Drawings_2_-_Edison_Floor_Replacement_Lower_Level_.pdf

PDF 396 KB Posted

Attached to
B027-08 Edison Middle School Floor Replacement
Solicitation number
B027-08
Issued by
New Haven County, Connecticut

About this file

This architectural drawing document pertains to the City of Meriden's floor replacement project at Edison Middle School in Connecticut. The drawing set provides detailed floor plans for the lower level of the facility, including a graphics legend and scale plans for various areas such as classrooms, corridors, locker rooms, toilet facilities, and stair/ramp configurations. The drawings are prepared by Edison Architecture & Interiors located at 4021 Main Street and serve as the basis for the contractor's work scope. The project involves the removal and replacement of approximately 4,088 square feet of VCT flooring in the SOAR hallway, gymnasium, teacher offices, and connected side halls, as delineated on the architectural plans provided.

The flooring contractor is responsible for complete removal and proper disposal of existing flooring, floor surface preparation, installation of a moisture mitigation system (Mapie Planiseal, Sika MB, Ardex MC Rapid, or equivalent), and installation of new VCT flooring to match existing patterns. The contractor must provide and maintain dumpsters for material disposal throughout the project duration and perform floor grinding with HEPA vacuum equipment. The contractor shall take precautions to protect surrounding surfaces during work execution. Work may be scheduled during summer hours from 6:00 a.m. to 2:30 p.m. daily. Furniture moving and VCT waxing are to be performed by others. The project specifications reference a 20-year warranty requirement for the moisture mitigation system.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GRAPHICS LEGEND

AO NVEER

DOOR MMEER

DETAL

M

CLASGR

STGRADE

1012 14 15 16 18

A 6TH SRADE 6TH SRADE

MATCH LINE

ETH ERADE CLAB 23

CORRIDOR

GROUP ROGH

VEMIR

PRE SHUTTE

ADE

CANOPY ABOVE

MATCH LINE

2 6 5 060 00220 13 15 16

POR 14 SCALE PLA

FOR 1/4 SCALE STAIR/RAHP PLANS AND DETAILS

POR I4 SCALE TOILET ROOM PLANS AND DETALS

POR FIRE SNUTTER ELEVATION AND DETAIL

GROUND FLOOR PLAN

216 LOCKER

KEY

COEDOR

LOCKERS

CORR

CLAOR

AssociatesAssociate EDISON

Architecture & Interiors

A

4021 Main Street

ACADEMI

FLOOR E

File details come from the government source that posted it. Updated .