Revised sheet CLIN0001 for the base option years 1 through 4 and task order number one.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN0001 Base
| Number | Bldg | Area | Estimated Square Footage | FTE’s | Cost per FTE | Extended Cost | Percent of Profit per FTE | |||
| Days | Evenings | Nights | Total | |||||||
| 1 | CRC | Front Entrance | 80,772 | 0 | $0.00 | |||||
| 2 | CRC | Patient Transport Entrance | 11,040 | 0 | $0.00 | |||||
| 3 | ACRF | Parking Garage P1 Entrance | 3,870 | 0 | $0.00 | |||||
| 4 | ACRF | Parking Garage P2 Entrance | 5,504 | 0 | $0.00 | |||||
| 5 | ACRF | Parking Garage P3 Entrance | 5,504 | 0 | $0.00 | |||||
| 6 | ACRF 10 | Garage Stairwells | 5,504 | 0 | $0.00 | |||||
| 7 | CRC | Playground | 11,766 | 0 | $0.00 | |||||
| 8 | CRC | Courtyard East | 16,191 | 0 | $0.00 | |||||
| 9 | CRC | Courtyard West | 16,191 | 0 | $0.00 | |||||
| 10 | CRC | East Patio | 8,984 | 0 | $0.00 | |||||
| 11 | B1 Patio | 11,514 | 0 | $0.00 | ||||||
| 12 | CRC | Patient Smoking Area | 500 | 0 | $0.00 | |||||
| 13 | ACRF | Enclosed Courtyard | 1,444 | 0 | $0.00 | |||||
| 14 | CRC | West Entrance Patio | 2,852 | 0 | $0.00 | |||||
| 15 | CRC | East Entrance Patio | 2,479 | 0 | $0.00 | |||||
| 16 | CRC | CRC B2 Corridor | 29,589 | 0 | $0.00 | |||||
| 17 | $0.00 | |||||||||
| 18 | Project/Cycle Cleaning | 0 | $0.00 |
| Totals | 213,704 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| Additional Cleaning Requirements Risk Level One: |
1. The contractor shall clean the entrances to the Clinical Center, which include the front entrance, patient transport entrance and six entrances from the parking garage, which are two on P1, two on P2 and two on P3. The Contractor shall clean one hundred feet outside beyond the entrances. The Contractor shall be responsible for emptying trashcans and cigarette butt containers. The Contractor shall remove all litter, leaves, cigarette butts and trash from the entrance and 100 feet beyond the entrance. The Contractor shall keep the entrances clean by sweeping and pressure washing or other cleaning procedures that are approved by the Chief, Housekeeping and Fabric Care Department (HFCD). The Contractor shall maintain all walk-off mats in safe and clean condition and; place and remove them when inclement weather warrants. Mats shall be cleaned and properly rolled when not in use. The Contractor shall clean the enclosed courtyards and the children’s play area of the Clinical Research Center in the same manner as the entrances. The Contractor shall remove snow from the front entrance until the snow removal contractor arrives. This removal will be done between the front curb and the front door so patients and visitors exiting automobiles will not have to walk through snow.
2. The Contractor shall clean the lower panels of the glass at the front entrance, ambulance entrance, the entrances to the east and west patios and the east and west courtyards up to the height of 10 feet.
THE COST PER FTE IS THE AVERAGE COST OF FTE'S (EXAMPLE IF THE CONTRACTOR HAS MORE THAN ONE CLASS OR TYPE-THE COST IS THE AVERAGE OF THE CLASSES OR TYPE)
Pricing Table -Option Year Four CLIN00001 - Risk Level One Cleaning NIHCL2010076
Revised 10-29-2010 &P
CLIN0001 Opt 1
| Number | Bldg | Area | Estimated Square Footage | FTE’s | Cost per FTE | Extended Cost | Percent of Profit per FTE | |||
| Days | Evenings | Nights | Total | |||||||
| 1 | CRC | Front Entrance | 80,772 | 0 | $0.00 | |||||
| 2 | CRC | Patient Transport Entrance | 11,040 | 0 | $0.00 | |||||
| 3 | ACRF | Parking Garage P1 Entrance | 3,870 | 0 | $0.00 | |||||
| 4 | ACRF | Parking Garage P2 Entrance | 5,504 | 0 | $0.00 | |||||
| 5 | ACRF | Parking Garage P3 Entrance | 5,504 | 0 | $0.00 | |||||
| 6 | ACRF 10 | Garage Stairwells | 5,504 | 0 | $0.00 | |||||
| 7 | CRC | Playground | 11,766 | 0 | $0.00 | |||||
| 8 | CRC | Courtyard East | 16,191 | 0 | $0.00 | |||||
| 9 | CRC | Courtyard West | 16,191 | 0 | $0.00 | |||||
| 10 | CRC | East Patio | 8,984 | 0 | $0.00 | |||||
| 11 | B1 Patio | 11,514 | 0 | $0.00 | ||||||
| 12 | CRC | Patient Smoking Area | 500 | 0 | $0.00 | |||||
| 13 | ACRF | Enclosed Courtyard | 1,444 | 0 | $0.00 | |||||
| 14 | CRC | West Entrance Patio | 2,852 | 0 | $0.00 | |||||
| 15 | CRC | East Entrance Patio | 2,479 | 0 | $0.00 | |||||
| 16 | CRC | CRC B2 Corridor | 29,589 | 0 | $0.00 | |||||
| 17 | $0.00 | |||||||||
| 18 | Project/Cycle Cleaning | 0 | $0.00 |
| Totals | 213,704 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| Additional Cleaning Requirements Risk Level One: |
1. The contractor shall clean the entrances to the Clinical Center, which include the front entrance, patient transport entrance and six entrances from the parking garage, which are two on P1, two on P2 and two on P3. The Contractor shall clean one hundred feet outside beyond the entrances. The Contractor shall be responsible for emptying trashcans and cigarette butt containers. The Contractor shall remove all litter, leaves, cigarette butts and trash from the entrance and 100 feet beyond the entrance. The Contractor shall keep the entrances clean by sweeping and pressure washing or other cleaning procedures that are approved by the Chief, Housekeeping and Fabric Care Department (HFCD). The Contractor shall maintain all walk-off mats in safe and clean condition and; place and remove them when inclement weather warrants. Mats shall be cleaned and properly rolled when not in use. The Contractor shall clean the enclosed courtyards and the children’s play area of the Clinical Research Center in the same manner as the entrances. The Contractor shall remove snow from the front entrance until the snow removal contractor arrives. This removal will be done between the front curb and the front door so patients and visitors exiting automobiles will not have to walk through snow.
2. The Contractor shall clean the lower panels of the glass at the front entrance, ambulance entrance, the entrances to the east and west patios and the east and west courtyards up to the height of 10 feet.
THE COST PER FTE IS THE AVERAGE COST OF FTE'S (EXAMPLE IF THE CONTRACTOR HAS MORE THAN ONE CLASS OR TYPE-THE COST IS THE AVERAGE OF THE CLASSES OR TYPE)
CLIN00001 - Risk Level One Cleaning NIHCL2010076
Revised 10-29-2010 &P
CLIN0001 Opt2
| Number | Bldg | Area | Estimated Square Footage | FTE’s | Cost per FTE | Extended Cost | Percent of Profit per FTE | |||
| Days | Evenings | Nights | Total | |||||||
| 1 | CRC | Front Entrance | 80,772 | 0 | $0.00 | |||||
| 2 | CRC | Patient Transport Entrance | 11,040 | 0 | $0.00 | |||||
| 3 | ACRF | Parking Garage P1 Entrance | 3,870 | 0 | $0.00 | |||||
| 4 | ACRF | Parking Garage P2 Entrance | 5,504 | 0 | $0.00 | |||||
| 5 | ACRF | Parking Garage P3 Entrance | 5,504 | 0 | $0.00 | |||||
| 6 | ACRF 10 | Garage Stairwells | 5,504 | 0 | $0.00 | |||||
| 7 | CRC | Playground | 11,766 | 0 | $0.00 | |||||
| 8 | CRC | Courtyard East | 16,191 | 0 | $0.00 | |||||
| 9 | CRC | Courtyard West | 16,191 | 0 | $0.00 | |||||
| 10 | CRC | East Patio | 8,984 | 0 | $0.00 | |||||
| 11 | B1 Patio | 11,514 | 0 | $0.00 | ||||||
| 12 | CRC | Patient Smoking Area | 500 | 0 | $0.00 | |||||
| 13 | ACRF | Enclosed Courtyard | 1,444 | 0 | $0.00 | |||||
| 14 | CRC | West Entrance Patio | 2,852 | 0 | $0.00 | |||||
| 15 | CRC | East Entrance Patio | 2,479 | 0 | $0.00 | |||||
| 16 | CRC | CRC B2 Corridor | 29,589 | 0 | $0.00 | |||||
| 17 | $0.00 | |||||||||
| 18 | Project/Cycle Cleaning | 0 | $0.00 |
| Totals | 213,704 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| Additional Cleaning Requirements Risk Level One: |
1. The contractor shall clean the entrances to the Clinical Center, which include the front entrance, patient transport entrance and six entrances from the parking garage, which are two on P1, two on P2 and two on P3. The Contractor shall clean one hundred feet outside beyond the entrances. The Contractor shall be responsible for emptying trashcans and cigarette butt containers. The Contractor shall remove all litter, leaves, cigarette butts and trash from the entrance and 100 feet beyond the entrance. The Contractor shall keep the entrances clean by sweeping and pressure washing or other cleaning procedures that are approved by the Chief, Housekeeping and Fabric Care Department (HFCD). The Contractor shall maintain all walk-off mats in safe and clean condition and; place and remove them when inclement weather warrants. Mats shall be cleaned and properly rolled when not in use. The Contractor shall clean the enclosed courtyards and the children’s play area of the Clinical Research Center in the same manner as the entrances. The Contractor shall remove snow from the front entrance until the snow removal contractor arrives. This removal will be done between the front curb and the front door so patients and visitors exiting automobiles will not have to walk through snow.
2. The Contractor shall clean the lower panels of the glass at the front entrance, ambulance entrance, the entrances to the east and west patios and the east and west courtyards up to the height of 10 feet.
THE COST PER FTE IS THE AVERAGE COST OF FTE'S (EXAMPLE IF THE CONTRACTOR HAS MORE THAN ONE CLASS OR TYPE-THE COST IS THE AVERAGE OF THE CLASSES OR TYPE)
CLIN00001 - Risk Level One Cleaning NIHCL2010076
Revised 10-29-2010 &P
CLIN0001 Opt 3
| Number | Bldg | Area | Estimated Square Footage | FTE’s | Cost per FTE | Extended Cost | Percent of Profit per FTE | |||
| Days | Evenings | Nights | Total | |||||||
| 1 | CRC | Front Entrance | 80,772 | 0 | $0.00 | |||||
| 2 | CRC | Patient Transport Entrance | 11,040 | 0 | $0.00 | |||||
| 3 | ACRF | Parking Garage P1 Entrance | 3,870 | 0 | $0.00 | |||||
| 4 | ACRF | Parking Garage P2 Entrance | 5,504 | 0 | $0.00 | |||||
| 5 | ACRF | Parking Garage P3 Entrance | 5,504 | 0 | $0.00 | |||||
| 6 | ACRF 10 | Garage Stairwells | 5,504 | 0 | $0.00 | |||||
| 7 | CRC | Playground | 11,766 | 0 | $0.00 | |||||
| 8 | CRC | Courtyard East | 16,191 | 0 | $0.00 | |||||
| 9 | CRC | Courtyard West | 16,191 | 0 | $0.00 | |||||
| 10 | CRC | East Patio | 8,984 | 0 | $0.00 | |||||
| 11 | B1 Patio | 11,514 | 0 | $0.00 | ||||||
| 12 | CRC | Patient Smoking Area | 500 | 0 | $0.00 | |||||
| 13 | ACRF | Enclosed Courtyard | 1,444 | 0 | $0.00 | |||||
| 14 | CRC | West Entrance Patio | 2,852 | 0 | $0.00 | |||||
| 15 | CRC | East Entrance Patio | 2,479 | 0 | $0.00 | |||||
| 16 | CRC | CRC B2 Corridor | 29,589 | 0 | $0.00 | |||||
| 17 | $0.00 | |||||||||
| 18 | Project/Cycle Cleaning | 0 | $0.00 |
| Totals | 213,704 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| Additional Cleaning Requirements Risk Level One: |
1. The contractor shall clean the entrances to the Clinical Center, which include the front entrance, patient transport entrance and six entrances from the parking garage, which are two on P1, two on P2 and two on P3. The Contractor shall clean one hundred feet outside beyond the entrances. The Contractor shall be responsible for emptying trashcans and cigarette butt containers. The Contractor shall remove all litter, leaves, cigarette butts and trash from the entrance and 100 feet beyond the entrance. The Contractor shall keep the entrances clean by sweeping and pressure washing or other cleaning procedures that are approved by the Chief, Housekeeping and Fabric Care Department (HFCD). The Contractor shall maintain all walk-off mats in safe and clean condition and; place and remove them when inclement weather warrants. Mats shall be cleaned and properly rolled when not in use. The Contractor shall clean the enclosed courtyards and the children’s play area of the Clinical Research Center in the same manner as the entrances. The Contractor shall remove snow from the front entrance until the snow removal contractor arrives. This removal will be done between the front curb and the front door so patients and visitors exiting automobiles will not have to walk through snow.
2. The Contractor shall clean the lower panels of the glass at the front entrance, ambulance entrance, the entrances to the east and west patios and the east and west courtyards up to the height of 10 feet.
THE COST PER FTE IS THE AVERAGE COST OF FTE'S (EXAMPLE IF THE CONTRACTOR HAS MORE THAN ONE CLASS OR TYPE-THE COST IS THE AVERAGE OF THE CLASSES OR TYPE)
CLIN00001 - Risk Level One Cleaning NIHCL2010076
Revised 10-29-2010 &P
CLIN0001 (4)
| Number | Bldg | Area | Estimated Square Footage | FTE’s | Cost per FTE | Extended Cost | Percent of Profit per FTE | |||
| Days | Evenings | Nights | Total | |||||||
| 1 | CRC | Front Entrance | 80,772 | 0 | $0.00 | |||||
| 2 | CRC | Patient Transport Entrance | 11,040 | 0 | $0.00 | |||||
| 3 | ACRF | Parking Garage P1 Entrance | 3,870 | 0 | $0.00 | |||||
| 4 | ACRF | Parking Garage P2 Entrance | 5,504 | 0 | $0.00 | |||||
| 5 | ACRF | Parking Garage P3 Entrance | 5,504 | 0 | $0.00 | |||||
| 6 | ACRF 10 | Garage Stairwells | 5,504 | 0 | $0.00 | |||||
| 7 | CRC | Playground | 11,766 | 0 | $0.00 | |||||
| 8 | CRC | Courtyard East | 16,191 | 0 | $0.00 | |||||
| 9 | CRC | Courtyard West | 16,191 | 0 | $0.00 | |||||
| 10 | CRC | East Patio | 8,984 | 0 | $0.00 | |||||
| 11 | B1 Patio | 11,514 | 0 | $0.00 | ||||||
| 12 | CRC | Patient Smoking Area | 500 | 0 | $0.00 | |||||
| 13 | ACRF | Enclosed Courtyard | 1,444 | 0 | $0.00 | |||||
| 14 | CRC | West Entrance Patio | 2,852 | 0 | $0.00 | |||||
| 15 | CRC | East Entrance Patio | 2,479 | 0 | $0.00 | |||||
| 16 | CRC | CRC B2 Corridor | 29,589 | 0 | $0.00 | |||||
| 17 | $0.00 | |||||||||
| 18 | Project/Cycle Cleaning | 0 | $0.00 |
| Totals | 213,704 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| Additional Cleaning Requirements Risk Level One: |
1. The contractor shall clean the entrances to the Clinical Center, which include the front entrance, patient transport entrance and six entrances from the parking garage, which are two on P1, two on P2 and two on P3. The Contractor shall clean one hundred feet outside beyond the entrances. The Contractor shall be responsible for emptying trashcans and cigarette butt containers. The Contractor shall remove all litter, leaves, cigarette butts and trash from the entrance and 100 feet beyond the entrance. The Contractor shall keep the entrances clean by sweeping and pressure washing or other cleaning procedures that are approved by the Chief, Housekeeping and Fabric Care Department (HFCD). The Contractor shall maintain all walk-off mats in safe and clean condition and; place and remove them when inclement weather warrants. Mats shall be cleaned and properly rolled when not in use. The Contractor shall clean the enclosed courtyards and the children’s play area of the Clinical Research Center in the same manner as the entrances. The Contractor shall remove snow from the front entrance until the snow removal contractor arrives. This removal will be done between the front curb and the front door so patients and visitors exiting automobiles will not have to walk through snow.
2. The Contractor shall clean the lower panels of the glass at the front entrance, ambulance entrance, the entrances to the east and west patios and the east and west courtyards up to the height of 10 feet.
THE COST PER FTE IS THE AVERAGE COST OF FTE'S (EXAMPLE IF THE CONTRACTOR HAS MORE THAN ONE CLASS OR TYPE-THE COST IS THE AVERAGE OF THE CLASSES OR TYPE)
CLIN00001 - Risk Level One Cleaning NIHCL2010076
Revised 10-29-2010 &P
CLIN0001 (5)
| Number | Bldg | Area | Estimated Square Footage | FTE’s | Cost per FTE | Extended Cost | Percent of Profit per FTE | |||
| Days | Evenings | Nights | Total | |||||||
| 1 | CRC | Front Entrance | 80,772 | 0 | $0.00 | |||||
| 2 | CRC | Patient Transport Entrance | 11,040 | 0 | $0.00 | |||||
| 3 | ACRF | Parking Garage P1 Entrance | 3,870 | 0 | $0.00 | |||||
| 4 | ACRF | Parking Garage P2 Entrance | 5,504 | 0 | $0.00 | |||||
| 5 | ACRF | Parking Garage P3 Entrance | 5,504 | 0 | $0.00 | |||||
| 6 | ACRF 10 | Garage Stairwells | 5,504 | 0 | $0.00 | |||||
| 7 | CRC | Playground | 11,766 | 0 | $0.00 | |||||
| 8 | CRC | Courtyard East | 16,191 | 0 | $0.00 | |||||
| 9 | CRC | Courtyard West | 16,191 | 0 | $0.00 | |||||
| 10 | CRC | East Patio | 8,984 | 0 | $0.00 | |||||
| 11 | B1 Patio | 11,514 | 0 | $0.00 | ||||||
| 12 | CRC | Patient Smoking Area | 500 | 0 | $0.00 | |||||
| 13 | ACRF | Enclosed Courtyard | 1,444 | 0 | $0.00 | |||||
| 14 | CRC | West Entrance Patio | 2,852 | 0 | $0.00 | |||||
| 15 | CRC | East Entrance Patio | 2,479 | 0 | $0.00 | |||||
| 16 | CRC | CRC B2 Corridor | 29,589 | 0 | $0.00 | |||||
| 17 | $0.00 | |||||||||
| 18 | Project/Cycle Cleaning | 0 | $0.00 |
| Totals | 213,704 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| Additional Cleaning Requirements Risk Level One: |
1. The contractor shall clean the entrances to the Clinical Center, which include the front entrance, patient transport entrance and six entrances from the parking garage, which are two on P1, two on P2 and two on P3. The Contractor shall clean one hundred feet outside beyond the entrances. The Contractor shall be responsible for emptying trashcans and cigarette butt containers. The Contractor shall remove all litter, leaves, cigarette butts and trash from the entrance and 100 feet beyond the entrance. The Contractor shall keep the entrances clean by sweeping and pressure washing or other cleaning procedures that are approved by the Chief, Housekeeping and Fabric Care Department (HFCD). The Contractor shall maintain all walk-off mats in safe and clean condition and; place and remove them when inclement weather warrants. Mats shall be cleaned and properly rolled when not in use. The Contractor shall clean the enclosed courtyards and the children’s play area of the Clinical Research Center in the same manner as the entrances. The Contractor shall remove snow from the front entrance until the snow removal contractor arrives. This removal will be done between the front curb and the front door so patients and visitors exiting automobiles will not have to walk through snow.
2. The Contractor shall clean the lower panels of the glass at the front entrance, ambulance entrance, the entrances to the east and west patios and the east and west courtyards up to the height of 10 feet.
THE COST PER FTE IS THE AVERAGE COST OF FTE'S (EXAMPLE IF THE CONTRACTOR HAS MORE THAN ONE CLASS OR TYPE-THE COST IS THE AVERAGE OF THE CLASSES OR TYPE)
CLIN00001 - Risk Level One Cleaning NIHCL2010076
Revised 10-29-2010 &P