The file's text, extracted by GovTribe without its formatting.
HDTRA2-17-R-0002
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
A&E Design Services
FFP
Perform services in accordance with attached Statement of Work dated 19 January 2016 and Ordering clauses. Appropriate CLIN will be defined with individual task order solicitations.
FOB: Destination
MAX
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
A&E Design Services T&M Perform services in accordance with attached Statement of Work dated 19 January 2016 and Ordering clauses. Appropriate CLIN will be defined with individual task order solicitations.
TOT MAX PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
A&E Design Services
CPFF
Perform services in accordance with attached Statement of Work dated 19 January 2016 and Ordering clauses. Appropriate CLIN will be defined with individual task order solicitations.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
CDRL deliverables
Not Separately Priced
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| OPTION |
| A&E Design Services |
FFP
Perform services in accordance with attached SOW dated 19 January 2016 and Ordering clauses. Appropriate CLIN will be defined with individual task order solicitations.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| OPTION |
| A&E Design Services |
T&M Perform services in accordance with attached Statement of Work dated 19 January 2016 and Ordering clauses. Appropriate CLIN will be defined with individual task order solicitations.
TOT MAX PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| OPTION |
| A&E Design Services |
CPFF
Perform services in accordance with attached Statement of Work dated 19 January 2016 and Ordering clauses. Appropriate CLIN will be defined with individual task order solicitations.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| OPTION |
| A&E Design Services |
FFP
Perform services in accordance with attached Statement of Work dated 19 January 2016 and Ordering clauses. Appropriate CLIN will be defined with individual task order solicitations.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| OPTION |
| A&E Design Services |
T&M Perform services in accordance with attached SOW dated 19 January 2016 and Ordering clauses. Appropriate CLIN will be defined with individual task order solicitations.
TOT MAX PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| OPTION |
| A&E Design Services |
CPFF
Perform services in accordance with attached SOW dated 19 January 2016 and Ordering clauses. Appropriate CLIN will be defined with individual task order solicitations.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| OPTION |
| A&E Design Services |
FFP
Perform services in accordance with attached SOW dated 19 January 2016 and Ordering clauses. Appropriate CLIN will be defined with individual task order solicitations.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| OPTION |
| A&E Design Services |
T&M Perform services in accordance with attached Statement of Work dated 19 January 2016 and Ordering clauses. Appropriate CLIN will be defined with individual task order solicitations.
TOT MAX PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| OPTION |
| A&E Design Services |
CPFF
Perform services in accordance with attached SOW dated 19 January 2016 and Ordering clauses. Appropriate CLIN will be defined with individual task order solicitations.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| OPTION |
| A&E Design Services |
FFP
Perform services in accordance with attached Statement of Work dated 19 January 2016 and Ordering clauses. Appropriate CLIN will be defined with individual task order solicitations.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| OPTION |
| A&E Design Services |
T&M Perform services in accordance with attached Statement of Work dated 19 January 2016 and Ordering clauses. Appropriate CLIN will be defined with individual task order solicitations.
TOT MAX PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| OPTION |
| A&E Design Services |
CPFF
Perform services in accordance with attached Statement of Work dated 19 January 2016 and Ordering clauses. Appropriate CLIN will be defined with individual task order solicitations.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
MAX
CONTRACT MINIMUM/MAXIMUM
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
| MINIMUM QUANTITY | MINIMUM AMOUNT | MAXIMUM QUANTITY | MAXIMUM AMOUNT | | | |
| N/A | | | | $25,000.00 | N/A | $9,500,000.00 |
(Option periods do not have separate Minimum and Maximum amounts. The Base period Minimum and Maximums continue to apply if any option is exercised.)
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0005 |
| Destination |
| Government |
| Destination |
| Government |
| 0006 |
| Destination |
| Government |
| Destination |
| Government |
| 0007 |
| Destination |
| Government |
| Destination |
| Government |
| 0009 |
| Destination |
| Government |
| Destination |
| Government |
| 0010 |
| Destination |
| Government |
| Destination |
| Government |
| 0011 |
| Destination |
| Government |
| Destination |
| Government |
| 0013 |
| Destination |
| Government |
| Destination |
| Government |
| 0014 |
| Destination |
| Government |
| Destination |
| Government |
| 0015 |
| Destination |
| Government |
| Destination |
| Government |
| 0017 |
| Destination |
| Government |
| Destination |
| Government |
| 0018 |
| Destination |
| Government |
| Destination |
| Government |
| 0019 |
| Destination |
| Government |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-4 |
| Inspection Of Services--Fixed Price |
| AUG 1996 |
| 52.246-6 |
| Inspection--Time-And-Material And Labor-Hour |
| MAY 2001 |
| 52.246-11 |
| Higher-Level Contract Quality Requirement |
| DEC 2014 |
Section F - Deliveries or Performance
F-1 PERIOD OF PERFORMANCE
The total ordering period of the contract shall not exceed 60 months from date of contract award; (if all options are exercised). Any task order placed during the ordering period shall be completed within 12 months of the end of the ordering period.
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
31-MAY-2018
| N/A |
| DEFENSE THREAT REDUCTION AGENCY/CXTFC |
LT MOHAMMAD AKBAR
1680 TEXAS ST SE
KIRTLAND AFB NM 87117-5669
505.846.8964
HDTRA2
31-MAY-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HDTRA2
31-MAY-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HDTRA2
31-MAY-2019
| N/A |
| DEFENSE THREAT REDUCTION AGENCY/CXTFC |
LT MOHAMMAD AKBAR
1680 TEXAS ST SE
KIRTLAND AFB NM 87117-5669
505.846.8964
HDTRA2
31-MAY-2019
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HDTRA2
31-MAY-2019
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HDTRA2
31-MAY-2020
| N/A |
| DEFENSE THREAT REDUCTION AGENCY/CXTFC |
LT MOHAMMAD AKBAR
1680 TEXAS ST SE
KIRTLAND AFB NM 87117-5669
505.846.8964
HDTRA2
31-MAY-2020
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HDTRA2
31-MAY-2020
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HDTRA2
31-MAY-2021
| N/A |
| DEFENSE THREAT REDUCTION AGENCY/CXTFC |
LT MOHAMMAD AKBAR
1680 TEXAS ST SE
KIRTLAND AFB NM 87117-5669
505.846.8964
HDTRA2
31-MAY-2021
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HDTRA2
31-MAY-2021
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HDTRA2
31-MAY-2022
| N/A |
| DEFENSE THREAT REDUCTION AGENCY/CXTFC |
LT MOHAMMAD AKBAR
1680 TEXAS ST SE
KIRTLAND AFB NM 87117-5669
505.846.8964
HDTRA2
31-MAY-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HDTRA2
31-MAY-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HDTRA2
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
Section G - Contract Administration Data
PROFIT OR FEE ON MATERIAL COST
Pursuant to FAR 52.232-7(b)(7) Payments under Time-and-Materials and Labor-Hour Contracts (Aug 2012), The Government will not pay profit or fee to the prime Contractor on materials under the Time and Materials CLIN.
| 52.232-10 |
| Payments under Fixed-Price Architect-Engineer Contracts |
| APR 2010 |
| 252.204-7006 |
| Billing Instructions |
| OCT 2005 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| JUN 2012 |
CLAUSES INCORPORATED BY FULL TEXT
252.201-9001 CONTRACTING OFFICE POINT OF CONTACT (POC) (Dec 2007)
The POC in the Procuring Contracting Office for this contract action is Susan McDaniel, Contract Specialist, DTRA-J4COQ, telephone number (505)853-0865, email address susan.j.mcdaniel.civ@mail.mil.
Contracting Officer’s Representative (COR) In accordance with DFARS 252.201-7000, COR appointments will be made on individual Task Orders.
252.216-9005 PROFIT OR FEE ON TRAVEL COSTS (JUL 2008)
Travel shall not be a profit or fee bearing cost element.
(End of clause)
252.232-9012 - Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT) formally (WAWF) – RECEIPT AND ACCEPTANCE (RA) INSTRUCTIONS (OCT 2015)
(a) As prescribed in DFARS clause 252.232-7003 Electronic Submission of Payment Requests (Jun 2012), Contractors must submit payment requests in electronic form. Paper copies will no longer be accepted or processed for payment unless the conditions of DFARS clause 252.232-7003(c) apply. To facilitate this electronic submission, the Defense Threat Reduction Agency (DTRA) has implemented the DoD sanctioned Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT) for contractors to submit electronic payment requests and receiving reports. The contractor shall submit electronic payment requests and receiving reports via (iRAPT). Vendors shall send an email notification to the Contracting Officer Representative (COR), Program/Project Manager or other government acceptance official identified in the contract by clicking on the Send Additional Email Notifications link upon every submission of an invoice/cost voucher in iRAPT. To access (iRAPT), go to https://wawf.eb.mil.
For questions, contact the DTRA iRAPT Team at dtra.belvoir.J4-8C.mbx.dtra-wawf-help@mail.mil.
(b) Definitions:
Acceptor: Contracting Officer’s Representative, Program/Project Manager, or other government acceptance official as identified in the contract/order.
Pay Official: Defense Finance and Accounting Service (DFAS) payment office identified in the contract/order.
SHIP To/Service Acceptor DoDAAC: Acceptor DoDAAC or DCMA DoDAAC (as specified in the contract/order).
DCAA Auditor DoDAAC: Needed when invoicing on cost-reimbursable contracts. (Go to www.dcaa.mil and click on the appropriate link under Locator to search for your DCAA DoDAAC.)
>>>>> For contracts that are administered by the Office of Naval Research (ONR): <<<<< Enter the ONR DoDAAC in the DCAA Auditor and Service Approver DoDAAC field in iRAPT.
(c) iRAPT Contractor Input Information:
The contractor shall use the following information in creating electronic payment requests in (iRAPT):
Invoice Type in iRAPT:
If billing for Cost Type/Reimbursable contracts (including T&M and LH), select “Cost Voucher” If billing for Firm-Fixed Price (FFP) Materials Only, select “Combo” If billing for FFP Materials and Service, select “Combo” If billing for FFP Services Only, select “2-n-1 (Services Only)” If the contract contains both FFP and Cost Type (including T&M and LH) line items, they must be invoiced separately on appropriate types mentioned above. Upon the written approval of the Project Manager or Contracting Officer’s Representative, the contractor may invoice both line items in one type of invoice.
For iRAPT Routing Information, See Table Below:
| Description |
| SF 26 |
| SF 33 |
| SF 1449 |
| DD 1155 |
Located in Block/Section
| Delivery Order |
| See Individual Order |
| 4 |
| 2 |
| Inspection |
| Section E (except SF 1449, See Entitled): |
INSPECTION AND ACCEPTANCE
| Acceptance |
| Section E (except SF 1449, See Entitled): |
INSPECTION AND ACCEPTANCE
| Ship To / Service Acceptor DoDAAC |
| 6 |
| 24 |
| 16 |
| 7 |
| Ship to Extension |
| Do Not Fill In |
| Services or Supplies |
| Based on majority of requirement as determined by monetary value |
| Final Invoice? |
| Do not change “N” (no) to “Y” (yes) unless this is the last invoice and the contract is ready for closeout. |
(d) Final Invoices/Vouchers -Final Payment shall be made in accordance with the Federal Acquisition Regulation (FAR) 52.216-7, entitled “Allowable Cost and Payment.”
Invoices - Invoice 2-n-1 (Services Only) and Invoice and Receiving Report (Combo) Select the “Y” selection from the “Final Invoice?” drop-down box when submitting the final invoice for payment for a contract. Upon successful submission of the final invoice, click on the Send Additional Email Notifications link to send an additional email notification to the Contracting Officer Representative (COR), Program/Project Manager or other government acceptance official identified in the contract.
Final Cost Vouchers - Once the final DCAA audit is complete for cost reimbursable contracts and authorization from DCAA is received, submit the final cost voucher to dtra.belvoir.J4-8C.mbx.closeouts@mail.mil .
**DO NOT SUBMIT FINAL VOUCHERS (ENDING IN “Z”) VIA iRAPT, submit only to the e-mail listed above.
(e) WAWF e-Business Suite Training may be accessed online at https://wawftraining.eb.mil/wbt/. To practice creating documents in iRAPT, visit the practice site at https://wawftraining.eb.mil. General DFAS information may be accessed using the DFAS website at http://www.dfas.mil/. Payment status information may be accessed using the myInvoice system at https://wawf.eb.mil. Your contract number and shipment/invoice number will be required to check status of your payment.
Note: For specific invoice related inquiries, email: dtra.belvoir.j4-8c.mbx.vendor-pay@mail.mil. Vendors shall forward any additional DTRA related iRAPT questions to dtra.belvoir.J4-8C.mbx.dtra-wawf-help@mail.mil.
(f) DCMA Administered Contract exceptions are as follows:
For iRAPT Routing Information, See Table Below:
| Description |
| SF 26 |
| SF 33 |
| SF 1449 |
| DD 1155 |
Located in Block/Section
| Ship To / Service Acceptor DoDAAC |
| 5 |
| 24 |
| 16 |
| 6 |
Final Cost Vouchers - Once the final DCAA audit is complete for cost reimbursable contracts and authorization from DCAA is received, submit the final cost voucher to the DCMA Office identified on the contract.
Note2: For specific invoice related inquiries, please contact the DCMA office identified on the contract. Vendors shall forward any additional DTRA related iRAPT questions to dtra.belvoir.J4-8C.mbx.dtra-wawf-help@mail.mil.
End of clause
252.237-9000 CONTRACT HOLIDAYS (JUN 2010)
(a) The price/costs in Section B of the contract include federal holiday observances; accordingly, the Government will not be billed for such holidays, except when services are required by the Government and are actually performed on the federal holiday.
(b) The following days are contract holidays:
| New Year’s Day | | | 01 January |
| Martin Luther King’s Birthday | Third Monday in January | | |
| President’s day | | | Third Monday in February |
| Memorial Day | | | Last Monday in May |
| Independence Day | | 04 July | |
| Labor Day | | | First Monday in September |
| Columbus Day | | | Second Monday in October |
| Veteran’s Day | | | 11 November |
| Thanksgiving Day | | Fourth Thursday in November | |
| Christmas Day | | | 25 December |
(c) If a federal holiday listed above falls on a Saturday or Sunday, the official observance of the holiday will be on the previous Friday or the following Monday.
(End of Clause)
Section H - Special Contract Requirements
252.203-9000 Prohibition on the Use of Senior Mentors (JUNE 2010)
(a) The use of senior mentors by the Defense Threat Reduction Agency (DTRA) enhances the readiness of the Agency across a wide range of strategic, operational, joint, functional, technical, management and development mission areas. The relevant prior service, joint force experience, and unique expertise of these senior consultants provide senior leadership with valuable insights and contribute to the continuous improvement of the Agencies’ operations.
(b) For the purposes of this clause, Senior Mentor is defined as a retired flag, general or other military officers (O-6) or retired senior civilian official (Senior Executive Service (SES), Senior Level (SL), Scientific and Professional (ST)) who provides expert experience-based mentoring, teaching, training, advice, and recommendations to senior military officers, staffs and students as they participate in war games, warfighting courses, operational planning, operational exercises, and decision-making exercises.
(c) In accordance with Secretary of Defense Memorandum entitled “Policy on Senior Mentors” dated April 1, 2010, DTRA will hire all senior mentors as highly qualified experts (HQE) under 5 U.S.C. 9903. This policy balances the need for DTRA to secure the specialized knowledge required for these operational exercises with the need to hire such experts in a manner that promotes public trust and confidence.
(d) The Contractor shall not include the use of senior mentors in bids or proposals for services/supplies offered to DTRA.
(e) The Contractor shall include the substance of this clause in all subcontracts.
252.204-9003 Contractor Access to DTRA Facilities or Information Systems (AUG 2007)
Contractors requiring access to Defense Threat Reduction Agency (DTRA) facilities or information systems worldwide will be required to obtain a Common Access Card (CAC), and shall comply with the identity proofing, registration, and accreditation requirements provided by the DTRA Physical Security Branch, Security and Counterintelligence Directorate. Further information may be obtained by contacting the Physical Security Branch at 703-767-2972 or 7951.
252.209-9000 ORGANIZATIONAL CONFLICTS OF INTEREST (FEB 2011)
a. Purpose. The primary purpose of this Clause is to aid in ensuring that: (1) the Contractor's objectivity and judgment are not biased because of its past, present, or currently planned interests (financial, contractual, organizational, or otherwise) which relate to work under this Contract, (2) the Contractor does not obtain an unfair competitive advantage by virtue of its access to non-public information regarding the Government's program plans and actual or anticipated resources, and (3) by virtue of its access to proprietary information belonging to others, the Contractor does not obtain any unfair competitive advantage.
b. Scope. The restrictions described herein shall apply to performance or participation by the Contractor and any of its affiliates or their successors in interest (hereinafter collectively referred to as "contractor") in the activities covered by this Clause as prime contractor, subcontractor, cosponsor, joint venturer, consultant, or in any similar capacity.
(1) Maintenance of Objectivity: The Contractor shall be ineligible to participate in any capacity in contracts, subcontracts, or proposals therefor (solicited or unsolicited) which stem directly from the Contractor's performance of work under this Contract. Furthermore, unless so directed in writing by the Contracting Officer, the Contractor shall not perform any services under this Contract on any of its own products or services, or the products or services of another firm if the Contractor is, or has been, substantially involved in their development or marketing. In addition, if the Contractor under this Contract prepares a complete, or essentially complete, Statement of Work to be used in competitive acquisitions, the Contractor shall be ineligible to perform or participate in any capacity in any contractual effort which is based on such Statement of Work or specifications. Nothing in this subparagraph shall preclude the Contractor from competing for follow-on contracts.
(2) Access To and Use of Government Information: If the Contractor, in the performance of this Contract, obtains access to information such as plans, policies, reports, studies, financial plans, or data which has not been released or otherwise made available to the public, the Contractor agrees that without prior written approval of the Contracting Officer, it shall not: (a) use such information for any private purpose unless the information has been released or otherwise made available to the public, (b) compete for work based on such information for a period of six (6) months after the completion of this Contract, or until such information is released or otherwise made available to the public, whichever occurs first, (c) submit an unsolicited proposal to the Government which is based on such information until one year after such information is released or otherwise made available to the public, and (d) release such information unless such information has previously been released or otherwise made available to the public by the Government.
(3) Access To and Protection of Proprietary Information: The Contractor agrees that, to the extent it receives or is given access to proprietary data, trade secrets, or other confidential or privileged technical, business, or financial information (hereinafter referred to as "proprietary data") under this Contract, it shall treat such information in accordance with any restrictions imposed on such information. The Contractor further agrees to enter into a written agreement for the protection of the proprietary data of others and to exercise diligent effort to protect such proprietary data from unauthorized use or disclosure. A copy of each such written agreement shall be furnished to the Contracting Officer. In addition, the Contractor shall obtain from each employee who has access to proprietary data and Government information (defined in subparagraph b(2)) under this Contract, a written agreement which shall in substance provide that such employee shall not, during his/her employment by the Contractor or thereafter, disclose to others or use for their benefit, proprietary data received in connection with the work under this Contract.
c. Subcontracts: The Contractor shall include this Clause, including this paragraph, in consulting agreements and subcontracts of any tier. The terms "contract," "Contractor," and "Contracting Officer" will be appropriately modified to preserve the Government's rights.
d. Representations and Disclosures:
(1) The Contractor represents that it has disclosed to the Contracting Officer, prior to award, all facts relevant to the existence or potential existence of organizational conflict of interests as that term is used in FAR Subpart 9.5.
(2) The Contractor agrees that if after award it discovers an organizational conflict of interest with respect to this contract, prompt and full disclosure shall be made in writing to the Contracting Officer which shall include a description of the action the Contractor has taken or proposes to take to avoid or mitigate such conflicts.
e. Remedies and Waiver:
(1) For breach of any of the above restrictions or for nondisclosure or misrepresentation of any relevant facts required to be disclosed during this contract, the Government may terminate this contract for default, disqualify the Contractor for subsequent related contractual efforts, and pursue such other remedies as may be permitted by law or this contract. If, however, in compliance with this clause, the Contractor discovers and promptly reports an organizational conflict of interest (or potential therefore) subsequent to contract award, the Contracting Officer may terminate this contract for convenience if such termination is deemed to be in the best interest of the Government.
(2) The parties recognize that it is impossible to foresee each circumstance to which this clause might be applied in the future and that the clause has effect which will survive the performance of this contract. Accordingly, the Contractor may at any time seek a waiver from the Contracting Officer by submitting a full written description of the requested waiver and the reasons in support thereof. If it is determined to be in the best interests of the Government, the Head of Contracting Activity will grant such a waiver in writing.
f. Modifications: Prior to a contract modification, when the Statement of Work is changed to add new work or the period of performance is significantly increased, the Contracting Officer will request, and the Contractor is required to submit, either an organizational conflict of interest disclosure or an update of the previously submitted disclosure or representation.
g. Termination: The restrictions imposed by paragraph b(1) of this clause will terminate one year after final payment on this contract. Restrictions upon use of government information and the requirement to protect proprietary information are permanent.
h. If an OCI mitigation plan is incorporated into the contract, the detailed implementation of the requirements of this clause is in the Contractor’s OCI mitigation plan attached to this contract.
252.237-9001 - Enterprise-wide Contractor Manpower Reporting Application (APR 2013)
1. In accordance with Section 2330a of title 10, United States Code (10 USC 2330a), Contractors shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor shall completely fill in all required data fields using the following web address: http://www.ecmra.mil/.
1. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at: http://www.ecmra.mil.
Section I - Contract Clauses
| 52.202-1 |
| Definitions |
| NOV 2013 |
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-5 |
| Covenant Against Contingent Fees |
| MAY 2014 |
| 52.203-6 |
| Restrictions On Subcontractor Sales To The Government |
| SEP 2006 |
| 52.203-7 |
| Anti-Kickback Procedures |
| MAY 2014 |
| 52.203-8 |
| Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity |
| MAY 2014 |
| 52.203-10 |
| Price Or Fee Adjustment For Illegal Or Improper Activity |
| MAY 2014 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| OCT 2010 |
| 52.203-13 |
| Contractor Code of Business Ethics and Conduct |
| OCT 2015 |
| 52.203-16 |
| Preventing Personal Conflicts of Interest |
| DEC 2011 |
| 52.203-17 |
| Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights |
| APR 2014 |
| 52.204-2 |
| Security Requirements |
| AUG 1996 |
| 52.204-2 Alt II |
| Security Requirements (Aug 1996) - Alternate II |
| APR 1984 |
| 52.204-4 |
| Printed or Copied Double-Sided on Postconsumer Fiber Content Paper |
| MAY 2011 |
| 52.204-9 |
| Personal Identity Verification of Contractor Personnel |
| JAN 2011 |
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| OCT 2015 |
| 52.204-13 |
| System for Award Management Maintenance |
| JUL 2013 |
| 52.204-15 |
| Service Contract Reporting Requirements for Indefinite-Delivery Contracts |
| JAN 2014 |
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| OCT 2015 |
| 52.209-9 |
| Updates of Publicly Available Information Regarding Responsibility Matters |
| JUL 2013 |
| 52.210-1 |
| Market Research |
| APR 2011 |
| 52.215-2 |
| Audit and Records--Negotiation |
| OCT 2010 |
| 52.215-8 |
| Order of Precedence--Uniform Contract Format |
| OCT 1997 |
| 52.215-10 |
| Price Reduction for Defective Certified Cost or Pricing Data |
| AUG 2011 |
| 52.215-11 |
| Price Reduction for Defective Certified Cost or Pricing Data--Modifications |
| AUG 2011 |
| 52.215-12 |
| Subcontractor Certified Cost or Pricing Data |
| OCT 2010 |
| 52.215-13 |
| Subcontractor Certified Cost or Pricing Data--Modifications |
| OCT 2010 |
| 52.215-14 |
| Integrity of Unit Prices |
| OCT 2010 |
| 52.215-14 Alt I |
| Integrity of Unit Prices (Oct 2010) - Alternate I |
| OCT 1997 |
| 52.215-15 |
| Pension Adjustments and Asset Reversions |
| OCT 2010 |
| 52.215-17 |
| Waiver of Facilities Capital Cost of Money |
| OCT 1997 |
| 52.215-18 |
| Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other than Pensions |
| JUL 2005 |
| 52.215-19 |
| Notification of Ownership Changes |
| OCT 1997 |
| 52.215-21 |
| Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications |
| OCT 2010 |
| 52.215-21 Alt III |
| Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications (Oct 2010) - Alternate III |
| OCT 1997 |
| 52.215-21 Alt IV |
| Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications (Oct 2010) - Alternate IV |
| OCT 2010 |
| 52.215-23 |
| Limitations on Pass-Through Charges |
| OCT 2009 |
| 52.216-7 |
| Allowable Cost And Payment |
| JUN 2013 |
| 52.216-8 |
| Fixed Fee |
| JUN 2011 |
| 52.219-8 |
| Utilization of Small Business Concerns |
| OCT 2014 |
| 52.219-9 |
| Small Business Subcontracting Plan |
| OCT 2015 |
| 52.219-9 ALT II (Dev) |
| Small Business Subcontracting Plan (Deviation 2016-O0009) - Alternate II |
| AUG 2016 |
| 52.219-16 |
| Liquidated Damages-Subcontracting Plan |
| JAN 1999 |
| 52.219-28 |
| Post-Award Small Business Program Rerepresentation |
| JUL 2013 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-21 |
| Prohibition Of Segregated Facilities |
| APR 2015 |
| 52.222-26 |
| Equal Opportunity |
| APR 2015 |
| 52.222-29 |
| Notification Of Visa Denial |
| APR 2015 |
| 52.222-37 |
| Employment Reports on Veterans |
| FEB 2016 |
| 52.222-40 |
| Notification of Employee Rights Under the National Labor Relations Act |
| DEC 2010 |
| 52.222-50 |
| Combating Trafficking in Persons |
| MAR 2015 |
| 52.222-54 |
| Employment Eligibility Verification |
| OCT 2015 |
| 52.223-5 |
| Pollution Prevention and Right-to-Know Information |
| MAY 2011 |
| 52.223-6 |
| Drug-Free Workplace |
| MAY 2001 |
| 52.223-18 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| AUG 2011 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| JUN 2008 |
| 52.225-25 |
| Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications. |
| OCT 2015 |
| 52.226-1 |
| Utilization Of Indian Organizations And Indian-Owned Economic Enterprises |
| JUN 2000 |
| 52.227-1 |
| Authorization and Consent |
| DEC 2007 |
| 52.227-11 |
| Patent Rights--Ownership By The Contractor |
| MAY 2014 |
| 52.227-17 |
| Rights In Data-Special Works |
| DEC 2007 |
| 52.228-5 |
| Insurance - Work On A Government Installation |
| JAN 1997 |
| 52.229-3 |
| Federal, State And Local Taxes |
| FEB 2013 |
| 52.229-4 |
| Federal, State, And Local Taxes (State and Local Adjustments) |
| FEB 2013 |
| 52.229-10 |
| State of New Mexico Gross Receipts and Compensating Tax |
| APR 2003 |
| 52.230-2 |
| Cost Accounting Standards |
| OCT 2015 |
| 52.230-3 |
| Disclosure And Consistency Of Cost Accounting Practices |
| OCT 2015 |
| 52.230-6 |
| Administration of Cost Accounting Standards |
| JUN 2010 |
| 52.232-7 |
| Payments Under Time-And-Materials And Labor Hour Contracts |
| AUG 2012 |
| 52.232-8 |
| Discounts For Prompt Payment |
| FEB 2002 |
| 52.232-10 |
| Payments under Fixed-Price Architect-Engineer Contracts |
| APR 2010 |
| 52.232-11 |
| Extras |
| APR 1984 |
| 52.232-17 |
| Interest |
| MAY 2014 |
| 52.232-20 |
| Limitation Of Cost |
| APR 1984 |
| 52.232-22 |
| Limitation Of Funds |
| APR 1984 |
| 52.232-23 |
| Assignment Of Claims |
| MAY 2014 |
| 52.232-25 |
| Prompt Payment |
| JUL 2013 |
| 52.232-25 Alt I |
| Prompt Payment (July 2013) Alternate I |
| FEB 2002 |
| 52.232-26 |
| Prompt Payment for Fixed-Price Architect-Engineer Contracts |
| JUL 2013 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--System for Award Management |
| JUL 2013 |
| 52.232-34 |
| Payment By Electronic Funds Transfer--Other Than System for Award Management |
| JUL 2013 |
| 52.232-37 |
| Multiple Payment Arrangements |
| MAY 1999 |
| 52.232-39 |
| Unenforceability of Unauthorized Obligations |
| JUN 2013 |
| 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors |
| DEC 2013 |
| 52.233-1 |
| Disputes |
| MAY 2014 |
| 52.233-1 Alt I |
| Disputes (May 2014) - Alternate I |
| DEC 1991 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.233-3 Alt I |
| Protest After Award (Aug 1996) - Alternate I |
| JUN 1985 |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| OCT 2004 |
| 52.236-22 |
| Design within Funding Limitations |
| APR 1984 |
| 52.236-23 |
| Responsibility of the Architect-Engineer Contractor |
| APR 1984 |
| 52.236-24 |
| Work Oversight in Architect-Engineer Contracts |
| APR 1984 |
| 52.236-25 |
| Requirements for Registration of Designers |
| JUN 2003 |
| 52.237-2 |
| Protection Of Government Buildings, Equipment, And Vegetation |
| APR 1984 |
| 52.237-9 |
| Waiver of Limitation on Severance Payments to Foreign Nationals |
| MAY 2014 |
| 52.242-1 |
| Notice of Intent to Disallow Costs |
| APR 1984 |
| 52.242-3 |
| Penalties for Unallowable Costs |
| MAY 2014 |
| 52.242-4 |
| Certification of Final Indirect Costs |
| JAN 1997 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.242-14 |
| Suspension of Work |
| APR 1984 |
| 52.243-1 |
| Changes--Fixed Price |
| AUG 1987 |
| 52.243-1 Alt III |
| Changes--Fixed Price (Aug 1987) - Alternate III |
| APR 1984 |
| 52.243-3 |
| Changes--Time-And-Material Or Labor-Hours |
| SEP 2000 |
| 52.244-2 |
| Subcontracts |
| OCT 2010 |
| 52.244-2 Alt I |
| Subcontracts (Oct 2010) - Alternate I |
| JUN 2007 |
| 52.244-4 |
| Subcontractors and Outside Associates and Consultants (Architect-Engineer Services) |
| AUG 1998 |
| 52.244-6 |
| Subcontracts for Commercial Items |
| NOV 2016 |
| 52.245-1 |
| Government Property |
| APR 2012 |
| 52.246-25 |
| Limitation Of Liability--Services |
| FEB 1997 |
| 52.247-63 |
| Preference For U.S. Flag Air Carriers |
| JUN 2003 |
| 52.248-1 |
| Value Engineering |
| OCT 2010 |
| 52.248-2 |
| Value Engineering--Architect-Engineer |
| MAR 1990 |
| 52.249-6 |
| Termination (Cost Reimbursement) |
| MAY 2004 |
| 52.249-6 Alt IV |
| Termination (Cost Reimbursement) (May 2004) - Alternate IV |
| SEP 1996 |
| 52.249-7 |
| Termination (Fixed-Price Architect-Engineer) |
| APR 1984 |
| 52.249-8 |
| Default (Fixed-Price Supply & Service) |
| APR 1984 |
| 52.249-14 |
| Excusable Delays |
| APR 1984 |
| 52.251-1 |
| Government Supply Sources |
| APR 2012 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
| 252.201-7000 |
| Contracting Officer's Representative |
| DEC 1991 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7001 |
| Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies |
| DEC 2008 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.203-7003 |
| Agency Office of the Inspector General |
| DEC 2012 |
| 252.203-7004 |
| Display of Hotline Posters |
| OCT 2016 |
| 252.203-7005 |
| Representation Relating to Compensation of Former DoD Officials |
| NOV 2011 |
| 252.204-7000 |
| Disclosure Of Information |
| OCT 2016 |
| 252.204-7002 |
| Payment For Subline Items Not Separately Priced |
| DEC 1991 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.204-7004 Alt A |
| System for Award Management Alternate A |
| FEB 2014 |
| 252.204-7005 |
| Oral Attestation of Security Responsibilities |
| NOV 2001 |
| 252.204-7015 |
| Notice of Authorized Disclosure of Information for Litigation Support |
| MAY 2016 |
| 252.205-7000 |
| Provision Of Information To Cooperative Agreement Holders |
| DEC 1991 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism |
| OCT 2015 |
| 252.211-7007 |
| Reporting of Government-Furnished Property |
| AUG 2012 |
| 252.215-7000 |
| Pricing Adjustments |
| DEC 2012 |
| 252.215-7002 |
| Cost Estimating System Requirements |
| DEC 2012 |
| 252.219-7003 |
| Small Business Subcontracting Plan (DOD Contracts)--Basic |
| MAR 2016 |
| 252.222-7006 |
| Restrictions on the Use of Mandatory Arbitration Agreements |
| DEC 2010 |
| 252.223-7004 |
| Drug Free Work Force |
| SEP 1988 |
| 252.223-7006 |
| Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials |
| SEP 2014 |
| 252.225-7012 |
| Preference For Certain Domestic Commodities |
| AUG 2016 |
| 252.225-7021 |
| Trade Agreements--Basic |
| SEP 2016 |
| 252.225-7043 |
| Antiterrorism/Force Protection Policy for Defense Contractors Outside the United States |
| JUN 2015 |
| 252.225-7048 |
| Export-Controlled Items |
| JUN 2013 |
| 252.226-7001 |
| Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns |
| SEP 2004 |
| 252.227-7013 |
| Rights in Technical Data--Noncommercial Items |
| FEB 2014 |
| 252.227-7022 |
| Government Rights (Unlimited) |
| MAR 1979 |
| 252.227-7024 |
| Notice and Approval of Restricted Designs |
| APR 1984 |
| 252.227-7025 |
| Limitations on the Use or Disclosure of Government-Furnished Information Marked with Restrictive Legends |
| MAY 2013 |
| 252.227-7028 |
| Technical Data or Computer Software Previously Delivered to the Government |
| JUN 1995 |
| 252.227-7033 |
| Rights in Shop Drawings |
| APR 1966 |
| 252.231-7000 |
| Supplemental Cost Principles |
| DEC 1991 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.236-7000 |
| Modification Proposals-Price Breakdown |
| DEC 1991 |
| 252.236-7009 |
| Option for Supervision and Inspection Services |
| DEC 1991 |
| 252.237-7010 |
| Prohibition on Interrogation of Detainees by Contractor Personnel |
| JUN 2013 |
| 252.242-7006 |
| Accounting System Administration |
| FEB 2012 |
| 252.243-7001 |
| Pricing Of Contract Modifications |
| DEC 1991 |
| 252.243-7002 |
| Requests for Equitable Adjustment |
| DEC 2012 |
| 252.244-7000 |
| Subcontracts for Commercial Items |
| JUN 2013 |
| 252.244-7001 |
| Contractor Purchasing System Administration |
| MAY 2014 |
| 252.245-7001 |
| Tagging, Labeling, and Marking of Government-Furnished Property |
| APR 2012 |
| 252.245-7002 |
| Reporting Loss of Government Property |
| APR 2012 |
| 252.245-7003 |
| Contractor Property Management System Administration |
| APR 2012 |
| 252.245-7004 |
| Reporting, Reutilization, and Disposal |
| SEP 2016 |
| 252.246-7000 |
| Material Inspection And Receiving Report |
| MAR 2008 |
| 252.247-7024 |
| Notification Of Transportation Of Supplies By Sea |
| MAR 2000 |
| 252.251-7000 |
| Ordering From Government Supply Sources |
| AUG 2012 |
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)
(a) Definitions. As used in this clause--
Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public Web sites) or simple transactional information, such as necessary to process payments.
Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
Safeguarding means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.
(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.
52.216-18 ORDERING. (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from date of award through 60 months if all options are exercised.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
52.216-19 ORDER LIMITATIONS. (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $25,000, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor:
(1) Any order for a single item in excess of $1,000,000;
(2) Any order for a combination of items in excess of $5,000,000; or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.
(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.216-22 INDEFINITE QUANTITY. (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 12 months from the end of the ordering period.
52.216-24 LIMITATION OF GOVERNMENT LIABILITY (APR 1984)
Clause fill-ins will be determined at Task Order Level
(a) In performing this contract, the Contractor is not authorized to make expenditures or incur obligations exceeding dollars.
(b) The maximum amount for which the Government shall be liable if this contract is terminated is dollars.
52.216-25 CONTRACT DEFINITIZATION (OCT 2010)
Clause fill-ins will be determined at Task Order Level
(a) A -------- [insert specific type of contract] definitive contract is contemplated. The Contractor agrees to begin promptly negotiating with the Contracting Officer the terms of a definitive contract that will include (1) all clauses required by the Federal Acquisition Regulation (FAR) on the date of execution of the letter contract, (2) all clauses required by law on the date of execution of the definitive contract, and (3) any other mutually agreeable clauses, terms, and conditions. The Contractor agrees to submit a -------- [insert specific type of proposal (e.g., fixed-price or cost-and-fee)] proposal, including data other than certified cost or pricing data, and certified cost or pricing data, in accordance with FAR 15.408, Table 15-2, supporting its proposal.
(b) The schedule for definitizing this contract is [insert date] .
(c) If agreement on a definitive contract to supersede this letter contract is not reached by the target date in paragraph (b) above, or within any extension of it granted by the Contracting Officer, the Contracting Officer may, with the approval of the head of the contracting activity, determine a reasonable price or fee in accordance with Subpart 15.4 and Part 31 of the FAR, subject to Contractor appeal as provided with completion of the contract, subject only to the Limitation of Government Liability clause.
(1) After the Contracting Officer's determination of price or fee, the contract shall be governed by--
(i) All clauses required by the FAR on the date of execution of this letter contract for either fixed-price or cost-reimbursement contracts, as determined by the Contracting Officer under this paragraph (c);
(ii) All clauses required by law as of the date of the Contracting Officer's determination; and
(iii) Any other clauses, terms, and conditions mutually agreed upon.
(2) To the extent consistent with subparagraph (c)(1) above, all clauses, terms, and conditions included in this letter contract shall continue in effect, except those that by their nature apply only to a letter contract.
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days of the contract expiration date; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 60 months.
52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)
``Active duty wartime or campaign badge veteran,'' ``Armed Forces service medal veteran,'' ``disabled veteran,'' ``protected veteran,'' ``qualified disabled veteran,'' and ``recently separated veteran'' have the meanings given at FAR 22.1301.
(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.
(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment…
This is the start of the file's text. The full file is on GovTribe.