HOLD_for_prevailing_wage.docx
DOCX document 13 KB Posted
- Attached to
- B027-08 Edison Middle School Floor Replacement
- Solicitation number
- B027-08
- Issued by
- New Haven County, Connecticut
About this file
This is a Scope of Work document for the City of Meriden, Connecticut, related to a flooring replacement project at Edison Middle School (Contract B027-08). The project involves the removal and replacement of approximately 4,088 square feet of VCT (vinyl composition tile) flooring in the SOAR hallway, gymnasium, teacher offices, and connected side halls. The flooring contractor is responsible for ripping out and properly disposing of existing flooring, preparing the substrate, and installing new VCT to match existing patterns. Prior to VCT installation, the contractor must apply a moisture mitigation system using Mapie Planiseal, Sika MB, Ardex MC Rapid, or equivalent 20-year warranted epoxy system. The contractor must also provide and maintain dumpsters for disposal of flooring material throughout the project duration. Floor grinding will be performed with HEPA vacuum attachment, though this process is not completely dust-free, and precautions should be taken to protect surrounding surfaces. Work is scheduled to occur during summer hours from 6:00 a.m. to 2:30 p.m. daily. Furniture moving and VCT waxing are to be completed by others.
The document indicates that prevailing wage requirements apply to this project. No specific pricing information, bid due dates, site visit schedules, or bidder conference details are provided in this file. Additional contract terms, including project timeline, award date, and funding sources, are not detailed in this document.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TEST
File details come from the government source that posted it. Updated .