Attachment_07_PRS_Amd_01.pdf
PDF 118 KB Posted
- Attached to
- DISCS CUSTODIAL SERVICES Federal contract opportunity
- Solicitation number
- HQ0013-18-Q-0041
- Issued by
- Defense Security Cooperation Agency
About this file
Amended PRS
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7.1 Performance Requirements Summary (PRS)
The contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The SS and the contractor’s Quality Control Plan provide information on contract requirements, the expected level of contractor performance and the expected method of government surveillance and confirmation of services provided. These thresholds are critical to mission success. Procedures as set forth in the FAR 52.212-4 (a), Contract Terms and Conditions -
Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies. During the first initial
30 days of the contract, two additional errors on each task shall be allowed in an effort to identify normal phase-in problems, except for any periodic cleaning service.
Performance Objective PWS
Para
Performance
Threshold
Remedy Method of
Assessment Bldg. 52
Facility Cleaning Service
a. Non-Carpeted Floors
b. Carpeted Floors
c. Stairways / Elevators /
Hallways/Stairwells
d. Kitchen Areas
e. Trash Removal
f. Walk-off Mats
g. Restrooms
h. Drinking Fountains
i. Erase Boards/White
Boards/Counters
(1 time per week only)
1.1
Inclusive
1 per day when bldg.
occupied for items a thru h
No more than 3 valid defects per month
Re-performance within 2 hours of notification during normal work hours
Periodic
Surveillance
Periodic Cleaning Services
a. Hard Floor – 3 x Yr Maintenance
b. Carpet Restorative Cleaning
– 3 x Yr
c. High Dusting Monthly
d. Window Cleaning– 3 x Yr
e. Window Sill Dusting -
Weekly
No more than 3 valid defects per month
Re-performance within 2 hours of notification during scheduled work hours
Periodic
Surveillance
Quality Control
Inspection procedures are followed and documented in accordance with Contractor’s
Quality
Control Plan Contractor shall provide a written
Corrective
Action Report within 24 hours of notification