HQ0147-09-R-0006 atch 10 CDRLs.pdf

PDF 1009 KB Posted

Attached to
Airborne Sensor Program (ABS)
Solicitation number
HQ0147-09-R-0006
Issued by

About this file

Attachment 10 Contract Data Requirements List

View the file

Other files

File Type Posted
A003.doc DOC document
HQ0147-09-R-0006-0002.doc DOC document
HQ0147-09-R-0006-0002 SF 33.docx DOCX document
HQ0147-09-R-0006-0002 atch 12 Section L.docx DOCX document
ABS RFP Q A 14 May 10.xlsx XLSX spreadsheet
ABS RFP Q A 3 May 10.xlsx XLSX spreadsheet
ABS RFP Q A 3 May 10.xlsx XLSX spreadsheet
1707.pdf PDF
HQ0147-09-R-0006-0001 atch 15 Mission Spt Pricing Instructions.docx DOCX document
HQ0147-09-R-0006-0001 Section B.docx DOCX document
HQ0147-09-R-0006-0001 atch 13 Section M.docx DOCX document
HQ0147-09-R-0006-0001.docx DOCX document
HQ0147-09-R-0006-0001 atch 1 SOW.docx DOCX document
ABS Pre-proposal Conference QA 21 Apr 10.xlsx XLSX spreadsheet
ARC Classified Access_Media Instructions REV.doc DOC document
FBO announcement.docx DOCX document
HQ0147-09-R-0006 DD 1707.pdf PDF
HQ0147-09-R-0006 atch 14 MDA OCI Policy.pdf PDF
HQ0147-09-R-0006 atch 4 PP Info Sheet.docx DOCX document
HQ0147-09-R-0006 atch 8 GFE Listing.pdf PDF
HQ0147-09-R-0006 Sections A through K.doc DOC document
HQ0147-09-R-0006 atch 7 Draft AF Plan.docx DOCX document
HQ0147-09-R-0006 atch 6 SubK Consent Letter.docx DOCX document
HQ0147-09-R-0006 atch 5 PPQ Cover Letter.docx DOCX document
HQ0147-09-R-0006 atch 15 Mission Spt Pricing Instructions.docx DOCX document
HQ0147-09-R-0006 atch 13 Section M.docx DOCX document
HQ0147-09-R-0006 atch 11 Cost Format A.xlsx XLSX spreadsheet
HQ0147-09-R-0006 atch 3 PP Questionnaire.docx DOCX document
HQ0147-08-R-0006 atch 1 SOW.docx DOCX document
ABS QA for FBO 8 Mar 10.xlsx XLSX spreadsheet
ABS QA for FBO 23 Feb 10 —
Draft Atch 6 - Past Performance SubContractor Consent Letter.pdf PDF
Draft Atch 1 - SOW —
Draft Atch 4 - Past Performance Information Sheet.pdf PDF
Draft RFP 10 Dec A thru K.pdf PDF
Draft Atch 13 Section M 9 Dec.pdf PDF
Draft Atch 5 - Past Performance Transmittal Letter.pdf PDF
Draft Atch 10 - CDRL Listing —
Draft Atch 3 - Past and Present Performance Questionnaire.pdf PDF
Draft Atch 11 - Cost Format A —
ITAR_Certification__Visitor_Badge_Request.doc DOC document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HQ0147-09-R-0006

Attachment 10

MDA/DTR

Airborne Sensors (ABS) Program

EXHIBIT A

CONTRACT DATA

REQUIREMENTS LIST

4 FEBRUARY 2010

A. INTRODUCTION

The Contract Data Requirements List (CDRL) is prepared in a word processing format to increase the efficiency of electronic development and transmission. Block numbering and titles remain as used in the DD Form 1423 as derived from Procedures for the Acquisition and Management of Technical Data, DoD 5010.12-M.

B. APPLICABLE DOCUMENTS

DoDD 5230.24, Distribution Statements on Technical Documents, March 18, 1987

C. AUTHORITIES (BLOCK 4)

Data Item Descriptions (DIDs) entered in CDRL blocks 2 and 4 are selected from the Acquisition Streamlining and

Standardization Information System (ASSIST) data base. The application of any DID tailoring is indicated by addition of the suffix "T" to the DID number entered in Block 4. Such tailoring is accomplished to relax format requirements or conform the data requirement to those requirements contained in the Statement of Work (SOW).

D. APPROVAL (BLOCK 8)

Selected data will require approval before their submission is considered final. The approving authority shall be the

MDA/DTR Contracting Officer’s Representative (COR) or government designated Task Manager (TM) as indicated by the first addressee entry of Block 14.a. The use of “N/A” in Block 8 does not forfeit or otherwise affect the Government’s right to consider unacceptable any submission of data that does not comply with the contract requirements.

E. DATA DELIVERY DUE DATES (BLOCKS 12 AND 13)

Data will be considered delinquent when not physically arriving or electronically available at the distribution destination on the date(s) specified. Unless otherwise indicated, references to “days” are calendar days.

F. SUPPLEMENTAL INFORMATION

N/A.

G. DEFINITIONS OF ACRONYMS AND ABBREVIATIONS

Entry Definition

LT Letter of transmittal

N/A Not applicable

ASREQ As required

ANNLY Annually

MTHLY Monthly

DAC Days after contract initiation

MAC Months after contract initiation xx DARP xx Days After Reporting Period

H. ADDRESSEE LIST

Block 14 Entry Complete Mailing Address

MDA/DTR Missile Defense Agency

MDA/DACT ATTN: MDA/______

Missile Defense Agency (MDA)

Building 5222 Martin Road

Redstone Arsenal, AL 35896

CDRL LISTING

CDRL

SOW Paragraph

Reference Data Item Description

001 Program Plan 2.1.3, 2.1.10 DI-MGMT-80909

002 Contract Work Breakdown Structure (CWBS) 2.1.2b DI-MGMT-81334

003 Integrated Master Schedule (IMS) 2.1.4, DI-MISC-81183A

004 Cost Performance Report (CPR) modified 2.3.3 DI-MGMT-81466

005 RESERVED RESERVED RESERVED

006 Contract Funds Status Report (CFSR) 2.3.3 DI-MGMT-81468

007 Interface Design Description 3.1.4 DI-IPSC-81436A

008 Product Drawings 3.1.4 DI-SESS-81000C

009 O&M Instructions for R&D Equipment 4.2.1 b DI-MISC-81414 010 Mission Assurance Implementation Plan (MAIP) 3.0, 3.1.2, 3.2.3, 3.2.4, 3.3, 3.4.1

DI-MISC-80048

011 T&E Program Plan 3.1.4 DI-NDTI-81284

012 RESERVED RESERVED RESERVED

013 Mission Status/Planning & Data Review Report 4.1.2.3, 4.1.2.4, 4.1.2.5, 4.1.4.1b, 4.1.4.1d

DI-MISC-80508B

014 Mission Final Report & Data Products 4.1.4.1b DI-MISC-80508B

015 Report, Record of meetings/Minutes 2.1.6 DI-ADMIN-81505

016 Improvement & Modernization Report 4.3.1 DI-MISC-80508B

017 Status Report 2.1.6b, 2.3.3 DI-MGMT-80368/M

Scientific and Technical Reports - Verification/Final Report 3.1.4 DI-MISC-80508B

019 Test Plan 3.1.4 DI-NDTI-80808

020 Recommended Spare Parts List 3.3.3 DI-ILSS-80134A

021 Technology Development Plan 4.4.1 DI-MISC-80508B

022 Technology Control Plan 2.1.10 DI-MISC-80508B

023 Software Test Report 3.1.4, 3.4.1 DI-ISPC-81440A

024 RESERVED RESERVED RESERVED

025 Hazardous Materials Mgmt Prgm (HMMP Report) 3.2.2 DI- MISC-81398

026 Software Version Description 3.4.1 DI-IPSC-81442A

027 Hazardous Waste Report 3.2.2 DI-MGMT-80899

028 Technical Data Package 3.1.3, 3.1.4, 4.1.1.2a DI-MISC-80508B

Non-CDRL Plans Requiring Document

029 Award Fee Plan Contract DI-ADMIN-80925

Government Furnished Property Management Plan Contract DI-ADMIN-80925

029 List of Compliance and Referenced Documents Contract DI-ADMIN-80925

029 Subcontract Plan Contract DI-ADMIN-80925

029 Subcontract Reports SF 294/295 Contract DI-ADMIN-80925

029 Physical Security Plan DD254 DI-ADMIN-80925

029 Physical Security Implementation Plan (PSIP) DD254 DI-ADMIN-80925

029 OPSEC Plan DD254 DI-ADMIN-80925 029 Information System Certification and Accreditation

Plan

DD254 DI-ADMIN-80925

DD Form 1423-1, JUN 90 Previous Editions are obsolete Page __1___ of ___1___Pages

C O N T R A C T D A T A R E Q U I R E M E N T S L I S T

(1 Data Item)

Forms Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite

1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503.

Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the

Contract/PR No. in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C: CATEGORY:

TDP TM OTHER X

17. PRICE GROUP

D. SYSTEM/ITEM

Airborne Sensor Program

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Program Plan

3. SUBTITLE

18. EST TOTAL

PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80909

5. CONTRACT REFERENCE

SOW Paragraph 2.1.3, 2.1.10

6. REQUIRING OFFICE

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

One

12. DATE OF FIRST SUBMISSION

30 DAC

14. DISTRIBUTION

8. APP CODE

A

F 11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBM.

ASREQ

a. ADDRESSEE b. COPIES final draft reg repr

16. REMARKS

BLOCK 4: Contractor format is acceptable. Electronic submission shall be made using

Microsoft Office Products. Document shall provide a comprehensive plan indicating how the contractor will approach and perform the efforts required under this contract.

DID Specific Tailoring

10.2.2 Deleted. CWBS should be developed to the level specified in CDRL

A002.

BLOCK 9: Distribution Statement F. Further distribution only as directed by MDA/DTR (Test

Resources -Airborne Sensor Program) or higher DoD authority.

Block 14: Electronic submission required, posting to ABS Portal may satisfy this requirement. Hard copies will be made available upon request. If document is posted to the

ABS Portal, each addressee shall be notified by e-mail indicating to which folder and subfolder the report has been posted and the date posted. E-mail and physical addresses are provided in Exhibit A Section H, Addressee List. CDRLs due on weekends and holidays shall be due the morning of the next business day.

G. PREPARED BY

H. DATE

I. APPROVED BY

ACO

MDA/DACT

15. TOTAL -----> 0 3 0

J. DATE

DD Form 1423-1, JUN 90 Previous Editions are obsolete Page __1___ of ___1___Pages

DD Form 1423-1, JUN 90 Previous Editions are obsolete Page 1 of 1 pages

(1 Data Item)

Forms Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite

1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503.

Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the

00013

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER X

17. PRICE GROUP

D. SYSTEM/ITEM

A002

2. TITLE OF DATA ITEM: CONTRACT WORK BREAKDOWN

STRUCTURE (CWBS)

3. SUBTITLE 18. EST TOTAL

PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81334

5. CONTRACT REFERENCE:

SOW para 2.1.2.b

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

8. APP CODE

A

F 11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBM.

ASREQ

a. ADDRESSEE b. COPIES final

BLOCK 4:

a. The CWBS Index (Part I) and Dictionary (Part II) shall be prepared in accordance with the Contractor Cost Data Reporting (CCDR) Plan.

b. The CWBS Index and Dictionary shall be extended from the summary reporting level provided by the Government in the CCDR Plan to the lowest level at which work will be done including identification of each individual management/control account. Contractor shall identify subcontracted effort, including subcontracted effort and name at the lowest level of the extended CWBS.

c. The CWBS shall be developed at a sufficient level of detail to provide cost visibility for the following prime and Subcontractor cost elements: a) nonrecurring design and recurring prototype manufacturing for all hardware elements; b) and software development at the component WBS level.

d. Contractor format is acceptable. Submission shall be made electronically. The

Government will have access, on an as-required basis, to electronic Contractor

CWBS data.

BLOCK 9: Distribution Statement F. Further distribution only as directed by MDA/DTR

(Test Resources -Airborne Sensor Program) or higher DoD authority.

BLOCKS 11, 12, & 13: Draft CWBS Index (Part I) shall be submitted with the proposal in response to the Government RFP. The complete CWBS Index and Dictionary shall be submitted in electronic format no later than 30 calendar days after award of definitized contract. Electronic submission shall be made using Microsoft Office Products.

requirement. Hard copies will be made available upon request. If document is posted to the ABS Portal, each addressee shall be notified by e-mail indicating to which folder and subfolder the report has been posted and the date posted. E-mail and physical addresses are provided in Exhibit A Section H, Addressee List. CDRLs due on weekends and holidays shall be due the morning of the next business day.

DD Form 1423-1, JUN 90 Previous Editions are obsolete Page 1 of 1 pages

(1 Data Item)

Forms Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite

1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503.

Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the

B. EXHIBIT

A

C: CATEGORY:

TDP TM OTHER X

17. PRICE GROUP

D. SYSTEM/ITEM

A003

2. TITLE OF DATA ITEM

INTEGRATED MASTER SCHEDULE (IMS)

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81183A

5. CONTRACT REFERENCE

SOW Para 2.1.4

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

MONTHLY

12. DATE OF FIRST SUBMISSION

30 DAC

14. DISTRIBUTION

SEE BLOCK 16

8. APP CODE

N/A

F 11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBM.

SEE BLOCK 16

a. ADDRESSEE b. COPIES final draft reg repr

Block 4:

a. An IMS shall be required for the ABS contract. Reporting shall include Program

Events, Accomplishments and Tasks.

b. Contractor format is acceptable. Electronic submission shall be made using

Microsoft Office Products. Schedule outputs will contain, at a minimum, Baseline

Start & Finish dates, Actual Start & Finish dates, durations, constraints (type and date), Predecessors, Successors, Percent complete, and unique activity ID numbers, SOW reference, WBS.

c. The contractor shall participate in periodic schedule risk assessments (SRA) at the request of the government. Frequency shall be as required.

Block 9: Distribution Statement F. Further distribution only as directed by MDA/DTR (Test

Block 11: Last day of contractor’s monthly accounting period.

Block 12: Initial submittal accompanied delivery of the firm proposal. First submittal 30 Days

After Contract Award.

Block 13: Subsequent submittals are due on the 15th of the month following contractor's accounting month with the exception of the December submittal, which will be submitted on 31

January. One additional day will be added to the delivery date for each company and/or federal holiday falling between the 1st and 15th of the month.

BLOCK 14: Electronic submission required, posting to ABS Portal may satisfy this requirement.

Hard copies will be made available upon request. If document is posted to the ABS Portal, each addressee shall be notified by e-mail indicating to which folder and subfolder the report has been posted and the date posted. E-mail and physical addresses are provided in Exhibit A Section H, Addressee List. CDRLs due on weekends and holidays shall be due the morning of the next business day.

FOR OFFICIAL USE ONLY

DD Form 1423-1, JUN 90 Previous Editions are obsolete Page 1 of 2 pages

FOR OFFICIAL USE ONLY

C O N T R A C T D A T A R E Q U I R E M E N T S L I S T

(1 Data Item)

Forms Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT

RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C: CATEGORY:

TDP TM OTHER X

17. PRICE GROUP

D. SYSTEM/ITEM

A004

2. TITLE OF DATA ITEM

MODIFIED COST PERFORMANCE REPORT (CPR)

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81466

5. CONTRACT REFERENCE

SOW Paragraph 2.3.3

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

MONTHLY

12. DATE OF FIRST SUBMISSION

30 DAC

14. DISTRIBUTION

SEE BLOCK 16

F

11. AS OF DATE

final draft reg repr

16. REMARKS

Block 4:

a. Contractor format is acceptable. Electronic submission shall be made using ANSI

ASC X 12 Transaction Set 839C, Project Cost Reporting, Version 004010. The

Government shall have access to, on an as-required basis, electronic Contractor Cost

Performance Report (CPR) data.

b. Reporting levels shall be IAW the contractor’s Work Breakdown Structure (WBS).

c. Format 1 reporting will be at Level Four of the WBS unless a different level of reporting is mutually agreed upon as required for areas of significant, cost and/or schedule risk. The contractor, with Government approval, shall review and update

Format 1 reporting annually in conjunction with the contractor’s annual EAC update consistent with the contractor’s system description. Current month cost (CV) and schedule variance (SV) explanations are required.

d. Formats 2 and 3 of the CPR are not required.

e. Format 5 shall incorporate at least the top 10 current month and cumulative cost variances, the top 10 current month and cumulative schedule variances, and an explanation of changes for the top 10 variance at completion (VAC) deltas. The current period variances shall be subject to a +/- $25K minimum threshold. The cumulative variances shall be subject to a +/- $50K minimum threshold. The variances at completion shall be subject to a +/- 10 percent minimum threshold. All

Budget at Completion (BAC) changes on Format 1 shall be explained in Format 5.

All Management Reserve (MR) transactions, including the work scope to be covered by the MR, the amount of MR to be distributed by WBS element and the forecasted/actual date of MR distribution shall be explained on Format 5.

Undistributed Budget (UB) transactions shall be explained in a similar manner.

Specific corrective actions, forecasted closure date, and impact to the Estimate at

Completion (EAC) shall be included in each variance narrative. Contractor shall explain to the lowest CWBS level necessary to completely explain the variances

“Best case” and “Worst case” EACs. Explanation of the PMB changes shall be in sufficient detail to explain the rationale for PMB adjustments for all periods.

f. The Government reserves the right to review and modify, through negotiations, the variance analysis requirements for Format 1during the performance of the contract, but no sooner than six months after contract award.

DD Form 1423-1, JUN 90 Previous Editions are obsolete Page 2 of 2 pages

Block 4 (cont.):

g. CPRs from major subcontractors shall be for the same/similar accounting period as the prime contractor consolidated submittal.

h. The contractor shall submit copies of major subcontractors as attachments to the prime contractor consolidated submittal.

i. For format 5 variance narratives include the nature of the problem, reasons for CV or

SV, impact on other WBS(s) tasks, impact to the program, corrective action and expected recovery. Also note if the variance is to continue, for how long.

Block 9: Distribution Statement F. Further distribution only as directed by MDA/DTR

Block 13:

a. Formats 1, 4 and 5 subsequent submissions are due on the 15th of the month following contractor's accounting month with the exception of the December submittal, which will be submitted on 31 January. One additional day will be added to the delivery date for each company and/or federal holiday falling between the 1st and 15th of the month.

the ABS Portal, each addressee shall be notified by e-mail indicating to which folder and subfolder the report has been posted and the date posted. E-mail and physical addresses are provided in Exhibit A, Section H, Addressee List. CDRLs due on weekends and holidays

DD Form 1423-1, JUN 90 Previous Editions are obsolete Page 1 of 1 pages

FOR OFFICIAL USE ONLY

C O N T R A C T D A T A R E Q U I R E M E N T S L I S T

(1 Data Item)

Forms Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington

Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the

Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.

B. EXHIBIT

A

C: CATEGORY:

TDP TM OTHER X

17. PRICE GROUP

D. SYSTEM/ITEM

A006

2. TITLE OF DATA ITEM

CONTRACT FUNDS STATUS REPORT (CFSR)

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT 81468

5. CONTRACT REFERENCE

SOW Para 2.3.3

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

Monthly

12. DATE OF FIRST SUBMISSION

30 DAC

14. DISTRIBUTION

SEE BLOCK 16

8. APP CODE

N/A

F 11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBM.

SEE BLOCK 16

a. ADDRESSEE b. COPIES final draft reg repr

16. REMARKS

Block 4:

a. Contractor format is acceptable. Electronic submissions shall be made electronically using Microsoft Office products. The Government shall have access, on an as-required basis, to electronic Contractor CFSR data.

b. Report by CLIN in block 11 of CFSR.

c. The “at completion” column of Block 12 shall be the contractor’s Estimated Price at

Completion (EPC) (including Government share of any projected overruns).

d. Projections in blocks 12,13,14 of the CFSR shall be monthly for at least six months, quarterly for the remainder of the government fiscal year, four quarters of the following fiscal year, and then annual to completion.

e. For block 15 of the CFSR, report actual payments received as a cumulative value for the period from contract award through the current report date. Include any pertinent information to explain a projected change in funding required or change to the EPC.

f. A reconciliation of the CFSR and CPR shall be performed and submitted as an attachment to the CFSR.

g. The contractor shall submit copies of major subcontractors CFSRs as attachments to the Contractor’s consolidated submittal.

Block 9: Distribution Statement F. Further distribution only as directed by MDA/DTR (Test

Block 13: Subsequent submittals are due on the 15th of the month following contractor's accounting month with the exception of the December submittal, which will be submitted on 31 January. One additional day will be added to the delivery date for each company and/or federal holiday falling between the 1st and 15th of the month.

addressee shall be notified by e-mail indicating to which folder and subfolder the report has been posted and the date posted. E-mail and physical addresses are provided in Exhibit A, Section H, Addressee List. CDRLs due on weekends and holidays shall be due the morning of the next business day.

15. TOTAL ---

0 3 0

DD Form 1423-1, JUN 90 Previous Editions are obsolete Page __1___ of ___1___Pages

(1 Data Item)

Forms Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite

1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503.

Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the

B. EXHIBIT

A

C: CATEGORY:

TDP TM OTHER X

17. PRICE GROUP

D. SYSTEM/ITEM

A007

2. TITLE OF DATA ITEM

Interface Design Description

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81436A

5. CONTRACT REFERENCE

SOW Paragraph 3.1.4

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

One/R

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

As REQ final

Microsoft Office Products.

BLOCK 12: Initial submittal required 6 months after contract award. The Government has 30 calendar days to review the first draft. The contractor has 30 calendar days, after receipt of Government comments, to prepare and deliver the final report.

BLOCK 13: Subsequent delivery, as required, for modifications or new developments:

delivery is required 6 weeks after final design acceptance (Gate 2).

addressee shall be notified by e-mail indicating to which folder and subfolder the report has been posted and the date posted. E-mail and physical addresses are provided in Exhibit A, Section H, DD Form 1423-1, JUN 90 Previous Editions are obsolete Page __1___ of ___1___Pages

(1 Data Item)

Forms Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of

Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT

RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.

B. EXHIBIT

A

C: CATEGORY:

TDP TM OTHER X

17. PRICE GROUP

D. SYSTEM/ITEM

A008

2. TITLE OF DATA ITEM

Product Drawings and Associated Lists

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81000C

5. CONTRACT REFERENCE

SOW Paragraph 3.1.4

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

One/R

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

final

BLOCK 4: Contractor format is acceptable. Electronic submission shall be made.

Content shall include all Drawings, Program Documentation, Test Documentation, Test and Instrumentation Data, Certification/Engineering Reports, Software Documentation, Technical Publications Documentation, and “As-Built” installation data. Contractor shall identify commercially available drawing development software to allow for government to purchase for viewing. Drawings shall be delivered in format capable of being viewed by the identified commercial software package and PDF.

BLOCK 12: For design changes, drawing updates, modifications or new developments, initial submission required 6 weeks after initial drawing completion. The Government has 30 calendar days to review.

Block 13: Updates as required with final submittal required 6 weeks after completion of flight validation testing. The Government has 30 calendar days to review all submittals.

The contractor has 30 calendar days, after receipt of Government comments, to prepare and deliver the final drawings/products.

addressee shall be notified by e-mail indicating to which folder and subfolder the report has been posted and the date posted. E-mail and physical addresses are provided in Exhibit A, Section H, DD Form 1423-1, JUN 90 Previous Editions are obsolete Page __1___ of ___1___Pages

(1 Data Item)

Forms Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite

1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503.

Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the

B. EXHIBIT

A

C: CATEGORY:

TDP TM OTHER X

17. PRICE GROUP

D. SYSTEM/ITEM

A009

2. TITLE OF DATA ITEM

Operations and Maintenance (O&M) Instructions for R&D Equipment

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81414

5. CONTRACT REFERENCE

SOW Paragraph 4.2.1.b

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

One/R

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

As Req final

Microsoft Office Products. The contractor shall prepare and deliver system description, subsystem descriptions, operation procedures, maintenance manuals, calibration procedures, schedule maintenance procedures, support equipment requirements, aircraft installation and checkout procedures, and data reduction procedures.

BLOCK 12: Delivery due 6 weeks after completion of flight validation testing for any modification or new development. The Government has 30 calendar days to review the first draft. The contractor has 30 calendar days, after receipt of Government comments, to prepare and deliver the final report.

addressee shall be notified by e-mail indicating to which folder and subfolder the report has been posted and the date posted. E-mail and physical addresses are provided in Exhibit A, Section H, DD Form 1423-1, JUN 90 Previous Editions are obsolete Page __1___ of ___1___Pages

(1 Data Item)

Forms Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite

1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503.

Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the

B. EXHIBIT

A

C: CATEGORY:

TDP TM OTHER X

17. PRICE GROUP

D. SYSTEM/ITEM

A010

2. TITLE OF DATA ITEM

Scientific and Technical Reports Summary

3. SUBTITLE

Mission Assurance Implementation Plan

18. EST TOTAL

PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI MISC-80048

5. CONTRACT REFERENCE

SOW Para 3.0, 3.1.2, 3.2.3, 3.2.4, 3.3. 3.4.1

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ONE

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

See Block 16 final

BLOCK 4: Contractor format is acceptable – recommend using any MDA provided tools or guides. Electronic submission shall be made using Microsoft Office Products.

Airborne Sensors (ABS) tailored MDA Assurance Provisions (MAP) shall provide the technical and management principles used to assure ABS mission success. Mission

Assurance Implementation Plan (MAIP) shall provide a comprehensive plan indicating the methods to be used by the contractor to implement the tailored MDA Assurance

Provisions (MAP) once approved by the Government.

BLOCK 9: Distribution Statement F. Further distribution only as directed by

MDA/DTR (Test Resources -Airborne Sensor Program) or higher DoD authority.

BLOCK 12: Contractor shall provide a draft MAP with the proposal. Contractor shall provide a draft MAIP within 30 calendar days after tailored MAP is approved by the

Government.

BLOCK 13: Contractor shall provide an updated document (applies to MAP and MAIP) addressing Government comments within 30 days of receipt (until final approval is received).

Subsequent updates only as necessary to address changes in identified processes.

Cost information may be requested, as necessary, to support this activity.

BLOCK 14: Electronic submission required, posting to ABS Portal may satisfy this the ABS Portal, each addressee shall be notified by e-mail indicating to which folder and subfolder the report has been posted and the date posted. E-mail and physical addresses are provided in Exhibit A, Section H, Addressee List. CDRLs due on weekends and

15. TOTAL -----> 01 3 0

DD Form 1423-1, JUN 90 Previous Editions are obsolete Page __1___ of ___1___Pages

(1 Data Item)

Forms Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite

1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503.

Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the

B. EXHIBIT

A

C: CATEGORY:

TDP TM OTHER X

17. PRICE GROUP

D. SYSTEM/ITEM

A011

2. TITLE OF DATA ITEM

Test and Evaluation Program Plan

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-81284

5. CONTRACT REFERENCE

SOW Paragraph 3.1.4

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

One/R

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

AS REQ

final

BLOCK 12: Initial submittal required 60 days after delivery order award for a modification or technology development. The Government has 30 calendar days to review the first draft. The contractor has 30 calendar days, after receipt of Government comments, to prepare and deliver the final report.

addressee shall be notified by e-mail indicating to which folder and subfolder the report has been posted and the date posted. E-mail and physical addresses are provided in Exhibit A, Section H, Addressee List. CDRLs due on weekends and holidays shall be due the morning of the next

DD Form 1423-1, JUN 90 Previous Editions are obsolete Page __1___ of ___1___Pages

(1 Data Item)

Forms Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite

1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503.

Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the

B. EXHIBIT

A

C: CATEGORY:

TDP TM OTHER X

17. PRICE GROUP

D. SYSTEM/ITEM

A013

2. TITLE OF DATA ITEM

TECHNICAL REPORT – STUDY SERVICES

3. SUBTITLE

MISSION STATUS / PLANNING & DATA REVIEW REPORT

18. EST TOTAL

PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

SOW Para 4.1.2.3, 4.1.2.4, 4.1.2.5, 4.1.4.1b, 4.1.4.1d

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

AS REQ

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

final draft reg repr

16. REMARKS

NOTE: This CDRL consolidates the requirements for Mission Planning documents

(MSP), Mission status (planning meetings), data review meetings, and mission reports (4-hr PMSM, 48-hr PMSSR, & MFR) into a new CDRL A013 for Mission Status/Mission

Reports.

Blk 4: Contractor format is acceptable. Electronic submission shall be made using

Blk 12: Documents will be submitted:

Mission Support Plan (MSP). MSP will be submitted in response to specific Mission

Requirements Documents (MRD) to document planned mission support for a specific mission. Report is required 30 days prior to first scheduled launch date (T-0). The MSP will be submitted to MDA/DTR for review and final distribution. Mission Status/Data

Review meetings. If lead time allows (typically 10 work days) prior to a presentation, draft presentation materials will be submitted to MDA/DTR for review 5 days prior to meeting. If time is short, final version of presentation and facing page narratives will be delivered 10 work days after review/meeting.

Mission Reports. Typical mission reports for each mission will be delivered IAW the

Data Management Plan/Data Handling Plan provided by the User. The 4-hr Post-Mission

Status Message (PMSM) and the 48-hr Post-Mission Status & Summary Report (PMSSR) are delivered to the MDA/DTR Government Representative to make secondary distribution. The Mission Final Report (MFR) will be provided to MDA/DTR for review and comment prior to making final distribution IAW the DMP/DHP. The MSP, PMSSR and MFR will include the following topics as appropriate: 1) Executive Summary, 2)

Mission overview and objectives, Vehicle(s) description, Timeline/Data Collection Plan, Mission and Post-mission support requirements and planning, 3) Test to be executed/Supported, 4) Range Interface requirements planning, 5) Sensor configuration and Data management activities.

Mission Assurance Briefings/Certification Letters. Provided to MDA/DTR after MSP submission at the Government’s request. Mission Critical Checklists will be delivered to

MDA/DTR post-mission at the Government’s request.

DD Form 1423-1, JUN 90 Previous Editions are obsolete Page __1___ of ___1___Pages

Contract FA8632-05-D-2455

CDRL A013

Block 16, Cont.

Blk 14: Electronic submission required. Posting to ABS Portal may satisfy this requirement.

However, copies to User Org and Test Range personnel shall be provided electronic copies of reports directly. Hard copies will be made available on request. If document is posted to the Portal, each addressee shall be notified by e-mail indicating the date and to which folder the report was posted. E-mail and physical addresses are provided in Exhibit A, Section H, DD Form 1423-1, JUN 90 Previous Editions are obsolete Page __1___ of ___1___Pages

(1 Data Item)

Forms Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite

1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503.

Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the

B. EXHIBIT

A

C: CATEGORY:

TDP TM OTHER X

17. PRICE GROUP

D. SYSTEM/ITEM

A014

2. TITLE OF DATA ITEM

Technical Report – Study Services

3. SUBTITLE

Mission Data Products

18. EST TOTAL

PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

SOW Paragraph 4.1.4.1b

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

SEE BLOCK 16

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

final

Block 4: Contractor format is acceptable. Electronic submission shall be made using

Block 9: Distribution Statement F: Further distribution only as directed by MDA/DTR

Block 12: Mission Data Products will be delivered in accordance with (IAW) the requirements established in the User's Data Management Plan/Data Handling Plan.

Block 14: Electronic submission required. Posting to ABS Portal may satisfy this requirement. However, copies to User Org and Test Range personnel shall be provided electronic copies of reports directly. Hard copies will be made available on request. If document is posted to the Portal, each addressee shall be notified by e-mail indicating the date and to which folder the report was posted. E-mail and physical addresses are provided in Exhibit A, Section H, Addressee List. CDRLs due on weekends and holidays

DD Form 1423-1, JUN 90 Previous Editions are obsolete Page __1___ of ___1___Pages

(1 Data Item)

Forms Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite

1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503.

Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the

B. EXHIBIT

A

C: CATEGORY:

TDP TM OTHER X

17. PRICE GROUP

D. SYSTEM/ITEM

A015

2. TITLE OF DATA ITEM

REPORT, RECORD OF MEETINGS/MINUTES

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMIN-81505

5. CONTRACT REFERENCE

SOW Para 2.1.6

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

SEE BLOCK 16

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

NONE

final

BLOCK 8: Only at the Quarterly Performance Review (QPR) meetings will MDA/DTR have approval for the minutes, the others will be documentary to record discussions, decisions (and associated rationale), and action items.

BLOCKs 10, 12 & 13: Documents to be submitted within 20 working days after each government attended meeting.

addressee shall be notified by e-mail indicating to which folder and subfolder the report has been posted and the date posted. E-mail and physical addresses are provided in Exhibit A, Section H, DD Form 1423-1, JUN 90 Previous Editions are obsolete Page __1___ of ___1___Pages

(1 Data Item)

Forms Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite

1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503.

Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the

B. EXHIBIT

A

C: CATEGORY:

TDP TM OTHER X

17. PRICE GROUP

D. SYSTEM/ITEM

A016

2. TITLE OF DATA ITEM

TECHNICAL REPORT – STUDY SERVICES

3. SUBTITLE

IMPROVEMENT AND MODERNIZATION REPORT

18. EST TOTAL

PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

SOW Para 4.3.1

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

12MAC

14. DISTRIBUTION

ANNLY

final

BLOCK 12: Report shall contain, as a minimum, detailed rationale, plans, design concept, performance improvement, technical payoff and cost information to allow technical assessment and evaluation of proposed improvements and modernization to system. Revisions shall be submitted annually to align with the government budget cycle.

The Government has 30 calendar days to review the first draft. The contractor has 30 calendar days, after receipt of Government comments, to prepare and deliver the final product.

addressee shall be notified by e-mail indicating to which folder and subfolder the report has been posted and the date posted. E-mail and physical addresses are provided in Exhibit A, Section H, DD Form 1423-1, JUN 90 Previous Editions are obsolete Page __1___ of ___1___Pages

(1 Data Item)

Forms Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite

1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503.

Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the

B. EXHIBIT

A

C: CATEGORY:

TDP TM OTHER X

17. PRICE GROUP

D. SYSTEM/ITEM

A017

2. TITLE OF DATA ITEM

Status Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A

5. CONTRACT REFERENCE

SOW Para 2.1.6b, 2.3.3

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

MONTHLY

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

final

BLOCK 12: Initial report is to cover period to end of first full month following award.

Report is due 15 days after completion of each month’s effort. If report is presented orally, provide viewgraphs and facing page narrative to attendees at meeting, (NTE 10 copies) in addition to written report.

Provide reporting down to WBS level sufficient to track progress to task and mission level.

addressee shall be notified by e-mail indicating to which folder and subfolder the report has been posted and the date posted. E-mail and physical addresses are provided in Exhibit A, Section H, DD Form 1423-1, JUN 90 Previous Editions are obsolete Page __1___ of ___1___Pages

(1 Data Item)

Forms Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite

1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503.

Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the

B. EXHIBIT

A

C: CATEGORY:

TDP TM OTHER X

17. PRICE GROUP

D. SYSTEM/ITEM

A018

2. TITLE OF DATA ITEM

TECHNICAL REPORT – STUDY SERVICES

3. SUBTITLE

VERIFICATION/FINAL REPORT

18. EST TOTAL

PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

SOW Para 3.1.4

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ONE

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

final

BLOCKs 12 & 13: Report shall contain a complete description of the support performed under the contract period of performance. Report shall provide a summary of all missions supported, results and system technical state and status:

1. Program Description

2. Mission Supported

3. Data Collected

4. Data Distribution/Archival Location

5. Data Release Authority

6. System Performance

7. Status of any upgrades/development activities

8. Status and/or disposition of all GFE or hardware

Submission of draft is due 60 days prior to contract end. The Government has 30 calendar days to review the first draft. The contractor has 30 calendar days, after receipt of Government comments, to prepare and deliver the final product.

addressee shall be notified by e-mail indicating to which folder and subfolder the report has been posted and the date posted. E-mail and physical addresses are provided in Exhibit A, Section H,

15. TOTAL -----> 01 3 0

DD Form 1423-1, JUN 90 Previous Editions are obsolete Page __1___ of ___1___Pages

(1 Data Item)

Forms Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite

1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503.

Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the

B. EXHIBIT

A

C: CATEGORY:

TDP TM OTHER X

17. PRICE GROUP

D. SYSTEM/ITEM

A019

2. TITLE OF DATA ITEM

TEST PLAN

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80808

5. CONTRACT REFERENCE

SOW paragraph 3.1.4

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

XTIMES

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

final

Microsoft Office Products

BLOCK 9: Distribution Statement F: Further distribution only as directed by MDA/DTR

BLOCK 12: For modifications and new technology development, Test Plan is due 60 days before testing commences. The Government has 30 calendar days to review and provide comments on the plan. The Contractor has 30 calendar days, after receipt of

Government comments, to prepare and deliver the final product. Subsequent drafts are due as required.

BLOCK 13: Updates due as required.

addressee shall be notified by e-mail indicating to which folder and subfolder the report has been posted and the date posted. E-mail and physical addresses are provided in Exhibit A, Section H,

15. TOTAL -----> 03 04 0

DD Form 1423-1, JUN 90 Previous Editions are obsolete Page __1___…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .