Performance Requirements Summary (PRS)
HQ0013-16-R-0002
12 Feb 2016
Performance Objectives
(Deliverable)
Acceptable Quality
Level
Monitoring
Method
User Support
(Deliverable 1)
Communication and research answers for users in a clear and comprehensive manner within 24 business hours.
100% inspection
EUM Helpdesk answers are provided to 100% of SCOs and COCOM with clear instructions and contact information.
Feedback from SCOs and COCOMs
Assist users and DSCA during EUM
Training Seminar (ETS). ETS are established by CCMDs.
100% inspection and
Feedback from SCOs
Be sure user guides are grammatically correct, functionally organized, and presented in a clear and logical fashion. Need to be updated after every SCIP-EUM enhancement.
100% inspection
Assure quarterly EUM newsletter is on time and grammatically correct, in a clear and logical fashion.
100% inspection
Maintain the EUM Support page in
SCIP-EUM. Ensure this is always up-to-date.
100% inspection and
Feedback from SCOs
Coordination with the SCIP Help
Desk to resolve automation issues as they arise.
100% inspection
Weapons Data Research
& Database Population
(Deliverable 2)
Conduct research with military departments, program offices, and manufacturers’ data to locate lists of selected weapons and their serial numbers. Newly defined defense articles should be uploaded to SCIP-
EUM within three business days.
Results from MILDEP monthly reports
Using the reconciliation report as a tool, identify and work potential problem areas. This is a periodic spot check prior to monthly reporting.
100% inspection
Review FMS cases and lines for which have not yet been received but expected to be delivered. This is a periodic spot check prior to monthly reporting.
Research late deliveries to determine the nature of delays. This will be identified by the monthly reporting.
100% inspection
Contact SCOs to advise of initial inventory requirements. This includes when new defense articles are added to
SCIP-EUM and when they have not performed the inventory.
100% inspection
Assist SCO’s with inventory difficulties.
Feedback from SCOs
Maintain a POC list by MILDEP, SCOs and COCOM worldwide. This should be reviewed on a quarterly basis.
100% inspection
Ensure Figure of Merit and other NVD performance characteristics are populated in the EEUM Reconciliation
Report.
100% inspection
Assist SCOs, as needed, with inventory locations.
Feedback from SCOs
Acceptable Quality
Level
Program Analysis
(Deliverable 3)
Analysis is presented on or before date specifically prescribed and coordinated by COR
100% inspection
Periodic and customized reports are submitted on time based upon
Government request
100% inspection
Various reports on comparison of data, inspection criteria, disposition status, program statistics and other related reports.
100% inspection
Data reports are correct, functionally organized, and present relevant and useful information
Application Maintenance
& Enhancement
(Deliverable 4)
Design documentation is grammatically correct, functionally organized, and presented in a clear and logical fashion
100% inspection
Projects are completed on time based on the established measurable milestones 100% inspection
Limited functionality issues with required analysis, design, coding, unit and system testing are addressed
Projects include development methodology, workload measurement process, audits of workload data, and realignment of positions are considered.
Acceptable Quality
Level
Miscellaneous
(Deliverable 5)
Recommendations for position changes, additions, or relocations include all required position characteristics as prescribed in the PWS.
100% inspection
Recommendations are presented in written format and are grammatically correct, functionally organized, and present the recommendations in a clear, logical fashion
100% inspection
Recommendations are presented with ample justification and supporting data 100% inspection
Alternative staffing strategies are presented with analysis of recognized advantages and disadvantages
100% inspection
Unconstrained staffing recommendations are presented on or before date prescribed in action plan
(unless specifically coordinated otherwise by COR)
100% inspection
Contractor provides COR copies of
100% of all materials and written products
100% inspection
Contractor staff/project manager is responsive to email and/or telephonic communications from the COR and CO
(or alternates) – replies are received within 2 work days for 95% of contacts
100% inspection
Contractor staff are professional in appearance and conduct during 100% of meetings, discussions, and site visits
Feedback from COR
Contractor staff are organized and prepared for meetings and site visits 100
% of the time in order to capitalize on limited direct contact time and opportunities
Feedback from COR
Contractor takes steps to control costs
100% of the time
Random inspection and feedback