Question # Technical/Contract Reference Question Government Response
1 Technical General
Are all existing systems centralized into a command control monitoring station? Can you provide a sample of an existing system inventory?
No. All existing systems are not centralized into a command control monitoring station. No, the Government can not provide a sample of an existing system inventory.
2 Technical General Who is the present contractor providing the services now?
The incumbent vendor currently providing these services is
Ross Professional.
3 Technical General
Are all the Alarms and Video going to a central station now? If answer is yes, who is the company providing those services? Or does the DOD have their own Alarm monitoring and video monitoring?
No. All alarms and video are not going to a central station.
The DoD does not have its own Alarm monitoring and video monitoring.
4 Technical
PWS Section 1.6.7 Security
Requirements: The Contractor shall comply with all DoD security policies and procedures.
Required security procedures are in
Annex 0005. The contractor is responsible for ensuring all subcontractors comply with all DoD security requirements and procedures.
What is the level of CMMC compliance requirement?
Will the new systems have to be DISA and RMF compliant? Will the contractor provide a Cyber Security
Test for the new ESS Systems to be installed?
The level of CMMC compliance required is Level 3. No, the new systems do not have to be DISA and RMF compliant; however, there may be situtations where
ICD705 compliant equipment is required. Yes, the contractor will be required to provide a cyber security test for the new ESS Systems to be installed.
5 Technical
PWS Section 1.6.7.1 Operations
(OPSEC) and Information Security:
Operations security (OPSEC) requirements will be coordinated per Army Operations
Security requirements of this PWS.
Contractors must be able to provide
OPSEC assurances further described in this PWS and corresponding Contract
Data Requirements List
(CDRL).
Can you please clarify this statement?
Yes. Additional actions may be required in order to ensure
OPSEC of certain aspects of performace. For example, this could be utilization of code phrases, not including addresses of project locations on any documentation, utilizing DoD Secure Access File Exchange (Safe) to send documentation or password protecting documents, etc.
6 Technical
PWS Section 1.6.13 Contractor Travel:
Contractor personnel may be required to travel to locations outside the NCR during the performance of this contract.
The contractor will not be reimbursed for actual costs of travel.
Costs for travel outside the NCR shall be billed in accordance with FAR 31.205-46
“Travel Costs,” which shall be approved by the Contracting
Officer prior to any travel. Contractor travel costs shall not exceed the maximum per diem rates allowed at the time of travel consistent with the substantive provisions of the
Federal Travel Regulation and the limitation of funds specified in this
Are most of the residences in the DC Area? What other
Estates have residences to be secured and monitors and/or services?
Yes. Most of the residences are in the National Capital
Region (NCR); however, there will be a small number of projects in undetermined areas of the US.
7 Technical
PWS Section 5.3. Maintenance and
Repair Services Support:
The Contractor is required to perform maintenance and repair services on all systems and enhanced physical security measures utilized during the performance of the contract.
Who The Government reserves the right to cancel or reschedule maintenance requests at project locations for any reason without any additional cost to the Government. The
Government will provide advance notification of schedule change requests or cancellations.
Please provide information as to the age of the equipment installed? Provide us an average of the installations and who was the company that installed those security systems? Will the DOD provide the parts for the maintenance? Is there an inventory of the technologies installed? Where is the Monitoring Command Center for those installed sensors and cameras? Is the room where the
Command Center is well ventilated?
The Government can not release sensitive security information into the public domain pertaining to the age of the equipment installed, the location(s) for the Monitoring
Command Centers, or whether or not the room where the
Command Center is well ventilated. No, the DoD will not provide the parts for maintenance. In accordance with
PWS Section 4.1, the contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract. No, there is no inventory for technologies installed.
8 Technical
PWS Section 5.4. Site Survey Support:
Prior to any scheduled work on installations, removals or upgrades, the
Contractor shall conduct a site survey.
Contractor will utilize the site survey to assist with the determination of necessary equipment, personnel, or additional requirements to complete work requested by the requiring unit.
Please provide a list of the sites and its locations, as well as average age of the installed security systems?
The Government will not provide a list of the sites and its locations, as well as the average age of the installed security systems into the public domanin due to the sensitive security nature.
9 Contracts
Solicitation HQ0034-22-R-0244, Section
C. Pass/Fail Criteria (Volume II and III), Is this contract set aside for large business only, or can small business provide a proposal as well; considering that the small business will have partnerships with other
Business Partners?
No, this is not set aside for any size of business. This requirement is being solicited under full and open competition in accordance with section 52.212-1
ADDENDUM, 52.212 Instructions to Offeror-
Commercial Items (FEB 2010) "Addendum" of the solicitation. Large and small businesses may submit a proposal.
10 Contracts
HQ0034-22-R-0244 Amendment 0001, Pg. 1 - 1. Extend the Questions due date and time from Friday January 27, 2023 to
Friday February 10, 2023 at 3PM.
Would the government be willing to extend the deadline
(or grant an extension) for this submission? Based on the requirements outlined in the solicitation documents, we do not feel that we can submit a satisfactory proposal in the timeline provided.
Yes. Please reference SolicitationHQ0034-22-R-0244
Amendment 0002, which extends the receipt of proposals due date to March 1, 2023 at 3PM (EST).
Vendor Questions
11 Contracts Attachment 1 PWS - Residential
Servicies Battalion (CID)_Final
Can the government please confirm that the most current and up-to-date Performance Work Statement (PWS) is the
PDF file titled "Attachment 1 PWS - Residential Servicies
Battalion (CID)_Final", posted on 02/06/2023?
Please reference Attachment 1 - PWS Residential Services
Battalion (CID) Amendment 0002 for the most current and up-to-date PWS.
12 Contracts
Attachment 1 PWS - Residential
Servicies Battalion (CID)_Final, Pg. 21, Task ID 5.9 and Attachment 24 TO 1
PWS - Residential Servicies Battalion
(CID), Pg. 20, Task ID 5.9
In the PDF file titled "Attachment 24 TO 1 PWS -
Residential Servicies Battalion (CID)," there is an
Estimated Workload Data grid on page 20. This states that
Task ID 5.9 - Help Desk Monitoring - is estimated at
5,616 Hours. This estimate jumps to 50,000 Hours in the
PDF file titled "Attachment 1 PWS - Residential Servicies
Battalion (CID)_Final." Can the government please clarify the rationale behind the higher number? The other labor categories seem to have utilized a different calculation
(x5), but this line items appears to be an anomaly.
Yes. The rationale behind the higher number identified in the IDIQ PWS is that the IDIQ hours of 50,000 under
Task ID 5.9 is based on the total potential five year ordering period of the contract. The 5,616 hours identified in the Task Order PWS under Task ID 5.9 will be the total number of hours needed to fulfill Task Order 1.
13 Technical
Attachment 6 - Key Personnel
Qualification, Install Technician; PWS
TO-1 Section 1.6.11 Key Personnel, Install Technician, page 6
The minimum required qualifications for Installation
Technician mandate a "Certified Alarm Technician - Level
1" Certification. There are multiple industry associations, manufacturers, integrators and distributors that offer a certification by this name. Will any one do, or did the
Government have a specific one in mind? Will commensurate experience qualify instead?
The proposed candidate for Installation Technician must meet all minimum requirements identified in the PWS.
14 Contracts Solicitation HQ0034-22-R-0244, Section
A.1.6 Electronic Submission
We requested a PIEE logon on 24 January, it was not approved until 7 February. We were not able to see the solicitation documents until they were published on
SAM.Gov on 6 February. Given the complexity of the proposal effort, would the Government consider extending the proposal due date by one week to give us time to prepare an appropriate response?
Yes. Please reference SolicitationHQ0034-22-R-0244
Amendment 0002, which extends the receipt of proposals due date to March 1, 2023 at 3PM (EST).
15 Technical
PWS Section 5.7 Removal and
Restoration Support; PWS, Technical
Exhibit 3 - Estimated Workload Data, Please confirm the LCAT for Restoration Technician should encompass all trade categories identified in the
PWS for restoration and hardening work (i.e., drywall, plywood, insulation, doors).
Confirmed. The Restoration Technician should encompass all trade categories identified in the PWS for restoration and hardening work to include a variety of restorative techniques.
16 Technical
PWS Section 5.7 Removal and
Restoration Support; PWS, Technical
Exhibit 3 - Estimated Workload Data, Should we assume that this LCAT will encompass ancillary finish work that is not specifically identified in the
PWS but will likely be required (i.e., painting, flooring).
Yes. This LCAT will encompass ancillary finish work to include touch up painting and flooring repair.
17 Technical
PWS Section 5.7 Removal and
Restoration Support; PWS, Technical
Exhibit 3 - Estimated Workload Data, If we assume this LCAT should include ancillary trade work how far do, we want to take that? Without specific scopes of work, we don’t know if we need wallpaper, plaster, trim work, etc. Do you feel that these could be accounted for later if/when these are identified as requirements based on future site surveys?
Yes. Please reference PWS Section 5.7, which indicates that the Contractor will conduct a site survey to determine the restorative efforts required.
18 Technical
PWS Section 5.7 Removal and
Restoration Support; PWS, Technical
Exhibit 3 - Estimated Workload Data, There are references in the PWS to hardening and blast mitigations, but no specifics; like question #3 should we assume that these requirements will be further specified later, and costs accounted for at that time?
Yes. Please reference PWS Section 5.7, which indicates that the Contractor will conduct a site survey to determine the restorative efforts required.
19 Technical PWS Section 5.2 Program Management
Support, 2nd bullet, page 13
The PWS references receiving approval through local jurisdiction(s) for modifications – will the Solutions
Architect be responsible for design required for submission to local AHJ?
Yes, the the Solutions Architect will be responsible for the design required for submission to local AHJ.
20 Technical General
Will the government be responsible for providing network and/or POTS communications into the residence from the street?
Yes, the Government will be responsible for providing network and/or POTS communications into the residence from the street.
21 Contracts PWS Section 1.6.11 Key Personnel, Senior Technician
Key personnel – under the Minimum Qualifications Senior
Technician it states a total of 10 years Technical
Experience with a minimum of 4 years of experience in security system design and engineering/complex integrated security systems. Bachelor’s degree in software engineering, engineering, electronics technology, civil engineering technology, mechanical engineering technology, or electrical engineering. Does the government mean to state that the key personnel can have either the years’ experience or the degree to qualify?
No. The proposed candidate must meet all minimum qualifications listed under PWS Section 1.6.11 Key
Personnel.
22 Contracts Attachment 5 Pricing Matrix Will the government adjust the pricing templates period of performance dates to align with the current year.
Yes. Please see Attachment 5 - Pricing Matrix
Admendment 0002
23 Contracts General What method for escalation of labor prices over the five years period of performance?
Vendors should formulate their own method for escalation of labor prices over the five (5) year ordering period of the contract.
24 Contracts
Solicitation HQ0034-22-R-0244, Section
C. Pass/Fail Criteria (Volume II and III), Do we need letters of commitment from current employes of the contractor?
Yes. In accordance with solicitation FAR 52.212-1
Instructions to Offerors-Commerical Items (FEB2012)
"ADDENDUM", the Offeror shall submit Letters of
Commitment for all proposed Key Personnel.
25 Contracts Attachment 2 Past Performance
Questionnaire
Past performance questionnaire states that it is due NLT
April 30, 2021 @ 3PM EST, when is the past performance questionnaire due?
The past performance questionaire is due with the proposal. Please reference SolicitationHQ0034-22-R-
0244 Amendment 0002, which extends the receipt of proposals due date to March 1, 2023 at 3PM (EST).
Please reference Attachment 2 - Past Performance
Questionnaire Amendment 0002.
26 Contracts Attachment 5 Pricing Matrix
The pricing model does not appear to be functional with formulas. Please provide an Updated pricing model with functional formulas used for evaluation.
Please see Attachment 5 Pricing Matrix Admendment
0002.
27 Contracts General Please provide attachment 21.
Please reference the solicitation and all attachments available electronically via PIEE.
28 Contracts Solicitation HQ0034-22-R-0244
Exhibit/Attachment Table of Contents
Is there a separate performance work statement for task order. Attachment 1 and attachment 24 performance work statements reads the same?
Yes. Please see Attachment 24 TO1 PWS Residential
Servicies Battalion (CID). Please reference the solicitation and all attachments available electronically via
Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil.
29 Technical PWS Section 1.6.8.2; PWS Section 4.2
Section 1.6.8.2 of the PWS states "provide a 24 hour, 365 days a year helpdesk/call center staffed exclusively by cleared personnel”; section 4.2 of the PWS says that a
Secret Facility Clearance is not required. Can the government clarify if the contractor is required to have a
Secret Facility clearance, and cleared personnel?
Yes. A Secret Facility Clearance is not required; however, all contractor personnel working on the contract will have a background investigation (this is what is referred to as cleared for work on the contract).
30 Contracts
Solicitation HQ0034-22-R-0244, Section
C. Pass/Fail Criteria (Volume II and III), Considering there is $1M per year in plug numbers in the pricing models it I impossible to determine whether those dollars can be spent with small businesses making it impossible to determine the amount to be contracted to small business. Therefore, we respectfully request the SB goal requirement be changed to reflect total labor dollars.
After further consideration, the Government will not change the SB goal requirement.
31 Contracts Solicitation HQ0034-22-R-0244, Section
A.1.6 Electronic Submission
We respectfully request a two-week extension to the due date; from the time we receive answers to the questions?
Please reference Solicitation HQ0034-22-R-0244
Amendment 0002, which extends the receipt of proposal due date to March 1, 2023 at 3PM (EST).