 | 200 |
| Labor | $0 | $0 | $0 | $1,319 | $1,465 | $0 | $2,784 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $0 | $0 | $0 | $1,026 | $1,172 | $0 | $2,198 | ||
| Subcontractor Fee | $0 | $0 | $0 | $41 | $47 | $0 | $88 | ||
| Procurement Overhead | $0 | $0 | $0 | $53 | $61 | $0 | $114 | ||
| G&A | $0 | $0 | $0 | $112 | $128 | $0 | $240 | ||
| Total Labor Cost | $0 | $0 | $0 | $2,551 | $2,873 | $0 | $5,424 | ||
| Fixed Fee | $0 | $0 | $0 | $125 | $141 | $0 | $267 | ||
| Total CPFF | $0 | $0 | $0 | $2,676 | $3,015 | $0 | $5,691 |
| SN | 2108 | Labor Hours | 0 | 0 | 0 | 0 | 100 | 100 | 200 |
| Labor | $0 | $0 | $0 | $0 | $1,099 | $1,099 | $2,198 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $1,465 | $1,465 | $2,930 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $59 | $59 | $117 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $76 | $76 | $152 | ||
| G&A | $0 | $0 | $0 | $0 | $160 | $160 | $320 | ||
| Total Labor Cost | $0 | $0 | $0 | $0 | $2,859 | $2,859 | $5,718 | ||
| Fixed Fee | $0 | $0 | $0 | $0 | $140 | $140 | $280 | ||
| Total CPFF | $0 | $0 | $0 | $0 | $2,999 | $2,999 | $5,998 |
SN All Total CPFF $1,250 $3,170 $3,876 $4,952 $6,013 $2,999 $22,260
| SN-LRDR | 0109 | Labor Hours | 100 | 200 | 200 | 100 | 0 | 0 | 600 |
| Labor | $871 | $2,033 | $2,344 | $1,319 | $0 | $0 | $6,567 | ||
| IWTA | $508 | $1,307 | $1,612 | $952 | $0 | $0 | $4,379 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| G&A | $51 | $131 | $161 | $95 | $0 | $0 | $438 | ||
| Total Labor Cost | $1,430 | $3,470 | $4,117 | $2,366 | $0 | $0 | $11,384 | ||
| Fixed Fee | $72 | $174 | $206 | $118 | $0 | $0 | $569 | ||
| Total CPFF | $1,502 | $3,644 | $4,323 | $2,485 | $0 | $0 | $11,953 |
| TC | 1109 | Labor Hours | 0 | 0 | 0 | 100 | 100 | 0 | 200 |
| Labor | $0 | $0 | $0 | $1,026 | $1,172 | $0 | $2,198 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $0 | $0 | $0 | $952 | $1,099 | $0 | $2,051 | ||
| Subcontractor Fee | $0 | $0 | $0 | $38 | $44 | $0 | $82 | ||
| Procurement Overhead | $0 | $0 | $0 | $50 | $57 | $0 | $107 | ||
| G&A | $0 | $0 | $0 | $104 | $120 | $0 | $224 | ||
| Total Labor Cost | $0 | $0 | $0 | $2,170 | $2,492 | $0 | $4,662 | ||
| Fixed Fee | $0 | $0 | $0 | $107 | $122 | $0 | $229 | ||
| Total CPFF | $0 | $0 | $0 | $2,276 | $2,615 | $0 | $4,891 |
| TC | 2109 | Labor Hours | 0 | 0 | 0 | 0 | 100 | 100 | 200 |
| Labor | $0 | $0 | $0 | $0 | $1,465 | $1,465 | $2,930 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $1,172 | $1,172 | $2,344 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $47 | $47 | $94 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $61 | $61 | $122 | ||
| G&A | $0 | $0 | $0 | $0 | $128 | $128 | $256 | ||
| Total Labor Cost | $0 | $0 | $0 | $0 | $2,873 | $2,873 | $5,746 | ||
| Fixed Fee | $0 | $0 | $0 | $0 | $141 | $141 | $283 | ||
| Total CPFF | $0 | $0 | $0 | $0 | $3,015 | $3,015 | $6,029 |
TC All Total CPFF $1,502 $3,644 $4,323 $4,761 $5,629 $3,015 $22,873
| TC | 0110 | Labor Hours | 100 | 200 | 200 | 100 | 0 | 0 | 600 |
| Labor | $581 | $1,452 | $1,758 | $1,026 | $0 | $0 | $4,817 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $871 | $2,033 | $2,344 | $1,319 | $0 | $0 | $6,567 | ||
| Subcontractor Fee | $35 | $81 | $94 | $53 | $0 | $0 | $263 | ||
| Procurement Overhead | $45 | $106 | $122 | $69 | $0 | $0 | $341 | ||
| G&A | $95 | $222 | $256 | $144 | $0 | $0 | $717 | ||
| Total Labor Cost | $1,627 | $3,894 | $4,574 | $2,610 | $0 | $0 | $12,705 | ||
| Fixed Fee | $80 | $191 | $224 | $128 | $0 | $0 | $622 | ||
| Total CPFF | $1,707 | $4,084 | $4,798 | $2,737 | $0 | $0 | $13,327 |
| TC | 1110 | Labor Hours | 0 | 0 | 0 | 100 | 100 | 0 | 200 |
| Labor | $0 | $0 | $0 | $1,319 | $1,465 | $0 | $2,784 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $0 | $0 | $0 | $952 | $1,099 | $0 | $2,051 | ||
| Subcontractor Fee | $0 | $0 | $0 | $29 | $33 | $0 | $62 | ||
| Procurement Overhead | $0 | $0 | $0 | $49 | $57 | $0 | $106 | ||
| G&A | $0 | $0 | $0 | $103 | $119 | $0 | $222 | ||
| Total Labor Cost | $0 | $0 | $0 | $2,452 | $2,773 | $0 | $5,224 | ||
| Fixed Fee | $0 | $0 | $0 | $121 | $137 | $0 | $258 | ||
| Total CPFF | $0 | $0 | $0 | $2,573 | $2,909 | $0 | $5,482 |
| TC | 2110 | Labor Hours | 0 | 0 | 0 | 0 | 100 | 100 | 200 |
| Labor | $0 | $0 | $0 | $0 | $1,172 | $1,172 | $2,344 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $1,099 | $1,099 | $2,198 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $44 | $44 | $88 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $57 | $57 | $114 | ||
| G&A | $0 | $0 | $0 | $0 | $120 | $120 | $240 | ||
| Total Labor Cost | $0 | $0 | $0 | $0 | $2,492 | $2,492 | $4,984 | ||
| Fixed Fee | $0 | $0 | $0 | $0 | $122 | $122 | $245 | ||
| Total CPFF | $0 | $0 | $0 | $0 | $2,615 | $2,615 | $5,229 |
TC All Total CPFF $1,707 $4,084 $4,798 $5,310 $5,524 $2,615 $24,039
| AE-B-UAF | 0111 | Labor Hours | 100 | 200 | 200 | 100 | 0 | 0 | 600 |
| Labor | $508 | $1,307 | $1,612 | $952 | $0 | $0 | $4,379 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $581 | $1,452 | $1,758 | $1,026 | $0 | $0 | $4,817 | ||
| Subcontractor Fee | $23 | $58 | $70 | $41 | $0 | $0 | $193 | ||
| Procurement Overhead | $30 | $76 | $91 | $53 | $0 | $0 | $250 | ||
| G&A | $63 | $159 | $192 | $112 | $0 | $0 | $526 | ||
| Total Labor Cost | $1,206 | $3,051 | $3,724 | $2,184 | $0 | $0 | $10,165 | ||
| Fixed Fee | $59 | $150 | $183 | $107 | $0 | $0 | $499 | ||
| Total CPFF | $1,265 | $3,201 | $3,906 | $2,292 | $0 | $0 | $10,664 |
| TC | 1111 | Labor Hours | 0 | 0 | 0 | 100 | 100 | 0 | 200 |
| Labor | $0 | $0 | $0 | $1,026 | $1,172 | $0 | $2,198 | ||
| IWTA | $0 | $0 | $0 | $1,319 | $1,465 | $0 | $2,784 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| G&A | $0 | $0 | $0 | $132 | $147 | $0 | $278 | ||
| Total Labor Cost | $0 | $0 | $0 | $2,476 | $2,784 | $0 | $5,260 | ||
| Fixed Fee | $0 | $0 | $0 | $124 | $139 | $0 | $263 | ||
| Total CPFF | $0 | $0 | $0 | $2,600 | $2,923 | $0 | $5,523 |
| TC | 2111 | Labor Hours | 0 | 0 | 0 | 0 | 100 | 100 | 200 |
| Labor | $0 | $0 | $0 | $0 | $1,465 | $1,465 | $2,930 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $1,099 | $1,099 | $2,198 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $44 | $44 | $88 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $57 | $57 | $114 | ||
| G&A | $0 | $0 | $0 | $0 | $120 | $120 | $240 | ||
| Total Labor Cost | $0 | $0 | $0 | $0 | $2,785 | $2,785 | $5,570 | ||
| Fixed Fee | $0 | $0 | $0 | $0 | $137 | $137 | $274 | ||
| Total CPFF | $0 | $0 | $0 | $0 | $2,922 | $2,922 | $5,845 |
TC All Total CPFF $1,265 $3,201 $3,906 $4,892 $5,845 $2,922 $22,031
GRAND TOTAL All $16,363 $40,039 $47,782 $55,444 $62,559 $31,008 $253,196
Labor Resources
| PRIME LABOR RESOURCES AND COST | ||||||||||||||||||||||||||||||||||||||||||
| Contractor: | Insert contractor name | |||||||||||||||||||||||||||||||||||||||||
| HQ0147-15-R-0021 - Logistics | ||||||||||||||||||||||||||||||||||||||||||
| The prime offeror will combine their labor resources with submittals from all IWTAs and subcontractors on this one tab. | ||||||||||||||||||||||||||||||||||||||||||
| Contractors will populate this tab to include the proposed contractor labor resources for all CLINs excluding Surge. | ||||||||||||||||||||||||||||||||||||||||||
| FBLRs are carried forward (linked) from the prime, IWTA, or subcontractor's FBLR tab. | ||||||||||||||||||||||||||||||||||||||||||
| To protect proprietary data, the IWTA or subcontractor may elect to copy the FBLRs in columns V:AA and paste as values before submission to the prime contractor, with the result that the IWTA or major subcontractor rates may be hard-coded in the prime offeror’s EPW. | ||||||||||||||||||||||||||||||||||||||||||
| For submission to the Government, the full detail of the IWTA or subcontractor direct/indirect rates and FBLR rates, and links to the IWTA's or subcontractor's FBLR tab will remain in-tact. | ||||||||||||||||||||||||||||||||||||||||||
| The prime contractor will also add hours and cost for minor subcontractors TBD. | ||||||||||||||||||||||||||||||||||||||||||
| Columns B through I, M through R, and T should be populated by the offeror, to present the proposed resources for accomplishing the PWS requirements. | ||||||||||||||||||||||||||||||||||||||||||
| The example data provided in Columns B through I, M through R, and T are there only for formula and link testing and should not influence the proposed EPW. | ||||||||||||||||||||||||||||||||||||||||||
| Use the drop-down arrows to populate the cells where possible. | 9 | 18 | 27 | 36 | 45 | 54 | ||||||||||||||||||||||||||||||||||||
| PWS | Description | Prime/Subcontractor Name | Prime, IWTA or Subcontractor | Major or Minor | Labor Category | Location | Work Site | CLIN-Pd-ST | Stakeholder | CLIN | Period | CFY 1 Hours | CFY 2 Hours | CFY 3 Hours | CFY 4 Hours | CFY 5 Hours | CFY 6 Hours | Total | BOE Reference | Index Column | CFY 1 FBLR | CFY 2 FBLR | CFY 3 FBLR | CFY 4 FBLR | CFY 5 FBLR | CFY 6 FBLR | AB | CFY 1 Cost | CFY 2 Cost | CFY 3 Cost | CFY 4 Cost | CFY 5 Cost | CFY 6 Cost | Total Cost | AJ | CFY 1 Fee | CFY 2 Fee | CFY 3 Fee | CFY 4 Fee | CFY 5 Fee | CFY 6 Fee | Total Fee |
| 3.1.1 | 3.1.1 Logistics Policy Administration | Prime R Us | Prime | Contract Program Manager | Huntsville, Alabama | Gov't Site | 0101BaseAB | AB | 0101 | Base | 50 | 100 | 100 | 50 | 300 | Cost Volume page 10, BOE Number 123456.01 | Contract Program ManagerHuntsville, AlabamaGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $871 | $2,033 | $2,344 | $1,319 | $0 | $0 | $6,567 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||
| 3.2.1 | 3.2.1 Product Support Management | Prime R Us | Prime | Contract Technical Lead | Hanscom AFB, Massachusetts | Gov't Site | 0102BaseDE | DE | 0102 | Base | 50 | 100 | 100 | 50 | 300 | Contract Technical LeadHanscom AFB, MassachusettsGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $581 | $1,452 | $1,758 | $1,026 | $0 | $0 | $4,817 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| 3.2.2 | 3.2.2 Design Interface | Prime R Us | Prime | Analyst (Advanced) | Dahlgren, Virginia | Gov't Site | 0103BaseDPF | DPF | 0103 | Base | 50 | 100 | 100 | 50 | 300 | Analyst (Advanced)Dahlgren, VirginiaGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $871 | $2,033 | $2,344 | $1,319 | $0 | $0 | $6,567 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| 3.2.3 | 3.2.3 Sustaining Engineering | Prime R Us | Prime | Analyst (Intermediate) | Fort Bliss, Texas | Gov't Site | 0104BaseDPL | DPL | 0104 | Base | 50 | 100 | 100 | 50 | 300 | Analyst (Intermediate)Fort Bliss, TexasGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $581 | $1,452 | $1,758 | $1,026 | $0 | $0 | $4,817 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| 3.2.4 | 3.2.4 Supply Support | Prime R Us | Prime | Analyst (Basic) | Vandenberg AFB Santa Barbara, CA | Gov't Site | 0105BaseDT | DT | 0105 | Base | 50 | 100 | 100 | 50 | 300 | Analyst (Basic)Vandenberg AFB Santa Barbara, CAGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $508 | $1,307 | $1,612 | $952 | $0 | $0 | $4,379 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| 3.2.5 | 3.2.5 Maintenance Planning and Management | Prime R Us | Prime | Analyst (Entry) | Colorado Springs, CO | Gov't Site | 0106BaseGD | GD | 0106 | Base | 50 | 100 | 100 | 50 | 300 | Analyst (Entry)Colorado Springs, COGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $508 | $1,307 | $1,612 | $952 | $0 | $0 | $4,379 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| 3.2.6 | 3.2.6 Packaging, Handling, Storage and Transportation | Prime R Us | Prime | Contract Program Manager | Huntsville, Alabama | Gov't Site | 0107BaseGM | GM | 0107 | Base | 50 | 100 | 100 | 50 | 300 | Contract Program ManagerHuntsville, AlabamaGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $871 | $2,033 | $2,344 | $1,319 | $0 | $0 | $6,567 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| 3.2.7 | 3.2.7 Technical Data | Prime R Us | Prime | Contract Technical Lead | Hanscom AFB, Massachusetts | Gov't Site | 0108BaseSN | SN | 0108 | Base | 50 | 100 | 100 | 50 | 300 | Contract Technical LeadHanscom AFB, MassachusettsGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $581 | $1,452 | $1,758 | $1,026 | $0 | $0 | $4,817 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| 3.2.8 | 3.2.8 Support Equipment | Prime R Us | Prime | Analyst (Advanced) | Dahlgren, Virginia | Gov't Site | 0109BaseSN-LRDR | SN-LRDR | 0109 | Base | 50 | 100 | 100 | 50 | 300 | Analyst (Advanced)Dahlgren, VirginiaGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $871 | $2,033 | $2,344 | $1,319 | $0 | $0 | $6,567 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| 3.2.9 | 3.2.9 Training and Training Support | Prime R Us | Prime | Analyst (Intermediate) | Fort Bliss, Texas | Gov't Site | 0110BaseTC | TC | 0110 | Base | 50 | 100 | 100 | 50 | 300 | Analyst (Intermediate)Fort Bliss, TexasGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $581 | $1,452 | $1,758 | $1,026 | $0 | $0 | $4,817 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| 3.2.1 | 3.2.10 Manpower and Personnel | Prime R Us | Prime | Analyst (Basic) | Vandenberg AFB Santa Barbara, CA | Gov't Site | 0111BaseAE-B-UAF | AE-B-UAF | 0111 | Base | 50 | 100 | 100 | 50 | 300 | Analyst (Basic)Vandenberg AFB Santa Barbara, CAGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $508 | $1,307 | $1,612 | $952 | $0 | $0 | $4,379 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| 3.2.1 | 3.2.11 Facilities and Infrastructure | Prime R Us | Prime | Analyst (Entry) | Colorado Springs, CO | Gov't Site | 1101Option 1AB | AB | 1101 | Option 1 | 50 | 50 | 100 | Analyst (Entry)Colorado Springs, COGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $0 | $0 | $0 | $952 | $1,099 | $0 | $2,051 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.2.1 | 3.2.12 Computer Resources | Prime R Us | Prime | Contract Program Manager | Huntsville, Alabama | Gov't Site | 1102Option 1DE | DE | 1102 | Option 1 | 50 | 50 | 100 | Contract Program ManagerHuntsville, AlabamaGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $0 | $0 | $0 | $1,319 | $1,465 | $0 | $2,784 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.3 | 3.3 BMDS Logistics Assessments and Analysis | Prime R Us | Prime | Contract Technical Lead | Hanscom AFB, Massachusetts | Gov't Site | 1103Option 1DPF | DPF | 1103 | Option 1 | 50 | 50 | 100 | Contract Technical LeadHanscom AFB, MassachusettsGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $0 | $0 | $0 | $1,026 | $1,172 | $0 | $2,198 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.1.1 | 3.1.1 Logistics Policy Administration | Prime R Us | Prime | Analyst (Advanced) | Dahlgren, Virginia | Gov't Site | 1104Option 1DPL | DPL | 1104 | Option 1 | 50 | 50 | 100 | Analyst (Advanced)Dahlgren, VirginiaGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $0 | $0 | $0 | $1,319 | $1,465 | $0 | $2,784 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.2.1 | 3.2.1 Product Support Management | Prime R Us | Prime | Analyst (Intermediate) | Fort Bliss, Texas | Gov't Site | 1105Option 1DT | DT | 1105 | Option 1 | 50 | 50 | 100 | Analyst (Intermediate)Fort Bliss, TexasGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $0 | $0 | $0 | $1,026 | $1,172 | $0 | $2,198 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.2.2 | 3.2.2 Design Interface | Prime R Us | Prime | Analyst (Basic) | Vandenberg AFB Santa Barbara, CA | Gov't Site | 1106Option 1GD | GD | 1106 | Option 1 | 50 | 50 | 100 | Analyst (Basic)Vandenberg AFB Santa Barbara, CAGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $0 | $0 | $0 | $952 | $1,099 | $0 | $2,051 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.2.3 | 3.2.3 Sustaining Engineering | Prime R Us | Prime | Analyst (Entry) | Colorado Springs, CO | Gov't Site | 1107Option 1GM | GM | 1107 | Option 1 | 50 | 50 | 100 | Analyst (Entry)Colorado Springs, COGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $0 | $0 | $0 | $952 | $1,099 | $0 | $2,051 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.2.4 | 3.2.4 Supply Support | Prime R Us | Prime | Contract Program Manager | Huntsville, Alabama | Gov't Site | 1108Option 1SN | SN | 1108 | Option 1 | 50 | 50 | 100 | Contract Program ManagerHuntsville, AlabamaGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $0 | $0 | $0 | $1,319 | $1,465 | $0 | $2,784 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.2.5 | 3.2.5 Maintenance Planning and Management | Prime R Us | Prime | Contract Technical Lead | Hanscom AFB, Massachusetts | Gov't Site | 1109Option 1SN-LRDR | SN-LRDR | 1109 | Option 1 | 50 | 50 | 100 | Contract Technical LeadHanscom AFB, MassachusettsGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $0 | $0 | $0 | $1,026 | $1,172 | $0 | $2,198 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.2.6 | 3.2.6 Packaging, Handling, Storage and Transportation | Prime R Us | Prime | Analyst (Advanced) | Dahlgren, Virginia | Gov't Site | 1110Option 1TC | TC | 1110 | Option 1 | 50 | 50 | 100 | Analyst (Advanced)Dahlgren, VirginiaGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $0 | $0 | $0 | $1,319 | $1,465 | $0 | $2,784 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.2.7 | 3.2.7 Technical Data | Prime R Us | Prime | Analyst (Intermediate) | Fort Bliss, Texas | Gov't Site | 1111Option 1AE-B-UAF | AE-B-UAF | 1111 | Option 1 | 50 | 50 | 100 | Analyst (Intermediate)Fort Bliss, TexasGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $0 | $0 | $0 | $1,026 | $1,172 | $0 | $2,198 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.2.8 | 3.2.8 Support Equipment | Prime R Us | Prime | Minor | Analyst (Basic) | Vandenberg AFB Santa Barbara, CA | Gov't Site | 2101Option 2AB | AB | 2101 | Option 2 | 50 | 50 | 100 | Analyst (Basic)Vandenberg AFB Santa Barbara, CAGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $0 | $0 | $0 | $0 | $1,099 | $1,099 | $2,198 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.2.9 | 3.2.9 Training and Training Support | Prime R Us | Prime | Major | Analyst (Entry) | Colorado Springs, CO | Gov't Site | 2102Option 2DE | DE | 2102 | Option 2 | 50 | 50 | 100 | Analyst (Entry)Colorado Springs, COGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $0 | $0 | $0 | $0 | $1,099 | $1,099 | $2,198 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.2.1 | 3.2.10 Manpower and Personnel | Prime R Us | Prime | Major | Contract Program Manager | Huntsville, Alabama | Gov't Site | 2103Option 2DPF | DPF | 2103 | Option 2 | 50 | 50 | 100 | Contract Program ManagerHuntsville, AlabamaGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $0 | $0 | $0 | $0 | $1,465 | $1,465 | $2,930 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.2.1 | 3.2.11 Facilities and Infrastructure | Prime R Us | Prime | Major | Contract Technical Lead | Hanscom AFB, Massachusetts | Gov't Site | 2104Option 2DPL | DPL | 2104 | Option 2 | 50 | 50 | 100 | Contract Technical LeadHanscom AFB, MassachusettsGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $0 | $0 | $0 | $0 | $1,172 | $1,172 | $2,344 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.2.1 | 3.2.12 Computer Resources | Prime R Us | Prime | Major | Analyst (Advanced) | Dahlgren, Virginia | Gov't Site | 2105Option 2DT | DT | 2105 | Option 2 | 50 | 50 | 100 | Analyst (Advanced)Dahlgren, VirginiaGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $0 | $0 | $0 | $0 | $1,465 | $1,465 | $2,930 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.3 | 3.3 BMDS Logistics Assessments and Analysis | Prime R Us | Prime | Minor | Analyst (Intermediate) | Fort Bliss, Texas | Gov't Site | 2106Option 2GD | GD | 2106 | Option 2 | 50 | 50 | 100 | Analyst (Intermediate)Fort Bliss, TexasGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $0 | $0 | $0 | $0 | $1,172 | $1,172 | $2,344 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.1.1 | 3.1.1 Logistics Policy Administration | Prime R Us | Prime | Minor | Analyst (Basic) | Vandenberg AFB Santa Barbara, CA | Gov't Site | 2107Option 2GM | GM | 2107 | Option 2 | 50 | 50 | 100 | Analyst (Basic)Vandenberg AFB Santa Barbara, CAGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $0 | $0 | $0 | $0 | $1,099 | $1,099 | $2,198 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.2.1 | 3.2.1 Product Support Management | Prime R Us | Prime | Major | Analyst (Entry) | Colorado Springs, CO | Gov't Site | 2108Option 2SN | SN | 2108 | Option 2 | 50 | 50 | 100 | Analyst (Entry)Colorado Springs, COGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $0 | $0 | $0 | $0 | $1,099 | $1,099 | $2,198 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.2.2 | 3.2.2 Design Interface | Prime R Us | Prime | Major | Contract Program Manager | Huntsville, Alabama | Gov't Site | 2109Option 2SN-LRDR | SN-LRDR | 2109 | Option 2 | 50 | 50 | 100 | Contract Program ManagerHuntsville, AlabamaGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $0 | $0 | $0 | $0 | $1,465 | $1,465 | $2,930 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.2.3 | 3.2.3 Sustaining Engineering | Prime R Us | Prime | Major | Contract Technical Lead | Hanscom AFB, Massachusetts | Gov't Site | 2110Option 2TC | TC | 2110 | Option 2 | 50 | 50 | 100 | Contract Technical LeadHanscom AFB, MassachusettsGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $0 | $0 | $0 | $0 | $1,172 | $1,172 | $2,344 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.2.4 | 3.2.4 Supply Support | Prime R Us | Prime | Major | Analyst (Advanced) | Dahlgren, Virginia | Gov't Site | 2111Option 2AE-B-UAF | AE-B-UAF | 2111 | Option 2 | 50 | 50 | 100 | Analyst (Advanced)Dahlgren, VirginiaGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $0 | $0 | $0 | $0 | $1,465 | $1,465 | $2,930 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.1.1 | 3.1.1 Logistics Policy Administration | Subcontract X | Subcontractor | Minor | Analyst (Intermediate) | Huntsville, Alabama | Gov't Site | 0101BaseAB | AB | 0101 | Base | 50 | 100 | 100 | 50 | 300 | Cost Volume page 10, BOE Number 123456.01 | Analyst (Intermediate)Huntsville, AlabamaGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $581 | $1,452 | $1,758 | $1,026 | $0 | $0 | $4,817 | $23 | $58 | $70 | $41 | $0 | $0 | $193 | ||||
| 3.2.1 | 3.2.1 Product Support Management | IWTA | IWTA | Major | Analyst (Basic) | Hanscom AFB, Massachusetts | Gov't Site | 0102BaseDE | DE | 0102 | Base | 50 | 100 | 100 | 50 | 300 | Analyst (Basic)Hanscom AFB, MassachusettsGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $508 | $1,307 | $1,612 | $952 | $0 | $0 | $4,379 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||
| 3.2.2 | 3.2.2 Design Interface | Subcontract X | Subcontractor | Major | Analyst (Entry) | Dahlgren, Virginia | Gov't Site | 0103BaseDPF | DPF | 0103 | Base | 50 | 100 | 100 | 50 | 300 | Analyst (Entry)Dahlgren, VirginiaGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $508 | $1,307 | $1,612 | $952 | $0 | $0 | $4,379 | $20 | $52 | $64 | $38 | $0 | $0 | $175 | |||||
| 3.2.3 | 3.2.3 Sustaining Engineering | Subcontract X | Subcontractor | Major | Contract Program Manager | Fort Bliss, Texas | Gov't Site | 0104BaseDPL | DPL | 0104 | Base | 50 | 100 | 100 | 50 | 300 | Contract Program ManagerFort Bliss, TexasGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $871 | $2,033 | $2,344 | $1,319 | $0 | $0 | $6,567 | $35 | $81 | $94 | $53 | $0 | $0 | $263 | |||||
| 3.2.4 | 3.2.4 Supply Support | Subcontract X | Subcontractor | Major | Contract Technical Lead | Vandenberg AFB Santa Barbara, CA | Gov't Site | 0105BaseDT | DT | 0105 | Base | 50 | 100 | 100 | 50 | 300 | Contract Technical LeadVandenberg AFB Santa Barbara, CAGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $581 | $1,452 | $1,758 | $1,026 | $0 | $0 | $4,817 | $23 | $58 | $70 | $41 | $0 | $0 | $193 | |||||
| 3.2.5 | 3.2.5 Maintenance Planning and Management | Subcontract X | Subcontractor | Minor | Analyst (Advanced) | Colorado Springs, CO | Gov't Site | 0106BaseGD | GD | 0106 | Base | 50 | 100 | 100 | 50 | 300 | Analyst (Advanced)Colorado Springs, COGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $871 | $2,033 | $2,344 | $1,319 | $0 | $0 | $6,567 | $35 | $81 | $94 | $53 | $0 | $0 | $263 | |||||
| 3.2.6 | 3.2.6 Packaging, Handling, Storage and Transportation | Subcontract Z | Subcontractor | Minor | Analyst (Intermediate) | Huntsville, Alabama | Gov't Site | 0107BaseGM | GM | 0107 | Base | 50 | 100 | 100 | 50 | 300 | Analyst (Intermediate)Huntsville, AlabamaGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $581 | $1,452 | $1,758 | $1,026 | $0 | $0 | $4,817 | $17 | $44 | $53 | $31 | $0 | $0 | $145 | |||||
| 3.2.7 | 3.2.7 Technical Data | Subcontract X | Subcontractor | Minor | Analyst (Basic) | Hanscom AFB, Massachusetts | Gov't Site | 0108BaseSN | SN | 0108 | Base | 50 | 100 | 100 | 50 | 300 | Analyst (Basic)Hanscom AFB, MassachusettsGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $508 | $1,307 | $1,612 | $952 | $0 | $0 | $4,379 | $20 | $52 | $64 | $38 | $0 | $0 | $175 | |||||
| 3.2.8 | 3.2.8 Support Equipment | IWTA | IWTA | Major | Analyst (Entry) | Dahlgren, Virginia | Gov't Site | 0109BaseSN-LRDR | SN-LRDR | 0109 | Base | 50 | 100 | 100 | 50 | 300 | Analyst (Entry)Dahlgren, VirginiaGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $508 | $1,307 | $1,612 | $952 | $0 | $0 | $4,379 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||
| 3.2.9 | 3.2.9 Training and Training Support | Subcontract X | Subcontractor | Major | Contract Program Manager | Fort Bliss, Texas | Gov't Site | 0110BaseTC | TC | 0110 | Base | 50 | 100 | 100 | 50 | 300 | Contract Program ManagerFort Bliss, TexasGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $871 | $2,033 | $2,344 | $1,319 | $0 | $0 | $6,567 | $35 | $81 | $94 | $53 | $0 | $0 | $263 | |||||
| 3.2.1 | 3.2.10 Manpower and Personnel | Subcontract X | Subcontractor | Major | Contract Technical Lead | Vandenberg AFB Santa Barbara, CA | Gov't Site | 0111BaseAE-B-UAF | AE-B-UAF | 0111 | Base | 50 | 100 | 100 | 50 | 300 | Contract Technical LeadVandenberg AFB Santa Barbara, CAGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $581 | $1,452 | $1,758 | $1,026 | $0 | $0 | $4,817 | $23 | $58 | $70 | $41 | $0 | $0 | $193 | |||||
| 3.2.1 | 3.2.11 Facilities and Infrastructure | Subcontract X | Subcontractor | Major | Analyst (Advanced) | Colorado Springs, CO | Gov't Site | 1101Option 1AB | AB | 1101 | Option 1 | 50 | 50 | 100 | Analyst (Advanced)Colorado Springs, COGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $0 | $0 | $0 | $1,319 | $1,465 | $0 | $2,784 | $0 | $0 | $0 | $53 | $59 | $0 | $111 | |||||||
| 3.2.1 | 3.2.12 Computer Resources | Subcontract X | Subcontractor | Minor | Analyst (Intermediate) | Huntsville, Alabama | Gov't Site | 1102Option 1DE | DE | 1102 | Option 1 | 50 | 50 | 100 | Analyst (Intermediate)Huntsville, AlabamaGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $0 | $0 | $0 | $1,026 | $1,172 | $0 | $2,198 | $0 | $0 | $0 | $41 | $47 | $0 | $88 | |||||||
| 3.3 | 3.3 BMDS Logistics Assessments and Analysis | Subcontract Z | Subcontractor | Minor | Analyst (Basic) | Hanscom AFB, Massachusetts | Gov't Site | 1103Option 1DPF | DPF | 1103 | Option 1 | 50 | 50 | 100 | Analyst (Basic)Hanscom AFB, MassachusettsGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $0 | $0 | $0 | $952 | $1,099 | $0 | $2,051 | $0 | $0 | $0 | $29 | $33 | $0 | $62 | |||||||
| 3.1.1 | 3.1.1 Logistics Policy Administration | Subcontract X | Subcontractor | Minor | Analyst (Entry) | Dahlgren, Virginia | Gov't Site | 1104Option 1DPL | DPL | 1104 | Option 1 | 50 | 50 | 100 | Analyst (Entry)Dahlgren, VirginiaGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $0 | $0 | $0 | $952 | $1,099 | $0 | $2,051 | $0 | $0 | $0 | $38 | $44 | $0 | $82 | |||||||
| 3.2.1 | 3.2.1 Product Support Management | IWTA | IWTA | Major | Contract Program Manager | Fort Bliss, Texas | Gov't Site | 1105Option 1DT | DT | 1105 | Option 1 | 50 | 50 | 100 | Contract Program ManagerFort Bliss, TexasGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $0 | $0 | $0 | $1,319 | $1,465 | $0 | $2,784 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.2.2 | 3.2.2 Design Interface | Subcontract X | Subcontractor | Major | Contract Technical Lead | Vandenberg AFB Santa Barbara, CA | Gov't Site | 1106Option 1GD | GD | 1106 | Option 1 | 50 | 50 | 100 | Contract Technical LeadVandenberg AFB Santa Barbara, CAGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $0 | $0 | $0 | $1,026 | $1,172 | $0 | $2,198 | $0 | $0 | $0 | $41 | $47 | $0 | $88 | |||||||
| 3.2.3 | 3.2.3 Sustaining Engineering | Subcontract X | Subcontractor | Major | Analyst (Advanced) | Colorado Springs, CO | Gov't Site | 1107Option 1GM | GM | 1107 | Option 1 | 50 | 50 | 100 | Analyst (Advanced)Colorado Springs, COGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $0 | $0 | $0 | $1,319 | $1,465 | $0 | $2,784 | $0 | $0 | $0 | $53 | $59 | $0 | $111 | |||||||
| 3.2.4 | 3.2.4 Supply Support | Subcontract X | Subcontractor | Major | Analyst (Intermediate) | Huntsville, Alabama | Gov't Site | 1108Option 1SN | SN | 1108 | Option 1 | 50 | 50 | 100 | Analyst (Intermediate)Huntsville, AlabamaGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $0 | $0 | $0 | $1,026 | $1,172 | $0 | $2,198 | $0 | $0 | $0 | $41 | $47 | $0 | $88 | |||||||
| 3.2.5 | 3.2.5 Maintenance Planning and Management | Subcontract X | Subcontractor | Minor | Analyst (Basic) | Hanscom AFB, Massachusetts | Gov't Site | 1109Option 1SN-LRDR | SN-LRDR | 1109 | Option 1 | 50 | 50 | 100 | Analyst (Basic)Hanscom AFB, MassachusettsGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $0 | $0 | $0 | $952 | $1,099 | $0 | $2,051 | $0 | $0 | $0 | $38 | $44 | $0 | $82 | |||||||
| 3.2.6 | 3.2.6 Packaging, Handling, Storage and Transportation | Subcontract Z | Subcontractor | Minor | Analyst (Entry) | Dahlgren, Virginia | Gov't Site | 1110Option 1TC | TC | 1110 | Option 1 | 50 | 50 | 100 | Analyst (Entry)Dahlgren, VirginiaGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $0 | $0 | $0 | $952 | $1,099 | $0 | $2,051 | $0 | $0 | $0 | $29 | $33 | $0 | $62 | |||||||
| 3.2.7 | 3.2.7 Technical Data | IWTA | IWTA | Major | Contract Program Manager | Fort Bliss, Texas | Gov't Site | 1111Option 1AE-B-UAF | AE-B-UAF | 1111 | Option 1 | 50 | 50 | 100 | Contract Program ManagerFort Bliss, TexasGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $0 | $0 | $0 | $1,319 | $1,465 | $0 | $2,784 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.2.8 | 3.2.8 Support Equipment | Subcontract X | Subcontractor | Minor | Contract Technical Lead | Vandenberg AFB Santa Barbara, CA | Gov't Site | 2101Option 2AB | AB | 2101 | Option 2 | 50 | 50 | 100 | Contract Technical LeadVandenberg AFB Santa Barbara, CAGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $0 | $0 | $0 | $0 | $1,172 | $1,172 | $2,344 | $0 | $0 | $0 | $0 | $47 | $47 | $94 | |||||||
| 3.2.9 | 3.2.9 Training and Training Support | IWTA | IWTA | Major | Analyst (Advanced) | Colorado Springs, CO | Gov't Site | 2102Option 2DE | DE | 2102 | Option 2 | 50 | 50 | 100 | Analyst (Advanced)Colorado Springs, COGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $0 | $0 | $0 | $0 | $1,465 | $1,465 | $2,930 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.2.1 | 3.2.10 Manpower and Personnel | Subcontract X | Subcontractor | Major | Analyst (Intermediate) | Huntsville, Alabama | Gov't Site | 2103Option 2DPF | DPF | 2103 | Option 2 | 50 | 50 | 100 | Analyst (Intermediate)Huntsville, AlabamaGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $0 | $0 | $0 | $0 | $1,172 | $1,172 | $2,344 | $0 | $0 | $0 | $0 | $47 | $47 | $94 | |||||||
| 3.2.1 | 3.2.11 Facilities and Infrastructure | Subcontract X | Subcontractor | Major | Analyst (Basic) | Hanscom AFB, Massachusetts | Gov't Site | 2104Option 2DPL | DPL | 2104 | Option 2 | 50 | 50 | 100 | Analyst (Basic)Hanscom AFB, MassachusettsGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $0 | $0 | $0 | $0 | $1,099 | $1,099 | $2,198 | $0 | $0 | $0 | $0 | $44 | $44 | $88 | |||||||
| 3.2.1 | 3.2.12 Computer Resources | Subcontract X | Subcontractor | Major | Analyst (Entry) | Dahlgren, Virginia | Gov't Site | 2105Option 2DT | DT | 2105 | Option 2 | 50 | 50 | 100 | Analyst (Entry)Dahlgren, VirginiaGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $0 | $0 | $0 | $0 | $1,099 | $1,099 | $2,198 | $0 | $0 | $0 | $0 | $44 | $44 | $88 | |||||||
| 3.3 | 3.3 BMDS Logistics Assessments and Analysis | IWTA | IWTA | Major | Contract Program Manager | Fort Bliss, Texas | Gov't Site | 2106Option 2GD | GD | 2106 | Option 2 | 50 | 50 | 100 | Contract Program ManagerFort Bliss, TexasGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $0 | $0 | $0 | $0 | $1,465 | $1,465 | $2,930 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.1.1 | 3.1.1 Logistics Policy Administration | IWTA | IWTA | Major | Contract Technical Lead | Vandenberg AFB Santa Barbara, CA | Gov't Site | 2107Option 2GM | GM | 2107 | Option 2 | 50 | 50 | 100 | Contract Technical LeadVandenberg AFB Santa Barbara, CAGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $0 | $0 | $0 | $0 | $1,172 | $1,172 | $2,344 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.2.1 | 3.2.1 Product Support Management | Subcontract X | Subcontractor | Major | Analyst (Advanced) | Colorado Springs, CO | Gov't Site | 2108Option 2SN | SN | 2108 | Option 2 | 50 | 50 | 100 | Analyst (Advanced)Colorado Springs, COGov't Site | $17.42 | $20.33 | $23.44 | $26.37 | $29.30 | $29.30 | $0 | $0 | $0 | $0 | $1,465 | $1,465 | $2,930 | $0 | $0 | $0 | $0 | $59 | $59 | $117 | |||||||
| 3.2.2 | 3.2.2 Design Interface | Subcontract X | Subcontractor | Major | Analyst (Intermediate) | Huntsville, Alabama | Gov't Site | 2109Option 2SN-LRDR | SN-LRDR | 2109 | Option 2 | 50 | 50 | 100 | Analyst (Intermediate)Huntsville, AlabamaGov't Site | $11.62 | $14.52 | $17.58 | $20.51 | $23.44 | $23.44 | $0 | $0 | $0 | $0 | $1,172 | $1,172 | $2,344 | $0 | $0 | $0 | $0 | $47 | $47 | $94 | |||||||
| 3.2.3 | 3.2.3 Sustaining Engineering | Subcontract X | Subcontractor | Major | Analyst (Basic) | Hanscom AFB, Massachusetts | Gov't Site | 2110Option 2TC | TC | 2110 | Option 2 | 50 | 50 | 100 | Analyst (Basic)Hanscom AFB, MassachusettsGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $0 | $0 | $0 | $0 | $1,099 | $1,099 | $2,198 | $0 | $0 | $0 | $0 | $44 | $44 | $88 | |||||||
| 3.2.4 | 3.2.4 Supply Support | Subcontract X | Subcontractor | Major | Analyst (Entry) | Dahlgren, Virginia | Gov't Site | 2111Option 2AE-B-UAF | AE-B-UAF | 2111 | Option 2 | 50 | 50 | 100 | Analyst (Entry)Dahlgren, VirginiaGov't Site | $10.16 | $13.07 | $16.12 | $19.05 | $21.98 | $21.98 | $0 | $0 | $0 | $0 | $1,099 | $1,099 | $2,198 | $0 | $0 | $0 | $0 | $44 | $44 | $88 |
FBLRs
| FULLY BURDENED LABOR RATE (FBLR) BUILD-UP | |||||||||||||||||||||||||||||||||||||||||||||||||
| Contractor: | Insert contractor name | ||||||||||||||||||||||||||||||||||||||||||||||||
| HQ0147-15-R-0021 - Logistics | |||||||||||||||||||||||||||||||||||||||||||||||||
| The prime contractor and each known subcontractor or IWTA will populate this tab to include the proposed FBLRs for their company. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Direct/Indirect rates are carried forward (linked) from the prime's, IWTA's or subcontractor's rates tab. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Offerors, IWTAs and major subcontractors must correct and tailor to eliminate errors and to conform to their estimating and accounting systems so that each rate/factor calculation uses the correct allocation base. | |||||||||||||||||||||||||||||||||||||||||||||||||
| For submission to the Government, the full detail of the direct/indirect rates and FBLR rates, and links to the rates tab will remain in-tact. | |||||||||||||||||||||||||||||||||||||||||||||||||
| To protect proprietary data, the IWTA or subcontractor may elect not to submit this tab to the prime contractor. | |||||||||||||||||||||||||||||||||||||||||||||||||
| RED Fringe Cost number means it doesn't meet the minimum fringe dollars per hour. | Contractor Fiscal Year | Contractor Fiscal Year | Contractor Fiscal Year | Contractor Fiscal Year | Contractor Fiscal Year | Contractor Fiscal Year | |||||||||||||||||||||||||||||||||||||||||||
| 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | ||||||||||||||||||||||||||||||||||||||||||||
| 2 | 5 | 2016 | 3 | 6 | 2016 | 4 | 7 | 2016 | 5 | 8 | 2016 | 6 | 9 | 2016 | 7 | 10 | 2016 | ||||||||||||||||||||||||||||||||
| Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | G&A Cost | FBLR (no fee/profit) | Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | G&A Cost | FBLR (no fee/profit) | Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | G&A Cost | FBLR (no fee/profit) | Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | G&A Cost | FBLR (no fee/profit) | Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | G&A Cost | FBLR (no fee/profit) | Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | ||||
| Base Labor | Base Labor | Base Labor | Base Labor | Base Labor | Base Labor | ||||||||||||||||||||||||||||||||||||||||||||
| Labor Category | Location | Work Site | Index Column | Rate | Rate | Rate | Rate | Rate | Rate | ||||||||||||||||||||||||||||||||||||||||
| Contract Program Manager | Huntsville, Alabama | Gov't Site | Contract Program ManagerHuntsville, AlabamaGov't Site | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% | $ 2.66 | $29.30 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% |
| Contract Technical Lead | Huntsville, Alabama | Gov't Site | Contract Technical LeadHuntsville, AlabamaGov't Site | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% |
| Analyst (Advanced) | Huntsville, Alabama | Gov't Site | Analyst (Advanced)Huntsville, AlabamaGov't Site | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% | $ 2.66 | $29.30 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% |
| Analyst (Intermediate) | Huntsville, Alabama | Gov't Site | Analyst (Intermediate)Huntsville, AlabamaGov't Site | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% |
| Analyst (Basic) | Huntsville, Alabama | Gov't Site | Analyst (Basic)Huntsville, AlabamaGov't Site | $7.00 | 10.00% | $ 0.70 | 20.00% | $ 1.54 | 10.00% | $ 0.92 | $10.16 | $9.00 | 10.00% | $ 0.90 | 20.00% | $ 1.98 | 10.00% | $ 1.19 | $13.07 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% |
| Analyst (Entry) | Huntsville, Alabama | Gov't Site | Analyst (Entry)Huntsville, AlabamaGov't Site | $7.00 | 10.00% | $ 0.70 | 20.00% | $ 1.54 | 10.00% | $ 0.92 | $10.16 | $9.00 | 10.00% | $ 0.90 | 20.00% | $ 1.98 | 10.00% | $ 1.19 | $13.07 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% |
| Contract Program Manager | Hanscom AFB, Massachusetts | Gov't Site | Contract Program ManagerHanscom AFB, MassachusettsGov't Site | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% | $ 2.66 | $29.30 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% |
| Contract Technical Lead | Hanscom AFB, Massachusetts | Gov't Site | Contract Technical LeadHanscom AFB, MassachusettsGov't Site | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% |
| Analyst (Advanced) | Hanscom AFB, Massachusetts | Gov't Site | Analyst (Advanced)Hanscom AFB, MassachusettsGov't Site | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% | $ 2.66 | $29.30 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% |
| Analyst (Intermediate) | Hanscom AFB, Massachusetts | Gov't Site | Analyst (Intermediate)Hanscom AFB, MassachusettsGov't Site | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% |
| Analyst (Basic) | Hanscom AFB, Massachusetts | Gov't Site | Analyst (Basic)Hanscom AFB, MassachusettsGov't Site | $7.00 | 10.00% | $ 0.70 | 20.00% | $ 1.54 | 10.00% | $ 0.92 | $10.16 | $9.00 | 10.00% | $ 0.90 | 20.00% | $ 1.98 | 10.00% | $ 1.19 | $13.07 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% |
| Analyst (Entry) | Hanscom AFB, Massachusetts | Gov't Site | Analyst (Entry)Hanscom AFB, MassachusettsGov't Site | $7.00 | 10.00% | $ 0.70 | 20.00% | $ 1.54 | 10.00% | $ 0.92 | $10.16 | $9.00 | 10.00% | $ 0.90 | 20.00% | $ 1.98 | 10.00% | $ 1.19 | $13.07 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% |
| Contract Program Manager | Dahlgren, Virginia | Gov't Site | Contract Program ManagerDahlgren, VirginiaGov't Site | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% | $ 2.66 | $29.30 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% |
| Contract Technical Lead | Dahlgren, Virginia | Gov't Site | Contract Technical LeadDahlgren, VirginiaGov't Site | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% |
| Analyst (Advanced) | Dahlgren, Virginia | Gov't Site | Analyst (Advanced)Dahlgren, VirginiaGov't Site | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% | $ 2.66 | $29.30 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% |
| Analyst (Intermediate) | Dahlgren, Virginia | Gov't Site | Analyst (Intermediate)Dahlgren, VirginiaGov't Site | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .