Revised Sheet One.xlsx

XLSX spreadsheet 43 KB Posted

Attached to
Specialized Hoiusekeeping Services
Solicitation number
Housekeeping082010
Issued by

About this file

Revised sheet CLIN0001 for the base option years 1 through 4 and task order number one.

View the file

Other files

File Type Posted
SF30 11-01-2010 A7.pdf PDF
Pricing Sheet Option Year 3 v2.xlsx XLSX spreadsheet
Pricing Task Order No 1 v2.xlsx XLSX spreadsheet
Pricing Sheet Option Year 4 v2.xlsx XLSX spreadsheet
Pricing Sheet Base Yearv2.xlsx XLSX spreadsheet
SF30 11-01-2010 A6.pdf PDF
Response to amendment 5 quetions.pdf PDF
Pricing Sheet Option Year 2 v2.xlsx XLSX spreadsheet
Pricing Sheet Option Year 1 v2.xlsx XLSX spreadsheet
Pricing Sheet Option Year 1 v2.xlsx XLSX spreadsheet
SF30 11-01-2010.pdf PDF
Pricing Task Order No 1 v2.xlsx XLSX spreadsheet
Merge File Solicitation.pdf PDF
Pricing Sheet Option Year 2 v2.xlsx XLSX spreadsheet
AMENDMENT NUMBER 5 Changes 11-01-2010.pdf PDF
Pricing Sheet Option Year 4 v2.xlsx XLSX spreadsheet
Pricing Sheet Option Year 3 v2.xlsx XLSX spreadsheet
Pricing Sheet Base Yearv2.xlsx XLSX spreadsheet
Amendment No 4 - Questions and responses SF30.pdf PDF
Attachment No 3 Revised.pdf PDF
Amendment No 3 - Questions and responses SF30 10-15-2010.pdf PDF
Section C revised 10-20-2010.pdf PDF
Response to amendment 3 quetions.pdf PDF
Listing of changes 10-21-2010.pdf PDF
Attachment No 10 - Revised past Performance Questionnaire.pdf PDF
Rooms with SQFT and Type.pdf PDF
Responses to questions.PDF PDF
Attachment no 11 - sectionk.pdf.pdf PDF
Attachment no 13 OR and 3rd floor layouts.pdf PDF
Amendment No 2 - Questions and responses.pdf PDF
Amendment No 1 -.pdf PDF
Pricing Sheet Option Year Three.xlsx XLSX spreadsheet
Pricing Sheet Option Year Two.xlsx XLSX spreadsheet
Pricing Sheet Option Year Four.xlsx XLSX spreadsheet
Pricing Sheet Option Year One.xlsx XLSX spreadsheet
Pricing Sheet Base Year.xlsx XLSX spreadsheet
Task Order 1 rev 09-16-2010.xlsx XLSX spreadsheet
Solicitattion NIHCL2010076.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN0001 Base

NumberBldgAreaEstimated Square FootageFTE’sCost per FTEExtended CostPercent of Profit per FTE
DaysEveningsNightsTotal
1CRCFront Entrance80,7720$0.00
2CRCPatient Transport Entrance11,0400$0.00
3ACRFParking Garage P1 Entrance3,8700$0.00
4ACRFParking Garage P2 Entrance5,5040$0.00
5ACRFParking Garage P3 Entrance5,5040$0.00
6ACRF 10Garage Stairwells5,5040$0.00
7CRCPlayground11,7660$0.00
8CRCCourtyard East16,1910$0.00
9CRCCourtyard West16,1910$0.00
10CRCEast Patio8,9840$0.00
11B1 Patio11,5140$0.00
12CRCPatient Smoking Area5000$0.00
13ACRFEnclosed Courtyard1,4440$0.00
14CRCWest Entrance Patio2,8520$0.00
15CRCEast Entrance Patio2,4790$0.00
16CRCCRC B2 Corridor29,5890$0.00
17$0.00
18Project/Cycle Cleaning0$0.00
Totals213,70400000$0.00
Additional Cleaning Requirements Risk Level One:

1. The contractor shall clean the entrances to the Clinical Center, which include the front entrance, patient transport entrance and six entrances from the parking garage, which are two on P1, two on P2 and two on P3. The Contractor shall clean one hundred feet outside beyond the entrances. The Contractor shall be responsible for emptying trashcans and cigarette butt containers. The Contractor shall remove all litter, leaves, cigarette butts and trash from the entrance and 100 feet beyond the entrance. The Contractor shall keep the entrances clean by sweeping and pressure washing or other cleaning procedures that are approved by the Chief, Housekeeping and Fabric Care Department (HFCD). The Contractor shall maintain all walk-off mats in safe and clean condition and; place and remove them when inclement weather warrants. Mats shall be cleaned and properly rolled when not in use. The Contractor shall clean the enclosed courtyards and the children’s play area of the Clinical Research Center in the same manner as the entrances. The Contractor shall remove snow from the front entrance until the snow removal contractor arrives. This removal will be done between the front curb and the front door so patients and visitors exiting automobiles will not have to walk through snow.

2. The Contractor shall clean the lower panels of the glass at the front entrance, ambulance entrance, the entrances to the east and west patios and the east and west courtyards up to the height of 10 feet.

THE COST PER FTE IS THE AVERAGE COST OF FTE'S (EXAMPLE IF THE CONTRACTOR HAS MORE THAN ONE CLASS OR TYPE-THE COST IS THE AVERAGE OF THE CLASSES OR TYPE)

Pricing Table -Option Year Four CLIN00001 - Risk Level One Cleaning NIHCL2010076

Revised 10-29-2010 &P

CLIN0001 Opt 1

NumberBldgAreaEstimated Square FootageFTE’sCost per FTEExtended CostPercent of Profit per FTE
DaysEveningsNightsTotal
1CRCFront Entrance80,7720$0.00
2CRCPatient Transport Entrance11,0400$0.00
3ACRFParking Garage P1 Entrance3,8700$0.00
4ACRFParking Garage P2 Entrance5,5040$0.00
5ACRFParking Garage P3 Entrance5,5040$0.00
6ACRF 10Garage Stairwells5,5040$0.00
7CRCPlayground11,7660$0.00
8CRCCourtyard East16,1910$0.00
9CRCCourtyard West16,1910$0.00
10CRCEast Patio8,9840$0.00
11B1 Patio11,5140$0.00
12CRCPatient Smoking Area5000$0.00
13ACRFEnclosed Courtyard1,4440$0.00
14CRCWest Entrance Patio2,8520$0.00
15CRCEast Entrance Patio2,4790$0.00
16CRCCRC B2 Corridor29,5890$0.00
17$0.00
18Project/Cycle Cleaning0$0.00
Totals213,70400000$0.00
Additional Cleaning Requirements Risk Level One:

1. The contractor shall clean the entrances to the Clinical Center, which include the front entrance, patient transport entrance and six entrances from the parking garage, which are two on P1, two on P2 and two on P3. The Contractor shall clean one hundred feet outside beyond the entrances. The Contractor shall be responsible for emptying trashcans and cigarette butt containers. The Contractor shall remove all litter, leaves, cigarette butts and trash from the entrance and 100 feet beyond the entrance. The Contractor shall keep the entrances clean by sweeping and pressure washing or other cleaning procedures that are approved by the Chief, Housekeeping and Fabric Care Department (HFCD). The Contractor shall maintain all walk-off mats in safe and clean condition and; place and remove them when inclement weather warrants. Mats shall be cleaned and properly rolled when not in use. The Contractor shall clean the enclosed courtyards and the children’s play area of the Clinical Research Center in the same manner as the entrances. The Contractor shall remove snow from the front entrance until the snow removal contractor arrives. This removal will be done between the front curb and the front door so patients and visitors exiting automobiles will not have to walk through snow.

2. The Contractor shall clean the lower panels of the glass at the front entrance, ambulance entrance, the entrances to the east and west patios and the east and west courtyards up to the height of 10 feet.

THE COST PER FTE IS THE AVERAGE COST OF FTE'S (EXAMPLE IF THE CONTRACTOR HAS MORE THAN ONE CLASS OR TYPE-THE COST IS THE AVERAGE OF THE CLASSES OR TYPE)

CLIN00001 - Risk Level One Cleaning NIHCL2010076

Revised 10-29-2010 &P

CLIN0001 Opt2

NumberBldgAreaEstimated Square FootageFTE’sCost per FTEExtended CostPercent of Profit per FTE
DaysEveningsNightsTotal
1CRCFront Entrance80,7720$0.00
2CRCPatient Transport Entrance11,0400$0.00
3ACRFParking Garage P1 Entrance3,8700$0.00
4ACRFParking Garage P2 Entrance5,5040$0.00
5ACRFParking Garage P3 Entrance5,5040$0.00
6ACRF 10Garage Stairwells5,5040$0.00
7CRCPlayground11,7660$0.00
8CRCCourtyard East16,1910$0.00
9CRCCourtyard West16,1910$0.00
10CRCEast Patio8,9840$0.00
11B1 Patio11,5140$0.00
12CRCPatient Smoking Area5000$0.00
13ACRFEnclosed Courtyard1,4440$0.00
14CRCWest Entrance Patio2,8520$0.00
15CRCEast Entrance Patio2,4790$0.00
16CRCCRC B2 Corridor29,5890$0.00
17$0.00
18Project/Cycle Cleaning0$0.00
Totals213,70400000$0.00
Additional Cleaning Requirements Risk Level One:

1. The contractor shall clean the entrances to the Clinical Center, which include the front entrance, patient transport entrance and six entrances from the parking garage, which are two on P1, two on P2 and two on P3. The Contractor shall clean one hundred feet outside beyond the entrances. The Contractor shall be responsible for emptying trashcans and cigarette butt containers. The Contractor shall remove all litter, leaves, cigarette butts and trash from the entrance and 100 feet beyond the entrance. The Contractor shall keep the entrances clean by sweeping and pressure washing or other cleaning procedures that are approved by the Chief, Housekeeping and Fabric Care Department (HFCD). The Contractor shall maintain all walk-off mats in safe and clean condition and; place and remove them when inclement weather warrants. Mats shall be cleaned and properly rolled when not in use. The Contractor shall clean the enclosed courtyards and the children’s play area of the Clinical Research Center in the same manner as the entrances. The Contractor shall remove snow from the front entrance until the snow removal contractor arrives. This removal will be done between the front curb and the front door so patients and visitors exiting automobiles will not have to walk through snow.

2. The Contractor shall clean the lower panels of the glass at the front entrance, ambulance entrance, the entrances to the east and west patios and the east and west courtyards up to the height of 10 feet.

THE COST PER FTE IS THE AVERAGE COST OF FTE'S (EXAMPLE IF THE CONTRACTOR HAS MORE THAN ONE CLASS OR TYPE-THE COST IS THE AVERAGE OF THE CLASSES OR TYPE)

CLIN00001 - Risk Level One Cleaning NIHCL2010076

Revised 10-29-2010 &P

CLIN0001 Opt 3

NumberBldgAreaEstimated Square FootageFTE’sCost per FTEExtended CostPercent of Profit per FTE
DaysEveningsNightsTotal
1CRCFront Entrance80,7720$0.00
2CRCPatient Transport Entrance11,0400$0.00
3ACRFParking Garage P1 Entrance3,8700$0.00
4ACRFParking Garage P2 Entrance5,5040$0.00
5ACRFParking Garage P3 Entrance5,5040$0.00
6ACRF 10Garage Stairwells5,5040$0.00
7CRCPlayground11,7660$0.00
8CRCCourtyard East16,1910$0.00
9CRCCourtyard West16,1910$0.00
10CRCEast Patio8,9840$0.00
11B1 Patio11,5140$0.00
12CRCPatient Smoking Area5000$0.00
13ACRFEnclosed Courtyard1,4440$0.00
14CRCWest Entrance Patio2,8520$0.00
15CRCEast Entrance Patio2,4790$0.00
16CRCCRC B2 Corridor29,5890$0.00
17$0.00
18Project/Cycle Cleaning0$0.00
Totals213,70400000$0.00
Additional Cleaning Requirements Risk Level One:

1. The contractor shall clean the entrances to the Clinical Center, which include the front entrance, patient transport entrance and six entrances from the parking garage, which are two on P1, two on P2 and two on P3. The Contractor shall clean one hundred feet outside beyond the entrances. The Contractor shall be responsible for emptying trashcans and cigarette butt containers. The Contractor shall remove all litter, leaves, cigarette butts and trash from the entrance and 100 feet beyond the entrance. The Contractor shall keep the entrances clean by sweeping and pressure washing or other cleaning procedures that are approved by the Chief, Housekeeping and Fabric Care Department (HFCD). The Contractor shall maintain all walk-off mats in safe and clean condition and; place and remove them when inclement weather warrants. Mats shall be cleaned and properly rolled when not in use. The Contractor shall clean the enclosed courtyards and the children’s play area of the Clinical Research Center in the same manner as the entrances. The Contractor shall remove snow from the front entrance until the snow removal contractor arrives. This removal will be done between the front curb and the front door so patients and visitors exiting automobiles will not have to walk through snow.

2. The Contractor shall clean the lower panels of the glass at the front entrance, ambulance entrance, the entrances to the east and west patios and the east and west courtyards up to the height of 10 feet.

THE COST PER FTE IS THE AVERAGE COST OF FTE'S (EXAMPLE IF THE CONTRACTOR HAS MORE THAN ONE CLASS OR TYPE-THE COST IS THE AVERAGE OF THE CLASSES OR TYPE)

CLIN00001 - Risk Level One Cleaning NIHCL2010076

Revised 10-29-2010 &P

CLIN0001 (4)

NumberBldgAreaEstimated Square FootageFTE’sCost per FTEExtended CostPercent of Profit per FTE
DaysEveningsNightsTotal
1CRCFront Entrance80,7720$0.00
2CRCPatient Transport Entrance11,0400$0.00
3ACRFParking Garage P1 Entrance3,8700$0.00
4ACRFParking Garage P2 Entrance5,5040$0.00
5ACRFParking Garage P3 Entrance5,5040$0.00
6ACRF 10Garage Stairwells5,5040$0.00
7CRCPlayground11,7660$0.00
8CRCCourtyard East16,1910$0.00
9CRCCourtyard West16,1910$0.00
10CRCEast Patio8,9840$0.00
11B1 Patio11,5140$0.00
12CRCPatient Smoking Area5000$0.00
13ACRFEnclosed Courtyard1,4440$0.00
14CRCWest Entrance Patio2,8520$0.00
15CRCEast Entrance Patio2,4790$0.00
16CRCCRC B2 Corridor29,5890$0.00
17$0.00
18Project/Cycle Cleaning0$0.00
Totals213,70400000$0.00
Additional Cleaning Requirements Risk Level One:

1. The contractor shall clean the entrances to the Clinical Center, which include the front entrance, patient transport entrance and six entrances from the parking garage, which are two on P1, two on P2 and two on P3. The Contractor shall clean one hundred feet outside beyond the entrances. The Contractor shall be responsible for emptying trashcans and cigarette butt containers. The Contractor shall remove all litter, leaves, cigarette butts and trash from the entrance and 100 feet beyond the entrance. The Contractor shall keep the entrances clean by sweeping and pressure washing or other cleaning procedures that are approved by the Chief, Housekeeping and Fabric Care Department (HFCD). The Contractor shall maintain all walk-off mats in safe and clean condition and; place and remove them when inclement weather warrants. Mats shall be cleaned and properly rolled when not in use. The Contractor shall clean the enclosed courtyards and the children’s play area of the Clinical Research Center in the same manner as the entrances. The Contractor shall remove snow from the front entrance until the snow removal contractor arrives. This removal will be done between the front curb and the front door so patients and visitors exiting automobiles will not have to walk through snow.

2. The Contractor shall clean the lower panels of the glass at the front entrance, ambulance entrance, the entrances to the east and west patios and the east and west courtyards up to the height of 10 feet.

THE COST PER FTE IS THE AVERAGE COST OF FTE'S (EXAMPLE IF THE CONTRACTOR HAS MORE THAN ONE CLASS OR TYPE-THE COST IS THE AVERAGE OF THE CLASSES OR TYPE)

CLIN00001 - Risk Level One Cleaning NIHCL2010076

Revised 10-29-2010 &P

CLIN0001 (5)

NumberBldgAreaEstimated Square FootageFTE’sCost per FTEExtended CostPercent of Profit per FTE
DaysEveningsNightsTotal
1CRCFront Entrance80,7720$0.00
2CRCPatient Transport Entrance11,0400$0.00
3ACRFParking Garage P1 Entrance3,8700$0.00
4ACRFParking Garage P2 Entrance5,5040$0.00
5ACRFParking Garage P3 Entrance5,5040$0.00
6ACRF 10Garage Stairwells5,5040$0.00
7CRCPlayground11,7660$0.00
8CRCCourtyard East16,1910$0.00
9CRCCourtyard West16,1910$0.00
10CRCEast Patio8,9840$0.00
11B1 Patio11,5140$0.00
12CRCPatient Smoking Area5000$0.00
13ACRFEnclosed Courtyard1,4440$0.00
14CRCWest Entrance Patio2,8520$0.00
15CRCEast Entrance Patio2,4790$0.00
16CRCCRC B2 Corridor29,5890$0.00
17$0.00
18Project/Cycle Cleaning0$0.00
Totals213,70400000$0.00
Additional Cleaning Requirements Risk Level One:

1. The contractor shall clean the entrances to the Clinical Center, which include the front entrance, patient transport entrance and six entrances from the parking garage, which are two on P1, two on P2 and two on P3. The Contractor shall clean one hundred feet outside beyond the entrances. The Contractor shall be responsible for emptying trashcans and cigarette butt containers. The Contractor shall remove all litter, leaves, cigarette butts and trash from the entrance and 100 feet beyond the entrance. The Contractor shall keep the entrances clean by sweeping and pressure washing or other cleaning procedures that are approved by the Chief, Housekeeping and Fabric Care Department (HFCD). The Contractor shall maintain all walk-off mats in safe and clean condition and; place and remove them when inclement weather warrants. Mats shall be cleaned and properly rolled when not in use. The Contractor shall clean the enclosed courtyards and the children’s play area of the Clinical Research Center in the same manner as the entrances. The Contractor shall remove snow from the front entrance until the snow removal contractor arrives. This removal will be done between the front curb and the front door so patients and visitors exiting automobiles will not have to walk through snow.

2. The Contractor shall clean the lower panels of the glass at the front entrance, ambulance entrance, the entrances to the east and west patios and the east and west courtyards up to the height of 10 feet.

THE COST PER FTE IS THE AVERAGE COST OF FTE'S (EXAMPLE IF THE CONTRACTOR HAS MORE THAN ONE CLASS OR TYPE-THE COST IS THE AVERAGE OF THE CLASSES OR TYPE)

CLIN00001 - Risk Level One Cleaning NIHCL2010076

Revised 10-29-2010 &P

File details come from the government source that posted it. Updated .