AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions ofthe document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Playground Equipment Installation, Removal, Disposal, Maintenance & Repair for Okinaw a & Mainland Japan
This amendment is to increase CLIN quantities; provide the seed projects for Okinaw a and Mainland, Japan; provide the date and time of the site visit and answ ers to questions of the vendor.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 30
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Feb-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HE1260-10-R-7001
X 9B. DATED (SEE ITEM 11)
07-Feb-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt ofOffer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:
(a) By completing Items 8 and 15, and returning 2 copies ofthe amendment; (b) By acknowledging receipt ofthis amendment on each copy of the offer submitted;
or (c) By separate letter or telegramwhich includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. Ifby virtue of this amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(Ifapplicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Feb-2010
CODE
DODDS-P/DDESS-G - PROCUREMENT DIVISION
MS. ROBIN BOYD
UNIT 35007
APO AP 96376-5007
HE1260 7. ADMINISTERED BY (Ifother than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
HE1260-10-R-7001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS & ANSWERS
SITE VISIT:
The following site visit has ben scheduled:
Mainland, Japan - A site visit will take place on 11 March 2010 to view the current playground at Lanham Elementary School, Atsugi, Japan at 11:00 a.m. If you are interested in attending the site visit, please contact Mr. Chan, Ping at DSN: 7225-7727 or via email at chan.ping@pac.dodea.edu or contact Ms.
Robin Boyd via email at robin.boyd@pac.dodea.edu to reserve.
Okinawa, Japan - A site visit will take place on 15 March 2010 to view the current playground at Zukeran Elementary School, Camp Foster, Okinawa, Japan at 11:00 a.m. If you are interested in attending the site visit, please contact Mr. Larry Adkison via email at larry.adkison@pac.dodea.edu or contact Ms.
Robin Boyd via email at robin.boyd@pac.dodea.edu to reserve.
QUESTIONS AND ANSWRS
A. Questions & Answers regarding this solicitation.
Q1: According to page1 paragraph 13 this solicitation is due 12 March 2010 at 3:00 PM, however, page 72 of the solicitation states all bids must be submitted not later than 19 March 2010 at 1400. When are4 bids due in for this solicitation
A1: Proposals for this solicitation are due 22 March 2010 at 3:00PM, Japan Standard Time.
Q2: On page 41 of the solicitation Paragraph 5 under Management Approach there is a statement, “delivery of playground equipment to Seoul Elementary School in Seoul, Korea” Who is responsible for the transport of the equipment from Seoul to Mainland Japan and Okinawa?
A2: That statement has been removed. The playground equipment needs to be sent directly to the school that installation will take place. Schools for installation, repair or maintenance will be identified at the time that task orders are issued on the contract.
Q3: Concerning the initial inspections of the playgrounds – Who is responsible for determining what requires repair and will the cost be covered by the government for the inspection and/or repairs?
A3: Initial inspections of the playgrounds for repair/maintenance will be done by the Government.
Q4: Will 2 contracts be awarded for Mainland, Japan and 2 contracts awarded for Okinawa?
A4: The Government intends to award a minimum of two (2) contracts per region. However, the Government could award more.
Q5: On page 42 of the solicitation under the Warranty Paragraph there is a requirement for a 15 Year Limited Warranty, Is this a manufacturers warranty? Also is this warranty on parts only or parts and labor?
A5: Under the Warranty section on pg 42, each 15-Year Warranty is clearly identified as to which is related. The warranty section also states that the Contractor will guarantee all work for a period of 12 months and repair all defects at not cost to the Government.
Q6: On page 49 of the solicitation under Liquidated Damages it states, “If the Contractor fails to complete work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,500.00 for each calendar day of the delay until the work is completed or accepted.” As that this solicitation is for a new installation, and maintenance does the $1,500.00 per day extend to both new installation work and maintenance work alike?
A6: The liquidated damage (LD) amount specified in FAR clause 52.xxxx herein, applies to new installation requirements only. However, LDs may also apply in maintenance or repair work that requires timely completion. Accordingly, each individual task order issued against the contract will state an applicable LD amount, if any.
Q7: Are Japanese business registration and licenses required in order to be awarded this contract
A7: An applicable, valid business license and/or registration issued by a local, state/prefectural or federal Japanese Government office is required in order to be considered for contract award. The reason for this is to ensure that the contractor has legal authority to perform contract requirements (i.e., demolition, disposal, installation, maintenance and repair of playground equipment and tiles) onsite in Japan and Okinawa. The Contracting Officer will consider the business license and/or registration of the subcontractor(s) or the joint venture partner if the prime contractor does not possess the aforementioned business license and/or registration. The Prime Contractor shall comply with all applicable labor and tax laws of Japan.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 12-Mar-2010 03:00 PM to 19-Mar-2010 03:00 PM.
The required performance has changed from a. This construction contract will be for the furnishing of playground equipment and tiles; removal and disposal of existing tiles and playground equipment; and/or, design and installaton of new playground equipment for Mainland Japan and Okinawa, Japan.b. Magnitude of estimate for each task order to design, demolish, furnish, and install playground equipment is between $100,000.00 and $700,00.00 (¥10,899,690 and ¥76,297,830).c. This will be a tradeoff source selection procurement in accordance with FAR 15.d. Enter prices in Section B – TYPED ONLYe.Reference Section L herein for Instructions for preparation of proposals and submission of Past Performance Information and other Submittal Requirements. to a. This construction contract will be for the furnishing of playground equipment and tiles;
removal and disposal of existing tiles and playground equipment; and/or, design and installaton of new playground equipment for Mainland Japan and Okinawa, Japan.b.Magnitude of estimate for each task order to design, demolish, furnish, and install playground equipment is between $100,000.00 and $700,00.00 (¥10,899,690 and ¥76,297,830).c. This will be a tradeoff source selection procurement in accordance with FAR 15.d. Enter prices in Section B – TYPED ONLYe. Reference Section L herein for Instructions for preparation of proposals and submission of Past Performance Information and other Submittal Requirements..
The following have been modified:
ADDENDUM
INFORMATION TO OFFERORS
A. Contract Type: The Government intends to award a Firm Fixed Price Indefinite Delivery, Indefinite Quantity contract.
B. Planned Period of Performance:
Base Period: 1 April 2010 – 31 March 2011 Option Year 1: 1 April 2011 – 31 March 2012 Option Year 2: 1 April 2012 – 31 March 2013 Option Year 3: 1 April 2013 – 31 March 2014 Option Year 4: 1 April 2014 – 31 March 2015.
C. Point of Contact:
Contract Specialist: Robin D. Boyd DoDDS Pacific DDESS Guam Directors Office Unit 35007
APO AP 96376-5007
Telephone: +81-6117-445883
DSN: 315-644-5883
E-Mail: robin.boyd@pac.dodea.edu
D. Invoice Instructions: To be provided at time of issuance of individual task orders.
E. Tax Exemption Language: Tax Exemption Status: The United States Department of Defense Education Activity (DoDEA), including the Department of Defense Dependents Schools Pacific (DoDDS-P) and Domestic Dependent Elementary and Secondary Schools Guam (DDESS-Guam), and the schools, facilities and offices comprising DoDDS-P/DDESS Guam, are activities of the United States Federal Government. As such, DoDDS-P/DDESS Guam, like all other US federal government agencies and organizations, are precluded from being taxed by reason of the Supreme Court Decision in McCullough v. Maryland, 17 USC 316 (1817). In addition, various US States have codified this immunity by appropriate statutes.
Although DoDDS Pacific and DDESS Guam are exempt from taxation, the following information is provided in case the public requires verification of DoDEA’s tax-exempt status: DoDEA Federal Tax ID is #26-2331642.
F. U.S. Dollar Versus Yen Equivalent: For the duration of this solicitation and/or contract the contractor shall use the following exchange rate in determining the Yen equivalent to referenced US dollar amounts in this solicitation provisions/contract clauses $1.00 = 81 08.9969. All referenced US dollar amounts in this solicitation provisions/contract clauses are modified to include “or Yen equivalent”.
G. Required Insurance (In addition to that required by Japanese Law)
a. The contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance on each vehicle used by the contractor at the work site.
Type Automobile Property Damage and Bodily Injuries Amount: JPY3,000,000 or Dollar equivalent for automobile property damage JPY30,000,000 or Dollar equivalent for bodily injuries
b. Prior to the commencement of work hereunder, the contractor shall furnish to the contracting officer a certificate or written statement of the above required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interests of the US Government in such insurance shall not be effective for such period as may be prescribed by the laws of the country of Japan in which this contract is to be performed and in no event less than thirty (30) days after written notice thereof to the contracting officer.
c. The contractor agrees to insert the substance of this clause, including this paragraph (c) in all subcontracts hereunder.
H. Multiple Award: The Government intends to award multiple (2) contracts for the same or similar commercial items to two companies in Okinawa and Mainland, Japan, from this solicitation.
I. Japanese Road Laws
a. The Contractor shall comply with Japanese Road Laws while on U.S. military installations to specifically include: Article 43, The Road Law (Japan) (prohibitive acts relative to roads). No person shall commit the following described acts:
b. Damaging the road, causing roads to be littered with debris, polluting the roads with debris or fall out from motor vehicles or otherwise defacing roads unreasonably or without due cause.
c. Article 43-2 (Measures to be taken to prevent cargo or things loaded on motor vehicles from falling out)
d. The agency managing a road may, when there is reasonable cause for him to feel that items or cargo being carried in or on a motor vehicle may fall out and damage, pollute, or otherwise deface the road in such manner as to hinder or obstruct the traffic, order the operator of the vehicle in question to take steps or measures necessary to prevent occurrence of such hindrance by stopping operation of the vehicle, correcting the method of loading or traveling, or operation of the vehicle.
J. Registration Of Motor Vehicles
Okinawa, Japan All company-owned and privately-owned motor vehicles required to be on U.S.
Government facilities during the performance of this contract must be registered with Vehicle Registration, Camp Foster. Necessary decals and/or permits will be issued and displayed on the vehicles in the manner as directed by the Vehicle Registration Officer.
Vehicle decals shall be removed from vehicles and turned in to Vehicles Registration, Camp Foster, at the end of the contract period or
Mainland, Japan Contractor will contact the Contracting Officer’s Representation (COR) for specific requriements regarding registration of motor vehicles.
K. IDIQ Minimum Guarantee: The Government shall satisfy the minimum guarantee requirement of the awarded IDIQ contract by the first online order or issuance of the first delivery order.
L. Formal Communication:
a. Formal communication such as requests for clarifications, questions, and/or information concerning this solicitation should be submitted via email to the Contract Specialist, Robin Boyd at robin.boyd@pac.dodea.edu . All questions are due to the contract specialist no later than Monday, 8 March 2009 at 0900 JapaneseStandard Time.
b. No information concerning this solicitation or requests for clarification will be provided in response to telephone calls from prospective Offerors. Inquiries will be answered and provided to all Offerors via amendment to this solicitation.
SECTION B - SUPPLIES OR SERVICES AND PRICES
SUBCLIN 0001AA
The pricing detail quantity has increased by 300,000.00 from 700,000.00 to 1,000,000.00.
SUBCLIN 0001AB
The pricing detail quantity has increased by 200,000.00 from 300,000.00 to 500,000.00.
SUBCLIN 0001AC
The pricing detail quantity has increased by 800,000.00 from 200,000.00 to 1,000,000.00.
SUBCLIN 0001AD
The pricing detail quantity has increased by 400,000.00 from 100,000.00 to 500,000.00.
SUBCLIN 0001AE
The pricing detail quantity has increased by 400,000.00 from 200,000.00 to 600,000.00.
SUBCLIN 0002AA
The pricing detail quantity has increased by 300,000.00 from 700,000.00 to 1,000,000.00.
SUBCLIN 0002AB
The pricing detail quantity has increased by 200,000.00 from 300,000.00 to 500,000.00.
SUBCLIN 0002AC
The pricing detail quantity has increased by 800,000.00 from 200,000.00 to 1,000,000.00.
SUBCLIN 0002AD
The pricing detail quantity has increased by 400,000.00 from 100,000.00 to 500,000.00.
SUBCLIN 0002AE
The pricing detail quantity has increased by 400,000.00 from 200,000.00 to 600,000.00.
SUBCLIN 1001AA
The pricing detail quantity has increased by 300,000.00 from 700,000.00 to 1,000,000.00.
SUBCLIN 1001AB
The pricing detail quantity has increased by 200,000.00 from 300,000.00 to 500,000.00.
SUBCLIN 1001AC
The pricing detail quantity has increased by 800,000.00 from 200,000.00 to 1,000,000.00.
SUBCLIN 1001AD
The pricing detail quantity has increased by 400,000.00 from 100,000.00 to 500,000.00.
SUBCLIN 1001AE
The pricing detail quantity has increased by 400,000.00 from 200,000.00 to 600,000.00.
SUBCLIN 1002AA
The pricing detail quantity has increased by 300,000.00 from 700,000.00 to 1,000,000.00.
SUBCLIN 1002AB
The pricing detail quantity has increased by 200,000.00 from 300,000.00 to 500,000.00.
SUBCLIN 1002AC
The pricing detail quantity has increased by 800,000.00 from 200,000.00 to 1,000,000.00.
SUBCLIN 1002AD
The pricing detail quantity has increased by 400,000.00 from 100,000.00 to 500,000.00.
SUBCLIN 1002AE
The pricing detail quantity has increased by 400,000.00 from 200,000.00 to 600,000.00.
SUBCLIN 2001AA
The pricing detail quantity has increased by 300,000.00 from 700,000.00 to 1,000,000.00.
SUBCLIN 2001AB
The pricing detail quantity has increased by 200,000.00 from 300,000.00 to 500,000.00.
SUBCLIN 2001AC
The pricing detail quantity has increased by 800,000.00 from 200,000.00 to 1,000,000.00.
SUBCLIN 2001AD
The pricing detail quantity has increased by 400,000.00 from 100,000.00 to 500,000.00.
SUBCLIN 2001AE
The pricing detail quantity has increased by 400,000.00 from 200,000.00 to 600,000.00.
SUBCLIN 2002AA
The pricing detail quantity has increased by 300,000.00 from 700,000.00 to 1,000,000.00.
SUBCLIN 2002AB
The pricing detail quantity has increased by 200,000.00 from 300,000.00 to 500,000.00.
SUBCLIN 2002AC
The pricing detail quantity has increased by 800,000.00 from 200,000.00 to 1,000,000.00.
SUBCLIN 2002AD
The pricing detail quantity has increased by 400,000.00 from 100,000.00 to 500,000.00.
SUBCLIN 2002AE
The pricing detail quantity has increased by 400,000.00 from 200,000.00 to 600,000.00.
SUBCLIN 3001AA
The pricing detail quantity has increased by 300,000.00 from 700,000.00 to 1,000,000.00.
SUBCLIN 3001AB
The pricing detail quantity has increased by 200,000.00 from 300,000.00 to 500,000.00.
SUBCLIN 3001AC
The pricing detail quantity has increased by 800,000.00 from 200,000.00 to 1,000,000.00.
SUBCLIN 3001AD
The pricing detail quantity has increased by 400,000.00 from 100,000.00 to 500,000.00.
SUBCLIN 3001AE
The pricing detail quantity has increased by 400,000.00 from 200,000.00 to 600,000.00.
SUBCLIN 3002AA
The pricing detail quantity has increased by 300,000.00 from 700,000.00 to 1,000,000.00.
SUBCLIN 3002AB
The pricing detail quantity has increased by 200,000.00 from 300,000.00 to 500,000.00.
SUBCLIN 3002AC
The pricing detail quantity has increased by 800,000.00 from 200,000.00 to 1,000,000.00.
SUBCLIN 3002AD
The pricing detail quantity has increased by 400,000.00 from 100,000.00 to 500,000.00.
SUBCLIN 3002AE
The pricing detail quantity has increased by 400,000.00 from 200,000.00 to 600,000.00.
SUBCLIN 4001AA
The pricing detail quantity has increased by 300,000.00 from 700,000.00 to 1,000,000.00.
SUBCLIN 4001AB
The pricing detail quantity has increased by 200,000.00 from 300,000.00 to 500,000.00.
SUBCLIN 4001AC
The pricing detail quantity has increased by 800,000.00 from 200,000.00 to 1,000,000.00.
SUBCLIN 4001AD
The pricing detail quantity has increased by 400,000.00 from 100,000.00 to 500,000.00.
SUBCLIN 4001AE
The pricing detail quantity has increased by 400,000.00 from 200,000.00 to 600,000.00.
SUBCLIN 4002AA
The pricing detail quantity has increased by 300,000.00 from 700,000.00 to 1,000,000.00.
SUBCLIN 4002AB
The pricing detail quantity has increased by 200,000.00 from 300,000.00 to 500,000.00.
SUBCLIN 4002AC
The pricing detail quantity has increased by 800,000.00 from 200,000.00 to 1,000,000.00.
SUBCLIN 4002AD
The pricing detail quantity has increased by 400,000.00 from 100,000.00 to 500,000.00.
SUBCLIN 4002AE
The pricing detail quantity has increased by 400,000.00 from 200,000.00 to 600,000.00.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
SEED PROJECT - MAINLAND, JAPA
Scope of Work – Lanham Elementary School, Atsugi Naval Housing, Japan Kindergarten Playground
1.0 Summary
1.1 The contractor will provide playground design, removal, disposal, installation, equipment and rubber safety tiles for the area shown in Attachment 1. Playground equipment and safety tile colors shall be coordinated with the DoDDS Pacific Facilities Branch (Terry Schlautman) prior to fabrication or manufacture. Playground equipment will be International Play Equipment Manufacturers Associations (IPEMA) certified to ASTM F1487, Standard Consumer Safety Performance Specification for Playground Equipment for Public use.
1.2. Provide proposal and playground design electronically (PDF, MSWord, ACAD 2000 or newer).
1.3. The playground equipment and rubber safety tiles shall be manufactured and installed in accordance with the guidelines shown in the 2008 Consumer Product Safety Commission (CPSC) “Handbook for Public Playground Safety”. The playground equipment must meet be ADA Accessibility Guidelines for Buildings and Facilities (ADAAG) compliant for 2-5 year olds. Playground equipment will include corrosive resistant paint for salt air environments.
1.4. The contractor will be responsible for the purchase, transportation and storage of all equipment and supplies.
1.5 School colors and information located at the following link http://www.lanham-es.pac.dodea.edu/
2.0 General Site Layout
2.1 A general site plan of the kindergarten playground area at Lanham ES is provided as Attachment
3.0 Site Improvements and Equipment Installation
3.1 Regrade the areas where the new playground equipment will be installed and surrounding areas as required providing proper surface drainage prior to the installation of the new playground equipment and rubber safety tiles.
3.2. Install the new playground equipment and tiles as specified in Attachment 1.
3.3. Install topsoil and solid edge-to-edge sodding on all disturbed areas or as required.
3.4. Provide hard surface materials.
3.5 Additional Links and information:
http://www.ipema.com/default.aspx http://www.astm.org/Standard/index.shtml http://www.cpsc.gov/cpscpub/pubs/playpubs.html http://www.access-board.gov/adaag/html/adaag.htm
4.0 Period of Performance
4.1 Work shall begin 5 days after award
4.2 All work will be completed before August 21, 2010
4.3 The contractor will provide an approved schedule within 45 days before construction
5.0 Submittals Requirements
5.1 The contractor will provide all parts, materials, and product information 30 days before construction. Including material specifications and physical properties (ASTM test methods utilized)
5.2 The contractor will provide disposal/recycle certificates or manifest of all materials 14 days after project completion. All construction waste (i.e. equipment, soil, debris etc) shall be disposed of off base. (Disposal shall be in accordance with the latest Japanese Environmental Standards and local regulations)
5.3 The contractor will provide all parts, materials, and product information 30 days before construction. Including material specifications and physical properties (ASTM test methods utilized)
5.4 The contractor will provide disposal/recycle certificates or manifest of all materials 14 days after project completion. (Disposal shall be in accordance with the latest Japanese Environmental Standards and local regulations)
6.0 Warranty
6.1 The contractor will guarantee all work for a period of 12 months and repair all defects at no cost to the Government.
Minimum warranty of playground equipment:
Fifteen (15) Year Limited Warranty on aluminum and steel posts, upright posts against structural failure due to corrosion, deterioration or workmanship.
Fifteen (15) Year Limited Warranty on clamps against structural failure due to corrosion, deterioration or workmanship.
Fifteen (15) Year Limited Warranty on Hardware (nuts, bolts, washers) including molded aluminum parts.
Fifteen (15) Year Limited Warranty on bolt-through fastening system
Fifteen (15) Year Limited Warranty on spring assemblies and aluminum cast animals.
Fifteen (15) Year Limited Warranty on main structure platforms and decks, metal roofs, table tops, bench tops, railings, loops and rungs and cables against premature wear due to natural deterioration or manufacturing defects.
Fifteen (15) Year Limited Warranty on all plastic components including structural failure due to materials or workmanship
SEED PROJECT - OKINAWA, JAPAN
Seed Project Attachment 2
Zukeran Elementary School Camp Foster, Okinawa Japan
Playground Measurements
SCOPE: Install new playground equipment, swings and uniform safety tile thickness with EPDM coating at the locations in Site Layout. Areas 2 are currently swing areas. Student capacity is reduced. Minimum requirements are:
Area Number Ages Occupancy Capacity: SM (Area)
1 2-12 at least 15 12 X 11
2 2-12 at least 4 14 X 13
Note:
Area 1:Include picnic area with cover and Trike track. Do not replace House or store.
Provide graphics for open area play (hopscotch, circles, pattern surface etc)
Area 2:Replace with swings perpendicular to the current layout (See drawings).
Area 3:Remove and dispose of playground equipment. Leave safety tiles in place
Attachment 3, “Zukeran ES Playground Report”: Remove, repair or correct the areas to comply with 2008 Consumer Product Safety Guide “Handbook for Public Playground Safety”.
The following have been modified:
PERFORMANCE WORK STATEMENT
Scope of Work Playground Design, Repair Installation and Disposal
Summary
1. Provide proposal and playground design electronically and hardcopy (PDF, MSWord, ACAD
2000 or newer). Submit 1 copy to the Facility Engineer in Okinawa and 1 copy to the Procurement Officer.
2. The contractor will provide playground design, removal, disposal, installation, equipment and rubber safety tiles. Site layout and photos shall be provided by the Government.
Playground equipment and safety tile colors shall be coordinated with the Government prior to fabrication or manufacture. Playground equipment will be International Play Equipment Manufacturers Associations (IPEMA) certified to ASTM F1487, Standard Consumer Safety Performance Specification for Playground Equipment for Public use.
3. The contractor shall provide a “Certified Playground Safety Inspector” (CPSI) that is certified by the National Recreation and Park Association (www.nrpa.org) to inspect the newly installed playground and provide the Government a written audit report prior to final payment of all work. The report will identify if the playground is in full compliance with all requirements of section 4 of this Summary.
4. The playground equipment and rubber safety tiles shall be manufactured and installed in accordance with the guidelines shown in the 2008 Consumer Product Safety Commission (CPSC) “Handbook for Public Playground Safety”. The playground equipment must meet be ADA Accessibility Guidelines for Buildings and Facilities (ADAAG) compliant for Ages 2- 5, 2-12 and/or 5-12.
5. The Contractor shall include equipment age appropriate and installation date sign at each location.
6. The contractor will be responsible for the purchase, transportation and storage of all equipment and supplies.
7. School colors and information located shall be coordinate with the Government
General Site Layout A general site plan of the main playground area shall be provided by the Government. Sample of propose equipment to be installed shall be provided by the Government.
Site Improvements and Equipment Installation
1. Regrade the areas where the new playground equipment will be installed and surrounding areas as required providing proper surface drainage prior to the installation of the new playground equipment and rubber safety tiles with ethylene propylene diene monomer (EPDM) coating.
2. Install new playground equipments, swings and uniform safety tile thickness with EPDM coating at the locations as identified by the Government with the minimum requirements given.
3. Install topsoil and solid edge-to-edge sodding on all disturbed areas if required.
4. Additional Links and information:
http://www.ipema.com/default.aspx http://www.astm.org/Standard/index.shtml http://www.cpsc.gov/cpscpub/pubs/playpubs.html http://www.access-board.gov/adaag/html/adaag.htm http://www.nrpa.org/
Period of Performance
1. Work shall begin 5 days after award.
2. All work will be completed as indicated
3. The contractor will provide an approved schedule within 45 days before construction
4. The contractor is required to complete this project, ready for use, within the number of calendar days specified in the contract. To ensure adequate time to correct any deficiencies noted by the Government during the final inspection, the contractor should schedule the final inspection through the Contract Administrator at least seven (7) calendar days prior to the scheduled project completion date. The contractor is solely responsible for scheduling this inspection and is reminded that failure to complete the project ready for use in accordance with the contract terms and conditions may result in the assessment of liquidated damages as described.
Submittals Requirements
1. The contractor will provide all parts, materials, and product information. Including material specifications and physical properties (ASTM test methods utilized)
2. The contractor will provide disposal/recycle certificates or manifest of all materials 14 days after project completion. (Disposal shall be in accordance with the latest Japanese Environmental Standards and local regulations)
3. The contractor will provide certificate endorsed from the manufacture stating the contractor is a certified installer for the equipment provided
Warranty The contractor will guarantee all work for a period of 12 months and repair all defects at no cost to the Government.
Minimum warranty of playground equipment:
Fifteen (15) Year Limited Warranty on aluminum and steel posts, upright posts against structural failure due to corrosion, deterioration or workmanship.
Fifteen (15) Year Limited Warranty on clamps against structural failure due to corrosion, deterioration or workmanship.
Fifteen (15) Year Limited Warranty on Hardware (nuts, bolts, washers) including molded aluminum parts.
Fifteen (15) Year Limited Warranty on spring assemblies and aluminum cast animals.
Fifteen (15) Year Limited Warranty on main structure platforms and decks, metal roofs, table tops, bench tops, railings, loops and rungs and cables against premature wear due to natural deterioration or manufacturing defects.
Fifteen (15) Year Limited Warranty on all plastic components including structural failure due to materials or workmanship.
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for SUBCLIN 0001AA has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 0001AB has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 0001AC has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 0001AD has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A
The following Delivery Schedule item for SUBCLIN 0001AE has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 0002AA has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 0002AB has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 0002AC has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 0002AD has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 0002AE has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 1001AD has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
The following Delivery Schedule item for SUBCLIN 1001AE has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 1002AA has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 1002AB has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 1002AC has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 1002AD has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 1002AE has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 2001AE has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 2002AA has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 2002AB has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 2002AC has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 2002AE has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 3001AE has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 3002AA has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 3002AB has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 3002AC has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 3002AE has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 4001AE has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A
The following Delivery Schedule item for SUBCLIN 4002AA has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 4002AB has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 4002AC has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
The following Delivery Schedule item for SUBCLIN 4002AE has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2010 TO
14-APR-2011
N/A N/A FOB: Destination
SECTION H - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
SPECIAL CONTRACT REQUIREMENTS
PERFORMANCE BOND
The Offeror shall furnish a performance bond in accordance with FAR Clause 52.228-15, Performance and Payment Bonds – Construction herein, as supplemented by this paragraph. No Payment bond is required.
SAFETY
The contractor shall comply with EM 385-1-1 Safety and Health Requirements Manual. The full text of a manual may be obtained electronically at this address:
http://www.usace.army.mil/CESO/Documents/EM385-1-1FINAL.pdf.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been added by full text:
ATTACHMENTS FOR SEED PROJECTS
Seed Project – Mainland, Japan (Lanham Elementary):
Attachment 1 – Location Map (1 page) Attachment 2 – Playground Demo Plan (1 Page) Attachment 3 - Playground New Plan (1 Page)
Seed Project – Okinawa, Japan (Zukeran Elementary):
Attachment 1 – Site Plan (5 pages) Attachment 2 – Scope of Work (See Section C- Seed Project Okinawa) Attachment 3 - Playgrounds Slide (7 pages) Attachment 4 – Product Descriptions (4 pages)
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
PROPOSAL PREPARATION
PROPOSAL PREPARATION INSTRUCTIONS
A. To ensure timely and equitable evaluations of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including providing representations and certifications, and submittal requirements.
Failure to meet a requirement may result in offer being ineligible for award
SUBMITTAL REQUIREMENTS
The offeror shall provide the following in its Technical Proposal:
1. Technical Factor 1 - Seed Project for Okinawa and Mainland Japan:
The general Statement of Work (SOW) and site layout for the seed project for 2 different schools in Okinawa and Mainland Japan will be included in Amendment 0001 to this solicitation. The offeror will need to review these SOWs, and include the following submittal requirements to address this Technical Evaluation Factor:
(a) Site Plan
(b) Design
(c) Parts List with description and quantity of parts – the offeror must state the Brand Name/Model# and Manufacturer of its proposed playground equipment and titles.
(d) Photographs and Renderings – photographs and/or renderings should clearly show the proposed playground equipment.
(e) An executive summary explaining its plan to accomplish the following contract requirements: delivery of playground equipment to Japan; customs clearance process;
removal and disposal of existing tiles and playground equipment; and, installation of new tiles and playground equipment by the required completion date. Include in this narrative, a table or activity list (a construction schedule) showing estimated delivery date, estimated demolition and disposal date and installation date (contract completion date).
Parts and Equipment List of brand name model: Offerors are reminded that, regardless whether they intend to propose the brand name or the equal brand/model of playground equipment and tiles, they must provide pictures and description of their proposed brand/model.
2. Technical Factor 2 - Management and Technical Capability:
(a) Provide a list of past and/or current construction projects similar in scope and complexity to the requirements of this contract. Include owners/customers of these projects – for example, NAVFAC/ROICC, Army Corps of Engineers, US Air Force CE Kadena, Government of Japan, etc. – and, also the U.S. dollar value of each project.
(b) Provide the names of subcontractor(s) the offeror will use for this contract (if any), as well as the offeror’s proposed warranty terms (if any) for parts, including for aluminum and steel posts, upright posts, clamps, hardware (nuts, bolts, washers), spring assemblies, aluminum cast animals, main structure platforms and decks, metal roofs, table tops, bench tops, railings, loops, rungs, cables and plastic components. The offeror’s warranty approach (e.g. in case of structural failure due to corrosion, deterioration or workmanship of equipment should be discussed in this summary.
(c) Provide a detailed resume of the offeror’s proposed Project Manager (PM) for this contract. The PM should have experience in facilities management and/or construction engineering/management and must speak, read and understand fluent English. Include training, education, licenses, certifications (if any) and experience with dates in his/her resume.
3. Technical Factor 3 - Past Performance:
The offeror shall provide a list of past and/or current clients or customers who can provide past performance information on the offeror. The past performance information shall be of contracts and/or projects similar in nature and scope to the requirements of this solicitation. This list should contain the following information:
a. Full name of reference
b. Organization of reference
c. Phone number
d. Email address
e. The value of the contract and/or project for reference
f. The date(s) of the contract and/or project
This List of References is necessary in case the Government does not receive a completed PPQ from the listed references, and there is no information in any Government PPI database which demonstrates the offeror’s past performance in accomplishing contract(s) or project(s) similar in nature to the requirement of this solicitation.
PRICE PROPOSAL – Submit original and two (2) copy.
(a) Complete blocks 14, 15, 16, 19 (as appropriate), 20A, 20B and 20C of the RFP, Sections A, Standard Form 1442. In doing so, the offeror accedes to the contract terms and conditions as written in the Request for Proposal (RFP) Sections A through K. These sections constitute the model contract.
(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN)
(c) Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For any other sections, the offeror shall only submit the pages, if any, that require a fill-in.
(d) The offeror shall provide backup pricing information (a price breakdown) that supports how the fixed prices were developed (labor hours, materials, overhead, profit, etc.).
PROPOSAL DUE DATE
(1) Submit your proposal to arrive NOT LATER THAN 22 March 2010, 2:00 p.m., LOCAL JAPAN TIME.
(2) Submit you past performance information to arrive NOT LATER THAN 8 March 2010. Include a cover letter with you reference list and email to:
robin.boyd@pac.dodea.edu or deliver to: DoDDS Pacific DDESS Guam, Procurement Division (DPPD), Bldg 290, Torii Station, Okinawa, Japan. Offerors are responsible for ensuring that their reference sources receive the questionnaires in time to complete and return the questionnaire to Procurement Division not later than the specified due date.
(3) All proposals delivered in response to this solicitation shall reflect the following information on the address label:
(a) Solicitation Number: HE1260-10-R-7001.
(b) The legend, “To be delivered unopened to the Contracting Officer”, and
(c) The volume and copy numbers contained in each box/envelope.
(4) Submit your proposal package via hand-delivery or regular mail or express mail to either of the following addresses:
Military Address:
DoDEA Pacific Director’s Office
Procurement Division Attn: Ms. Robin Boyd Unit 35007
APO, AP 96376-5007
Or, Commercial Address:
Torii Station DoDDS Pacific DDESS Guam – Director’s Office Procurement Division – Attn: Ms. Robin Boyd Sobe, Yomitan-son Bldg 290 Okinawa, Japan 904-0304
Offerors may also contact Contract Specialist, Ms. Robin Boyd, for any questions via her telephone: +81-611-744-5781.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .